Tobias huang portfolio

Page 1

PORTFOLIO Po-Chia Huang


Po-Chia Huang Curriculum Vitae Email : tobias_huang@icloud.com Tel : +886 912-648-272 No.154, Zhengrong St., Caotun Township, Nantou County 542, Taiwan (R.O.C.)

Education Master of Architecture

07/2013 - 07/2017

Tunghai University, Taichung

Master of Electrical Enginnering 09/2008 - 07/2010 National Chiao Tung University, Hsinchu, Taiwan B.S. Electrical Engineering 09/2004 - 07/2008 National Chiao Tung University, Hsinchu, Taiwan

Skills Intelligent Architecture Expert - Sensor Network Expert - Internet of Things(IoT) Software Photoshop, Illustrator, Autocad, Sketchup, Rhinoceros, Grasshopper, Microsoft Office Handwork Modeling, Drawing, Sketching Design Skills Site Analysis, Urban Design Planning, Prototype Development Programming C, C++, JAVA, Assembly Code

Work Experience Intelligent Environment Dept., Chief Software Engineer

Jan. 2017 - present

Scarlet Tech Ltd, Taipei, Taiwan ‧ Internet of Things (IoT) for Intelligent Environment ‧ Sensor Network for Intelligent Environment Architecture Internship

Jul. 2016 - Aug. 2016

UNEMORI ARCHITECTS, Tokyo, Japan ‧ Join Project "Roji*Hiroba" in Tokushima ‧ Join Project "Sukagawa Civic Center" in Fukushima Group Leader

Jul. 2014 - Aug. 2014 5-Week Workshop of URS27M, Yangmingshan, Taipei, Taiwan ‧ Community Empowerment. ‧ Designed, rebuilt the old dormitory. ‧ The 2014 "Old Building New Life Awards", third place. R&D Dept., Senior Software Engineer

Oct. 2011 - Sept. 2013

HTC Corporation, Ltd, Taipei, Taiwan ‧ Bluetooth 4.0 Product Development ‧ Android Graphic R&D Dept., Chief Software Engineer

Scarlet Tech Ltd, Taipei, Taiwan ‧ Bluetooth 4.0 Windmeter

Dec. 2012 - Sept. 2013


Curriculum Vitae

00

Educational Works 00 The Landscape of Time

01

Winery and Church of Seediq

01 New Urban Landscape x Forest Neighbor

11

Taipei Central Park x landmark x housing

Contents

02 Behind The Scenes

15

Social Housing for Youth

03 Invisible City

19

Dormitory

04 In Between

21

House

05 Deformation Community Activity Center

23

06 The Corner

25

07 Workshop

27

Gallery + Education Facility

Old Building New Life & Cultural Heritage


Po-Chia Huang Portfolio

The Landscape of Time Winery and Church of Seediq

00 Seediq is one of the most important natives of Taiwanese aborigines. They lived around the Wanda area 50 years ago before the dam constructing. The site is now occupied by a huge water reservoir and a hydraulic power plant, making a great danger of flodding and dam crashing due to 75 % of reservoir volume fullfilled by silt. My proposal establishes a method to remove the dam in four phases, because the downstream area doesn’t have the ability to digest the silt over short period. In the same time , the reclaimed land will be generated as farmlands for Seediq self-production. Those concrete removed from dam will be the material for construction of architecture and shaping farmland, so that it could make a circulation of material usage and achieve the balance between removal and construction. The winey and a church ,apearing after the dam removal, wil be part of sustainable sytem and landscape for aborigines of this area.

01


Thesis design 00 The Landscape of Time Industry v.s. Power v.s. Nature Resource Dam Construction Process

The factories of industry areas around Taiwan’s coast line consume lots of energy. The hydraulic power plant on the site, located deep in the mountain, is one of the contributer of the system, but it harms the landscape and Seediq’s living authorities.

Blocked the river, and also contruct the water channel to replace the original one. Then constructing the dam.

Danger by Infrastructure - Wanda Dam The Wanda reservoir has the import position of electricity generating, but close to terminate due to 75% of the volume occupied by silt. It may put the people’s life in great danger because the doubling pressure acts on Wanda Dam. Increasing the osibility of water flooding and dam crashing.

Wanda Dam Section

River branch blocked, and then make it as a water spillway for reservoir to control the water level.

Dam Construction History

02


STRATEGY - DAM REMOVAL PROCESS v.s RECLAIMED LAND

re-do cement walls from the crash dam pieces

The mechanism is established to removal the dam and generate the re-claimed land in progress. There are total 4 phases. Each phase, the silt will be released and flow toward the river downstream. Land under water covered by silt will reveal gradually after each phase. The silt containing rich organic nutrition could be transformed to farmland for crops or plants.

steel truss

cement blocks from dam

roll gabion revetment from the crash dam pieces

seediq tradional construction

THE STRUCTURE SYTEM - CRASH DAM PIECES REUSGE The cement waste from dam deconstruction could be the structure or foundations of the architecture and ridges of rice field. The winery builds up from different scale cement blocks from dam distruction. Finally, the process will create a new self-productive system for local aborigines.

structure system of winery

BORN FROM CONCRETE WASTE

Po-Chia Huang Portfolio

885 EL

03

120 meter

120 meter

120 meter

120 meter

120 meter


Thesis design 00 The Landscape of Time

The void generating along the maintained tunnel when dam removal phases executed.

POCH’E SPACE

the chapel in the EL 985 - 995

THE POCHE SPACE - ROAD TOWARD BAPTISMA The church and a series of sacred spaces are carved when dam removal process. Space is arranged along the repair pipeline and make a strong connection between past and future. Believers will follow the passway and feel the rough texture of WANDA dam indside. In the end, the path leads you toward a place surrounding by rock array which show the original patterns of dam constructed ...

L rar

r

by room and t ry The concrete platform of the past hoisting tower EL 1025 m

Pria ry road t EL 1005 m

Concrete dam

Main entrance from the shelter house EL 1005 m

church space arrangement

keep silt for farming Emergency entrance for quick achieve the sensor corridor EL 1005 m Sencond entrance close to the concrete platform of the past hoisting tower

Emergency exit from the machine

cement fragments as check dams

910 EL

600 meter

04


Po-Chia Huang Portfolio THE DAM REMOVAL PROCEDURE The removal engineer switch the position. After one side removed , second, It switches to the oppsite side and third, remove the center part. This is a circle progress till the end.

The ďŹ nal stage of the removal will remain part of the dam for the furture construction. The 30 meter gigantic WATERFALL will be a spectacular spot.

PHASE ONE

RE-SHAPE

It releases amount of silt and lake water at each stage and leads a water fall for each step. The position of the water fall located by the engineering excuted location and could be amazing view.

PHASE TWO

FINAL PHASE

WATERFALL

PHASE THREE

PHASE FOUR Process of Dam Removal

05

55/56


Thesis design 00 The Landscape of Time

REHABILITATE LAND

RECLAIMED - LAND REVEALING For each phase, the silt will be released and flow toward the downstream of the river. Those part of mountain covered by silt before will reveal gradually in each phase. The silt of upstream of the water reservoir is not suitable for cultivated activity, but downstream.

Reclaimed Land Revealing

06


Po-Chia Huang Portfolio

WINERY

The winery merges with the waterfront and riceďŹ eld. It uses the products and water of this new born land and then create a sustainable productive system. Not only as a symbolic landmark of the place but plays the role of the village public open space extension.

07

WINERY


Thesis design 00 The Landscape of Time

THE CHURCH ATTACHED ON THE DAM

- The Landscape of Time to be continued

THE CHURCH SECTION MODEL

THE WINERY FITTED ON THE LAND


Po-Chia Huang Portfolio

PRAY ROOM

KITCHEN ENTRANCE

PLATFORM

INNER LOBBY

09

WINERY


Thesis design 00 The Landscape of Time

Wind sweeps the rice ďŹ elds and blows toward the direction of dam remain. The winery stands out on the new reclaimed surrounding crops and rice. It will be constructed by reusing the crashing concrete from the dam and digests the borderline product of plants such as rice straws. It is born from the landscape and witness the miracle.

12 10


Po-Chia Huang Portfolio

New Urban Landscape Taipei Central Park Taipei Songshan airport, Taipei, Taiwan, 2018 Spring

01

Partner : 7 students of Tunghai Architecture

Taipei Songshan Airport occupys huge area in the center of Taipei, but the amount of total passengers is decreseaing rapidly in recent year. What if the Airport is removed to release great open space. It could be translated to dierent functionalities to beniďŹ t the Taipei urban area. Keep the airport runway because it follows up wind direction and represented the history of the city and airport itself. Design a folding route to cross the original runway back and forth. De-contour the route to create the samll journey inside the side to feel the mix-up of nature, history, and time. It will be an unique experience for concrete jungle citizens.

site arragement - Taipei Central Park

11

concept diagram


Educational work 01 New Urban Landscape

Deck .Lake. Transportation Station

12


Po-Chia Huang Portfolio

The Lake and Transportation Station

13


Educational work 01 Forest Neighbor

Forest Neighbor landmark x housing Qingshui, Taichung, Taiwan, 2016 Summer Partner : Raymond, Chiu

Not only for youths but also stimulate local comercial events. A courtyard surrounding by reflected materials to reflect the inner environment. Creating a illusion of having a forest in the community, promoting the whole area and the comercial values. Concept

COURTYARD

TYPE : 3B

TYPE : 2B

TYPE : 1B

Unit Type TERRACE COURTYARD

Site as Hub

Floor / Ground floor Public & Open Space Scale / 1 : 600

Landmark

New Alley

14


Po-Chia Huang Portfolio

Behind T he Scenes Social Housing for Youth

02 The site is located in the edge of the downtown and sub-rural area. There is a huge bridge lifting up as a fast track toward the highway interchange. It’s transporting a huge amount of vehicles daily and make the commercial advrtisers to put a lots of advertises on the elevations of the building around the site. Behide this phenomenon, there is a great chance to link owners of buildings and the constructors rent the billboard and provide the cheaply rent for young talents.

15


Educational work 02 Behind The Scenes 1.5 km

0.9 km 1.7 km 0.6 km

0.6 km

2.4 km

section of urban street

1 to 2-level

3 to 4-level

5 to 8-level

over 9-level

FLOOR MAPPING

2.9 km

The bridge connects the downtown area toward the highway interchange. It leads lots of advertisement boards surrounding around the site due to driving sight on the bridge and pedstrian’s line of sight on street from grond floor. It means a great amount of economic benefits could be form as a mechanism to trigger a social housing project in the site.

16


HOUSING UNITS

Po-Chia Huang Portfolio

0

1

3

5m

Different type of units are located behind various scale and price advertisements. The income from the bill-boards is used to supply the budget of whole housing. Those youth can have their own room and studio, and each unit has its flexibility to re-arrange by the owner to fit the requirements. In general, each unit has one studio, bedroom and toilet, the space of the studio could be split to more dynamic space for users.

advertise income as allowance

17


Educational work 02 Behind The Scenes

NEW ECONOMIC LANDSCAPE

ECONOMIC PROCESS multi-function corridor

living units

advertise fac’ade

The corridor sapce connects the front ground of each level will be as a flexible public space for various daily life events for youths, such as co-working studio, exhabitions, workshops. It also provids youth enough space to create their life style and communicate to each other to collide with sparks to create new idea.

0

2

5

10

floor plan

18


Po-Chia Huang Portfolio

Invisible City Dormitory

03

Space Prototype point

extend to line

compose to cuved surface

The image and design concept were generated from the article of “Invisible City”. Converted to diagrams at first, they were then transformed into concept models. Second, combine the concept models with different scales and operations; rotating or shifting. Therefore, the complex space model was composed. As a result , a dormitory was designed upon reference of space model and site conditions.

Diagrams The city of Leonia, it’s a city surrounded by daily trashes and extending daily in the article. It’s like mountain chains and expending the city. Imagine if there are many cities like Leonia. The edge spaces between cities are composed by different kinds of objects and allow us to have interesting imagination.

19


Educational work 03 Invisible City

Operation to Compose units

different scale combination 0

5

15

25

+15.3 floor plan

0

5

15

25

+5.7 floor plan

Site Overview second entrance

bike way section of main public space

education facility main entrance

The site is located on a slope land adjacent to the eduction facilities inside Tunghai university. It focuses on generating a great public realm surrounded by the dormitories. Part of the building is raised above the ground so that the public space can have easy access.

The courtyard in the center provides opportunity of interactions between students. Moreover, it still allows students interacting inside the dorm. There are many continuous sapces composed by the speical units, making the actions between students easy to happen. 0

5

15

25

+2.5 floor plan

20


Po-Chia Huang Portfolio

In Between House

04

This project is focused on producing the perspective by observation behavior of human beings in urban. Issues and perspectives were produced from your personal life experiences and observations. Those materials were converted to generate the design operation methods of a “HOUSE�. The design represents the attitude of how I realize the relationship between people and urban.

Twisted paths


Educational work 04 In Between

City is a collection of rules. We follows those rules to keep the society working fine. However, we usually follow them blindly, frequently. It’s necessary to rethink and break out some of them. It’s not only the philosophy question, but also the reality needed to face.

0

1

3

5

3rd floor plan

0

1

3

5

2nd floor plan

0

1

3

5

1st floor plan

0

1

3

5

Concept Model

regularization

ex-cep-tion

redefine the behaviors and actions

0

1

3

5

BB Section

AA Section

22


Po-Chia Huang Portfolio

Deformation

05

Community Activity Center

The design, a community centre, is for the residents nearby. The community centre contains a easy meal shop, a daycare center, a community classroom, a small library, and a gallery. The design strategy comes from observing the context around the site. You can observe lots of “frames� along the street, just like a short clip when wandering. Furthermore, if there are lots of framed programs in the same axis, it may create shopwindows result. making the relationships between programs more interesting.

Basic Concept

one frame

frames along axis

frames along 2 axises and sharing one frame


Educational work 05 Deformation

Strategy Programs or views along different axises. It can share the view of each other where 2 axises crossing. Along the axis, it makes a special space effect like window shops and consider the action or nature elements as scene. Make residents have special space experiences.

0

2

5

10

0

2

5

10

2nd floor plan

Site Observation Wandering on the streets around the site, there is a series of spaces of shopwindow. It’s obvious that each frame contains its own program or nature elements inside.

0

2

5

10

AA Section

0

2

5

10

BB Section

1st floor plan

24


Po-Chia Huang Portfolio

The Corner Gallery + Education Facility

06 The site is located in a complete block with three sides facing streets. This project has two phases. First, we design a gallery in the the first corner. The gallery combines office space, exhibition space and a simple lecture hall. The second phase is an addition of educational facility in another corner, and it’s necessary to integrate with the gallery due to the same owner.

0

25

2

5

10

Gallery Section


Educational work 06 The Corner C

0

2

5

10

4th floor plan

0

2

5

10

3rd floor plan

0

2

5

10

2nd floor plan

C

0

2

5

1st floor plan

10

The gallery is a 6-story building adjacent to a 4-story of educational facility. As basic design element, bar-shaped space are shifted and juxtaposed to create interesting moving path for visitors of gallery and facility.

0

2

5

10

AA Section

0

2

5

10

BB Section

26


Po-Chia Huang Portfolio

Workshop

Structure of Deck

Structure of Bridge

Structure of Stairs

Structure of Deck

Old Building New Life

URS27M, Yangmingshan, Taipei, Taiwan, 2014 Summer

07

Partner : MARCH I, TUNGHAI UNIVERSITY

between roof and tree between house and house between house and tree between house and tree

Final Result

Process Yangmin Mountain

Final Result Floriculture Experiment Center

Crown

This is a workshop focusing on implementing, hand-made ability and co-working. The goal of this workshop is to rebuild an oďŹƒcial residence and make it a residents-friendly public space. Analysis on human behaviors are made. Deck, bridge, and stairs are constructed to connect all of the space in dierent level, creating exciting special experience and connections with the nature. Taipei City

Underneath URS27M

27


Educational work 07 Workshop

Workshop

Cultural Heritage Taichung City Hall Revive, Open University, 2014 Summer Partner : 12 students from dierent universities

Site Overview

Monsoon Analysis kami

south-west monsoon

original condiotion kaze

south-west monsoon

south-west monsoon of Taiwan in summer use monsoon to cool down the temperature

new entrance of public space for local residents

Taichung City Hall is a historical building and built by Japanese with considering meaningful axis, Kami-Kaza.

create semi-outdoor space for residents state capitol

The proposal is to revive Taichung City Hall by relating to the locals. An open university for local elders is proposed to reshape the public space and lower the temperature with monsoon of Taiwan for energy reduction.

28


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.