1 minute read

FEATURED

Next Article
RPC 3-STEP PROCESS

RPC 3-STEP PROCESS

MICROSOFT OFFICES RESTON, VA

One of our largest projects to date featured an office buildout and millwork for 3-floor, 20,000 square feet commercial workspace. Within 4.5 months, our team successfully designed, fabricated, and installed custom cabinetry, engineered wood plank, columns, and ceilings.

Advertisement

NURSING CONSULTANTS SILVER SPRING, MD

Complete 4-month remodel of 3,500 square-foot headquarters for medical staffing agency. The project expanded from its initial scope of 2-offices/1-conference room to include 4-offices, printer room, reception area, huddle room and full kitchen. This project was extremely rewarding as it tested our ability to adapt and still exceed client expectations despite widespread supply chain challenges amid the pandemic, along with significant material delays. It also required ongoing collaboration with technical vendor experts to install an intricate, high-end door locking/security system and glass design feature cutout in an existing wood door.

This article is from: