ARQ ARCHITECTURE
PORTFOLIO
2016 SEBASTIAN
FACULTY OF ARCHITECTURE, URBANISM AND LANSCAPE
ROSS
SEPTEMBER 2016
RESUME PERSONAL INFORMATION
Graduate in Architecture and BIM Modeler
COMPETITIONS
Name: Sebastian Ross Ibañez Born: Santiago, Chile Age: 24 years old Nationality: Chilean English Level: Intermediate
Name: Hills islands of San bernardo Project: San Bernardo Ecological Axis Work Team: Bosquejos + Other Specialists Date: September 2015
ACADEMIC PROCESS
Name: Housing Master Plan Pampa of Alto Hospicio Project: Dwell The Coastal Desert Dunes Work Team: Regeneraxion Date: November 2015 Honorable Mention
Graduate in Architecture, Specializing in Urbanism Central University of Chile. Duration: 2010 to 2015
PROFESSIONAL TRAINING Type: Social Housing Working Hours: 100 hours Project: Design and Regulation of Social Housing Institution: ARQZ Supervising Architect: Eduardo Jimenez Software: Autodesk Revit, AutoCad 2D Completion date: May 2014 Type: Construction Practice Working Hours: 200 hours Project: School “Capitan Pastene” Institution: INGECONS Supervising Engineer: Elias Castillo Completion Date: February 2015 Type: Professional Practice Working Hours: 230 hours Project: Workspaces Designed in BIM Models Institution: CONTRACT WORKPLACES Supervising Architect: Consuelo Larrea, Architect Software: Autodesk Revit, AutoCad 2D, Illustrator Completion Date: February to March 2016
Name: National Innovation Contest “My place is my garden” Project:Memo-Riel Square, San Work Team: Bosquejos Urbanos Date: December 2015
CONTACT DETAILS +56 9 73073189
sky.ross.arq@gmail.com Skype: sebastianskyross
PROFFESSIONAL SKILLS
Adobe Photoshop
Bernardo
llllllllll A d o b e I l l u s t ra t o r
llllllllll
Adobe InDesign
llllllllll A u t o d e s k Re v i t
PROFESSIONAL WORKS Project: BIM Design and Modeler Company: ARQZ Diseño BIM Professional: Eduardo Jimenez, Architect and BIM Manager. Software: Revit, Naviswork Date: December 2013 to March 2014 Project: Designer and Renderist Company: Bosquejos Urbanos Professional: Freddy Arratia, Architect Software: Revit, Lumion, Photoshop Date: December 2014 to April 2015
llllllllll AutoCad 2D
llllllllll Rhinoceros 3D
llllllllll Lumion
llllllllll Sketchup
llllllllll Microsoft Office
llllllllll Artlantis
llllllllll V i d e o ARCHITECTURE E d i t PORTAFOLIO ing
l l l l l l l l KPF ll 2 SEBASTIAN ROSS IBAÑEZ
ABOUT ME I consider myself a positive, cheerful, caring and responsible person, qualities that are essential to preserve human quality and establish good relationships. I think it’s always good to contribute in different ways to a team and my strength is to have a mastery of all the tools to be a support for those who need me. A strength of mine is Revit (800 hours of modeling) which I have incorporated into my training and I have always found offices where this tool is the foundation to new opportunities. During my training as an architect at the Central University of Chile, I developed a great interest to in learning about sustainable architecture, architectural design and digital resources. Digital resources have allowed to explore, innovate, and develop architecture to meet the needs of people. Architecture for me, is a transformation of the natural world through the human intelligence and it’s this one that never stops growing. Therefore, the architectural process can always be further developed in its various edges. The important thing for me is to form a team in which collective learning is achieved to converge in the architectural project. The bigger the fish tank, the bigger the fish can grow. KPF is a life dream that I was aware at the time I started to study architecture. I’m a professional of great commitment. I have worked in companies ranging in size - small, medium and large. I know that KPF is a big step above. in the direction I want to direct my career. I am committed to collaborate and give my best effort in the team environment, using my full potential with the different digital tools I master. I know that I can contribute positively to KPF and to achieve great teamwork within my participation in big projects and human relations. I am excited about the idea of working with KPF and be able to live this great experience and unique opportunity to further strengthen my skills and knowledge in architecture.
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
3
PLAZA 3
MICRO PLAZA1 SECTOR RESIDENCIAL FUNICULAR
INDEX
FUNICULAR
BARRIO GASTRONOMICO
05
08
STAGE 2
STAGE 3
11
STAGE 4
STAGE 5
PLAZA VEHICULAR PEATONAL ESC 1:200
FACULTAD DE ARQUITECTURA
URBANISMO
36
4.23
4.23
6.53
1150 2.04 5.60
3.56
DESLINDE CASA 13290
4.21 4.21
9.91
PROFESSIONAL WORKS
COMPETITIONS
DESLINDE CASA 1156
3.50
3.50 3.50
4.80
4.80
4.20 18.98 17.07 3.28 2.20
0.90
1.08 4.00
8
DESLINDE CASA 13294
35
31
3.56
LINEA OFICIAL 1156
1162
DE CALZADA
ESQUEMA SUPERFICIE NIVEL 2 1 : 200
SUPERFICIE TERRENO
11
0.15
1150 2.04 5.53
EJE
ESQUEMA SUPERFICIE NIVEL 1
0.15
11
0.15
0.15
0.15
0.15
11
3.565.1
F
-0.5 m N 19.1 m E
1162
DE CALZADA
1 : 200
11
H 1.11 B
ESTUDIANTE: TALL SEBASTIAN ROSS“ EJE
1.97
LINEA OFICIAL 1156
EJE
J 2.36
3.17
0.90 10.88 17.20
DESLINDE CASA 13292
F
1150
PLAZA CON EQUIPAMIENTO DE SERVICIO ESC 1:200
PROFESOR: DIEGO PORTALES AYUDANTE: FELIPE ZAPATA / FRANCISCO AZAGRA
G 4.10 4.10
5.18 4.10
3.56
PAISAJE
PLAZA DEPORTIVA
5.18 5.18
4.26 2.00
9.95
4.26
3.56
A 1.97
-0.5 m N 19.1 m E
4.30
4.23
4.23
4.30
DESLINDE CASA 13290
4.23
4.23
4.30
4.23
4.23
4.30
DESLINDE CASA 13290
3.50
3.50 3.50 4.20
12
5.70
DESLINDE CASA 13292
5
DESLINDE CASA 1149
DESLINDE CASA 13296
6
4.10
7
12
I
6.53
12
3.56 C
DESLINDE CASA 13296
5
DESLINDE CASA 1149
D
1.97
3.89 1.99
6
DESLINDE CASA 1149 5.53 3.17 2.36 1.97 1.20 1.25 1.11
1150
E
DESLINDE CASA 1156
7
12
B
3.70
3.46
18.98 17.07 2.20 3.28
0.15
10.82 17.20
4.13 1.84
4.00
3.48
1.22
DESLINDE CASA 13294
0.08
5.18
0.18 0.08
B
5.18 5.18
0.50
3.33
4.10
2.05
2.63
0.15
2.12 4.03
5.53
3.48 0.93
3.89 1.99
0.88 0.88 1.90
DESLINDE CASA 13290
DESLINDE CASA 1149 5.60 DESLINDE CASA 1149 5.60
5.53
2.05 0.59 0.08
PROFESSIONAL PRACTICE
Y
TALLER X URBANO
MICRO PLAZA 2
2.12 4.03
SOCIAL PRACTICE
PLAZA DE SERVICIO
20
TELEFERICO BORDE CERRO ESC 1:500
24
PLAZA DE DESCANSO
ESTACION TELEFERICO
SUPERFICIE
10
3.31
LINEA OFICIAL
16,46 M2 33,95 M2
SUPERFICIE
1186
1180
1174
1168
1162
C
13,17 M2
D
7,12 M2
E
5.68
6,89 M2
F
25.25
4,05 M2
G
8,05 M2 1 M2
I
17.15
2.37
H
11,01 M2
J
11,32 M2
SUBTOTAL
UBICACION
62,53 M2
3.29
1 : 500
TOTAL
10.84
10.84
10.84
17,49 M2
N° 219/88
ZONA
5.48
8.07
DESLINDE CASA 1156
17.02 2.37
17.18
2.37
3.62
DESLINDE CASA 1156
3.62 17.05 2.37 10.84
9
96,48 M2
9
0.14
0.14
9
SUPERFICIE
N° 219/88
B
SUPERFICIE A INGRESAR
1.5 m N 19.1 m E
13296
10
19.88
9
R. F.
A
SUBTOTAL
13292
13294
1156
OFICIAL LINEA
A
5.48
16.92 13290
HABITACION 1 15 m²
0.15
0.15
8.63
BAÑO 2 6 m²
A
10
5.53
3.15
3.31
A
COMEDOR 12 m²
10.91
DESLINDE CASA 13292
3.31
A
10
ZONA
ESTRUCTURA DE ACERO PERFIL COSTANERA 10X5 CMS
0.15
3.16
1.76
COCINA 6 m²
DESLINDE CASA 13292
3.31
1.76
33,95 M2
SUPERFICIE APROBADAS
5.58 0.05
0.05
4.88
4.20
0.08
RICARDO LYON Nº3204, SANTIAGO, CHILE
3.45
10
LAS PARCELAS 1150, EL BOSQUE
2.23 10.84
3.30
10.84
ROL S.I.I. Nº
5740-63
B 36.40%
0.08 1.17
3.48
5.00
7
6
5
FIRMA
1162
8
FIRMA ESTADO
PERMISO DE OBRA VIVIENDA SOCIAL CONTENIDO
LINEA OFICIAL F 0.05 0.15
1.95
D 1.79
1.74
1.90
1.79
1.69
E
0.05 0.15
5.38
5.58
1 : 50
3-32940
EDUARDO JIMENEZ ARENAS
A
A
5.48
PLANTA NIVEL 2 CONSTRUCCION Y DEMOLICION
ELIZABETH DOMINGUEZ CORNEJO
ARQUITECTO
8
1156
1156
5.53
5
MANDANTE
38.35%
5.77%
1.22
AMPLIACION LAS PARCELAS
UBICACIÓN
9
5.16
3.33 1.17
3.08
0.15
1.90
7
1 : 50
11
4.08
1.90
2.05
EJE DE CALZADA
PLANTA NIVEL 1 CONSTRUCCION Y DEMOLICION
0.05
0.05 4.20 7.65 3.45
2.16
2.09
2.03
1.96
2.09
B
0.08 0.08
5.00
6
C
38.34%
B 0.08
1.75 3.48
DISTANCIA LINEA OFICIAL A EJE DE CALZADA
7
12
PROYECTO
C
0.07 0.86
0.75 2.13 5.53
LINEA DE VEREDA
1156
B
3.33 1.06
5
38.34% 5.60
36.40%
DISTANCIA LINEA OFICIAL A EJE DE CALZADA
0.16
0.15 E
Sección 0
10
1.96
2.19
2.19
2.12
1.99
1.90
2.05
1.69
D
5.02
0.14
8
9
1.97
1.79
6
31.55%
LINEA OFICIAL LINEA OFICIAL 0.08
4.85 1.90
F
C
1.5 m N 19.1 m E
LINEA OFICIAL
7
4.17
50% ADOSAMIENTO DESLINDE CASA 1156
0.15 2.72 0.15 0.94
8
0.53 0.15
12
11 BALCON 2 m²
C
0.14
0.07
8
1.5 m N 19.1 m E 2.06
DESLINDE CASA 13294
3.29 1.44 C
8
1.99
DESLINDE CASA 13296
DESLINDE CASA 13296
BAÑO 1 2 m²
C
5.38
HABITACION 2 16 m² HABITACION 3 5 m²
0.15
5.02
5.02
RF: N° 219/88 FECHA: 27/03/1982 CASA ORIGINAL 33,95 M2
SALA COMUN 13 m²
5.02
PROYECCION SEGUNDO PISO
50% ADOSAMIENTO DESLINDE CASA 1156
7.38
DESLINDE CASA 13294
5.48
6
5
PLANAS NIVEL 1 Y 2 CONSTRUCCION Y DEMOLICION PLANTA DE EMPLAZAMIENTO PLANTA DE UBICACION ESQUEMA Y CUADRO DE SUPERFICIES
EMPLAZAMIENTO 1 : 100
LÁMINA
AR-100-001
NORTE
FECHA
16/06/14
KUEHNE + NAGEL PLANO
A320
ISOMETRICAS
ESCALA FECHA
11/19/15
PROYECTISTA C.GUZZINI- A.GARCIA ESTADO Todas las medidas se verificarán en obra.
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
4
STAGE 2:
THE GENERAL TRAINING. INTERMEDIATE LEVEL. DEVELOPMENT PROJECT Responds to the formalization and realization of projects, depending on the community. The emphasis is on program and project development to its context. From the architectural concept to the morphological development.
workshops
III - IV
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
5
WORKSHOP IV / ITALY SPACE, PIZZA, ART Y SPORT / Professor: Javier Bize Exercises: STRENGTHEN THE IDENTITY NEIGHBORHOOD ITALY The project is focused on mural painting and a space for youth development, integrated to the community, while expressing the popular culture of its environment, the neighborhood.
FINAL MODEL
FIRST RENDER
A - A` SECTION
FINAL MODEL
MODEL IN CONTEXT
FINAL MODEL ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
6
EDIFICATION IV / SUSTAINABLE CABIN FOR THE SOUTHERN CHILE / Professor: Gabriela Armijo Exercises: DESIGN OF SUSTAINABLE HOUSING We explore different referents to generate a sustainable design, and based on this model we decided model this cabin with a good airtight enclosure, with thermo panels and walls with high thermal insulation materials.
ISOMETRIC SECTION
CONSTRUCTIVE SCHEME
CONSTRUCTIVE SCHEME
CROSS SECTION
FINAL MODEL ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
7
STAGE 3:
THE GENERAL TRAINING. INTERMEDIATE LEVEL, DEVELOPMENT PROGRAM workshops focusing on community development and integration, taking into account an urban approach to strengthen the identity, and cultural and social well-being.
workshops
V - VI
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
8
DIGITAL REPRESENTATION / Professor: Pablo Cordoba The aim of this course is to create photomontages from simple images such as AutoCad drawings, photographs of a room, and free works. It shows a wide domain of digital tools with respect to the capabilities of PHOTOSHOP and I successfully completed the course.
PHOTOMONTAGES
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
9
WORKSHOP VI / INTEGRATION OF COASTAL EDGE, VIEWPOINT PLATFORM / Professor: Marcelo Reyes Exercises: URBAN DESIGN The project is presented in a Viewpoint platform emerging from the an important public space. Leaving the avenue and the train station below the platform allows fluid continuity of public space created formed by the hill and up to the waterfront. The Master Plan considers the integration of the creek with the coastline by enhancing the artistic, commercial, educational character, and, also, promoting the environmental recovery of Valparaiso to preserve the ecosystem and more viable tourism. URBAN PLAN
SCHEMATIC PROGRAM
SCHEMATIC PROGRAM
MATERIALITY
B-B SECTION
PROJECT SKETCHES
A-A SECTION ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
10
STAGE 4:
THE GENERAL TRAINING. ADVANCED LEVEL. STRUCTURAL DEVELOPMENT Proceeds to the realization of the projects in their structural, constructive and program development, giving importance to its graphic and technical representation.
workshops
VII - VIII
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
11
RHINOCEROS / Professor: Cristian Frias 425
375
400
400
3447
400
1926
400
We were responsible to design a structure to contemplate the landscape of a hill near the sea. One of the requirements was to have two cultural spaces and structurally complex envelope. Nivel 2 1 : 200
PLANIMETRY
Nivel 5
+14.49 m 3000
LEVEL -1
1800 425
375
400
400
425
975
Nivel 4 +9.89 m
910
+4.99 m
200
1000
Nivel 3
989
400
400
1449
1719
90
100
1427
Nivel 2
220
400
+2.99 m
Nivel 1 +0.00 m
ELEVACION NORTE NORTH ELEVATION
100
Nivel 3
1 : 200
400
400
425
350
850
375
1447
Nivel 5
Nivel 5
+14.49 m
604
+14.49 m
550
390
20
1799
730
LEVEL 1
299
21
1 : 200
400
Nivel 4
Nivel 4 +9.89 m
380
Nivel 3
989
+4.99 m
200
20
400
Nivel 3
1449
490
20
+9.89 m
Nivel 2
+2.99 m
Nivel 1
LEVEL 2
400
400
425
375
825
375
SECCION ESTRUCTURAL
Nivel 1 +0.00 m
ELEVACION PONIENTE WEST ELEVATION 1 : 200
1200
20
249
800
1 : 200
+0.00 m
EAST ELEVATION
ELEVACION ORIENTE
1245
21
1 : 200
299
479
Nivel 4
+4.99 m
Nivel 2
+2.99 m
Nivel 5
208
530
20
+14.49 m
Nivel 4 +9.89 m 30 20 350
400
1719
1200
Nivel 3
Nivel 5
249
20
+14.49 m
Nivel 5
299
+14.49 m+2.99 m
+14.49 m
Nivel 3 +2.99 m
Nivel 4
Nivel 2
1 : 200
+2.99 m
Sección 4
Nivel 3 +4.99 m
1 : 200
Nivel 1
LONGITUDINAL SECTION 290
24
376
Nivel 1
24
219
30
1 : 200
Nivel 5
CROSS SECTION
1245
1 : 200
Sección 4
530 20 20
CROSS SECTION 1944
Nivel 1 +0.00 m
Nivel 3
Nivel 1
1 : 200
+0.00 m
Sección 5
CROSS SECTION
1 : 200
+14.49 m
20 30
+2.99 m
+2.99 m
Nivel 1 +0.00 m
Nivel 5
+14.49 m 820
710
320
Sección 3
Nivel 2
Nivel 2
+2.99 m
+0.00 m
Nivel 3
+4.99 m
1 : 200
Nivel 2
+2.99 m
+0.00 m
Sección 5
Nivel 3 +4.99 m
1 : 200
Nivel 2
Sección 0
Nivel 1 +0.00 m
291
Sección 3
+14.49 m
+9.89 m
350
+4.99 m
Nivel 5
380
Nivel 3
120 2950 199
30 20
+0.00 m
+0.00 m
Nivel 4
+9.89 m
Nivel 1
+0.00 m
+2.99 m
Nivel 4
+9.89 m
Nivel 1
+4.99 m
Nivel 2
530
500
Nivel 2
Nivel 1
Sección 0
Nivel 3 +4.99 m
1019
+9.89 +2.99 m
Nivel 5
+14.49 m
+4.99 m
Nivel 4 2
Nivel 4 +9.89 m
291 20 380
20 350 30
Nivel 5
Nivel 3 +4.99 m
Nivel 4 +9.89 m
30 20
+14.49 m
Nivel 4 +9.89 m
249
1 : 200
1019
SOUTH ELEVATION
ELEVACION SUR
Nivel 5
120 2950 199
+9.89 m
500
Nivel 4
LONGITUDINAL SECTION
+4.99 m
Nivel 5 Nivel 2
+14.49 m
20 30
+14.49 m
180
Nivel 5
1 : 200
20
Nivel 5
Nivel 4
24
50
1245
Nivel 5
1944
20
Nivel 3 +4.99 m
Nivel 2 +2.99 m
Nivel 1 +0.00 m
+14.49 m
Nivel 3 +4.99 m
Nivel 2 +2.99 m
Nivel 4
1420
+9.89 m
LONGITUDINAL SECTION
Nivel 1 +0.00 m 420
+4.99 m
Sección 6
Nivel 3
1 : 200
180
350
50
1 : 200
Nivel 3 20
Sección 2
Nivel 1 +0.00 m
Nivel 5
180
Nivel 4 2 +9.89 +2.99 m
LONGITUDINAL SECTION
Nivel 4 +9.89 m
+14.49 m 350
219 20 30
710
320
1420
+9.89 m
420
376
30
24
820
290
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
+4.99 m
12
Nivel 2 +2.99 m
Nivel 1 +0.00 m
Sección 2
RENDERS ON LUMION
MODEL PROCESS ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
13
WORKSHOP VIII / REVITALIZATION OF PUBLIC SPACE AND INTEGRATION WITH PUBLIC TRANSPORT / Professor: Luciano Basauri Exercises: URBAN MOBILITY CONTEST / MATERIALITY: WOOD The project aims to contribute a solution for urban mobility. The materiality of the project should be primarily wood for purposes of CORMA contest. The project proposes to reformulate the space by creating a public square between the two entrances to the subway and generating an ongoing project interaction between local trade and public spaces.
GENERAL FLOOR 1
ANALYSIS 3
2
SE ELIMINA ELTERCER PAISAJE CONTEMPLAN DOUNACREACIONDE2NUEVOSACCESOSEN LA ZONA “ENTRE METROS” PROPONIENDO UNA TRANSVERSALIDAD.
PROBLEMATICA GENERAL: PIEZAS URBANAS DESTINADAS ESPECIFICA MENTE AL USO DE TRANSPORTE MOTORIZA DO, SIENDO EL AUTOMOVIL EL ICONO DE LA PROBLEMATICA “CUELLO DE BOTELLA” EX PUESTA EN LA CIUDAD.
-
1
3
2
4
CONTRASTE PARADEROS EXISTENTES
PROBLEMATICAS DEL CASO:
SE GENERA UNA PASARELA OTORGANDO IN FRAESTRUCTURA QUE SOLUCIONA LA 7 5 6 CONECTIBILIDAD ENTRE METRO, PLAZA Y JPARADERO.
8
---
UP
ESPACIO ENTRE METROS DE DELINCUENCIA Y BASURA CONSECUENCIA DE SOLOS DOS AC CESOS DEL METRO POLARIZADOS, GENERAN DO UN DESUSO Y NEGATIVIZANDO EL AREA
A
CORTE B-B
FALTA DE SERVICIOS PROBLEMAS PARA CRUZAR CALLES PRINCI PALES. COMERVIO VAGO FALTA DE IDENTIDAD DE NODO INTERCOMU NAL.
UP
PLATAFORMA QUE PRETENDE CONEC TAR LA PLAZA CON EL ESPACIO “ENTRE METROS” MEDIANTE UNA NIVELACION DEL PAVIMENTO OTORGANDO MAYOR ESPACIO E IMPORTANCIA AL PEATON Y AL CICLISTA EN EL ESPACIO PUBLICO
A -
UP
ESPERAS PEATONALES INSEGURAS
UP
PARADERO 128 m²
A
A
CORTE D
UP UP
15
UP
15
ESTACIONAMIENTOS DE BICICLETA PARA CONEXION INTERMODAL FOMENTANDO LA BICICLETA Y DESINSENTIVANDO EL AU TOMOVIL. NUEVOS PARADEROS Y MEJORAMIEN TO DE ESTOS
CORTE A
LOCALES AL PASO
CORTE C C
B
B
SE CREA UNA TRAMA ORGANIZADORA DEL PROYECTO QUE RESPONDE EN ORDEN LOGICO A PARTIR DEL ESPACIO “ENTRE METROS”
-
VOLUMENES CON FACHADA DESPRENDIDA Y ALEJADA DEL NIVEL DE SUELO PARA GENERAR CON DICION DE LIVIANDAD Y LEVEDAD APROYECTO
B
B
2
SE ESTABLECE COMERCIO AL PASO DE FLUJOS PRONCIPALES.
-
-
1
UP
3
TESIS GENERAL: INCENTIVAR EL USO DEL TRANSPORTE PUBLICO ADEMAS DE ESTIMULAR LA UTILIZACION DE LA BICICLETA, EL ESPACIO A INTERVENIR PRESENTA SITUACIONES DE DECI SION POR PARTE DEL PEATON ASIMISMO UN COBIJO A SU CAMINABILIDAD Y TRANSITAR. ESTA INICIATIVA SE ENMARCA DENTRO DEL CONCEPTO “PARK AND RIDE” -
1
2
SE PROPONE PROGRAMA DE SERVICIOS CON EL FIN DE MEJORAR LA CALIDAD E IMAGEN DEL TRANSPORTE PUBLICO.
3
4
5
6
7
8
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
14
LONGITUDINAL SECTION CORTE C C 1 : 50
pasarela nivel met +8.62 m
CORTE C C
250
250
250
250
250
250
200
1 : 50
pasarela nivel met
74
+8.62 m
40
CORTE C C
10
1 : 50
pasarela nivel plaz
200
243
+4.72 m
pasarela nivel nivel met pasarela entr +8.62 m 549 250
250
10
40
425
726 4 4
+3.10 m
250
pasarela nivel plaz
200
265243
+4.72 m
pasarela nivel entr Nivel peatonal
549
+0.00 m
10
40
7426 4
425 74
+3.10 m
pasarela nivel plaz
265 243
+4.72 m
A
CORTE B B
14
15
B
1 : 100
pasarela nivel entr
LONGITUDINAL SECTION 265
A
CORTE B B
Nivel peatonal +0.00 m
549
26 4
425 74
+3.10 m
14
15
B
1 : 100
74
pasarela nivel metro +8.62 m
Nivel peatonal +0.00 m
A
CORTE B B
14
15
CORTE D
B
1 : 100
pasarela nivel metro +8.62 m
CORTE D
pasarela nivel metro +8.62 m
CORTE A A
2
1 : 100
3
4
5
2218
2185
CORTE D
619 305
CORTE A A
1421
305
2
3
4
5
6
70
1 : 100
6 2186
305
Nivel vigascarretera
1421
2185
+5.50 m
305
pasarela nivel plaza +4.72 m
2
3
30
430
70510
30
425
550
1 : 100
779
708
CORTE A A
2186
308
619 230
CROSS SECTION
10
2218
2nivel gimnacio
4
pasarela nivel entremetro +3.10 m
+2.90 m
5 2185
6 2186
305
1421
308
Nivel vigascarretera +5.50 m
40
40 619
230
10 445
2218
pasarela nivel plaza
305
+4.72 m 779
708
2nivel gimnacio
pasarela nivel entremetro +3.10 m
+2.90 m
308
Nivel vigascarretera +5.50 m
40
40
230
10 445
430
70 510
425
550
30 30
pasarela nivel plaza +4.72 m
779
708
2nivel gimnacio +2.90 m
pasarela nivel entremetro +3.10 m
40
445
430
510 40
425
550
30 30
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAĂ‘EZ
KPF
15
CONSTRUCTION DETAIL 470
TECHO DE MADERA Y POLICARBONATO DE 100 MM
10
10
+ 715
4
30
PIEZA DE ACERO ESBELTA EN PERFIL TOBULAR DE 40MM PARA UNION ENTRE MODULO ESTRUCTURAL Y TECHO
MODIFICACION METRO
9
PASARELA
+ 764
39
SCHEMATIC PROGRAM
27
VIGA ESTRUCURAL DE PINO SECO Y RADIATADO DE 15OMM X 300MM
VOLUMENES ENTRE METRO TRANSVERSALIDAD EN AMBOS EJES DEL PROYECTO PARADEROS
10 39
+ 715
4
PASAMANOS DE MADERA TUBULAR
30
MODIFICACION METRO
10 273
PASARELA
470 + 764
9
LOCALES AL PASO
266
TECHO DE MADERA Y POLICARBONATO DE 100 MM FACHADA DE MADERA CEPILLADA Y BARNIZADA DE 40MM ALEJADAS DE LA ESTRUCTURA PARA PROVEER LIVIANDAD PIEZA DE ACERO ESBELTA EN PERFIL TOBULAR DE 40MM PARA UNION ENTRE MODULO ESTRUCTURAL Y TECHO
ESTACIONAMIENTO BICICLETA
TRANSVERSALIDAD EN AMBOS EJES DEL PROYECTO
27
VIGA ESTRUCURAL DE PINO SECO Y RADIATADO DE 15OMM 3XTENSORES INFERIORES 300MM DE 8 MM DE DIAMETRO
VOLUMENES ENTRE METRO
PARADEROS pasarela nivel plaza
+ 447
273 25
5
+4.72 m
4
MADERA LAMINADA DE FACHADA DE MADERA 50 MM DE GROSOR, CEPILLADA Y BARNIZADA PARA PROEEVER 40CM DE 40MM ALEJADAS DE DEESTRUCTURA SEPARACIONPARA ENTRE LA LA ESTRUCTURA Y LA PROVEER LIVIANDAD FACHADA
LOCALES AL PASO
266
ESTACIONAMIENTO BICICLETA
PILARES MIXTOS; TUBULARES Y PASAMANOS DE MADERA CUADRADOS DE 30X30 Y TUBULAR 30 DE GROSOR MADERA SECA DE PINO RADIATADS 3 TENSORES INFERIORES DE 8 MM DE DIAMETRO
VIGA DE MADERA DE PINO SECA Y RADIATADA DE 260MM X 100MM CADA 20 CM DE SEPARACION
pasarela nivel plaza
+ 447
25
5
+4.72 m
4
MADERA LAMINADA DE 50 MM DE GROSOR, PARA PROEEVER 40CM DE SEPARACION ENTRE LA ESTRUCTURA Y LA FACHADA + 236
441
PILARES MIXTOS; TUBULARES Y CUADRADOS DE 30X30 Y 30 DE GROSOR MADERA SECA DE PINO RADIATADS
VIGA DE MADERA DE PINO SECA Y RADIATADA DE 260MM X 100MM CADA 20 CM DE SEPARACION
PERFIL DE ACERO QUE UNE A LA MADERA CON LA FUNDACION
+ 0
70
441
+ 236
CORTE PASARELA 1 : 20
+ 0 60
36
60
FUNDACIONES DE HORMIGON POBRE 60X60X70 CM
pasarela nivel plaza +4.72 m 70
PERFIL DE ACERO QUE UNE A LA MADERA CON LA FUNDACION
CORTE PASARELA 1 : 20
60
36
60
pasarela nivel entremetro +3.10 m
20 20
FUNDACIONES DE HORMIGON POBRE 60X60X70 CM
pasarela nivel plaza +4.72 m
CORTE PARADERO PASARELA 1 : 50
pasarela nivel entremetro +3.10 m
20 20
CORTE PARADERO PASARELA 1 : 50
LONGITUDINAL SECTION /BRIDGE ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
16
FIRST FLOOR
SECTION /BICYCLE PARKING
ISOMETRIC / CONSTRUCTION DETAIL
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
17
WORKSHOP VIII / GERIATRIC HOSPITAL / Professor: Mauricio Santibañez Exercises: HEALTH COMPLEX INFRASTRUCTURE A new geriatric hospital that integrates new green areas and considers fundamentals of accessibility. The project has been developed to meet all the requirements of an elder.
OUTSIDE VIEW
INSIDE VIEW
OUTSIDE VIEW PLANTAS PLANTAS 1
2
3
5
4
800
A
800
6
800
6A
Room 15 m² TALLER 61 m²
A SUCIA 14 m² A LIMPIA 8 m²
DANZA 67 m²
GIMNASIO 62 m²
6B
SECCION C C
3
4
7
TALLER 61 m²
4
D
GIMNASIO 62 m²
6
ZONA DE JUEGOS
300 800
D
B
4
BAÑO SERV 8 m²
1261 800
SECCION D D
INSUMOS 14 m²
CAMARIN 32 m²
800
DUCHA 14 m²
7
CAMARIN9 32 m²
PLATAFORMA AJEDREZ
F
21
20
21
10
DUCHA 11 m²
22
10
23
BB CC 9
1200
800
19
11
AJEDREZ
ESTAR
OFICINA COORDINACION 34 m²
FARMACIA 22 m²
800
800
800
800
800
800
800
750
H J
NUTRICION 28 m²
BODEGA DE 810INSUMOS 33 m²
800
SECCION E E
I
450
MULTIPROFESIONAL 21 m²
1
2
BAÑO 7 m²
16
3
SECCION B B 600
800
17
800
18
800
19
800
20
800
LIMPIEZA 23 m²
21
800
BODEGA FRIA 35 m²
22
800
800
24
J
CENTRAL
FACULTAD DE URBANISMO
ARQUITECTURA Y PAISAJE
PROYECTO TALLER VIII ETAPA SEMIFINAL Período S2 - 2014 FECHA: 15-12-2014
1088
1
2
Monitores:
NICOL KURTE
17
2
3
10 179
210
19
3D
5
4
1600 118
184
109
111
20
21
22
23
24
13
14
L4 LAMINA
FIRST FLOOR
6
800 191
195
191
111
108
178
232
175
107
A
1 : 200
ESTUDIANTE
18
SEBASTIAN SKY ROSS IBAÑEZ CONTENIDO LÁMINA:
1
NIVEL 1
16
3
MAURICIO SANTIBAÑEZ CRISTIAN SEGOVIA
1 : 200
14
SECCION E E
K
PROFESORES GUÍA: NIVEL 1
13
810
ACCESO DE SERVICIO Y ESTACIONAMIENTOS
650
K 23
800
K
UNIVERSIDAD
12
BODEGA FRIA 35 m²
Room Not Enclosed
1088
650
1200
ACCESO DE SERVICIO Y ESTACIONAMIENTOS
I
J
LIMPIEZA 23 m²
800
COCINA 87 m²
ASEO
K
H NUTRICION 28 m² 23 BODEGA DE INSUMOS 24 33 m²
I BAÑO 7 m²
105
308
SECCION B B 600
10
Room Not Enclosed
MULTIPROFESIONAL 21 m²
H J
22 COCINA 87 m²
ASIST SOCIAL 30 m²
450
18
G
ASEO
I
17
450
16
750
G
12
24
ESTAR
OFICINA COORDINACION 34 m²
FARMACIA 22 m²
14
650
PISCINA 266 m²
105
Room 16 m²
13
AA CC 11
Igual
308 800
H
BB
12
SECCION F F
Igual
DUCHA 14 m²
20 8
300
800
G 292
ASIST SOCIAL 30 m² Room 7 m²
19
14
650
Igual
18 ESPACIO MULTICULTURAL
13 AA
PISCINA 266 m²
9
11
CAMARIN 27 m²
6B
17
12
SECCION F F
Igual
8
6ESPACIO MULTICULTURAL 6A
F E 16
10
DUCHA 11 m²
8
Igual
Igual
SALA TECNICA 26 m²
5
11
CAMARIN 27 m²
7
Room 16 m²
800
F
6B
ZONAPLATAFORMA DE JUEGOS 292
Room 7 m²
9
SECCION G G
7
D
SALA TECNICA 26 m²
6B
6A
SECCION D D
E
G
A SUCIA 14 m² A LIMPIA 8 m²
DANZA 67 m²
5
800
1261
SECCION C C
C E
E
8
6A
Room 15 m²
D
F
BAÑO SERV 8 m² INSUMOS 14 m²
C A
B
SECCION G G
6
B
800
800
800
300
300
800
800
2
450
1
B
5
A
NORTE 6A
A SUCIA A LIMPIA 14 m² 8 m²
6B
801
1
B
2
3
10 118
179
+210 5.00 184
1600 109
111
195
191
111
108
178
232
175
4
801
D
761
E
F
5 6
8
6B
9
BAÑO SERV 8 m²
11 114
26
9
8
114
9
E
800
231
18
19
20 8
22
10
23
CC AA
12
24
G BB
17
401
NUTRI 18 m²
NUTRI 18 m²
400
18
400
400
400
401
399
PSICOGERI PSICOGERI PSICOGERI PSICOGERI GERONTO 18 m² 18 m² 18 m² 18 m² 18 m²
19
20
9
GERONTO 18 m² 21
399
CCK3
958
CC
637
11
22
KINE 10 18 m²
KINE 18 m²
23
INSUMOS 21 m²
H
H
24
750 1210
12
dental 18 m²
401
399
399
401
EVAL MULTI EVAL MULTI EVAL MULT EVAL MULT 17 m² 16 m² 17 m² 17 m²
811
NUTRI 18 m²
NUTRI 400 m² 18
NUTRI 396 18 m²
NUTRI 400 18 m²
400
400
400
400
401
399
ALZAHIMER ALZAHIMER 17 m² 17 m² A SUCIA A LIMPIA 8 m² 7 m² PSICOGERI PSICOGERI PSICOGERI PSICOGERI GERONTO 800 400 18 m² 410 18 m² 18 m² 18 m² 18 m² 8615
399
401
958
KINE 17 m²
GERONTO 1588 18 m²
GERONTO GERONTO 18 m² 18 m²
I
637
KINE 17 m² 15
dental 18 m² 393
500
KINE 403 18 m²
KINE 400 18 m²
795
INSUMOS 21 m²
J
ASEO
10
600
800
800
800
450
2
16
3
900
500
800
800
800
393
17
811
396
18 400
800
800
A SUCIA 8 m²
400
A LIMPIA 7 m²
KINE 17 m²
ALZAHIMER ALZAHIMER 17 m² 17 m²
19
800
20 400
600
800
800
800
805
800
800
22
1588
800
KINE 17 m²
K
SECOND FLOOR
21
410
23
403
8615
10
800
I
EVAL MULTI EVAL MULTI EVAL MULT EVAL MULT 17 m² 16 m² 17 m² 17 m²
MARCHA MARCHA 16 m² 21 m²
1
NIVEL 2
401
GERONTO GERONTO 18 m² 18 m²
15
800
750 1210
450
MARCHA MARCHA 16 m² 21 m²
900
I
ISOMETRIC VIEW
399
NUTRI 18 m²
G
401
J
399
NUTRI 18 m²
ASIST SOCIAL 23 m²
H J
K
401
16
15
dental 18 m²
30
15
dental 18 m²
BB
12 30
ASEO
800
I
401
Room 16 m²
111 0
11
21
F
ASIST SOCIAL 23 m² Room 7 m²
800
F
H
201
815
815
G
111 0
CCK3
7
600
800
182
201
10 11
Room 16 m²
17
231
8
6B
16
12 182
AA
INSUMOS 14 m²
K3
6A
10
7 K2
7 + 5.00
F
Room 7 m²
10
E
G
4
26
6B C
D
INSUMOS 14 m²
6A
K3
6A
+ 5.00
600
800
D
+ 5.00 A SUCIA A LIMPIA 14 m² 8 m²
6 B
10
7 K2
C
5
B C E
BAÑO SERV 8 m²
107
A
D
6
B
800 191
761
C A
5
4
800
800
1 : 200
400
24
795
800
J
805
K
K 1
2
3
16
17
1
2
3
4
5
18
19
20
21
22
23
24
ARCHITECTURE PORTAFOLIO
6
NIVEL 2 1 : 200
A
B
1
2
+ 8.50
3
4
5
6B
6
C A
D
SEBASTIAN ROSS IBAÑEZ
6A A SUCIA 14 m² A LIMPIA 8 m²
BAÑO SERV 7 m²
6A D
4
5 6
A SUCIA 14 m² A LIMPIA 8 m²
INSUMOS 14 m²
6B
7
8
9
10
KPF
18
SECCION G G 1 : 100
20
40 15
I
H
G
330
294
2
4
5
E - E SECTION
20
15
I
H
G
330
135
J
15
15
335
40 15
335
40 15
15 15
335
365
350
305
15
135
135
30
15
15
15
445
335
335
365
350
15
15
294
135
15
15
445
3
15
C - C SECTION
335
335
5
J
335
15
4
15
305
30
15
SECCION C C
SECCION E E
1 : 100
1 : 100
SECCION C C
SECCION E E
1 : 100
1 : 100
B
B
+ 13.10
TECHUMBRE 15
A
15 55
REVESTIMIENTO
PISO TECNICO
55
CIELO FALSO
55
55
PISO TECNICO
+ 12.00
TECHUMBRE
95
CIELO FALSO
+ 12.00
95
A
+ 13.10
294
VIGA VOLADIZA REVESTIMIENTO PISO
REVESTIMIENTO
+ 8.50
CIELO FALSO
AISLAMIENTO TERMICO
40
55
PISO TECNICO ENTRE VIGAS
294
15
VIGA VOLADIZA
REVESTIMIENTO PISO CIELO FALSO
LAMAS HORIZONTALES 60 CM
AISLAMIENTO TERMICO LOSA H.A. 150 MM
100
+ 3.50
LAMAS HORIZONTALES 60 CM
295
295
10
VEGETACION
15
55
PISO TECNICO ENTRE VIGAS
+ 5.00
40
15
295
295
+ 8.50
PILAR 40 X 40 CM HORMIGON ARMADO
+ 0.00
FUNDACION
+ -0.15
+ 3.50
DISIPADOR SISMICO
35
40
100
VEGETACION
LOSA H.A. 150 MM
15
300
+ 5.00
40
10
DOBLE FUNDACION
FACHADA NORTE LAMA VERTICAL 1 : 25
PROYECTO TALLER VIII
UNIVERSIDAD
CENTRAL
FACULTAD DE URBANISMO
ETAPA SEMIFINAL Período S2 - 2014
PROFESORES GUÍA:
MAURICIO SANTIBAÑEZ CRISTIAN SEGOVIA
Monitores:
NICOL KURTE
300
ARQUITECTURA Y PAISAJE
FECHA: 15-12-2014
L5 LAMINA
ESTUDIANTE
SEBASTIAN SKY ROSS IBAÑEZ CONTENIDO LÁMINA:
CORTES Y ESCANTILLON
NORTE
+ 0.00
PILAR 40 X 40 CM HORMIGON ARMADO FUNDACION
+ -0.15
35
40
DISIPADOR SISMICO
40
EXPLODED ISOMETRIC / CONSTRUCTION DETAIL
3
40 15
15
2
CONSTRUCTION DETAIL
FACHADA NORTE LAMA VERTICAL 1 : 25
ARCHITECTURE PORTAFOLIO UNIVERSIDAD
CENTRAL
FACULTAD
DE
ARQUITECTURA
PROYECTO TALLER VIII ETAPA SEMIFINAL Período S2 - 2014
DOBLE FUNDACION
PROFESORES GUÍA:
MAURICIO SANTIBAÑEZ CRISTIAN SEGOVIA
Monitores:
NICOL KURTE
ESTUDIANTE SEBASTIAN ROSS IBAÑEZ
KPF
SEBASTIAN SKY ROSS IBAÑEZ CONTENIDO LÁMINA:
CORTES Y ESCANTILLON
19 NORTE
CONECTANDO LA CIUDAD CON SU ENTORNO NATURAL
CIUDAD CIUDADCON CONSU SUENTORNO ENTORNONATURAL NATURAL
MICRO MICRO PLAZA PLAZA33
MICRO MICRO PLAZA1 PLAZA1
MICRO PLAZA SECTOR RESIDENCIAL
CTOR ECTOR SIDENCIAL ESIDENCIAL FUNICULAR
VISTA VISTATELEFERICO TELEFERICOYYMURO MUROESCALADA ESCALADACOMO COMOHITOS HITOS DE DELA LACIMA CIMA FUNICULAR
FUNICULAR FUNICULAR PLAZA PLAZADE DE DESCANSO DESCANSO
ESTACION ESTACION TELEFERICO TELEFERICO
BARRIO BARRIO GASTRONOMICO GASTRONOMICO
PLAZA PLAZADE DE SERVICIO SERVICIO
ESTACION TELEFERICO
BARRIO GASTRONOMICO
STAGE 5:
PRE-SPECIALIZATION IN URBANISM. PROFESSIONAL LEVEL. ESTACION ESTACION Focuses on urban areas, analyzing, and creating strategies that allow us to TELEFERICO TELEFERICO develop a master plan for urban improvements. MICRO MICRO PLAZA PLAZA22
PLAZA PLAZA DEPORTIVA DEPORTIVA
workshops
IX - X
JE SOCIO ECOLOGICO, PLATAFORMAS MIRADORES
A CIUDAD CON SU ENTORNO NATURAL
MICRO PLAZA 3
MICRO PLAZA1 SECTOR RESIDENCIAL
500 1:500
NORTE NORTE
PLAZA PLAZAVEHICULAR VEHICULARPEATONAL PEATONALESC ESC1:200 1:200
AD AD DE DE ARQUITECTURA ARQUITECTURA
SMO NISMO
YY
PAISAJE PAISAJE
FUNICULAR
TALLER TALLERXX URBANO URBANO
PLAZA PLAZACON CONEQUIPAMIENTO EQUIPAMIENTODE DESERVICIO SERVICIO ESC ESC1:200 1:200
PROFESOR: PROFESOR:DIEGO DIEGOPORTALES PORTALES PLAZA DE AZAGRA AYUDANTE: / /FRANCISCO AYUDANTE:FELIPE FELIPEZAPATA ZAPATA FRANCISCO AZAGRA ESTACION
DESCANSO
TELEFERICO BORDE CERRO ESC 1:500
PLAZA VEHICULAR PEATONAL ESC 1:200 VISTA TELEFERICO Y MURO ESCALADA COMO PLANTA ESC PLANTA ESC1:1000 1:1000HITOS DE LA CIMA
22
PLAZA CO ESC 1:200
ARCHITECTURE PORTAFOLIO FACULTAD DE ARQUITECTURA XXCONTENIDO: URBANO / /DIEGO ZAPATA / / FRANCISCO AZAGRA TALLER X PROFESOR: DIEG TALLER URBANO DIEGOPORTALES PORTALES / /FELIPE FELIPE ZAPATA FRANCISCO AZAGRA ESTUDIANTE: ESTUDIANTE: TALLER CONTENIDO: SEBASTIAN ROSS IBAÑEZ KPF 20 APONIENTE MMI INNAA CERRO APONIENTE Y YYREACTIVADOR PAISAJE AYUDANTE: FEL URBANO SEBASTIAN PLAN SEBASTIANROSS ROSS“ “EJE PLANMAESTRO MAESTRO ARTICULADOR BORDE SAN EJEURBANISMO ARTICULADOR REACTIVADOR BORDE CERRO SANCRISTO CRIST
LL
MATERIALIZACION I / Professor: Felix Villa Exercises: RECICLABLE MODULE A module is designed in the Cerro San Cristobal for an exercise of materialization. Using recycled pallets, for economic reasons, and the ecological space, to support use of nature garden walls, we were able to achieve a functioning greenhouse and contribution to reforestation. EXPLODED ISOMETRIC CONSTRUCTION RENDER CONSTRUCTION DETAIL DETAIL
MATERIALIZACION DE PROYECTO
PLACA DE POLICARBONATO
PALLETS DE MADERA USADOS
PALLETS
POLICARBONATO SOLUCION DE POLICARBONATO CON REMATE METALICO PARA IMPERMEABILIZAR ESQUINA
EXPRESIVIDAD FORMAL
UNION DE PALETS CON CLAVOS ESCANTILLON
SEGÚN EL LEVANTAMIENTO DE ELEMENTOS PREEXISTENTES EL PROYECTO ESTA CONDICIONADO POR SU VINCULACIÓN CON LA NATURALEZA, YA SEA DESDE EL PUNTO DE VISTA FÍSICO MATERIAL, SIENDO TAMBIÉN UNA ESTRUCTURA DISEÑADA PARA LA INTEMPERIE DONDE REGULA CIERTAS CONDICIONES CLIMÁTICAS. Y TAMBIÉN MEDIANTE SU SOSTENIBILIDAD Y SUSTENTABILIDAD MANTENIENDO UN ENFOQUE ECOLÓGICO INCORPORANDO VEGETACIÓN Y SISTEMAS DE CAPTACIÓN DE AGUAS LLUVIAS Y CONCEBIDO CON MATERIALES RECICLADOS
VIGA PRINCIPAL 8"X 4" VIGA TECHUMBRE PINO RADIATA 4"X2"
VIGAS SOPORTANTES DE PALLETS PILAR 6" X 6"
UNION DE PALETS CON VIGA SECUNDARIA POR CLAVOS
UNIONES METALICAS (ESTRIBOS)
Fundaciones 1 : 50
PIES DE PILARES METALICOS
PALLETS 1MT X 1MT
VIGAS SECUNDARIAS LOSA 4" X 2" SE
EXPRESIVIDAD Y SOSTENIBILIDAD USO DE PALETS RECICLADOS, PARA GENERAR UN DISEÑO ECONOMICO, DESECHABLE Y REUTILIZABLE
ESCANTILLON
PILAR PINO RADIATA 6" X 6" VIGA DE PINO RADIATA UNION PALLETS 4" X 2"
PISO DE MADERA 2 CM ESPESOR
JUEGO DE TRAMAS
VIGA LOSA PINO RADIATA 4"X2" PISO MADERA 2CM ESPESOR N.P.T.
+0.22 m
PIE DE PILAR METALICO 20 CM ALTO
N.T.N.
ESTRUCTURA LOSA
FUNDACION DE HORMIGON 30X30X50 CMS
-0.10 m
1 : 50
ECONOMIA
Fundaciones -0.60 m
ESCANTILLON 1 : 10
SE Copy 1
N.P.T.
+0.22 m
N.T.N. -0.10 m
Fundaciones -0.60 m
Norte (N)
3.500 $ PALETS DE MADERA USADO 1M X 1M
MATERIALES UTILIZADOS
PIES DE PILARES METALICO
ESTRIBOS CON ALAS EXTERIORES (VIGAS)
HERRAJES ESTRUCTURALES PARA MADERA ESTRIBOS CON ALAS INTERIOES (VIGAS)
8techPALETS POR FACHADA = 2 FACHADA POR VOLUMEN= 22 TOTAL PALETS POR VOLUMEN= 44 +32 (CUBIERTA) TOTAL 76 PALLETS =266.000 $ POR VOLUMEN 8 VOLUMENES = 2.128.000$ MANTENCION ANUAL CICLO DE VIDA 4 AÑOS
1 : 50
REFERENTES N.P.T.
+0.22 m
N.T.N. -0.10 m
MADERA COMO PILARES Y VIGAS ESTRUCTURA, PISO Y ENVOLVENTE
ACERO GALVANIZADO UNION ESTRUCTURAL ENTRE PIEZAS
POLICARBONATO COMO CUBIERTA DE TECHUMBRE
Fundaciones
3D View 1
-0.60 m
FRONTAL ELEVATION Oriente (E)
IDEA GANADORA CONCURSO GAUDI 2008-2010 “PALLET HOUSE”
FACULTAD DE ARQUITECTURA URBANISMO Y PAISAJE
1 : 25
“COMEDOR DE TEMPORADA AGRICOLA DE PALLET” (2010)
MATERIALIZACION_ 1º
SEMESTRE
PROFESORES_FELIX VILLA _ ALFONSO REYES
2015
ESTUDIANTE:
SEBASTIAN ROSS IBAÑEZ
TRABAJO FINAL DE SEMESTRE
CONTENDIO: MATERIALIZACION
L A M I N A
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
_ 03
21
B
DESARROLLO MORFOLOGICO DE LA PROPUESTA
WORKSHOP XI-X URBAN DESIGN / NEW ACCES FOR THE INTEGRATION OF METROPOLITAN PARK SANTIAGO WITH RECOLETA Professor: Diego Portales / Exercises: SUSTAINABLE URBAN DESIGN
IDO URBANO SE ENCUENTRA ENTRE DOS CERROS ISLAS DONDE EXISTE UNA GRAN AMARU, Y SU CONTEXTO GEOGRAFICO COMPLEJO.
PROBLEMATICA
TEMA/ CASO/ SAN CRISTOBAL includes new TheVILLAproject ONAL, ECOLOGICO AREAS DE ESPARCIMIENTO, PARQUES Y NUEVOS SENDEROS EL PARQUE POSEE FORTALECIENDO EL CARACTER DEBORDE ESTE COMO UN PARQUE METROPOLITANO, QUE PRETENDE INTE PROYECTO/ SOCIOECOLOGICO CERRO SAN CRISTOBAL tation and environmental
TE ES LA VILLA TUPAC AMARU, EX VILLA SAN CRISTOBAL, UBICADA ENTRE EL CERRO SAN CRISTOBALELY PROPOSITO DE LA PROPUESTA DE PLAN MAESTRO EN LA ZONA DE LA VILLA SAN CRISTOBAL, EX VILLA TUPAC AMARU Y SUS ALREDEDORES. ESTE TEJIDO URBANO SE ENCUENTRA ENTRE DOS CERROS ISLAS DONDE EXISTE UNA GRAN RENOVACION URBANA ENTRE CERROS POR EL HECHO DE LIDIAR CON ESTOS FENOMENOS GEOGRAFICOS. POR TANTO DEBEMOS ENTENDER EL FENOMENO DE LA CIUDAD, DE LA VILLA TUPAC AMARU, Y SU CONTEXTO GEOGRAFICO COMPLEJO. MASTERPLAN BUSCA SOLUCIONAR DICHA DESCONECCION Y FALTA DE EQUIPAMIENTO.
PROBLEMATICA
access that allow recreational and educational public spaces in order to benefit the city and the mountain ecosystem through reforesawareness. An improvement of the existing infrastructure is generated. Sporting, cultural, ecological, and recreational aspects of Cerro San Cristobal were strengthened. EL CASO DE ESTUDIO DEL TALLER, SE ENFOCA EN CHILE, REGIÓN METROPOLITANA, EL SECTOR SUR DE RECOLETA, UNA ZONA EL CASO ESPECÍFICAMENTE ES LA VILLA TUPAC AMARU, EX VILLA SAN CRISTOBAL, UBICADA ENTRE EL CERRO SAN CRISTOBAL Y EL CERRO BLANCO. LA VILLA Y SU ENTORNO CARECE DE ESPACIOS DE ESPARCIMIENTO Y ACCESIBILIDAD A SUS CERROS, POR TANTO LA ESTRATEGIA DE MASTERPLAN BUSCA SOLUCIONAR DICHA DESCONECCION Y FALTA DE EQUIPAMIENTO. RELACION DE EL CERRO COMO UN ELEMENTO QUE SE ENTIENDE EN LA CIUDAD. MEDIANTE EQUIPAMIENTO DEPORTIVO, SOCIAL, COMUNAL, EDUCACIONAL, ECOLOGICO AREAS DE ESPARCIMIENTO, PARQUES Y NUEVOS SENDEROS EL PARQUE POSEE TODO EL POTENCIAL Y LAS CONDICIONES PARA SER HABITADO POR GENTE DEL BARRIOY DE LAS MISMAS PROXIMIDADES DEL CERRO SAN CRISTOBAL. FORTALECIENDO EL CARACTER DE ESTE COMO UN PARQUE METROPOLITANO, QUE PRETENDE INTE
GRARSE DE FORMA MAS EFICAZ CON EL TEJIDO URBANO. EL PROYECTO CONSIDERA UNA REFORESTACION, PLAZAS INUNDABLES, CAPTACION DE AGUAS LLUVIAS, EDUCACION MEDIOAMBIENTAL, RECICLAJE URBANO Y HUMEDALES. AS LLUVIAS, EDUCACION MEDIOAMBIENTAL, RECICLAJE URBANO Y HUMEDALES. NECESIDAD DE VINCULACION FORMALIZAR ACCESO Y VIVIENDA: CONTROL SOCIAL ESTRATEGIA DE TRANSPORTE PUBLICO PLAZA COMO ESPACIOS PUBLICOS DE INTERES EXTENDER PLATAFORMA (MIRADOR 360º) REGENERACION CIMA, LADERA Y BORDE DEL CERRO S PUBLICOS PROBLEMAS DE INTERES EXISTENTES EXTENDER PLATAFORMA (MIRADOR 360º) REGENERACION CIMA, LADERA Y BORDE DEL CERRO
DAD SOCIAL
SITUACION ACTUAL
SIN ACCESO NI BORDE FORMAL
CARENCIA ESPACIO PUBLICO
A
CON EL CERRO
PROPUESTA
BORDE
GASTRONOMIA: SOPORTE Y SERVICIO
ESTRATEGIA DE REGENERACION DEL BARRIO Y CERRO
ACCESIBILIDAD UNIVERSAL
QUE GENERAN SEGURIDAD SOCIAL
SITUACION ACTUAL
PROPUESTA
ESTRATEGIA DE REGENERACION DEL BARRIO Y CERRO
DESVINCULACION CON CERRO
INSEGURIDAD
B
ZONA DE INTERVENCION
MODEL PROCESS
DESARROLLO MORFOLOGICO DE LA PROPUESTA
PROYECTO EJE SOCIO ECOLOGICO, PLATAFORMAS MIRADORES
A PROPUESTA
CONECTANDO LA CIUDAD CON SU ENTORNO NATURAL
STRATEGIES
MICRO PLAZA 3
MICRO PLAZA1 SECTOR RESIDENCIAL FUNICULAR
VISTA TELEFERICO Y MURO ESCALADA COMO HITOS DE LA CIMA
FUNICULAR
BARRIO GASTRONOMICO
PROGRAMA ZONA RESIDENCIAL PROFESOR: DIEGO PORTALES AYUDANTE: FELIPE ZAPATA / FRANCISCO AZAGRA
TEMPERATURE CONTROL ESTUDIANTE: SEBASTIAN ROSS FACULTAD DE ARQUITECTURA
URBANISMO
Y
PAISAJE
ESTACION TELEFERICO
TALLER X URBANO
L A M I N A _1
CONTENIDO: FUNDAMENTOS
PROFESOR: DIEGO PORTALES AYUDANTE: FELIPE ZAPATA / FRANCISCO AZAGRA
ESTUDIANTE: SEBASTIAN ROSS
CONTENIDO: FUNDAMENTOS
PLAZA DE DESCANSO PLAZA DE SERVICIO
ESTACION TELEFERICO
L A M I N A _1
MICRO PLAZA 2
PROPUESTA DE PLAN MAESTRO EN LA ZONA DE LA VILLA SAN CRISTOBAL, EX VILLA TUPAC AMARU Y SUS ALREDEDORES. ESTE TEJIDO URBANO SE ENCUENTRA ENTRE DOS CERROS ISLAS DONDE EXISTE UNA GRAN IAR CON ESTOS FENOMENOS GEOGRAFICOS. POR TANTO DEBEMOS ENTENDER EL FENOMENO DE LA CIUDAD, DE LA VILLA TUPAC AMARU, Y SU CONTEXTO GEOGRAFICO COMPLEJO.
PLAZA DEPORTIVA
PROBLEMATICA
DEL TALLER, SE ENFOCA EN CHILE, REGIÓN METROPOLITANA, EL SECTOR SUR DE RECOLETA, UNA ZONA EL CASO ESPECÍFICAMENTE ES LA VILLA TUPAC AMARU, EX VILLA SAN CRISTOBAL, UBICADA ENTRE EL CERRO SAN CRISTOBAL Y VILLA Y SU ENTORNO CARECE DE ESPACIOS DE ESPARCIMIENTO Y ACCESIBILIDAD A SUS CERROS, POR TANTO LA ESTRATEGIA DE MASTERPLAN BUSCA SOLUCIONAR DICHA DESCONECCION Y FALTA DE EQUIPAMIENTO.
O COMO UN ELEMENTO QUE SE ENTIENDE EN LA CIUDAD. MEDIANTE EQUIPAMIENTO DEPORTIVO, SOCIAL, COMUNAL, EDUCACIONAL, ECOLOGICO AREAS DE ESPARCIMIENTO, PARQUES Y NUEVOS SENDEROS EL PARQUE POSEE Y LAS CONDICIONES PARA SER HABITADO POR GENTE DEL BARRIOY DE LAS MISMAS PROXIMIDADES DEL CERRO SAN CRISTOBAL. FORTALECIENDO EL CARACTER DE ESTE COMO UN PARQUE METROPOLITANO, QUE PRETENDE INTE AS EFICAZ CON EL TEJIDO URBANO. EL PROYECTO CONSIDERA UNA REFORESTACION, PLAZAS INUNDABLES, CAPTACION DE AGUAS LLUVIAS, EDUCACION MEDIOAMBIENTAL, RECICLAJE URBANO Y HUMEDALES. VIVIENDA: CONTROL SOCIAL GASTRONOMIA: SOPORTE Y SERVICIO
NTE: N ROSS
ESTRATEGIA DE TRANSPORTE PUBLICO ACCESIBILIDAD UNIVERSAL
PLAZA COMO ESPACIOS PUBLICOS DE INTERES QUE GENERAN SEGURIDAD SOCIAL
CONTENIDO: FUNDAMENTOS B DESARROLLO MORFOLOGICO DE LA PROPUESTA
EXTENDER PLATAFORMA (MIRADOR 360º) SITUACION ACTUAL PROPUESTA
REGENERACION CIMA, LADERA Y BORDE DEL CERRO ESTRATEGIA DE REGENERACION DEL BARRIO Y CERRO
L A M I N A _1
NORTE
TELEFERICO BORDE CERRO ESC 1:500
PLAZA VEHICULAR PEATONAL ESC 1:200
ISOMETRIC /FACULTAD URBAN DESIGN DE ARQUITECTURA URBANISMO
Y
PAISAJE
TALLER X URBANO
PLAZA CON EQUIPAMIENTO DE SERVICIO ESC 1:200
PROFESOR: DIEGO PORTALES AYUDANTE: FELIPE ZAPATA / FRANCISCO AZAGRA
PLANTA ESC 1:1000
2
L
URBANO / DIEGO PORTALES / FELIPE ZAPATA / FRANCIS ESTUDIANTE: TALLER X CONTENIDO: M I N A CERRO SEBASTIAN ROSS“ EJE ARTICULADOR PLAN MAESTRO Y REACTIVADOR BORDEAPONIENTE ARCHITECTURE PORTAFOLIO
SEBASTIAN ROSS IBAÑEZ
KPF
22
VISTA DEL BORDE Y ACCESO DEL CERRO SAN CRISTOBAL ESC 1:500
PLAZA MIRADOR CICLISTICO ESC 1:200
ESTRUCTURA DE SOMBREADEROS CON TENSO ESTRUCTURA + MOBILIARIO URBANO ESC 1 : 50
RENDER / NEW ACCESS FACULTAD DE
SCO AZAGRA
O SAN CRISTOBAL”
URBANISMO
ARQUITECTURA
Y
PAISAJE
TALLER X URBANO
ISOMETRIC / URBAN DESIGN
PROFESOR: DIEGO PORTALES AYUDANTE: FELIPE ZAPATA / FRANCISCO AZAGRA
ESTUDIANTE: SEBASTIAN ROSS
CONTENIDO: AXONOMETRICAS
L A M I N A _3
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
23
SOCIAL PRACTICE The office has a social area that implements regularization of social housing, plan designs, and extensions, as an alternative for people with limited resources.
ARQZ BIM DESGIN
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
24
3.46
B
4.26
DESLINDE
0.15
0.05 7.65
1.06
3.45
0.30 1.49
0.14
2.27
2.27
C
5.72 0.12
9
0.45
10.84
0.78
2.09
2.09 1.00 0.18
0.12
4.66
0.26
+2.39 m
Sección 0
10
2.16
2.27
2.03
1.96
1.96
2.19
2.12
2.16
2.27
2.19
5.72 0.57
B
0.08
3.48
4.08
2.05
1.17
3.08
1.22
2.27
3.33 1.17
0.94
0.15
2.39
1.90
3.27
1.90
0.08
2.27
0.08
2.13
1.82
2.27
3.48
8
1.23
0.14
0.14
0.30
0.16
8
C
3.30
DESLINDE CASA 13296
0.94
1.44 0.07
+4.66 m
B
ELEVACION SUR DEMOLICION Y CONSTRUCCION
5
0.15
0.95
1.84
3.48
AA.
1 : 50
CORTE TRANSVERSAL DEMOLICION Y CONSTRUCCION
1156
0.88
8
A
SECOND FLOOR CONSTRUCTION / DEMOLITION AMPLIACION 7
RICARDO LYON Nº3204, SANTIAGO, CHILE
2.05
0.07 0.86
2.23
DISTANCIA LINEA OFICIAL A EJE DE CALZADA
+0.00 m
3.48 5.58
5.00
5.00
2.05
Nivel 1
1156
0.88
1.84
DISTANCIA LINEA OFICIAL A EJE DE CALZADA
5.53
1.00
0.95
11 BALCON 2 m²
Nivel 3
5
6
7
6
RICARDO LYON Nº3204, SAN LINEA OFICIAL F
PROYECTO
0.05 0.15
5
0.96
0.15
1.35
1.16
7
1.91
0.15
6
0.48
0.48
2.32
2.27
3-32940
0.45
1.39
CONTENIDO
10.86
CORTE LONGITUDINAL DEMOLICION Y CONSTRUCCION
1.16
1.91
ELEVACION NORTE, SUR, ORIENTE, 0.15 PONIENTE 2 CORTES TRANSVERSALES CONSTRUCCION Y MEOLICION CORTE LONGITUDINAL DEMOLICION Y CONSTRUCCION
PROYECTO
5
0.88
AMPLIACION LAS PARCELAS 0.15
CC.
1UBICACIÓN : 50
0.30
+0.00 m
1.90
0.15
1.90
0.15
1.61
1.73 3.33
CORTE TRANSVERSAL DEMOLICION Y CONSTRUCCION
LAS PARCELAS 1150, EL BOSQUE
0.15
LÁMINA
AR-100-002
FECHA
16/06/14
0.88
Nivel 1
LONGITUDINAL SECTION CONSTRUCTION / DEMOLITION
RICARDO LYON Nº3204, SANTIAGO, CHILE
Nivel 1
2.27
0.94 1.35
2.27
0.15
NORTE
0.15
CC.
1 : 50
ELEVACION NORTE, SUR, PONIENTE 2 CORTES TRANSVERSALE CONSTRUCCION Y MEOLIC CORTE LONGITUDINAL DEM CONSTRUCCION
0.30
0.30
1.39 0.96
2.27
2.27
2.13
0.88
0.45 0.94
0.14
0.30
0.12
4.66
0.12
1.48
0.12
3.44
ESTADO
PERMISO DE OBRA VIVIEN
+0.00 m
CONTENIDO
4.66
0.12
0.12
0.12
4.66
0.12
0.14
2.32
2.27
1.29
0.65
1.43
0.88
1 : 50
1.29
2.27
2.27
0.05
0.05 2.27
0.12
0.14
4.66
2.27
BB.
10.86 N.C.T. + 5.7 m
0.15
0.30
0.30
0.14
ESTADO
PERMISO DE OBRA VIVIENDA SOCIAL
0.30
CORTE TRANSVERSAL DEMOLICION Y CONSTRUCCION
1 : 50
FIRMA ARQUITECTO
FIRMA
+2.39 m
3-32940
2.27
4.66
0.88
0.12
CROSS SECTION CONSTRUCTION / DEMOLITION AA.
0.05
0.05 2.27
0.12
FIRMA ARQUITECTO
FIRMA
2.27
2.05
ELIZABETH DOMINGUEZ CORNEJO
EDUARDO JIMENEZ ARENA
EDUARDO JIMENEZ ARENAS
1.84 2.13
3.48
MANDANTE
ELIZABETH DOMINGUEZ CORNEJO
+0.00 m
0.95
5740-63
2.27
2.39
0.14
+2.39 m
Nivel 1
0.15
ROL S.I.I. Nº
MANDANTE
Nivel 2
2.23
1 : 100
Nivel 3
Nivel 2
0.94
3.27
1 : 50
LAS PARCELAS 1150, EL BOSQUE
5740-63
+4.66 m
2.27
+2.39 m
+0.00 m
EMPLAZAMIENTO
0.05
0.30 1.49 0.78 0.45
Nivel 2
Nivel 1
LAS PARCELAS 1150, EL B N.C.T. + 5.4 m
+4.66 m
Nivel 3
1.9
7
UBICACIÓN
12
PLANTA NIVEL 2 CONSTRUCCION Y DEMOLICION
UBICACIÓN
2.27
2.27
2.27
10
ROL S.I.I. Nº
1.00 0.12
9
N.C.T. + 5.4 m
N.C.T. + 5.4 m
+4.66 m
2.27
8
AMPLIACION LAS 11 PARCELAS
N.C.T. + 5.7 m
5
1 : 50
Nivel 3
0.18
+2.39 m
4.66
Nivel 2
6
1.95
PARCELAS
N.C.T. + 5.7 m
N.C.T. + 5.7 m
12
1.9 F
7
LINEA OFICIAL LINEA OFICIAL
PLANTA NIVEL 1 CONSTRUCCION Y DEMOLICION
5.72
11
2.39
2.21
6
7
4.20
5
0.15
12 4.88
2.72
5.02
0.53
50% ADOSAMIENTO DESLINDE CASA 1156
HABITACION 2 16 m²
Nivel 2
5.11
0.12 1.75
C
0.08
2.05
0.15
0.15
+ 4.7 m
8
1 : 50
1.06 0.14
0.30
10
1.23
9
5.44
0.82 0.18
4.66
17.15
2.37 10.84 0.14
5.02
5.02
DESLINDE CASA 13294
0.15
2.37 15.09
HABITACION 3 5 m²
N.C.T. + 5.4 m
1.49 0.78 0.45 2.05
3.48
7
N.C.T. + 5.7 m
2.27
OFICIAL
1.33
LINEA
2.27
5.53
DESLINDE CASA 1156
4.66
10.84
3.31
N.C.T. + 5.7 m
0.94
0.75 2.13
2.39
2.27
1.06
CORTE TRANSVERSAL DEMOLICION 7 Y CONSTRUCCION 6
EJE DE CALZADA
+4.66 m
1.06
0.78
3.31
0.90
DESLINDE CASA 13292
0.15 17.02 2.37
2.39
2.39
3.29
9
PROYECTO
Nivel 3
3.50
5.18 4.10
DESLINDE CASA 13296 4.23
4.23
4.30
4.23
2.27
0.82
5.72
2.39
5
FIRST FLOOR CONSTRUCTION / DEMOLITION 1 : 50
3.15
3.31 1.33
0.18 2.21
5.02
6
0.30
7 AA.
1.06
1.06
0.11
0.82
5.44
3.31
4.66 5.72
17.18
2.37
1 : 50
2.27
2.27
0.91 0.12 0.51 0.76
1.97
B
3.33
0.66
2.23
1 : 50
1 : 50
LINEA OF
1 : 500
ELEVACION PONIENTE DEMOLICION Y CONSTRUCCION
7
0.30
1.06 0.20 1.16 2.27
1.99
2.06
1.99
2.39
1.00
2.21 0.12
4.66
0.18
0.88
5.58
ELEVACION NORTE DEMOLICION Y CONSTRUCCION
FRONT ELEVATION
0.16
+0.00 m
4.06
6
1.5 m N 19.1 m E
19.88
UBICACION
1.5 m N 19.1 m E
+2.39 m
1.90
Nivel 1
Nivel 1
N.C.T. + 5.7 m
13294
13296
10
9
C
Nivel 2
0.08
+0.00 m
5.58
BAÑO 1 2 m²
2.07
5.44 2.27
2.27
Nivel 1 +0.00 m
2.27
2.39
+0.00 m
A
16.92
13290
13292
0.05
0.15
DESLINDE CASA 13296
1.06 0.14
+2.39 m
LINEA DE VEREDA
+0.00 m
5
9
+4.66 m
5.53
Nivel 1
2.27
1.33 1.06
SALA COMUN 13 m²
Nivel 3
1.5 m N 19.1 m E
Nivel 1
ELEVACION SUR DEMOLICION Y CONSTRUCCION
2.27
2.27
10.84 1.00
7
C
3.27 1.82
5.02
2.13
2.37 15.09
3.48
+0.00 m
+ 4.9 m
LINEA OFICIAL
ON PONIENTE DEMOLICION Y CONSTRUCCION
A
10
3.29
RF: N° 219/88 FECHA: 27/03/1982 CASA ORIGINAL 33,95 M2
N.C.T. + 5.7 m
Nivel 2
8
1.23
0.18
4.66 2.39
+2.39 m
+2.39 m
0.26
5.11 0.57
2.27
2.27
0.82
0.30
1.48
2.27
2.16
Nivel 2
Nivel 2
2.05
+2.39 m
8.63
HABITACION 1 15 m²
N.C.T. + 5.7 m
1.33
+4.66 m
4.66
+4.66 m
8
11
N.C.T. + 5.4 m
BAÑO 2 6 m²
4.30
6
7
0.30
Nivel 3
1.06
0.16
Nivel 3
3.31
Nivel 2
N.C.T. + 5.7 m
+ 4.7 m
+2.39 m
10
2.39
+4.66 m
+ 4.7 m
+4.66 m
9
0.30 3.31 3.31
50% ADOSAMIENTO DESLINDE CASA 1156
DESLINDE CASA 13294
7.38
6Nivel 3
5.02
0.90
0.78
1.06
1 : 50
5
Nivel 2 +2.39 m
0.14
10.84
5
ELEVACION ORIENTE DEMOLICION Y CONSTRUCCION
Nivel 3
10
+0.00 m 2.37
PROYECCION SEGUNDO PISO 2.37
N.C.T. + 5.4 m
+ 4.9 m
1150 2.04 5.60
-0.5 m N 19.1 m E
Nivel 1
0.30
5
11
11
Nivel 1
5.02
15.09
5.02
N.C.T. + 5.7 m
Nivel 2
A
1.39 DESLINDE CASA 1156
3.62
4.66
17.05
4.66
2.37
1.39 1.15
1.00
9
2.37
10.84
6
+4.66 m
0.15
0.15
0.82 0.18
5.44
1.21
3.31
5.02
7
Nivel 3
3.62
1.33
4.66
COMEDOR 12 m²
ELEVACION PONIENTE DEMOLICION Y CONSTRUCCION 1 : 50
12 +4.66 m
2.27
1.76
1.76
ESTRUCTURA DE ACERO PERFIL COSTANERA 10X5 CMS
2.39
N.C.T. + 5.4 m
F
Nivel 3
1.06
DESLINDE CASA 13292
0.41
3.31
3.16
0.48
1.06
0.78
2.27
2.27
10
8
N.C.T. + 5.7 m
1.97
E
0.15
0.15
0.15
0.15
0.11 2.39
2.39
9
12
11
1.33 0.82
5.72
5.72
1.39
2.39
COCINA 6 m²
A
1.00 0.30
10
4.30
12
N.C.T. + 5.7 m
2.27
2.27
2.27
4.66
Nivel 1 +0.00 m
11
3.31
1.97
ESQUEMA SUPERFICI
0.15
11
N.C.T. + 5.7 m
1.06
10
0.78
9
11
N.C.T. + 5.4 m
Nivel 2
3.31
E
1 : 200
8
+2.39 m
4.23
N.C.T. + 5.4 m
Nivel 3 +4.66 m
5
DESLINDE CASA 1149
8
0.90
1.06
1.06
1.06
1.06
Social practice consists of regularizing social housing and design extensions. Therefore, the three houses with which they worked were fully modeled in REVIT and all its technicians for approval in their respective municipalities planes were generated. This work is designed for people with limited economic resources, therefore, the work of the architect is to make the greatest contribution with the least amount of resources committed to accomplishing social integration.
6
DESLINDE CASA 13290
N.C.T. + 5.7 m
7
12
4.30
N.C.T. + 5.7 m
9 4.23
10
12
4.23
11
5
DESLINDE CASA 1149
4.30
SOCIAL
6
DESLINDE CASA 13290
OF
4.23
12
4.23
12
4.30
11
7
12
ARQZ BIM DESIGN Exercises: REGULATION HOUSING
B
4.10
0.15
3.50 3.50
4.13 1.84
4.20
3.48
1.22
0.08
3.89 1.99
0.18 0.08
DESLINDE CASA 13292
0.50
3.33
18.98 17.07 2.20 3.28
2.05
2.63
0.15
6.53
0.93
4.00
5.53 3.48
0.88 0.88 1.90
DESLINDE CASA 13294
5.53 2.05 0.59 0.08
1.90
0.15
1.90
0.15
1.61
1.73
0.15
3.33
LÁMINA
AR-100-002
CORTE TRANSVERSAL DEMOLICION Y CONSTRUCCION
FECHA
16/06/14
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
25
PROFESSIONAL PRACTICE Internationally recognized company dedicated to office designs and workspaces in BIM models for different clients.
CONSTRACT WORKPLACES
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
26
PROJECT: KUHNE NAGEL
The projects was developed in Revit in collaboration with the design and generation of project. Seeking projects create opportunities for more dynamic work philosophy in open plan spaces and recreation
PRIVADO 13.46 m²
PRIVADO 9.57 m²
PRIVADO 14.93 m²
INFORMAL MEETING
PRIVADO
Redundant Room
PRIVADO
PHONE BOOTH
13.91 m²
PHONE BOOTH
SR 8P
QUIET ROOM
PRIVADO 15.22 m²
SERVIDOR 15.74 m²
ASISTENTES SENIOR
ESPERA
COFFEE LOUNGE
TDA
55.45 m²
INSIDE VIEW RENDER
OPEN PLAN
INSIDE VIEW RENDER
INFORMAL MEETING
BAÑOS BAÑO DISC. BODEGA
CLOSET ASEO
SR 4P
A1000
KUEHNE + NAGEL PRIVADO
PRINT QUIET ROOM
20.63 m²
SR 6P
PLANO
PLANTA DE ARQUITECTURA
ESCALA
1:100
FECHA
07/14/14
PROYECTISTA C.GUZZINI- A.GARCIA SR 4P INFORMAL MEETING
PRIVADO 13.59 m²
PRIVADO 15.79 m²
ESTADO Todas las medidas se verificarán en obra.
El proyecto y el diseño indicados en este plano son propiedad intelectual de Contract Chile S.A. Está prohibida su utilización total o parcial sin la expresa autorización escrita de la empresa.
SALA REUNIONES DIRECTORIO 20P
FIRST FLOOR
Av. Kennedy 7600 Vitacura, Santiago - Chile Tel: +56 2 2797-8800 info@contract.cl
ELEMENTOS Awww.contractworkplaces.com REUBICAR
SPRINKER A DESPLAZAR
DIFUSORES A DESPLAZAR
RETORNOS A DESPLAZAR
KUEHNE + NAGEL
ESCALA
Superposicion de Especialidades 1:100
FECHA
12/02/16
PLANO
A1060
PROYECTISTA C.GUZZINI- A.GARCIA ESTADO
REV-0
Todas las medidas se verificarán en obra.
El proyecto y el diseño indicados en este plano son propiedad intelectual de Contract Chile S.A. Está prohibida su utilización total o parcial sin la expresa autorización escrita de la empresa.
CONFLICT ANALYSIS
Av. Kennedy 7600 Vitacura, Santiago - Chile Tel: +56 2 2797-8800 info@contract.cl www.contractworkplaces.com
ISOMETRIC MODEL
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
27
PROJECT: LENOVO The project was commissioned to me completely to elaborate the corresponding plane architecture, lighting, flooring, technical drawings, 3D design, screens, doors and all necessary plans to build office construction documents within tight deadlines. FIRST FLOOR / TECHNICAL ARCHITECTURE PLAN 3136.1
120
15
25 164.5
79.7
R1
G2 G1
110 106
11 0 101.5
R1 R1
7.5
264.7
291.5
54 10 54
27.5
P1 90 304.5
R2
R2 Pintura esmalte al agua. SW 7064
R3
R3 Pintura esmalte al agua. SW 6990
R4 Mosaico de Vidrio MP.MEZCLA GRIS de MK
382.2 692.2
A1
A1 Vanitorio con pedestal, modelo igual que en baños existentes. unidades: 1
A2
A2 Inodoro con Mochila Modelo igual que en baños existentes Unidades : 1
A3
A3 Lavaplato simple de acero inoxidable bajo cubierta. Modelo a definir Unidades: 1 GRÁFICAS Y LOGOS
18.8
R1
11
291.5
90
BODEGA GENERAL
61
60
R1 Pintura esmalte al agua. SW 7004
100
G1 90.7
R1
162.5
261.5
75.7 75.7
88
P1 90
131.5
110
261.5
PANTALLA
SALA REUNIONES
R4
R1
ARTEFACTOS SANITARIOS 320
15
160
90
MUEBLES EXISTENTES
P1 90 136
160
79.7
R1
90.7
R3
11
105 105
9
R1
131.5 60.5 71
101.5
105
60 299
1575.6
236.3
145.7 SERVIDOR INTERNO
REVESTIMIENTOS
15 105
106
R3
161 71
GUARDADOS / PRINT AREA
90 13.5
109.5
SALA REUNIONES
110
320
345 210.7
6.5
P1 90
80
ESCRITORIOS EXISTENTES
330
236.2
G2
101
299
208.5 269.5
110
115.5
312
109.5
A1 25
761.5
173.6 110.1
11
PANTALLA
60
P2 A2 70
210 88 88
110
230.5
2
260.5
27.7
120
160
160 250
101
88.5
11
70
R1
P4 Puerta Protex H=2.50m Nueva unidades: 1
P4 95
115
269.5
110
P3 Puerta corredera Placarol Laminada H = 210 cms, color negro. Nueva / Unidades : 2
P3 85
110.1
INSIDE VIEW RENDER
P2 Puerta Placarol Laminada H = misma altura que existentes, mismo color que baños existentes Nueva / Unidades : 1
P2 70
215
SALA DE REUNIONES SHOWROOM SERVER 2
234.2
SHOWROOM SERVER
70 82.1
311
314
90
P1 90
20
11
110
113.5 70
82.1
P4 95
11
110
120.1
160
160 BENCH EXISTENTE
25
234.2
209.2
43.2
2 20
95
PANTALLA
PV1 110
110
142
160
G2
OPEN PLAN
250
2
146
100
100 144
PV1 110
160
25
25
15 163.4 100 56 110.6 234.2
90 106
230.7
11
R1
120 PANTALLA
93.4
684.8 692.3
T.D.A
140.2 11 370.7
88
129.7
71
62.5
G2 380
PRIVADO
R1
R1
R1
142
160
PANEL MOV. REUTILIZADO
83.5
IMPRESORA DE PIE
1.8
382.3
R1
160
22.5 61
120
R1
142
160
307
90
P1 90106
51.5
RECEPCIÓN Y AREA ESPERA
115.6
R1
210
160 160
MUEBLES EXISTENTES
130.9 PUESTOS PERSONAL ITINERANTE
66.5 66.5
G3 R3
G1 R3
25
296
P1 90
270
P1 90
R2
11
541.5
160
T.D.A
65
209.5
R4
59.5
R2
30
88
259
G2 R3
60
142
54
100 85
52.5
11
120 379.7
88
150.3
R1
375
30
45
115.6
78.5 23
R3
8 LOCKERS
PANTALLA
1029
131.5
85
239.7
110
100
P3 85
108
R3
11
R1 227.8
G1
KITCHENETTE
88.9
PHONEBOOTH
P3 85
52.5
15
113.5
100
PHONEBOOTH
GRÁFICA
69.6
191
R1
PV1 Puerta de Vidrio Laminado H=2.50m Nueva / unidades: 2 P1 Puerta Placarol Laminada H=2.50m Reutilizada y Teñida en color Negro / unidades: 9
PV1 110
1283.8
9 11
173
R1
86.4
BENCH EXISTENTE
BENCH EXISTENTE
320
2
74.2 2
234.2
160
R1
123.4
P1 90
150.3
61.4 70
79.9
SALA REUNIONES COMPONIBLE
160 61.5
320
320 192.2
90
20
11
115.6
OPEN PLAN
P1 90
COFEE
SALA REUNIONES COMPONIBLE
100
100
70
173
R1 R1
17.5 85
A3 145.9
R3
105
70
160 113.5
110 160 330 10
102.7
G2
10.8
115.6
160 BENCH EXISTENTE
160 160
BENCH EXISTENTE
335
320 54
325.5
ESCRITORIOS EXISTENTES
106
1575.6
150.4
660.9
373.5
211.8
105 105
142
160
G2
2
70
160
160
105
90
142
R2
160
114.5
110.1
15
160
357
15
142
15
160
15
142
15
110.1
20 119
71 10
1273.7
REFERENCIA TERMINACIONES PUERTAS
INSIDE VIEW RENDER
G1 G1 PROGRAMA
Gráfica color corte ploter Colocación en Pared H= de piso a cielo G2 1 Gráfica color corte ploter Colocación en Crista/ Franja de 120 cms de Puestos operativos 36 alto, centrada al punto medio del cristal Puestos G3 gerenciales 1 G3 Logo Corpóreo MDF lacado Puestos flotantes 2 Colocación en Pared Dimensiones: 121,9 x 40 cmas TOTAL 40 G2
Recepción
FIRST FLOOR PHONEBOOTH
8 LOCKERS GRÁFICA OPEN PLAN
OPEN PLAN
SERVIDOR INTERNO
MUEBLES EXISTENTES
PANTALLA
BAÑO NUEVO
SALA REUNIONES COMPONIBLE
SALA REUNIONES
1
Showroom Laptops y Tablets
1
Server
1
Coffee
1
SALA REUNIONES
El proyecto y el diseño indicados en este plano Línea Nuevos sonMuebles propiedadde intelectual de Contract Chile S.A. Está prohibida su utilización total o parcial sin la expresa autorización escrita de la empresa.
Muebles Especiales Nuevos
Muebles Existentes Reutilizados
BODEGA GENERAL
45.5
45.5
106.5
L3
L3
L3 229.5
120
122
61
62
L3
L3
120
39 61 122
L3
183
L3
L3 11
117
L3
183
L2
438.3
61
183
L2
L2
L2
L2
122
72 11 59
114
73.5 9 47.5
L2
L1
L1
122
L1
L1
L1
L1
L1
L1
118
L5 87.5
96
L2 L3
122
L3
183
L2
LOSA A LA VISTA
120
75
L3
VIGA PARA PANEL MOVIL
Altura C = 260 cms
L1: Equipo Fluorescente embutido 60 X 60 cms, Lampara PL-L 2 x 55 Watts. 32 Unidades reutilizadas Unidades ED. CRUZ DEL ,16 SUR / P4 Nuevas A1000 L2: PANEL SLIM LINEAL LED embutido 15 X 120 cms, 38 Watts, 4000°k, DRIVER Planta de Arquitectura PLANO ELECTRONICO. 23 Unidades Nuevas 1:100 ESCALA FECHA L3: Foco embutido para11-02-2016 lampara LED Gu10 4,5 Watts, Bisel cuadrado. PROYECTISTA Alejandro García 24 Unidades reutilizadas. ESTADO
REV-VF
L4: Foco Embutido PLC 2x26 Watts 8 Unidades Reutilizadas
Todas las medidas se verificarán en obra.
L5: PANEL SLIM LED sobrepuesto 15 X 120 cms, 40 Watts, 4000°k El proyecto 1 Unidad Nueva y el diseño indicados en este plano
son propiedad intelectual de Contract Chile S.A.
L2
114
L2
65
56.5
61
122
L1
122 87.2
L4
Altura B = 250 cms
61
L2
L3
25.8
L3
61 41.8
77
L2
123.7
152.2 30.8
183
L4
L1
Altura A = 230 cms
Está prohibida su utilización total o parcial sin la L6: PERFIL SUSPENDIDO 2.3 mts cinta led expresa autorización escrita de la empresa. 3000°k 67.5 Watts. 1 Unidad Nueva
61
56.5
L1
72
L1
93.9
96
114
L2
65
L2
L4
L1 183
30.5 30.5
61
L1
87.4
122
L1
61.6
215.7
122 61
L1
L1
120
61
L2
L1
120
L1
L1
79.9
L1
L2
183
75
127.6
L1
122
L1
L1
50 25
61
120
L1
122
L3
L2
75 25 50
L1
61
L3
L1
122
L3
183
L1
71
61
L3
L3
L1
LENOVO
L4
L2 L6
L1
61
L3
L3 178
122
91.5
L3
61 41.8
122
L3
L1
183
L3
31.8
91.5
61
652.5 L1
L3
183
122
61
L3 L2
61
89.8
71.1
183
31.6
L3 L2
110
L2
212.2
L2
122
L4
140
110
L2
L1
122
L1
L1
200
183
61
L3
L1
20
183
L3
L1
50.3 50.3 50.3 50.3 50.3
438.3
L1
61
122
61 122
L1
122
46.1
99.2
175
L4 L1
61
120
42
89.8
L1
122
34.9
L4
129.8
L1
Vitacura, Santiago - Chile Tel: +56 2 2797-8800 info@contract.cl www.contractworkplaces.com
Modular
61
46.1
L1
122
104.3
L1
61
104.3
L1
122
62.1
L1
105
61
L1
122
L1
61
46.1 40
61
Yeso cartón
120
122
46.1
61
105
122
47.8 49.6 49.6
61
98.1
122
57.7
61
230.7 115.4
122
57.7
61
42
REV-VF
Av. Kennedy 7600 REFERENCIAS CIELORRASO
110
122
11-02-2016
* Área óptima en función al número de puestos de trabajo > 8m²se verificarán en obra. Todas las medidas
PANTALLA
34.9
61
1:100
318,6 m²
Área netaPROYECTISTA / Puestos de trabajo Alejandro García 7.6 m²
250
122
A1010
2
Puestos FECHA de trabajo
FIRST FLOOR / LIGHTNING PLAN 61
2
Planta Tecnica Piso 4
PLANO
Área neta oficina ESCALA
GRÁFICA
PANTALLA
NOTA: Viga superior de apoyo de cristales se pintara con pintura Color Negro Satinado (R3)
1
Showroom Servidores
ESTADO
PANEL MOV. REUTILIZADO
10 65
2
SSHH
GRÁFICA
T.D.A
T.D.A SALA REUNIONES COMPONIBLE
MUEBLES EXISTENTES
ESCRITORIOS EXISTENTES
SHOWROOM SERVER
PANTALLAS REUTILIZADAS
PUESTOS IMPRESORA PERSONAL ITINERANTE DE PIE
2
Sala de reuniones - 5 personas
ED. CRUZ Phone booth / Quiet DEL roomSUR / P4
SALA DE REUNIONES SHOWROOM SERVER
GUARDADOS / PRINT AREA
PANTALLA ORIENTABLE
PRIVADO
RECEPCIÓN Y AREA ESPERA
KITCHENETTE
ESCRITORIOS EXISTENTES
COFEE
LENOVO - 6 personas Sala de reuniones Sala de reuniones - 4 personas
BENCH EXISTENTE
BENCH EXISTENTE
BENCH EXISTENTE
BENCH EXISTENTE
BENCH EXISTENTE
PHONEBOOTH
77.9
L4
ISOMETRIC MODEL Av. Kennedy 7600 Vitacura, Santiago - Chile Tel: +56 2 2797-8800 info@contract.cl www.contractworkplaces.com
ARCHITECTURE PORTAFOLIO LENOVO
SEBASTIAN ROSS IBAÑEZ
KPF
28
PROJECT: MERCADO LIBRE The project was developed in the welfare office, a space that is friendly, comfortable and without large hierarchies, where there are common rules for the development of collaboration spaces and teamwork you are always looking for. INFORMAL MEETING
BASUREROS RECICLAJE
ADMINISTRACION
RRHH
GERENCIA GRAL
CRECIMIENTO IT + UX
4
MEETI NG 5
MEE TING 1
A
20 KW
TAB LER O SAL
4 RAC SER K VER
IN ROW
20 KW
SALIDA DE ESCAPE
3
RAC SER K VER
2
BAS T.
IT + UPS
2 Peldaño de h=20 s cm
BAÑO
ICAS GR AF
PIZ AR RA
BAS T.
PRINT Peld año h=1 de 6 cm
IT LAB
KITCHENETTE
CO PUE RR RTA ED ER A
BAÑO
BODEGA MATERNIDAD
PHONE BOOTH 2
SALA DE REUNIONES 8 P.
PHONE BOOTH 3
PHONE BOOTH 4
SALA DE REUNIONES 8 P.
BODEGA ASEO
PHONE BOOTH 5
M BAÑO DISCAPACITADOS
IT + UX S RO RE AJE SU BA CICL RE
SALA DE REUNIONES 18 P.
PHONE BOOTH 1
IT +UX
MERCADO ENVIO
H
Rampa sobrepu esta móvil
PIZA RR A
SO INGRE S VISITA
RAC SER K VER
IN ROW UPS
LOGO
CARTELERA DIGITAL
IN ROW
CAR DIG TE ITAL LER A
AS IC AF GR
CK
BODEGA
HALL DE ASCENSORES
SALA RAC SER K VER
Lockers RA
INGRESO EMPLEADOS
COMEDOR / SALA DE CAPACITACION
20 KW
BODEGA FINANZAS
1
PRINT AREA
BAT ERIA S
MEETING 3
2 MEETING
MEETING
E BL IA MUE MED TI MUL
VENDOMATICAS
MICROINFORMATICA
SALA DE REUNIONES 4 P.
MESA ALTA DE TRABAJO
INFORMAL MEETING
INSIDE VIEW RENDER
FIRST FLOOR
MERCADO LIBRE
EDIFICIO NUEVA APOQUINDO
ISOMETRIC MODEL
PLANO
Isometrica Piso 22
ESCALA
N/A
FECHA
03/30/15
A321
PROYECTISTA M. Fournies - A.García ESTADO Todas las medidas se verificarán en obra.
El proyecto y el diseño indicados en este plano son propiedad intelectual de Contract Chile S.A. Está prohibida su utilización total o parcial sin la expresa autorización escrita de la empresa.
Av. Kennedy 7600 Vitacura, Santiago - Chile Tel: +56 2 2797-8800 info@contract.cl www.contractworkplaces.com
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
29
PROGRAMA - PISO 02
PROGRAMA - PISO 03
01
Sala de reuniones - 8 personas
Showroom servicio - 8 personas
01 01 02
Meeting
02
MEETING
BAÑOS MUJERES
SALA TABLEROS
2 RACKS
SHAFT
BAÑOS MUJERES
D.A.
RH
MAQ. SNACK
MAQ. CAFÉ
RH
PIZARRA EN PILAR
SALA COMUNICACIONES
CL. CHAQUETAS
LOCKERS
BAÑO PRIVADO
TV 42" MEETING
LOCKERS
4 TV'S
SHAFT
SHAFT
BAÑOS HOMBRES
MAQ. SNACK
MAQ. CAFÉ
D.A.
SUBGERENTES
TABLERO ELECTRONICO
PIZARRA EN PILAR
B OPEN PLAN
TV
GTES B
A1002
COASIN - EDIFICIO 17
GTE A
GTE A
GTE A
GTE B
A1001
1:100
FECHA
25/02/16
PROYECTISTA
M. FOURNIES - N. VEGA
ESTADO
REV-4
TV 42"
TV 42"
SUBGERENTES
PLANTA ARQUITECTURA P02
ESCALA
SUBGERENTES
SUBGERENTES
SUBGERENTES
SUBGERENTES
PIZARRA EN PILAR
C.AS
PLANO
SUBGERENTES
PIZARRA EN PILAR
BAÑOS HOMBRES
B
SUBGERENTES
COASIN - EDIFICIO 17
RH
TV
SALA COMUNICACIONES SHAFT
PIZARRA EN PILAR
PIZARRA EN PILAR
B SALA REUNIONES 8P
S.REUNIONES 4P TV
OPEN PLAN
PIZARRA EN PILAR
TV
TABLERO ELECTRONICO
LOCKERS
VACIO SOBRE HALL DE ACCESO
OPEN PLAN RACK SHOWROOM
COFFEE
TV S.REUNIONES 4P
SHAFT
PIZARRA EN PILAR
HALL ASCENSORES
CL. CHAQUETAS
D.A. D.A.
S.REUN IONES 4P
BAÑOS HOMBRES
SHAFT
B
BAÑOS MUJERES
LOCKERS
SALA COMUNICACIONES
SALA COMUNICACIONES
B
SHAFT
PIZARRA EN PILAR
PIZARRA EN PILAR
BAÑOS MUJERES
SALA TABLEROS
KITCH.
BAÑOS HOMBRES
SUBGERENTES
B
RS RH
BODEGA PRINTS
BAÑO PRIVADO
MEETING
MAQ. SNACK
TV
TV TABLERO ELECTRONICO
PHONE BOOTH
SALA REUNIONES 8P
RH D.A.
OPEN PLAN
CL. EQUIPOS
LOCKERS
MAQ. CAFÉ
SHOWROOM
S.REUNIONES 4P SECRETARIA
SHAFT HALL ASCENSORES
SALA COMUNICACIONES
CL. EQUIPOS
PIZARRA EN PILAR
D.A.
TV
BODEGA GERENCIA
COFFEE
KITCH. SHAFT
GUARDARROPIA
BAÑOS HOMBRES
SALA COMUNICACIONES
LOCKERS
S.REUNIONES TV 4P
TV
PIZARRA EN PILAR
PRINTS
OPEN PLAN
SHAFT
KITCH.
C.AS
SHAFT
PHONE BOOTH
C.AS
BAÑOS HOMBRES
PHONE BOOTH
TV SUBGERENTES
TV 42"
OPEN PLAN
PHONE BOOTH
GTE A
PIZARRA EN PILAR
. D.A
SUBGERENTES
MEETING
TV 42" x 2
MAQ. CAFÉ
BAÑO PRIVADO
GTE A
GTE A
A
PIZARRA EN PILAR
TABLERO ELECTRONICO
RS RH
TV
SHAFT HALL ASCENSORES
BAÑO DISCAPACITADOS
TV
A
BODEGA
LOCKERS SHAFT
BAÑO PRIVADO
OPEN PLAN
MAQ. SNACK
BODEGA
A
PIZARRA EN PILAR
KITCH.
KITCH.
S. REUNIONES 14 P
GTE GENERAL
GTE A
GTES B
32
WORK COFFEE
TV 42" (CON BRAZO ANCLADO A LOSA
RH
LOCKERS
Puestos de trabajo Área neta / Puestos de trabajo
TV 42"
SHAFT
D.A.
TV 70"
MAQ. MAQ. MAQ. CAFÉ SNACK BEBIDAS
TV 42"
BAÑOS MUJERES
TV 42"
MAQ. CAFE
SHAFT
TV
1369 m² 232 5.90 m²
Área neta oficina
TV 42"
O CON ACCESA DE AIRE CORTIN
REFRIGEDORES
SALA TABLEROS
INFORMAL MEETING
01
Impresoras de sobremesa INFORMAL MEETING
TV RH
D
02 SUBGERENTES
OPEN PLAN
A
BAÑOS MUJERES
C
02 02
Guardarropia
Puntos de Contingencia: 138
Impresoras de sobremesa
A
TABLERO ELECTRONICO
RS RH
04
Sala de Lockers
TV
TOTEM VIDEOJUEGOS
BODEGA
CLOSETS
C.AS TABLERO ELECTRICO
03 01
KITCHENETTE
25PP
MEETING CLOSETS
TOTEM VIDEOJUEGOS
INFORMAL MEETING
TV 42"
S. REUNIONES 4P
BODEGA
TOTEM VIDEOJUEGOS
Puntos de Contingencia: 63
A
01
Meeting Phone Booth
PIZARRA EN PILAR
TV 42"
SALA DE CRISIS
2 TV's
SHOWROOM SERVICIO
Área neta / Puestos de trabajo
TV
TOTEM VIDEOJUEGOS
1114 m² 163 6.83 m²
Área neta oficina
02
Work Coffee -135pp aprox.
Cuarto Cableado
01 INFORMAL MEETING
Puestos de trabajo
02
Sala de reuniones - 4 personas
Bodega
03 TV
TV 42"
S. REUNIONES 4P
GTE A
D
ACCES CORTIN O CON A DE AIRE
S. REUNIONES 4P
TV TV
C
02
Sala servidor
TV
Subgerentes
03
Work Coffee Phonebooth
Bodega
TV
172 42 10 8 232
Supervisores
TOTAL
Sala de Crisis - 8 personas
PASILLO TECNICO 30 PANTALLAS
Mesa de Ayuda Puestos operativos
13
163
PIZARRA EN MACHON
25 124
Puestos subgerentes
Sala de reuniones - 4 personas
D
C
1
NOC Puestos operativos
GUARDADO TIPO KARDEX
Puestos gerentes A
TOTAL
TV 42"
PROJECT: COASIN
SUBGERENTES
PLANO
PLANTA ARQUITECTURA P03
ESCALA
1:100
FECHA
25/02/16
PROYECTISTA
M. FOURNIES - N. VEGA
ESTADO
REV-4
SUBGERENTES
PUERTA A SELLAR
SUBGERENTES
SUBGERENTES
PUERTA A SELLAR
Todas las medidas se verificarán en obra. Layout P2 1 : 100
C
FIRST FLOOR
Todas las medidas se verificarán en obra.
D Layout P3 1 : 100
El proyecto y el diseño indicados en este plano son propiedad intelectual de Contract Chile S.A. Está prohibida su utilización total o parcial sin la expresa autorización escrita de la empresa.
SECOND FLOOR Av. Kennedy 7600 Vitacura, Santiago - Chile Tel: +56 2 2797-8800 info@contract.cl www.contractworkplaces.com
C
D
C
THIRD FLOOR El proyecto y el diseño indicados en este plano son propiedad intelectual de Contract Chile S.A. Está prohibida su utilización total o parcial sin la expresa autorización escrita de la empresa.
D
INSIDE VIEW RENDER Av. Kennedy 7600 Vitacura, Santiago - Chile Tel: +56 2 2797-8800 info@contract.cl www.contractworkplaces.com
INSIDE VIEW RENDER
ISOMETRIC MODEL ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
30
COMPETITIONS
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
31
CONCURSO
CERROS
RVA_RED VERDE AZUL
SAN BERNARDO ECOLOGICAL AXIS
ISLA
CVSB
UNA ECOMATRIZ PARA SAN BERNARDO
CerroChena
Parque de la Sustentabilidad Urbana y el patrimonio arqueológico. Su cercanía al núcleo urbano le entrega potencial como espacio para enseñanza y práctica de sustentabilidad urbana. Esto apoyado con actividades de recreación que existen hoy y su potencial arqueológico que le entrega el Pucara. Adicionalmente, la gran superficie de este cerro lo convierte en el principal reducto de la flora y fauna nativa de la comuna y de la eco-matriz propuesta. Se propone laguna de captación para riego.
ECODUCTO
Programa: Sendero al Pucará, huertos urbanos, practica de permacultura, compostaje, reciclaje en microescala (punto verde) y feria de productos orgánicos.
It is a project developed in conjunction with a team of professionals for ecological and urban areas. A proposal was generated with different ecological axes that connect the various islands and hills connecting an ecological reserve and, consequently, encouraging the preservation and enhancement of the territory is developed. This project has a diverse program that nurtures the cultural characteristics, common interest, recreation, sports, ecological and productive therefore provides all that regards the Ecological Dimension, Social Dimension and Urban Dimension.
CorredorCalleSanJose
de les Rama
Ecoducto
Este corredor se abre paso entre la densa y consolidada trama urbana. Es un ejemplo de cómo intervenir sectores comerciales sin perjuicio de la continuidad y calidad del corredor. Se propone concentrar flujo de vehículos en un lado del perfil y favorecer arborización y peatonalización en el otro. Programa: ciclovía, estaciones de descanso.
ión grac Inte
Puente verde que favorece el flujo de la fauna en puntos conflictivos como cruces de autopista y cruces de línea férrea.
CerroHasbun
ParqueJardínNativo Se propone crear en este cerro un ‘Jardín botánico de especies nativas’. Como resultado, existiría un diverso muestrario de especies de árboles, arbustos y plantas locales en una pequeña extensión de terreno de fácil acceso para la comunidad. Esto servirá principalmente de apoyo para clases de botánica en colegios de la comuna. Se propone un reemplazo gradual de especies exóticas. Programa: Sendero a la cumbre, aulas abiertas (plataformas), vivero nativo.
ión grac Inte
de les Rama
ECODUCTO
ECODUCTO
ECODUCTO
Debido a su posición estratégica de mirador al casco histórico de la comuna y su maestranza. Se propone utilizar los senderos a la cumbre para establecer una narración del proceso de fundacion y desarrollo de la comuna y la ciudad.
te Lími
CANA L ES PEJI NO
Programa: Sendero a la cumbre, aulas abiertas (plataformas), paneles y miradores indicando elementos icónicos de la ciudad.
ión grac Inte
ción sifica de Den Buffer Límite
de les Rama
ECODUCTO
CerroAdasme
ParqueMuseoHistóricoabierto.
er Buff de
aa inad dest Área us tario icas Camp ersi Biológte Univ cias Ambien Cien dio y Me
n ació ific Dens
icación de Densif Buffer Límite
CorredorCanalEspej ino Tras incorporar estrategia de gestión, se recuperaran acciones de agua que permitirán que este canal sea la principal fuente hídrica que alimenta áreas verdes de la comuna. Se incorpora puntos de tratamiento no invasivo de agua, haciéndolo escénicamente más atractivo. El canal surtirá a laguna de captación para riego en Cerro Chena.
CorredorCalleCentral Este corredor se abre paso entre áreas residenciales de baja densidad. Este funcionaria como un ejemplo de intervención en sectores residenciales, con un perfil más extenso, donde se funde el corredor público con los antejardines privados, creando así también mayor area de micro-ambientes para la fauna.
Programa: Ciclovía, sendero de paseo, estaciones de descanso, áreas de picnic.
Programa: ciclovía, estaciones de descanso, plazas.
CerroNegro:‘Eco-cerro’ Muestrario renovables.
de
energías
Complementando la planta de biogas ubicada en la ladera sur-oriente del cerro, se incorporaran en este, programas relacionados a la educación ambiental y de energías renovables. Se fomentará pequeñas zonas (carácter educativo) donde se mostrará el funcionamiento y beneficios de diversos modos de coleccion de energía. Se promocionara llegada de facultades (universidad) relacionadas con medio ambiente en terrenos aledaños al cerro.
CA NA L
Programa: senderos, aulas abiertas, centro experimental (laboratorio); áreas con paneles solares, áreas con turbinas eólicas, área con energía hidráulica (microturbinas), zonas de picnic.
ES PE JI NO
Corredor Camino Los Morros Este corredor se abre paso entre áreas rurales y residenciales de baja densidad. Aca se aprovecha la poca consolidación del perfil de la calle y la flexibilidad de los paños de borde para proponer un corredor de mayor espesor y densidad arbórea. Programa: ciclovía, estaciones de descanso, zonas de picnic.
Cerro Los Morros: ‘Hidro-cerro’
Muestrario de tratamientos y relacionesconelagua.
RIO MAI PO Escala 1:5000
SHCEMATIC PROGRAM
MASTER PLAN 50
100
Programa: Sendero a la cumbre; parque inundable (tipo humedal) junto al canal espejino; piscinas de decantación de sedimentos; pequeños captadores de agua-lluvia, biofiltros para purificación de agua y formas sustentables de acarreo de agua.
200m
7568
Código de Identificación
N
PHOTOMERGE
Escala Grafica 0
Potenciando su condición privilegiada (frente al río Maipo), este cerro se convierte en un mirador natural al río. Se privilegia su potencial para trabajar temas hídricos. Se propone reforestación del cerro con flora del tipo higrófilo propia del bosque Mediterráneo.
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
32
DWELL THE COASTAL DESERT DUNES
The purpose of the Master Plan is to create a neighborhood that facilitates social integration valuing public space as an integrating agent. It is understood that this is the meeting place between different people and where the unexpected can happen. To this end, it is proposed to create a network of public spaces, which constrains the design of the road structure and facilitates a cohesive and sustainable urban design. CONSTRUCTION DETAIL “Habitar las dunas del desierto Costero”
El propósito del Plan Maestro es generar un barrio que facilite la integración social valorando el espacio público como agente integrador. Se entiende que este es el lugar de encuentro entre personas diferentes y es donde puede ocurrir lo inesperado. Para activar este rol, es necesario abordar el espacio público al menos desde tres escalas: la barrial, la intermedia entre grupos de viviendas, y la íntima, entre grupos de vecinos. Con este fin se propone generar una red de espacios públicos, que condicione el diseño de la estructura vial, y que facilite un diseño urbano cohesionado y sustentable ESTRUCTURA URBANA: La trama del lugar nace de la propiuesta de prolongación de las vías articuladoras existentes y la integración con el contexto existente.
Vialidad Estructurante Vialidad Secundaria Vialidad Local Ciclovias Senderos Peatonales
ESTRUCTURA VIAL: Que considera la red estructurante existente, propone una red local menor de flujos vehiculares junto a una red de ciclovías, y potencia la permeabilidad peatonal de lugar
CAL
LE ALEM ANIA
Red de Espacios Públicos Red de Ciclovias Circuito Peatonal
RED DE ESPACIOS PUBLICOS: La propuesta entrega un sistema de espacios públicos de diversas caracterísiticas que son integrados a través de un sistema permeable de conectividad peatonal local.
JAPO
N
PROLO
NGAC
ION
CALLE
CHINA
CA LLE ALE MA NIA
CALLE
Frente Urbano Circuito Peatonal
LON
NGAC
YS MARIN
ION
PRO
PROLO
GLAD
GACIO
N CA
AVEN IDA
LLE
POL
ONIA
DISEÑO URBANO INTEGRADO: Frentes urbanos activos y continuos, seguridad pasiva sobre el espacio público, jerarquización y contención de los espacios públicos a través del uso dell lleno y vacío considerando y respondiendo pasivamente a las variables climáticas propias de la zona.
Vias Secundarias / Locales Circuito Peatonal Condominios / Manzanas
PRO CA LONGA LLE JAP CION ÓN
MANZANAS - CONDOMINIOS: Zonas controladas que permiten llevar al interior de la manzana lo que generalmente se da en los frentes. Control de futuras ampliaciones a través de un diseño que considere una variedad de respuestas a la problemática.
LAS DUNAS COMO ESTRUCTURADOR DEL ESPACIO PÚBLICO.
LAS UNIDADES DE VIVIENDA E CONFORMAN CONJUNTOS HABITACIONALES.
CA LLE PRO YEC TAD
A
PRO CA LONGA LLE CH CION INA
MASTER PLAN
Bloques Proteccion Solar / Térmica Bloques Control de Vientos Bloques en sentido Oriente - Poniente para un mejor aprovechamiento solar y térmico
DISEÑO URBANO SUSTENTABLE: Manzanas con control del sol y vientos mediante la disposición inteligentes de edificios de mayor altura. Manzanas en sentido oriente-poniente para mejor respuesta bioclimática y soleamiento controlado de los espacios públicos y privados.
URBAN SECTION
RENDER + PHOTOMERGE
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
33
MEMO- RIEL SQUARE
Memo Riel, project refers to the old railway stations that lends a historical landmark to the municipality of San Bernardo and preserves communal identity. An interactive public space with elements and materials from a rail station is designed, including playful furniture that values the participation of citizens to transform the public space at will according to the needs of the moment.
VIDEO QR CODE
MEMORIELES EN MOVIMIENTO Un reconocimiento a una vida de trabajo.
1
DURMIENTES La huella del tiempo
2
RIELES El recorrido de una vida
CONSTRUCTION DETAIL
3
Sistema Constructivo. Plataformas Ferroviarias.
Puesta en valor de la identidad Ferroviaria.
Plaza Ángel Guarello. San Bernardo
RENDER + PHOTOMERGE
LA FAMILIA COMO MOTOR DE PROYECTO
CELEBRAR EL RECUERDO
TRASPASO DE EXPERIENCIAS
MEMORIA FERROVIARIA
Ruedas de tren en Acero
MEMORIEL
Soporte de seguridad Acero Galvanizado.
CONSTRUCTION DETAIL
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
34
OTHER WORKS
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
35
ARQZ BIM DESIGN / VALLE ESCONDIDO
Office dedicated to the creation of a comprehensive three-dimensional model of the building which allows us to deliver to the customer a solution for the difficult task of coordinating a project resulting in a work without conflict.
RENDER
ISOMETRIC ARCHITECTURE MODEL AND INSTALLATIONS
RENDER
ISOMETRIC VIEW ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
36
ARQZ BIM DESGIN / INTEGRA MEDICA
One of the first projects we received in the office was modeling in BIM with different specialties for functionality with Naviswork. A study of interference between elements was completed, thus preventing problems that exist.
ISOMETRIC ARCHITECTURE MODEL AND INSTALLATIONS
INSTALLATIONS ON ARCHITECTURE MODEL ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
37
BOSQUEJOS URBANOS / MUNICIPAL PROYECT
A community with limited resources achieved performance in architectural work for the municipality of San Bernardo and projects for people with low income.
SEDE SOCIAL SEDE S.A.H SEDESOCIAL SOCIAL S.A.HS.A.H
o nl a yc i Vo inn cSuol ca ic ai ol n n I t ne t ge r gar ca i co i nIonnyt eygVr iVanic cni u c u l a c i o n S o c i a l
S o c i a l
1
SEDE SOCIAL
SEDE SOCIAL SEDE SOCIAL
11
1
11
2
22 2
2
||
|
3
3
33
33
4
44
4 5
4 5 5
4
5 ORDENANZA GENERAL DE URBANISMO Y CONSTRUCCION LA FAMILIA COMO MOTOR DE PROYECTO.
LIA COMO MOTOR DE PROYECTO. COMO MOTOR DE PROYECTO.
PROGRAMA ARQUITECTONICO
78.42 M2
• COCINA • BAÑO UNISEX • BAÑO MINUSVALIDO Proyecto se ubica en zona de Equipamiento + zona de Área verde (utilizando solo el 5% según el art 2.1.30 O.G.U.C ) • SALON DE REUNIONES Y ACTIVIDADES • OFICINA N°1 Y N°2 PROGRAMA ARQUITECTONICO 78.42 M2 ORDENANZA GENERAL DE URBANISMO Y CONSTRUCCION Zona de Emplazamiento ZU6
ORDENANZA GENERAL DE URBANISMO Y CONSTRUCCION
PROGRAMA ARQUITECTONICO
Zona de Emplazamiento ZU6 Zona de Emplazamiento ZU6
• •• •• •• ••
Proyecto se ubica en zona de Equipamiento + zona de Área Proyecto se ubica en de según Equipamiento + zona de Área verde (utilizando solozona el 5% el art 2.1.30 O.G.U.C ) verde (utilizando solo el 5% según el art 2.1.30 O.G.U.C )
78.42 M2
COCINA COCINA BAÑO UNISEX BAÑO BAÑO UNISEX MINUSVALIDO BAÑO SALONMINUSVALIDO DE REUNIONES Y ACTIVIDADES SALON DEN°1 REUNIONES Y ACTIVIDADES OFICINA Y N°2
SEDE SOCIAL
SAN ALBERTO HURTADO Obra realizada siendo Alcaldesa la Sra. Nora Cuevas Contreras
SECPLA SECRETARIA COMUNAL SEDE SOCIAL
DE PLANIFICACIÓN 2015
SEDE SOCIAL
SAN HURTADO ARCHITECTURE PORTAFOLIO SANALBERTO ALBERTO HURTADO SEBASTIAN ROSS IBAÑEZ KPF Obra realizada siendo Alcaldesa la Sra. Nora Cuevas Contreras Obra realizada siendo Alcaldesa la Sra. Nora Cuevas Contreras
SECPLA SECRETARIA COMUNAL DE PLANIFICACIÓN 2015 SECPLA SECRETARIA COMUNAL DE PLANIFICACIÓN 2015
5
5
38
o memorial g.a.p
, LA JUSTICIA Y LA REPARACION.
ARCHITECTURE THESIS FREDY ARRATIA / GAP MEMORIAL / RENDERS AND PHOTOMONTAGE
LA ARQUI
cio memorial g.a.p
DAD , LA JUSTICIA Y LA REPARACION.
LA ARQUITECTURA DE LOS HECHOS ES LA MAS FUERTE DE TODAS, LOS OBJETOS QUE SIGNIFICAN ALGO Y QUE ESTAN DISPUES
espacio memorial g.a.p DE LA VERDAD , LA JUSTICIA Y LA REPARACION.
LA ARQUITECTURA DE LOS HECHOS ES LA MAS FUERTE DE TODA
Vista
SANAR EL CUERPO Y HOY ESTE ESPACIO SE TRANSFORMARA EN BODEGAS PARA UN NUCLEO UN ESPACIO PARA SANAR EL ALMA.
LOS VECINOS ESPERARON POR 40 AÑOS UN HOSPITAL PARA EMPRESARIAL ; LO MINIMO QUE SE LES DEBE ES
Vista
Vista
Vista
SANAR EL CUERPO Y HOY ESTE ESPACIO SE TRANSFORMARA EN BODEGAS PARA UN NUCLEO UN ESPACIO PARA SANAR EL ALMA.
LOS VECINOS ESPERARON POR 40 AÑOS UN HOSPITAL PARA EMPRESARIAL ; LO MINIMO QUE SE LES DEBE ES
SANAR EL CUERPO Y HOY ESTE ESPACIO SE TRANSFORMARA EN BODEGAS PARA UN NUCLEO EMPRESARIAL ; LO MINIMO QUE SE LES DEBE ES UN ESPACIO PARA SANAR EL ALMA. Vista
LOS VECINOS ESPERARON POR 40 AÑOS UN HOSPITAL PARA
Vista
ARCHITECTURE PORTAFOLIO
SEBASTIAN ROSS IBAÑEZ
KPF
39
PHOTOGRAPHY IS ONE OF MY GREAT PASSIONS
ARCHITECTURE PORTAFOLIO SEBASTIAN ROSS IBAÑEZ
KPF
40
THANK Y O U
SEBASTIAN
ROSS
ARCHITECTURE PORTFOLIO