FACILITIES&OPERATIONS

Perhaps nowhere is the Firm Foundation of our school more keenly evident on a daily basis than through the work performed by our Facilities and Operations Team The work of this team is to keep our school facilities functioning at a high level, in good repair, and continually planning for the future

Taking words from Herodotus, the work of our team is "stayed neither by snow nor rain nor heat nor darkness from accomplishing their appointed course with all speed "

After working long hours to prepare for the opening day of school, our intrepid team almost immediately faced the impending landfall of Typhoon Hinnamnor, followed closely by Typhoon Nanmidol The team, led by Mr DaeHo Koo, worked tirelessly to prepare for the typhoon, and with solid preparation, the school "weathered" both storms with only minor damage

Water leaks have been an ongoing structural defect challenge since the opening of the school.