Industrial, logistics and storage facilities

Page 1

Industrial, logistics and storage facilities


Experience in the industry Industrial construction holds an important position in a wide range of services offered by Skanska. For many years, we have successfully executed production plants, logistics centers and warehouse facilities all over the country. Our great contracting capacity, years of experience and highly qualified staff enable the execution of the most complex projects, also at operating facilities without disrupting their operation. Successful executions of construction works at operating production plants make us an expert in this field. If a client is not able to suspend the operations of an extended plant, we do our best to ensure the construction works do not disrupt the production process of the plant. It requires high flexibility and precise planning of the entire execution, from materials delivery to the execution of all scopes of work. The execution of modern logistics and warehouse centers is an important part of industrial construction. We can be proud of our great experience in this field also. We constructed one of the largest furniture and home appliances distribution warehouses in Central and Eastern Europe - JYSK in Radomsko. We have also built distribution centers for our key client, Lidl Polska, distribution centers for Jeronimo Martins Polska and the largest, in the history for UPS, handling center for Central and Eastern Europe.

We execute construction investments for the production needs of the largest global companies in the automotive, pharmaceutical, furniture, food, home appliances and metal industries. Investments worth mentioning include, among others: Electrolux dishwasher factories in Żarów, Siewierz and Świdnica, Toyota factories in Jelcz Laskowice and Wałbrzych, Bosch and Siemens factories in Łódź as well as executions for Łabędy Steelworks in Gliwice, “Balcerzak i Spółka” and Unilever Polska S.A. During works on industry investments for our clients, we employ not only Polish engineers, but also engineers from our sister company - Skanska Czech Republic as a result of which, we gain more access to specialist knowledge and equipment. The outcome has been the establishment of a joint team having competence related to concrete pavements used in the construction of concrete surfaces in parking lots and warehouses in logistics centers built, e.g. for Jeronimo Martins Polska. Together we also executed an extension and reconstruction of a container terminal within the premises of the Northern Port in Gdańsk as well as an extension of a container terminal for the largest rail freight carrier in the country, PKP CARGO in Poznań Franowo.

Legend Green construction

Certificates

Modern technology

the application of renewable energy sources and materials safe for humans

obtaining LEED and BREEAM certificates

the application of technology such as BIM, 3D, laser scan, drone, etc.

Design & Build Project

*CCI

Super-deadline

a combination of design works with construction, under a single contract

Skanska social campaign “Safety near a construction site”, trips to construction sites

a project completed ahead of the contractual deadline

*Corporate Community Involvement

2


Lidl Distribution Center in Bydgoszcz Within a mere nine months, we constructed an immense Distribution Center in Bydgoszcz, with a hall surface area of 45,000 sqm. On the initiative of the investor (Lidl), the facility was awarded with LEED certificate at gold level (LEED Gold) and it has numerous green solutions to boast of. These include: the recovery of heat from the cooling installation, connected to the floor heating system in the hall; the application of natural agents - ammonia - in the cooling system; LED light fittings with a DALI intelligent control system enabling considerable savings in electricity consumption; a rainwater recovery system for toilet flushing and the watering of plants.

Lidl Distribution Center in Bydgoszcz is our first warehouse project to undergo the LEED multi-criteria building assessment.

2015, Kujawsko-Pomorskie Voivodeship Client: Lidl Polska Sp. z o.o. Usable area: 45,000 sqm Cubic capacity: 586,359 m³

Handling center and a branch of UPS in Stryków We were the contractor of the largest handling center in Central and Eastern Europe in the history of UPS. During execution of the investment, we used equipment with a 3D control system, working with a spatial model. With the use of the equipment, we executed earthworks and structure layers under the roadway, parking lots and the hall. Within a mere six months, we executed the project and constructed both the facility and its external infrastructure. The works were conducted in the winter season. The center has been equipped with state-of-the-art technology enabling the sorting of 15,000 packages an hour.

2015, Łódzkie Voivodeship Client: Panattoni Europe Usable area: 14,222 sqm Cubic capacity: 168,528 m³ Net value: PLN 31,468,197

Application of modern BIM technology allowed us to execute the project within a mere six months.

Extension of a warehouse in Nowy Dwór Mazowiecki For La Lorraine Polska - manufacturer of bakery products we extended a plant by providing fully-automatized, high-storage cold stores for deep-frozen products. It is one of the largest and most modern facilities of this type in the country. The highest building within the plant premises - the high cold store - reaches a height of almost 41 m. Its structure consists of self-supported racks with a capacity of up to 16,000 palettes loaded and stored in a fully-automatized manner. The racks are used to store frozen bakery products at a temperature of -25°C. Within the framework of the investment, a low-temperature cold store with docks, pasteurization and delivery building were also constructed.

The investment has been executed at an operating plant. Thanks to our experience, the production process in the factory was not interrupted.

2015, Mazowieckie Voivodeship Client: La Lorraine Polska Usable area: 8,395 sqm

3


Did you know that... During the execution of industrial, logistics and warehouse facilities, we apply state-of-the-art construction technology by using integrated BIM processes (a process of smart information management during the facility lifetime). The application of this technology increases the effectiveness of the use of resources in an investment and it ensures more efficient preparation and coordination of works during the execution of a contract.

We are the leader in the field of green construction, which has been confirmed by LEED certificates (Leadership in Energy and Environmental Design - a system for certification of sustainable buildings) awarded to, amongst others, offices that we construct. The Lidl Distribution Center in Bydgoszcz executed by us is the first warehouse project that was awarded a LEED certificate at gold level (LEED Gold).

Our offer includes services in the scope of design, production and the assembly of steel structures. We execute contracts for the needs of large logistics and distribution centers, in addition to smaller industrial plants. We hold the Certificate of Steel Structure Manufacturer issued by the Polish Chamber of Steelworks.

We are experienced in executing projects at operating production plants. We are flexible and precise both when it comes to planning and the execution of a project. This means that the client can be certain that works conducted by us will not interrupt the production process at the plant.

We consider issues of health and safety at work as important as keeping deadlines and budgets. We work in observance of safety at work standards that are binding for all Skanska constructions throughout the world. Human health and safety is the top priority for us.

We have our own design office, which ensures the proper execution of investment, including industrial facilities, in the Design & Build (D&B) formula.

MPK bus depot in Głogów Thanks to the project executed by us, Głogów gained a modern public transport bus depot with professional workshop facilities. Under the contract, we executed, amongst others: a bus depot hall used mainly for vehicle servicing, equipped with five repair stations and a bus ozone wash, a fuel station with a fuel system including a tank with a capacity of 50 m3 and distributors as well as a dispatch building. Furthermore, the depot station has been equipped with mechanic’s kits and lifts for vehicles. The investment has increased the standard of services rendered within the framework of public transport in Głogów.

2015, Dolnośląskie Voivodeship Client: MPKM in Głogów Usable area: 1,854 sqm Cubic capacity: 12,741 m³ Net value: PLN 14,200,000

The depot has been equipped with wireless self-propelled pole lifts, exhaust extractors and entry gateways to the depot station to minimize heat loss.

Board Packaging Production Plant in Bochnia In the Bochnia Economic Activity Zone, we designed and executed a modern Board Packaging Production Plant with a high degree of cleanliness. It is another investment for the leading Polish producer of corrugated board and packaging, apart from the plants in Krzycko Wielkie, At the plant, we installed a 1.6 MW transformer - able to cover electricity consumption of 260 households and installations - 6.5 km of ventilation ducts and 25 km of installation pipes. The facility was awarded with a BRC IOP certificate confirming the highest production standards.

Construction of the roof consumed almost 600 tons of steel manufactured and mounted by our Steel Structure Manufacturing Plant.

4

2014, Małopolskie Voivodeship Client: Werner Kenkel Bochnia Sp. z o.o. Usable area: 21,535 sqm Cubic capacity: over 216,627 m3 Net value: PLN 49,854,778


Technical Maintenance Hall at an MZA depot “Kleszczowa” in Warsaw 2015, Mazowieckie Voivodeship Client: MZA Sp. z o.o.

Premix Production Plants in Połaniec 2015, Świętokrzyskie Voivodeship Client: Premix Sp. z o.o.

Investment Activity Zone in Bytom 2015, Śląskie Voivodeship Client: The Municipality of Bytom and the Municipal Roads and Bridges Authority

Container terminal in Poznań Franowo 2015, Wielkopolskie Voivodeship Client: PKP CARGO S.A.

Philip Morris manufacturing plant in Cracow Extension 2014, Małopolskie Voivodeship Client: Philip Morris Polska

SEGRO Industrial Park Wrocław warehouse halls 2014, Dolnośląskie Voivodeship Client: Segro Poland Sp. z o.o.

Lidl Distribution Center in Turzyn near Wyszków 2013, Mazowieckie Voivodeship Client: Lidl Polska Sp. z o.o.

Jeronimo Martins Distribution Center near Kraków 2013, Małopolskie Voivodeship Client: Jeronimo Martins Polska S.A.

Production plant in Wrocław 2013, Dolnośląskie Voivodeship Client: Sumika Ceramics Poland Sp. z o.o.

5


Other projects Construction of a poultry breeding farm in Stoczek, for Integra Sp. z o.o., 2016, Mazowieckie Voivodeship Extension of a Logistics Center in Mosina, for Anton Röhr Sp. z o.o., 2016 and 2014, Wielkopolskie Voivodeship Construction of a high-stack warehouse at a logistics center in Modła Królewska near Konin, for Kramp Polska, 2015, Wielkopolskie Voivodeship Extension of a production plant in Gniewomierz, for Faurecia Automotive Polska S.A., 2015, Dolnośląskie Voivodeship Extension of Meat and Poultry Processing Plant in Sława, for “Balcerzak i Spółka”, 2015, Lubuskie Voivodeship Extension of Chocolate Factory in Łódź, for Barry Callebaut Manufacturing Polska - 2nd stage, 2015, Łódzkie Voivodeship Construction of a warehouse building in Stanowice, for BIMS PLUS FHH Sp. z o.o., 2015, Dolnośląskie Voivodeship Construction of halls for the Pipe Production Department in Gliwice, for HUTA ŁABĘDY S.A., 2015, Śląskie Voivodeship Extension of a manufacturing plant of liquid industrial paints in Tarnów, for Beckers, 2015, Małopolskie Voivodeship Construction of Volvo Prototype Workshop hall in Wrocław, for Volvo POLAND Sp. z o.o., 2015, Dolnośląskie Voivodeship Adaptation of a manufacturing and warehouse hall in Złotoryja for FAIST CHemTec, 2015, Dolnośląskie Voivodeship Extension of a charging bay as well as a heat processing and finishing bay on the premises of BGH Polska Sp. z o.o. in Katowice, 2015, Śląskie Voivodeship Construction of a Volvo Servicing Center in Pruszcz Gdański, for Volvo POLAND Sp. z o.o., 2014, Pomorskie Voivodeship Development of an internal reserve field in Gdańsk, for DCT Gdańsk S.A., 2014, Pomorskie Voivodeship

Did you know that...

6

Construction of a pig breeding farm with accompanying facilities in Brylewo, for Breeding Center “GARZYN” Sp. z o.o., 2014, Wielkopolskie Voivodeship Construction of warehouse halls in Wrocław, for Segro Poland Sp. z o.o., 2014, Dolnośląskie Voivodeship Extension of a Finished Goods Warehouse for the Electrolux Manufacturing Plant in Świdnica, for Electrolux Poland Sp. z o.o., 2014, Dolnośląskie Voivodeship Extension of a hall for the needs of long rail manufacturing for ArcelorMittal Polska, Branch in Dąbrowa Górnicza, 2014, Śląskie Voivodeship Construction of pig iron transfer station for ArcelorMittal Polska, Branch in Kraków, 2013, Małopolskie Voivodeship Construction of Distribution Center in Lubartów, for Jeronimo Martins Polska S.A., 2013, Lubelskie Voivodeship Extension and adaptation of a production plant in Wrocław, for Wago Elwag Sp. z o.o., 2013, Dolnośląskie Voivodeship Extension of the Department for Liquid Soup Production in Poznań, for Unilever Polska S.A., 2013, Wielkopolskie Voivodeship Construction of a Distribution Center in Ruda Śląska, for Jeronimo Martins Polska S.A., 2012, Śląskie Voivodeship Construction of an industrial hall in Nowa Sarzyna, for Zakłady Chemiczne Organika, 2012, Podkarpackie Voivodeship Extension of a manufacturing hall in Kraków, for Stalprodukt S.A., 2012, Małopolskie Voivodeship Construction of a hen house shed with a density of 50,000 pieces (200 LSU) - production of breeding eggs in Stradyń near Wolsztyn for HAMA Plus S.A., 2012, Wielkopolskie Voivodeship


Skanska in Poland We are one of the world’s leading project development and construction companies. Our history dates back to 1887. We operate in Europe and America. In Poland, we are the market leader. As a general contractor, we construct enclosed structures, roads, bridges, rail and tram lines as well as hydro-engineering facilities. We also develop green office spaces, apartments and suites. We focus on local presence and client relations. Our branches are located throughout the country. We have successfully executed both small projects for local investors and extended engineering or enclosed structure contracts. We construct facilities for the largest global companies in the automotive, pharmaceutical, furniture, home appliances and metal industries, hotel and retail chains, public investors and the military. By the same token, we are equally committed when it comes to smaller investments such as country and municipal roads, bicycle paths, schools and kindergartens. The most significant of our undertakings include: the north section of the A1 highway, Świnna Poręba water reservoir, Złote Tarasy shopping center in Warsaw, Poznań Western Bypass, a bridge on the Odra River in Brzeg Dolny, an airport in Jasionka near Rzeszów, football stadiums in Kielce and Kołobrzeg, the W-Z route in Gdańsk, university facilities in Łódź, Poznań, Zielona Góra, Wrocław and Rzeszów, as well as numerous sporting facilities throughout the country.

For many years, we have been at the top in rankings for best employers in the construction and technical industry as well as trade rankings. Our principles have been specified in our “Code of Conduct”. On every market, we work in pursuance of shared values: we care for human life, we operate ethically and transparently. Together, we are better and the client is paramount. Our main goal is to build for the benefit of the society. We supply products and services of the highest quality to our clients and business partners. We own bituminous mass production plants, concrete production plants, road laboratories, aggregate mines, equipment bases and a steel structure manufacturing plant. At every stage of the investment process, we apply quality standards compliant with the requirements of ISO and AQAP standards. We are experienced in the execution of green facilities compliant with the requirements of the LEED certification. We are one of signatories of the Cooperation for Safety in Construction - an initiative of the largest general contractors in Poland, aimed at eliminating fatal accidents at construction sites. For years, at schools throughout Poland, we have conducted our own educational campaign for children “Safety near a construction site”.

Annually, we execute ca. 1,300 investments in Poland. In our projects, we employ people of various predispositions who complement the skills of the whole team. For example, if the project manager is an engineer, his team includes people who contribute complementary skills and experience, e.g. knowledge of economics. Skanska is successful on the market thanks to these people and their excellent, varied abilities.

7


Skanska S.A. www.skanska.pl Follow us in social media: facebook.com/skanskapolska youtube.com/skanskapoland linkedin.com/company/skanska-property-poland instagram.com/byskanska

Due to our consideration for the natural environment, this leaflet has been printed on eco-friendly paper manufactured with respect for the natural environment.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.