SIYU CAO_ARCHITECTURE DESIGN_PORTFOLIO_2018

Page 1

PORTFOLIO SIYU CAO Selected Projects 2014-2019


PREFACE

This portfolio showcases six selected projects from my architectural studies. These works emphasize users' experience by creating interaction between architectural space and environment. This portfolio is the reduced version.


CONTENTS

4

City Fitness Plaza

[STAGED SCENE] -Melbourne City Baths Renovation-

10

Exhibition of Diller & Scofidio

[SHARING VIRTUAL&REALITY] -How Human Body Mediate New Form-

18

Residential Site&Single Tower Design

[LOOKING TO THE PARK] -City Gap Connection in Milan-

24

Water City

[WATERSCRAPER] -Explore Future Urbanism-

30

Community Center Under Skyrail

[THE PLACE OF TRANSPORT] -Shared Space between Children and Adult-

32

Applied Architectural Technology

[MELBOURNE TOWER] -Skyrise Tower in CBD-

24

AAVisiting School in Beijing

[3D GALLERY]

-VR Application in Design-

36

Tectonic Grounds

[JELLYFISH]

-Interactive Installation-


Selected Projects 2014-2019

4

[STAGED SCENE] -Melbourne City Baths RenovationNew connection between inside and outside | 8/2017-11/2017, Melbourne,Australia | | Individual Academic Work | | Studio: Master of Architecture Studio E | | Tutor:Laura Mรกrtires(laura@martiresdoyle.com) |

EXPECTED SITE COLLAGE

To active the connection with surroundings, there are three layers: underground - introduce landscape and skylight to swimming pool along the streets ground floor - open to the public as a rest space upper level - introduce entertainment like bars and restaurants The concept transforms the site to a 'stage' with people's daily life


Selected Projects 2014-2019

5

The goal of the project is to transform the historical Melbourne City Baths to an energetic public plaza like a 'stage' which encourages the communication between the site and surrounding people at the crossing. Picking architectural components in the site and recomposing is designing approach of this projects it shows a new thinking in location responding.

SITE COMPONENTS

HISTORICAL CITY BATHS

RENOVATION


Selected Projects 2014-2019

6

0

5m

A-A' SECTION


Selected Projects 2014-2019

7

SWIMMING POOL

0

5m

LONG SECTION A-A'


Selected Projects 2014-2019

8

A

Underground Floor Plan 0

10m


Selected Projects 2014-2019

9

MAIN SQUARE

A'

A'

A

Ground Floor Plan 0

10m

First Floor Plan 0

10m


Selected Projects 2014-2019

10

[SHARING VIRTUAL& REALITY] -How human body mediate the new form of space| 8/2016-11/2016, Melbourne,Australia | | Cooperative Academic Work(2 people) | | Studio: Master of Architecture Studio C | | Tutor:Ben Waters(ben.waters@studioosk.com.au) |

FORM GENERATION

The archive displays typical projects of Diller and Scofidio in different periods by sharing of real space(red) and digital performance(blue). Entrance located on the roof with multi stairs and elevators.The flexible traffic system provides visitors to create their own route and experience in the museum.

SITE LOCATION


Selected Projects 2014-2019

11

PROJECTS ANALYSIS The project is the application of abstract theory of Diller and Scofidio based on research-Body as a media reflects social code by technology solutions. The archive design of human perforamance and experience aims to create a multiple possible sample that fit in contemporary architecture design.


Selected Projects 2014-2019

12


Selected Projects 2014-2019

13


Selected Projects 2014-2019

14


Selected Projects 2014-2019

15


Selected Projects 2014-2019

16

[LOOKING TO THE PARK] - City Gap Connection in Milan|10/2014-6/2015, Milan,Italy| |Cooperative Academic Work| |Studio: Architectural Design Studio 3| |Tutor:Scotti Francesca Claudia(francesca.scotti@polimi.it)|

HISTORICAL CITY

OLD

SITE LOCATION

LACK OF LANDSCAPE

INDUSTRY/NEW RESIDENTIAL

CONNECTION

SITE LOCATION NEW RESIDENTIAL

OLD INDUSTRIAL AREA & NEW RESIDENTIAL TRADITIONAL CITY FABRIC

SITE PHOTO Photographed at Milan,10/2014


Selected Projects 2014-2019

17

The site is an obvious gap in the urban fabric between historical and modern Milan city. To maintain the skyline and increase landscape in Milan city, the central liner park faces to both surrounding residential and people. This course includes site plan and single building design, structure,construction and drawing.

Prada Foundation N

0

100M

SITE PLAN


Selected Projects 2014-2019

18

PROCESS The railway is still working

The liner park covers the railway

Landmark towers face to City Center

North towers and south houses bridge city skyline

EXPLORED AXONOMETIC


Selected Projects 2014-2019

19

The north tower has a closed facade facing northern street and southern residential for the privacy consideration.While the west and east facade,espeically the angled balcony,is open for looking to the park.

STREET VIEW

LOOKING TO THE LINER PARK


Selected Projects 2014-2019

20

COUPLE SUITE

FAMILY SUITE


Selected Projects 2014-2019

21

FORM GENERATION

NORTH TOWER DESIGN

GROUND FLOOR PLAN

SINGLE SUITE

2-6 FLOOR PLAN

COUPLE SUITE

7-10 FLOOR PLAN

COUPLE SUITE

FAMILY SUITE


Selected Projects 2014-2019

22

TERRACE DETAIL


Selected Projects 2014-2019

23

Facade Material-Plaster A high-quality fit-out of the building that offers aesthetic attractiveness and will protect the walls for a long period of time.

Using steel skeleton IPE100 to reach the aesthetic of high and straight, also create a upwards trend and characteristic for the mini-tower.


Selected Projects 2014-2019

24

[WATERSCRAPER] -Explore Future Urbanism|3/2018-6/2018, Melbourne,Australia| |Individual Academic Work| |Studio: Design Thesis| |Tutor:Toby Reed(toby@n-r.com.au)|

GRID GENERATION

Key Elements

Extension&Iteration

Multicenter

Final Grid

GRID APPLICATION

Road System

City Functions

Service Functions

Living & Landscape Relationship

WaterCity


Selected Projects 2014-2019

25

FORM ITERATION

The sea location emphasizes the uncertainty of future life and city. The landscape-centered project target at protecting fragile landsacpe from climate change and rethinking the relationship between nature and people.


Selected Projects 2014-2019

26

BIRD VIEW

BOAT VIEW


TO

PA D FE

RA LLE BD UA

SQ

LC GR RE

ID WA TER

SITE PLAN

D

IC KE N S

TOW ER

ST

ST KILDA BEACH

Selected Projects 2014-2019

27

EE

EL ST E R RC K


Selected Projects 2014-2019

28

EXPLORED SYSTEMS


Selected Projects 2014-2019

29

1

N

2 3 5

1

4

6

2

7

4

6

8

3

8 5

10

7

9 11

GROUND FLOOR PLAN

UPPER FLOOR PLAN

50m

0

1 theater 2 shops&retails 3 restaurants 4 greenhouse 5 gallery 6 market/live music lane 7 vertical farm 8 hotel 9 terrian 10 beach 11 restaurants

1 2 3 4 5 6 7 8

0

50m

voutdoor cinema activity center office flooding dock tunnel home office residential hotel

MAIN STREET SECTION 0

25m


Selected Projects 2014-2019

30

[CHI(IDREN)-(a)DULT] -Sharing Community-

| 3/2017-6/2017,Melbourne,Australia | | Studio:Master of Architecture Studio D | | Tutor:Peter Hogg(phogg@unimelb.edu.au) |

CHILDREN

CONCEPT

FORM

For shared by the community at Murrumbeena Station,the project explores the relationship between children and adults and bridging the gap between ages for better communication among them. ADULT FUNCTION

To achieve this goal,I try to coalesce their physical boundary in space and design 'children' style space for adults and 'adult' style space for children.

STREET VIEW


Selected Projects 2014-2019

31


Selected Projects 2014-2019

32

[MELBOURNE TOWER] - SKYRISE TOWER IN CBD -

| 3/2017-6/2017,Melbourne,Australia | | Individual Academic Work(Construction Part) | | Studio: Applied Architectural Technology | Tutor:Giorgio Marfella(giorgio.marfella@unimelb.edu.au) | | Dion Keech(dion.keech@unimelb.edu.au) |

FORM GENERATION

In order to maximize view toward the two streets and to increase the stability of the skyscraper, the tower is tapered from bottom to the top. The conceptural crown is designed as an extension of the tower to fit the tower tapering, which allows the upwash to follow the surface and go through the exposed structure.


33 Selected Projects 2014-2019

5mmWaterproof 30mm Knauf Insulation SentechVetra Point-S-Series Spider

5mm U-Series Steel Gutter Board

20mm Double Pilkington Planar Glazing Roof

8mm Steel Plate

Low Modulus Sealant

100 SHS

Angle Bracket

100mm Down Pipe

50mm SHSTruss SentechVetra Point-SSeries Spider Bracket 1700mm Depth Truss

01 A5.1

ROOF CORNER

100 SHS

02 A5.1

SCALE 1:5

GUTTER SCALE 1:5

20mm Double Pilkington Planar Glazing

310 UC

50mm SteelTruss

150X100 RHS Iaminated Safety Glass

SentechVetra Point-S-Series Spider

Turnstile Cover Aluminuim Frame

Angle Bracket

Tempered Safety Glass 100 SHS

150x100 RHS

200

Low Modulus Sealant

100 SHS Alucobond Cladding Panel Rivet or ScrewAlucobond Clip Low Modulus Sealant Aluminium Fixing Clips 40x20mm Top Hat IsolationTape Between Steel&Aluminium Surfaces

20mm Double Pilkington Planar Glazing 03 A5.1

AluarAluminium Glazing Frame 50mm SHSTruss

ENTRANCE SECTION SCALE 1:5

Angle Bracket

10mm Sealant 300x600mm Stone Tile

EXTERNAL

5mmAWS Waterproof System

INTERNAL

70mm Screed Alucobond Cladding Panel Low Modulus Sealant ExtrudedAluminium Sub-Frame AB416 Top Hat Aluminium Fixing Clips 40x20mm

Sliding Door AluarAluminium Door Frame 150x100 RHS 04 A5.1

GROUND SCALE 1:5

05 A5.1

LOBBY FACADE DETAILS

ENTRANCE PLAN SCALE 1:10


Selected Projects 2014-2019

34

[3D GALLERY] -VR Application in Design|16/12/2017-23/12/2017,Beijing,China | | Studio:AA Visiting School-Spacial Amplification | | Tutor:Soomeen Hahm(s.hahm@soomeenhahm.com)|

FORM GENERATION IN UNITY

APPLICATION IN 751 PARK


Selected Projects 2014-2019

35

GALLERY IN DIFFERENT ROUTES


Selected Projects 2014-2019

36

[JELLYFISH] -Interactive Installation|5/2/2018-16/2/2017,Melbourne,Australia | | Cooperative Academic Work | | Studio: Tectonic Grounds | | Tutor:Jannette Le(jannette.le@unimelb.edu.au) |


37

EXPODED MODULE AXONOMETRIC 1 - Motor 2 - Straight-toothed rack 3 - Gears 4 - Support frame 5 - Primary component 6 - Secondary component

Selected Projects 2014-2019

EXPODED MODULE AXONOMETRIC

MOVEMENT

2

3

4

1

5

[ 220 ] [ 220 ]

MOVEMENT MOVEMENT 6 [ 225 ]

Phase C

SUB-STRUCTURE

EXPLODED AXONOMETRIC

SUB-STRUCTURE

Perspex Tri-arm frame

r i l l i s hstate a torw a i t i nGears g s turning t a t e clockwise; o r c l oStraight-toothed s i n g : G e a r srack t ugoing r n i ndown. g Frillish atF waiting closing; clockwise;Straight-toothed rack going down

Frillish at waiting state or closing; Gears turning clockwise; Straight-toothed rack going down.

Frillish opening; Gears turning anti-clockwise; Straight-toothed rack going up.

Frillish opening:Gears turning anti-clockwise;Straight-toothed

Frillish opening;up Gears turning anti-clockwise; Straight-toothed rack going up. rack going

A tri-arm perspex frame is employed as the sub-structure of each individual cluster, where each arm holds up 1 module. The perspex sub-frame is screwed on top to connected 3 individual modules. The tri-arm configuration prevents overlapping of the modules and stops them from colliding during movement.


THANK YOU

SIYU CAO Architecture Design


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.