YAVAPAI COLLEGE CAMPUS MASTER PLAN
2 |  Yavapai College Campus Master Plan
Table of Contents I. Introduction
A. B. C.
II.
Planning Process
Purpose Of The Plan Campus Master Plan Objectives Planning Context
A. Planning Philosophy B. Master Planning Process C. Campus and Community Engagement D. Summary of Outreach E. Building Consensus F. Acknowledgments
III. Master Planning Drivers
A. B. C. D.
Master Planning Drivers Overview External Planning Drivers Internal Planning Drivers Campus-by-Campus Analysis
IV. Master Plan Recommendations
A. B.
System Wide Recommendations Campus-by-Campus Recommendations Summary
V. Implementation
A. B. C.
Implementation Overview Phasing And Cost Matrix Key Project Sequencing
Yavapai College Campus Master Plan  | 3
4 |  Yavapai College Campus Master Plan
Letter from the President A Vision for the Future “The vast possibilities of our great future will become realities only if we make ourselves responsible for that future.” – Gifford Pinchot, First Chief of the United States Forest Service No one can predict the future but, as the quote above suggests, we can take steps to help ensure that our future is great. It is for this reason that I am pleased to present the Yavapai College Campus Master Plan to you. It serves as one important step in defining our future direction. The Campus Master Plan is the result of a significant investment of time and energy on the part of faculty, staff, students, and community members. It presents a shared vision for Yavapai College that is rooted in the mission of our great institution. Higher education is currently undergoing a number of dynamic transitions from the way courses are delivered to the role of the institution within the regional economy. Yavapai College is charged with delivering more advanced technologies to reach a larger demographic. We are also striving to build upon existing strong partnerships within the community, region, and state and to create new ones. The Campus Master Plan takes these factors into consideration and provides us with a vision that is responsive to them. The outcome of this effort is not a detailed blueprint, but rather a flexible, living document designed to better adapt to unexpected changes that undoubtedly lie ahead. I believe the Campus Master Plan will facilitate our making wise future decisions about how best to use our resources. I would like to express my sincere appreciation to all campus and community constituents that participated in this exciting nine month process. Your input has helped shape this document and ensure that we are all united in our effort to define a successful future for Yavapai College. I look forward to our continued collaboration as we move forward together to implement the Yavapai College Campus Master Plan. Warm Regards, Dr. Penelope Wills President, Yavapai College Yavapai College Campus Master Plan | 5
6 |  Yavapai College Campus Master Plan
Yavapai College Mission, Vision, and Ends The Yavapai College Campus Master Plan reflects the mission, vision, and ends of the institution. It provides a guiding framework to address future growth and changes in the decade ahead that represent the goals and aspirations of both the college and the community.
Mission Statement The Mission of Yavapai College is to provide quality higher learning and cultural resources for the diverse populations of Yavapai County.
Vision Statement Yavapai College exists to provide educational and cultural opportunities to students of all ages. We shall strive to create stronger partnerships and enhance leadership to develop and strengthen our community. Our students will have the abilities to be active participants in the global community.
Ends Statement Yavapai College exists so communities within Yavapai County are equipped with the vision and skills to create a sustainable economic environment. The college will fulfill this role at a justifiable cost.
Ends 1.1 Education Ends Students achieve their educational goals. 1.2 Economic Ends Communities have the leadership and educational resources to generate and sustain economic base jobs. 1.3 Community Ends Yavapai County residents have access to a vibrant social and cultural life.
Yavapai College Campus Master Plan  | 7
8 |  Yavapai College Campus Master Plan
Introduction
10 |  Yavapai College Campus Master Plan
Introduction Yavapai College was established in 1965 through a countywide initiative to enhance educational opportunity within Yavapai County. In 1970, the institution’s first building was dedicated on a 100-acre site in Prescott, Arizona. Since that time, Yavapai College has expanded its presence in the county to include two campuses: Prescott and Verde Valley, as well as four centers: Chino Valley, Career and Technical Education (CTEC), Prescott Valley, and Sedona. In early 2013, Yavapai College (YC) embarked upon development of the Yavapai College Campus Master Plan (Campus Master Plan) through a transparent nine-month process that sought input from students, faculty, staff, administrators, community members, and outside stakeholders. The effort produced this campus master plan report which presents a unifying vision for Yavapai College that aligns the institution’s strategic initiatives, educational master plans, and physical development goals into a single document to help guide the future direction of the college. This document is designed as a long-range tool that can adapt and flexibly respond to unforeseen changes. The Campus Master Plan presents a visionary, yet realistic framework for growth. It defines parameters for the strategic management and phasing of development that is rooted in the master plan objectives outlined on the next page. It identifies both short-term, mid-term, and long-term goals which are intended to encourage student success and promote greater efficiency throughout the institution. Many of the concepts illustrated in the master plan are multi-year initiatives. Together, they represent a holistic vision for the future of Yavapai College.
Completed over a 9-Month Process Organized into 6 Steps. Master Planning Process Focused on Consensus Building. Encompasses all Yavapai College Campuses and Centers. Embraces both Campus and Community. Initiatives Focused on Encouraging Student Achievement. Promotes Shared Resources Between Departments. Provides a 10-Year Vision for Yavapi College.
Yavapai College Campus Master Plan  | 11
Purpose of the Plan A Living Document The Campus Master Plan is a collection of powerful ideas. These ideas establish the framework for coordinating physical change across Yavapai College’s campuses and centers. The master plan report is the culminating product of the master planning process. It is a composite document of goals, objectives, observations, ideas, and recommendations. Graphics help support and illustrate these key concepts. The master plan report is designed to serve as a living document, allowing flexibility in its application as specific planning initiatives and goals evolve over time. In order to address the possibility of change, the Campus Master Plan Objectives (shown on the adjacent page) serve as one of the most important pieces of information outlined within these pages. The Campus Master Plan Objectives provide the fundamental guiding framework that should advise all future planning decisions at Yavapai College. They convey the intent, goals, and long-term values of the institution. They are designed to be the most enduring component of the plan. All recommendations outlined in this report were measured against these five Campus Master Plan Objectives. 12 |  Yavapai College Campus Master Plan
Does the plan encourage efficiency in the yavapai college system? ENHANCE EFFICIENCY
RIGHT PROGRAMS IN RIGHT LOCATIONS
Does it position compatible programs and services together? Does the plan minimize travel between campuses? Does it locate programs in physical proximity to strategic partners? Does the plan foster increased educational opportunities? Does the plan encourage new strategic relationships?
community & culture
SUPPORTS EDUCATION MASTER PLAN
EXPAND OFFERINGS ACROSS COUNTY
economic development
education
strategic partnerships
shared resources
Campus Master Plan Objectives
ENCOURAGE REGIONAL ECONOMIC DEVELOPMENT
Does the plan broaden the educational reach of the college? Does it align with the educational master plan? Does the plan encourage student retention? Does the plan increase exposure within the community? Does it expand cultural offerings for the yavapai campus and community? Does it distribute resources appropriately across the region? Does the plan encourage increased economic development? Is the plan responsive to the economic needs of yavapai county? Does the plan position programs in a location to maximize economic benefit? Yavapai College Campus Master Plan  | 13
Planning Context The master planning effort encompassed an evaluation of all Yavapai College campuses and centers: Prescott, Verde Valley, Chino Valley, Prescott Valley, CTEC, and Sedona. Each location was analyzed for both its academic and programmatic role within Yavapai College. The master planning team also gained an understanding of all off-site facilities the college utilizes for educational purposes.
Existing District Assignable Square Feet (ASF)
As part of the process, the master planning team conducted an environmental scan as a critical first step in the planning effort. Local, regional, and statewide data was collected from secondary sources to provide a broad-level baseline for the study. The findings derived from this analysis served as key master planning drivers that shaped development of the final campus master plan. In addition, detailed enrollment data was collected from Yavapai College. Data on enrollment projections and course offerings was validated by campus representatives through multiple on-site meetings. Fall semester 2013 is used as the Base Year for analysis throughout the master plan. For Fall semester 2013, total annualized student full-time equivalent (SFTE) was 4,245. The Prescott Campus supported the largest student population in 2013 and is expected to continue to do so through 2023. The Sedona Center supported the smallest population with 45 SFTE. For Fall semester 2023, SFTE projections vary widely by campus as the programs at Chino Valley are migrated to other locations, and Sedona credit coursework migrates to dual credit (in high schools) and online. Sedona physical facilities will focus on OLLI and Community Education programming which is in high demand. At the District level, online programs are expected to see continued growth, as well as off-site programming that appeals to high school students. Enrollment and space utilization data significantly informed the master planning effort and will be discussed in more detail later in this report. 14 |  Yavapai College Campus Master Plan
Master Plan Enrollment Assumptions
Yavapai College: Who’s Where Today?
Yavapai College Campus Master Plan  | 15
16 |  Yavapai College Campus Master Plan
Process
Planning Philosophy An Inclusive Approach The Campus Master Plan was completed over a nine-month planning period that began in the spring of 2013. The master planning process followed a clear methodology defined by six distinct phases: (1) Discovery, (2) Cross Discipline Analysis, (3) Space Needs, (4) Exploration of Alternatives, (5) Preliminary Plan, and (6) Final Plan & Documentation. An inclusive, consensus-based approach was utilized to encourage greater representation across wide reaching constituent groups. The Campus Master Plan is representative of a collaborative effort between Yavapai College and the communities it serves. Extensive input from these groups guided the process, providing valuable insight to the planning team and allowing constituents to gain ownership of the master plan.
18 |  Yavapai College Campus Master Plan
Discovery
Master Planning Process
I. Discovery
II. Cross Discipline Analysis
III. Space Needs
The master planning process began with the Discovery Phase which consisted of listening and learning. This important first step included data collection, interviews and meetings, and the development of goals for the master plan.
The planning team evaluated both physical features of all locations, as well as the distribution of programs and services within the college. Conclusions established baseline parameters for the master plan framework.
A spatial evaluation of all campuses and centers was completed to understand the existing and future space needs for Yavapai College. The analysis considered educational master plan goals and comparisons to peer institutions.
YAVAPAI COLLEGE CAMPUS MASTER PLAN
Draft Report January 2014
C B A
IV. Exploration of Alternatives
V. Preliminary Plan
VI. Final Plan & Documentation
This phase involved the testing of ideas. Three alternative concept scenarios were presented and thoroughly scrutinized against the master plan objectives as well as against the political and logistical realities affecting Yavapai College.
The best aspects of the alternative concepts were refined into a single preliminary plan for each Yavapai College location. This task quantified and verified the programmatic elements and space needs for completion of the final plan.
The last phase of the planning process included preparation of the final Campus Master Plan, development of a phasing and cost matrix, as well as documentation of the goals, objectives, and recommendations in a final report. Yavapai College Campus Master Plan  | 19
Campus and Community Engagement A Transparent Process During every phase of the master planning process, Yavapai College students, faculty, staff, and community constituents were encouraged to participate in feedback opportunities to help guide development of the master plan. An inclusive and transparent process was achieved by involving individuals from all facets of the Yavapai College community. Input was solicited from an expansive audience in an attempt to capture diverse perspectives on the master plan. Open house meetings were held on both sides of Mingus Mountain and student open forums were conducted at each Yavapai College location. Efforts to engage the campus and community also transcended beyond traditional outlets, such as local newspapers and open houses, to include communication through the Yavapai College website and the distribution of online surveys. In addition, Yavapai College administrators personally reached out to community officials and business leaders to keep them apprised of the process. As a result, the variety of outreach methods used to engage constituents produced very useful feedback and enhanced the outcome of Yavapai College’s Campus Master Plan.
20 |  Yavapai College Campus Master Plan
Summary of Outreach The following list provides a summary of outreach conducted as part of the process:
April 2-4, 2013
Project Kick-off Meetings: Campus Advisory Committee Executive Committee Guided Tours: Prescott Campus Sedona Center Verde Valley Campus Chino Valley Center CTEC Prescott Valley Center Student Open Forums: Prescott Campus Sedona Center Verde Valley Campus Chino Valley Center CTEC Prescott Valley Center
April 17, 2013
Online Survey Distributed via Email
April 26, 2013
Faculty Input Sessions: Business, Computer Science, District Workforce & Economic Development Nursing & Allied Health Science/PE Art/Music
Social Sciences/Humanities Career & Technical Education Foundation Studies
May 14-16, 2013 Space Needs Analysis Sessions: Dir. Facilities & Planning Mgmt. Dean of CTEC Dean of Verde Valley Osher Lifelong Learning Institute & Community Education Dean of Bus., Computer Science Dean of Student Services Athletics Dean of Science & Health VP for Advancement & Ed. Foundation VP for Instruction & Student Services VP for Finance & Admin. Services Director of Institutional Research Dean of Foundation Studies Dean of Visual & Performing Arts Open Houses: Prescott Campus Verde Valley Campus Analysis Meetings: Campus Advisory Committee Executive Committee May 29-30, 2013 Instructional Division Input Sessions: Business, Computer Science, District Workforce & Economic Development
Nursing and Allied Health Science PE/Athletics Osher Lifelong Learning Institute Career & Technical Education Music Art Social Sciences/Humanities Foundation Studies
August 8, 2013
Alternatives Meetings: Campus Advisory Committee Executive Committee Open House Presentation
September 24, 2013
Preliminary Plan Meetings: Campus Advisory Committee Executive Committee
October 10-11, 2013
Open Houses: Verde Valley Campus Prescott Campus Online Survey Posted on YC Website
November 12, 2013
District Governing Board Meeting
December 10, 2013
District Governing Board Meeting Yavapai College Campus Master Plan  | 21
Building Consensus Guided by Thoughtful Input Throughout the process, the master planning team received a tremendous amount of support and engagement from faculty, staff, and students of Yavapai College, as well as from members of the regional community. All those who participated provided thoughtful input to help build consensus for the Campus Master Plan and guide the college towards a vision that is forward-thinking, yet realistic. Yavapai College would like to express its gratitude to all individuals involved with the master planning effort. Thank you.
22 |  Yavapai College Campus Master Plan
Acknowledgments Executive Committee
Penny Wills, President Clint Ewell, VP for Finance & Administrative Services Steve Walker, VP of Advancement Greg Gillespie, VP for Instruction & Student Services thru May 2013 Barbara Wing, Interim Representative for Instruction & Student Services Stuart Blacklaw, VP for Instruction & Student Services starting November 2013
Campus Advisory Committee
Jim Bostwick, Faculty, Foundation Studies –Verde Valley Roy Breiling, Faculty, Visual Performing Liberal Arts Ed Bushman, Faculty, Business Computer Science, District Workforce & Economic Development Patrick Burns, Information Technology Systems Manager Joe Cappelli, Police Chief Brad Clifford, Athletic Director Sandy Garber, Dean of Student Services Dennis Garvey, Dean of Community Education Kara Gianetto, Faculty, Science & Health Ernie Hernandez, Faculty, Career & Technical Education Stacey Hilton, Dean of Instructional Support & Improvement Bob Hoskovec, Director of Student Life Tom Hughes, Director of Institutional Research Rose Hurley, Director of Human Resources Mike Lange, Director of Marketing and Communications David Laurence, Director of Facilities John Morgan, Dean of CTEC/CV/PV
James Perey, Dean of Verde Valley Campus & Sedona Center Gino Romeo, Faculty - Faculty Senate Representative Jeff Rose, Assistant Director of Facilities Joni Westcott, YCSA Caleb Boone, CHP Representative Natalie Black, SLC Representative
Master Planning Team
Eddie Garcia, Principal-in-Charge Doug Kozma, Principal Campus Planner Lauren Williams, Campus Planner Katie Stachler, Project Manager Lorna Allen, Site Designer
Frank Markley, Ph. D., Academic Planner Shuli Steele, Academic Planner
Yavapai College Campus Master Plan  | 23
24 |  Yavapai College Campus Master Plan
Planning Drivers
26 |  Yavapai College Campus Master Plan
Master Planning Drivers Overview As part of the master planning process, an Analysis Phase was completed in order to understand both the external and internal factors affecting the future of Yavapai College. The themes that emerged during this phase of the process served as the master planning drivers throughout the remainder of the master planning effort. The analysis included an evaluation of external planning drivers such as current trends in higher education, county demographics, and occupational job growth projections for both Yavapai County and the State of Arizona. Each external planning driver was considered for its possible implications in shaping the future of Yavapai College. The Analysis Phase also included a review of internal planning drivers as part of a district-wide analysis. This evaluation encompassed a review of the Yavapai College Mission, Vision, and Ends Statements, as well as the Educational Master Plans 2012-2017 and Strategic Plan. In addition, an analysis of program offerings, delivery locations, existing space needs, classroom utilization, and the physical composition of each campus was evaluated in order to understand opportunities for greater efficiency and ways to improve educational access across the Yavapai College system. Together, the findings derived from this analysis guided development of the master plan alternatives, as well as the final campus master plan recommendations. An understanding of both external and internal drivers helps ensure that Yavapai College is well positioned for future success.
External Planning Drivers: Trends in Higher Education Yavapai County Demographics Yavapai County & Arizona Occupational Trends Internal Planning Drivers: Mission, Vision, and Ends Statements Strategic Plan Educational Master Plans Future Enrollment Projections System-Wide Efficiency: Classroom Utilization Replication of High-Cost Programming Geographic Proximity
Yavapai College Campus Master Plan  | 27
External Planning Driver: Trends in Higher Education The analysis process began with a review of the current trends in higher education and the potential impact these trends will have upon the future of Yavapai College. Actual as well as anticipated shifts in higher education have created a growing sense of uncertainty among institutions of higher learning. The emergence of Massive Open Online Courses (MOOCs) and new online degree options are triggering questions about what kind of educational infrastructure will be needed in the future.
Limited Funding - Increase Efficiency Increased Accountability:
Retention, Completion, Transfer
Increasingly, institutions of higher learning are being asked to do more with less. Since 2008, state and federal funding levels have diminished across the country, yet accountability as it relates to retention, completion, and transfer rates has increased. In addition, communities are routinely turning to their local colleges to help lead regional economic development initiatives.
Rise in Online Education
A shift is also occurring in the classroom with a move away from the traditional didactic learning environment to a more studentcentered active learning model. Campuses nationwide are trending towards more flexible spaces both inside and outside. There are many higher education options today making it imperative that institutions find ways to create a distinct identity to help attract and retain talented students.
Leading Regional Economic Development
28 |  Yavapai College Campus Master Plan
Creating Identity in a Crowded Market Changing Pedagogies Expanded University-Comm. College Relations
External Planning Driver: Rise in Online Education One key external planning driver impacting the future outlook for Yavapai College is the continued rise in online education. Over the past decade, online education has emerged as an increasingly popular delivery method for higher education courses. Many traditional institutions of higher learning, including Yavapai College, have embraced this trend and responded with online classes and programs. The table below charts nationwide growth in online education over a ten year period from
2002-2011. The increase in online education at Yavapai College over this same period closely mirrors this growth rate. Future enrollment projections for Yavapai College suggest that online education is expected to continue to increase significantly over the ten-year master planning horizon.
Online Enrollment as a Percent of Total Enrollment: Fall 2002 - Fall 2011
Source: Babson Survey Research Group- 2013 Yavapai College Campus Master Plan  | 29
External Planning Driver: Yavapai County Demographics Yavapai College - Fall 2012 The Analysis Phase included a review of demographic information, both historical census data and future population projections, in order to better target areas of future expansion within Yavapai County. Prescott Valley demonstrated the most significant population growth over the past decade and is expected to continue to follow a similar pattern of growth over the next ten-year period. In total, Yavapai County is projected to grow in population by 19 percent over the ten-year planning horizon. There is anticipated to be continued diversity across age cohorts with the largest growth expected in the 30-39 and 65 and older populations.
Arizona State and County Population Projections ARIZONA STATE AND COUNTY POPULATION PROJECTIONS: 2012 TO 2031 (2012-2031) Year
Arizona
Phoenix Metro
Tucson Metro
Balance of State
Yavapai County
2012 2013 2014 2015 2016
Population Estimates for Yavapai County (2000-2012) Population Estimates for Yavapai County 2000 ‐ 2012. Percent July 1, 2010 Est. July 1, Est. July 1, Est. July 1, Est. July 1, Est. July 1, Est. July 1, Est. July 1, Est. July 1, Est. July 1, Change 2000 Census/Estimate Period Est. Revised 2012 2001 2002 2003 2004 2007 2008 2009 2000 2011 to 2012 to Census
211,137 10,984 11,429 4,051 11,280 4,001 407 6 40,371 38,489 7,278 82,840
212,585 10,967 11,188 4,104 11,399 3,952 420 6 40,041 39,105 7,370 84,033
Yavapai 211,917 210,899 Camp Verde 10,916 10,875 Chino Valley 10,988 10,825 Clarkdale 4,102 4,103 Cottonwood 11,379 11,238 Dewey ‐ Humboldt 3,945 3,896 Jerome 430 441 Peoria (part) 6 7 Prescott 39,932 39,771 Prescott Valley 39,116 38,839 Sedona (part) 7,248 7,191 Balance of County 83,854 83,714
169,520 211,247 10,849 9,513 10,808 7,901 3,431 4,084 11,237 9,288 3,890 ‐ 332 443 ‐ 7 34,487 39,873 23,829 38,769 7,229 7,189 73,509 84,098
173,343 211,583 10,883 9,701 10,783 8,007 3,542 4,072 11,224 9,784 3,889 ‐ 342 442 ‐ 7 35,364 39,865 24,537 38,964 7,275 7,181 74,791 84,273
176,672 24.8% 182,534 9,777 14.4% 9,910 7,851 36.5% 8,506 3,582 18.7% 3,632 10,044 20.8% 10,335 ‐ ‐ 352 33.0% 362 ‐ ‐ 35,550 15.6% 37,140 26,096 63.5% 27,387 7,279 ‐0.7% 7,291 76,142 14.6% 77,969
187,623 10,169 8,688 3,666 10,614 3,757 373 ‐ 38,178 30,265 7,294 74,617
6,498,600 4,273,900 990,400 1,234,300 211,600 6,572,000 4,329,300 998,300 1,244,400 213,200 6,659,800 4,393,500 1,008,400 1,257,900 216,100 6,777,500 4,478,700 1,022,100 1,276,700 220,800 6,912,200 4,577,100 1,037,200 1,297,900 226,200 5 Year Change 6% 7% 5% 5% 7% 2017 7,059,000 4,684,300 1,053,600 1,321,100 232,200 2018 7,205,700 4,792,000 1,069,900 1,343,800 238,000 2019 7,347,500 4,897,400 1,085,300 1,364,800 243,200 July 1, 2010 Percent 2020 7,485,000Est. July 1, 5,000,100 1,100,000 1,384,900 247,900 Est. July 1, Est. July 1, Est. July 1, Est. July 1, Est. July 1, Est. July 1, Est. Revised Change 2000 2021 7,622,100 5,102,8002009 1,114,700 1,404,600 2011 252,400 2005 2006 2007 2008 2012 to Census to 2012 10 Year Change 17% 19% 13% 14% 19% 196,629 202,764 211,137 212,585 211,917 210,899 211,247 211,583 24.8% 2022 7,758,600 5,205,600 1,129,200 1,423,800 256,900 10,375 2023 10,783 7,895,400 10,984 10,967 10,916 10,875 10,849 10,883 14.4% 5,308,700 1,143,700 1,443,000 261,200 11,175 2024 11,296 8,031,700 11,429 11,188 10,988 10,825 10,808 10,783 36.5% 5,411,900 1,158,200 1,461,600 265,500 3,726 3,769 8,168,200 4,051 4,104 4,102 1,480,100 4,103 4,084269,700 4,072 18.7% 2025 5,515,600 1,172,500 10,975 2026 11,056 8,305,100 11,280 11,399 11,379 11,238 11,237273,800 11,224 20.8% 5,619,800 1,186,800 1,498,500 3,74415 Year Change 3,873 4,001 3,889 28% 3,952 31% 3,945 20% 3,896 21% 3,890 29% 386 407 420 1,201,000 430 441 443277,800 442 33.0% 2027397 8,441,700 5,724,400 1,516,300 16 6 6 6 7 7281,700 7 2028 17 8,578,300 5,829,400 1,215,100 1,533,800 38,838 2029 39,699 8,715,200 40,371 40,041 39,932 39,771 39,873285,600 39,865 15.6% 5,934,900 1,229,100 1,551,200 33,686 2030 35,860 8,852,800 38,489 39,105 39,116 38,839 38,769289,400 38,964 63.5% 6,041,100 1,243,100 1,568,600 7,309 7,255 8,990,500 7,278 7,370 7,248 1,585,500 7,191 7,189293,100 7,181 ‐0.7% 2031 6,147,900 1,257,100 38% 84,033 44% 83,854 27% 83,714 28% 84,098 39% 76,40020 Year Change 78,759 82,840 84,273 14.6%
Source: Office of Employment & Population Statistics, Arizona Department of Administration Source: Office of Employment & Population Statistics, Arizona Department of Administration
30 | Yavapai College Campus Master Plan
Source: Arizona Department of Administration, Office of Employment & Population Statistics, 12/07/2012 Source: Office of Employment & Population Statistics, Arizona Department of Administration
2032 2033
9,128,500 9,266,000
6,255,100 6,362,300
1,270,900 1,284,700
1,602,500 1,619,000
296,800 300,300
External Planning Driver: Yavapai County & Arizona Occupational Trends The demographic analysis was coupled with a review of occupational trends across both Yavapai County and the State of Arizona. The objective for evaluating this data was to ensure that Yavapai College is well-positioned to meet future employment needs in the region. The diagram on the right identifies the major occupational groups within the State of Arizona and their projected change thru the year 2020. Construction, extraction, healthcare, education and hospitality related fields are expected to demonstrate strong growth over the ten-year master planning horizon. 38 percent of Yavapai County is employed in areas showing over 20 percent projected growth within the next decade. Yavapai College currently offers training in all of the areas demonstrating over 30 percent growth by 2020. The occupational data suggests that the college should continue to support these programs and possibly look for ways to increase educational access to them across the county.
Source: Office of Employment & Population Statistics in cooperation with U.S. Department of Labor, Bureau of Labor Statistics
Yavapai College Campus Master Plan  | 31
Internal Planning Driver: Educational Master Plans In 2012, Yavapai College completed an Educational Master Plan for each of the six divisions within the college, as well as a seventh master plan for district services: • Business, Computer Science, District Workforce & Economic Development Division • Career & Technical Education Division • Foundation Studies Division • Sciences & Health Division • Visual, Performing, & Liberal Arts Division • Division of Lifelong Learning • District Services Information Technology Services (ITS) Library Services Student Services Each educational master plan provides a five-year outlook detailing program costs, future academic goals, and areas of potential growth. The divisions that identified the greatest opportunity for program growth were the Career & Technical Education Division, Sciences & Health Division, and the Division of Lifelong Learning. The master planning team thoroughly reviewed each of these documents to ensure that the goals and recommendations of the Campus Master Plan align with the academic goals of Yavapai College. 32 | Yavapai College Campus Master Plan
Internal Planning Driver: Geographic Proximity By physical size, Yavapai County is one of the largest counties within the United States. The defining natural feature within the county is Mingus Mountain which bisects the region in a north-south direction. This presents many challenges to providing adequate educational access and student services across the region. Yavapai College currently supports
one campus on each side of Mingus Mountain, as well as four centers throughout the county. During master plan outreach sessions, many Yavapai College constituents raised concerns over the need to routinely commute between locations. They expressed a desire to minimize travel across the county for faculty, staff, and students.
Yavapai College Campus Master Plan  | 33
Internal Planning Driver: Off-Site Locations In addition to Yavapai College’s two campuses and four centers, numerous off-site locations are utilized by the college for classes and technical training programs. These are the result of corporate, municipal, and institutional partnerships. This approach allows Yavapai College to expand educational access within the region, control program and facility costs, and better target specific types of students such as high school students through the Mountain Institute Joint Technical Education
34 |  Yavapai College Campus Master Plan
District programs (JTED). The diagram below represents an abbreviated list of the many sites utilized by Yavapai College throughout the county. This has proven a successful approach for the college and suggests that partnership opportunities should continue to be strengthened and explored.
Internal Planning Driver: Program Distribution An important objective of the Campus Master Plan was to identify opportunities for improved efficiency across Yavapai College. A key strategy to understanding opportunities for greater efficiency was to first understand where potential inefficiencies exist. As part of the analysis process, the master planning team evaluated program offerings and delivery by location in order to better understand areas of program duplication. The assessment consisted of a physical mapping exercise to understand the geographical locations of program offerings within each of the six Yavapai College divisions. Program duplication was then identified and evaluated against program costs and the necessity of multiple locations. The diagrams on the right show that all divisions support some level of programming across the county. However, Career & Technical Education and Sciences & Health demonstrated greater inefficiencies than other divisions. High-cost programs such as nursing and the sciences are being taught in multiple locations. Northern Arizona Regional Training Academy (NARTA) spends considerable time and money moving students between off-site locations. Together, this puts strains on administrators, faculty, and student support services. An opportunity exists to improve efficiency in these areas by consolidating and centralizing key programs.
Visual, Performing & Liberal Arts
Business & Computer Science
Career & Technical Education
Foundation Studies
Sciences & Health
Lifelong Learning & Comm. Ed.
Yavapai College Campus Master Plan  | 35
Internal Planning Driver: Existing Space Needs Assessment An important aspect of the district-wide analysis was understanding exactly how much and what type of space Yavapai College currently supports, as well as how this space compares to institutional peers. Student Full Time Equivalent (SFTE) enrollment, course data, and faculty and staff information were used to establish the relative quantities of space needed for this analysis. The amount of space required was compared to existing space on campus to illustrate surpluses or deficits in various space categories. When the space needs guideline analysis was
36 |  Yavapai College Campus Master Plan
applied at the Base Year (Fall 2013), only the Prescott Valley Campus generated a need for additional space. The Verde Valley Campus demonstrated the largest existing surplus of space given enrollment, program, and staffing data. While the Career & Technical Education Center also generated a significant surplus of space, future enrollment projections suggest that program growth will soon fill this space.
Internal Planning Driver: Classroom Utilization Analysis A classroom utilization analysis was completed to identify potential inefficiencies at Yavapai College. The course data and facility inventory files for the Fall 2013 semester were used to conduct the analysis. Results by campus or center are noted in the table below. In reviewing the District average, classrooms were being utilized 21 weekly room hours at 57% student station occupancy. Classrooms averaged 31 assignable square feet (ASF) per station. Typical community college guidelines suggest rooms be used 35 weekly room hours at 65% student station occupancy as fiscal realities demand more efficient course scheduling.
Weekly Room Hours
The average number of hours per week a room is scheduled over a term or semester.
Student Station Occupancy The average percent of seats filled when a room is occupied during scheduled use.
Given the guidelines, classrooms at Prescott Valley and CTEC are at full utilization while Prescott can grow from 1,595 to 2,690 FTE and Verde Valley can grow from 310 to 883 FTE before additional classrooms are needed. There are no national guidelines that exist, but there are other sources to guide assessment: • Western Interstate Commission on Higher Education (WICHE) • Council of Educational Facility Planners International (CEFPI) • Arizona Board of Regents (ABOR) • Paulien & Associates - benchmark of more than 160 community colleges Yavapai College Campus Master Plan | 37
Campus-by-Campus Analysis: Prescott Campus Overview The Prescott Campus is Yavapai College’s oldest location with the first campus building constructed on this property in 1970. Today, it supports over 500,000 gross square feet of space and the college’s largest student population. Yavapai College administrative leaders reside on this campus. In addition, the campus is home to the college’s successful Osher Lifelong Learning Institute (OLLI) that provides programming throughout Yavapai County. The Prescott Campus appeals to a more traditional student by providing the most comprehensive academic and student life
38 | Yavapai College Campus Master Plan
offerings as compared to the college’s other locations. Student housing and full-service dining is only offered on this campus. This is also the only location to support athletic venues and a performing arts center. Open space amenities such as a community supported sculpture garden and nature trail form the perimeter of campus. The campus is located approximately one mile from downtown Prescott and is essentially landlocked in its current position.
Campus-by-Campus Analysis: Prescott Campus Campus Organization This diagram depicts the existing campus land use organization found on the Prescott Campus. This campus is the most complex of Yavapai College’s locations due to its age, size, and program diversity. The current layout represents a successful campus organization with compatible uses positioned close to one another to help create campus neighborhoods. Academic facilities, shown in blue, take prominence in the core of campus. Residential, athletic, and administrative uses are positioned around the perimeter. Student life facilities are strategically located near hubs of activity within the center of campus. Parking is distributed throughout campus and presents an opportunity to reconsider its future placement to better unite campus neighborhoods to the academic core.
Yavapai College Campus Master Plan  | 39
Campus-by-Campus Analysis: Prescott Campus Campus Gathering Space The following diagram identifies important indoor and outdoor gathering spaces found on the Prescott campus. Social spaces are key to creating an appealing campus environment and encouraging students to remain on campus to study and socialize. Campus gathering spaces are well positioned within the academic core of campus and near student housing. Building 3 serves as the center point of student life since it supports the campus dining facility. Building 19 takes on a secondary role containing the library, cafe, computer lab, and large meeting space. The space assessment identified the need for additional student life space on this campus. An opportunity exists to expand and improve existing social spaces to create even more desirable options for students, faculty, and staff to gather.
40 |  Yavapai College Campus Master Plan
Campus-by-Campus Analysis: Prescott Campus Campus Connectivity (Pedestrian, Vehicular, Wayfinding) As part of the analysis process, connectivity across the Prescott Campus was reviewed to identify potential opportunities for improvement. Campus connectivity encompasses pedestrian and vehicular circulation on campus, as well as wayfinding. There is one primary vehicular access point on campus from Sheldon Street. The entry can often be difficult for approaching motorists to see and suggests the need for increased signage. The location of this entry creates a significant amount of vehicular traffic within the center of campus. Pedestrian connectivity is limited across the entire campus, making it challenging for people to access student housing on the north or administrative offices on the south. An opportunity exists to strengthen connections across campus. A nature trail runs along the eastern, northern, and western boundaries of campus. It stops just short of connecting with the trail that winds through the existing sculpture park. These trails are valued by campus constituents and should be preserved.
Yavapai College Campus Master Plan  | 41
Campus-by-Campus Analysis: Verde Valley Campus Overview The Verde Valley Campus is located on the east side of Mingus Mountain in Yavapai County. It represents Yavapai College’s second largest location by both student enrollment and size. Over 120,000 gross square feet of space is present on this campus. The Verde Valley Campus also offers numerous academic and student life offerings as demonstrated by the diverse space distribution on campus. The campus recently received a $17 million dollar renovation to upgrade all facilities including the introduction of the Southwest Wine Center and vineyards.
42 |  Yavapai College Campus Master Plan
Verde Valley Campus is located in the town of Clarkdale on property surrounding by residential uses. The campus currently owns a substantial portion of property to the south of the developed portion of campus. This presents numerous opportunities for growth if needed in the future.
Campus-by-Campus Analysis: Verde Valley Campus Campus Organization The existing land use organization of the Verde Valley Campus represents an ideal layout for an institution of higher education. Parking is positioned on the perimeter allowing the center of campus to exist as a pedestrian focused environment. Academic facilities, shown in blue, are located within the center of campus with student life spaces and public interface zones accenting the core. The only exception to this organization is the position of the winery, located strategically to the west near the existing vineyards. Administrative uses occupy a logical space adjacent to the center of campus and recreation spaces and facility support services are appropriately positioned near the perimeter. Future development should continue to build upon this land use organization to further strengthen the campus.
Yavapai College Campus Master Plan  | 43
Campus-by-Campus Analysis: Verde Valley Campus Gathering Space The adjacent diagram depicts the gathering spaces found on the Verde Valley Campus. The campus has one primary indoor gathering space. It is the student center located within Building F. A cafe and lounge space is provided inside this facility. With its strategic location near the center of activity, it serves as a very popular space to gather on campus. Multiple outdoor gathering spaces exist on campus. They range in size and character from the large Pavilion space to small individual seating areas. Due to the size of the Pavilion, people do not casually gather in this area. The space is most successful when programmed with an event. The current outdoor spaces appear to adequately serve the campus.
44 |  Yavapai College Campus Master Plan
Campus-by-Campus Analysis: Verde Valley Campus Connectivity (Pedestrian, Vehicular, Wayfinding) An analysis of connectivity was also completed for the Verde Valley Campus. The campus has two primary vehicular entry points off of Black Hills Drive. Finding the campus from 89A can be challenging for motorists due to the lack of signage. However, efforts are currently underway with the Arizona Department of Transportation to correct this situation. Due to the existing land use organization, with parking at the perimeter, the interior of campus is easily navigated by pedestrians. Potential improvements could be made to pedestrian connections to existing parking areas since not all parking areas are well connected to the interior of campus. An unmaintained nature trail begins at the southern edge of the developed portion of the Verde Valley campus and extends to the west. An opportunity exists to upgrade the quality of this trail system to provide an additional recreational feature on campus.
Yavapai College Campus Master Plan  | 45
Campus-by-Campus Analysis: Chino Valley Center Overview The Chino Valley Agribusiness & Science Technology Center serves as Yavapai College’s center for agribusiness studies, hydroponics, equine science, and fisheries management. One 12,919 gross square foot classroom building is located on the site, along with several greenhouses to support academic coursework. The building was designed with a focus on sustainability and received LEED Silver status from the United States Green Building Council. A small area within the classroom building is dedicated to student center space. The facility currently serves the existing
46 |  Yavapai College Campus Master Plan
programs well. However, underutilized classroom space is available within the building. The Chino Valley Campus is located in a rural area within Old Home Manor. The campus occupies a large portion of land which allows for the presence of two wetlands and an equestrian arena for academic use. Plans are currently underway for the addition of an unmanned aviation program and lineman program.
Campus-by-Campus Analysis: Career & Technical Education Center Overview The Career & Technical Education Center (CTEC) is located on an eight acre parcel of land in the City of Prescott near Interstate 89A and the Prescott Municipal Airport. It serves as the hub of Yavapai College’s trade and technical programs. The programs share one large hi-bay space encompassing 108,000 gross square feet. As the diagram below demonstrates, the majority of the facility is dedicated to laboratory space. The facility is strategically positioned near compatible uses and corporate partners. The airport provides key training space for Yavapai College’s
aviation programs. Very limited student center space exists within this facility and limited parking presents daily challenges for students, faculty, and staff. During daytime hours, CTEC is primarily utilized by high school students taking programs through JTED. Around five o’clock, the campus transitions to an older student population taking courses for certification.
Yavapai College Campus Master Plan | 47
Campus-by-Campus Analysis: Prescott Valley Center Overview The Prescott Valley Center is located along Glassford Hill Road within a commercial area of Prescott Valley. The center is located adjacent to Bradshaw Mountain High School and Glassford Hill Middle School. The facility is a one-story linear building encompassing 21,235 gross square feet of space. This space is almost equally distributed between classrooms, laboratories, and offices. In addition to general education courses, the center serves as the hub for the NARTA police certification program. Both indoor and outdoor physical training space is provided
48 | Yavapai College Campus Master Plan
for this program. NARTA is an intensive program that requires housing and dining services. For this reason, students are shuttled between Yavapai College locations, as well as off-site partner locations to meet all of the program’s needs. The center also serves as the home of the college’s emergency medical service programs. A second Yavapai College owned facility is located across the street near the Prescott Library. This 10,168 gross square foot facility is currently occupied by Northern Arizona University.
Campus-by-Campus Analysis: Sedona Center Overview Yavapai College’s Sedona Film School and Osher Lifelong Learning Institute fill the space available within the Sedona Center for Arts and Technology. The center is defined by one 18,004 gross square feet building located within a defunct cultural park. The facility was not originally designed to serve as a classroom building and thus presents many challenges to use by the film school. As the diagram below highlights, the majority of space within the building is dedicated to classrooms and laboratories. Yavapai College only owns a very small
portion of land around the building. A small parking lot adjacent to the building is due to an agreement with the cultural park owner. During peak times, parking becomes a significant challenge for the center. The Sedona Center is located several miles west of downtown Sedona. Most students live in Cottonwood and commute to the center for classes.
Yavapai College Campus Master Plan  | 49
50 |  Yavapai College Campus Master Plan
Recommendations
System-wide Recommendations The Master Plan recommendations were generated after analyzing all of the data and information gathered. Serving such a wide geographical region and diverse population continues to be a goal of the college. Migration of several programs is recommended to minimize travel for faculty and students between campuses. This will allow for a more efficient administrative model, consolidate cost intensive programs such as nursing and CTEC, and co-locate programs requiring housing and services such as athletics and NARTA. The Master Plan recommends building on the strong presence of the two main campuses at Prescott and Verde Valley by enhancing them with social and student activity spaces. Creating places to linger and learn with a student life focus within the existing facilities will attract more students to the campus and encourage them to stay on campus before and after class. In addition to maintaining the two existing campuses, the Master Plan recommends a larger, consolidated facility in Prescott Valley to accommodate the new Nursing and Allied Health Center of Excellence. Consolidating the programs from Prescott and Verde Valley, while still offering pre-nursing classes at each campus, will allow the college to leverage the resources allocated to an advanced program. Moving the EMS/EMT program to the new campus will build on the synergies these programs have with the Nursing and Allied Health program further reinforcing the focus of the new campus. The map, shown at right, outlines the migrations and developments.
Prescott: • NARTA and Administration of Justice move from Prescott Valley to Prescott • Nursing moves to Prescott Valley (Science and Pre-Nursing remain) Verde Valley: • Agriculture and Equine move from Chino Valley to Verde Valley • Nursing moves to Prescott Valley (Science and pre-nursing remain) • Enhance partnerships with high schools including JTED and International Baccalaureate Prescott Valley: • Sell existing two facilities and replace with one large center, with enough land to eventually become a campus • Current programs migrate to new location with the exception of NARTA and Administration of Justice • Create Center for Excellence for Nursing and Allied Health • Partner with NAU to offer Bachelor and graduate degrees CTEC: • Expand existing programs and partnerships Chino Valley: • Agriculture and Equine move to Verde Valley • Sell existing facility • Continue to serve community via online, dual credit, and proximity to full- service campus Sedona: • OLLI moves to lease space closer to Sedona • Sell existing facility • Continue to serve community via online, dual credit, and proximity to full service campus
52 | Yavapai College Campus Master Plan
System-wide Recommendations: Who’s Where in the Future? Legend
Business & Computer Science Career & Technical Education Foundation Studies Sciences & Health
Sedona OLLI / Community ED 89
Visual / Performing / Liberal Arts
89A
Verde Valley
CTEC Career Tech Education
Sustainable Agriculture
Science & Pre-Nursing
Animal Science
Visual and Performing Arts
17
OLLI / Community ED CTE (JTED)
Prescott
260 89A
Visual and Performing Arts
Prescott Valley
Science & Pre-Nursing
Nursing / Allied Health
NARTA
EMS / EMT
OLLI / Community ED
NAU Yavapai NAU Yavapai Grad Programs
169
89 17
Locations To Be Determined Linemen Fire Science UAV
Yavapai College Campus Master Plan | 53
System-wide Recommendations: Centers of Excellence Migration also offers an opportunity to create centers of excellence by focusing program delivery at each location. This will allow the college to maintain strong independent locations that are interwoven with the overall goals and vision of the college. Destination programs draw students from around the state and nation, making the Yavapai College brand well known. Strong partnerships have been formed with regional businesses for the mining and NARTA programs while aviation and gunsmithing attract students on a national level. The introduction of viticulture and enology builds on the wineries in the Verde Valley promising to be a destination program as well. Fortifying regional partnerships with Yavapai Regional Medical Center and Verde Valley Medical Center creates opportunities for students and community members alike, allowing the college to truly serve the community at large.
NARTA
AVIATION 54 |  Yavapai College Campus Master Plan
VITICULTURE / ENOLOGY
Each location will have a unique focus while still maintaining general education for learners of all ages. Prescott Campus - Performing and Visual Arts Athletics Verde Valley Campus - Viticulture and Enology, Agriculture Visual Arts Prescott Valley Center - Nursing Allied Health CTEC -
Career and Technical Education
MINING
GUNSMITHING
System-wide Recommendations: System-wide Space Needs Summary The table at the right shows the ten year enrollment assumptions with the program migrations proposed by the master plan taken into account. The table below uses these assumptions to show the space available at each location today as well as the amount of space needed today and projected to be needed ten years from now. The space needs are given in assignable square feet (ASF) which will then be adjusted with a grossing factor to arrive at the gross square feet (GSF) required at each location. The table identifies additional space requirements at Prescott Valley and CTEC while also showing an overage of space at the Prescott and Verde Valley Campuses over the next ten years. This does not, however, tell the complete story. While there is space available at both Prescott and Verde Valley, it is not the right type and mix of space needed for program requirements. As a result, the following pages recommend specific spaces be introduced on these campuses over the life of the master plan.
Ten Year Enrollment Assumptions Campus Prescott
2013 Annualized SFTE
2023 Annualized SFTE
1,595
1,353
-15.2% -100.0%
% Change
Chino Valley
108
-
CTEC
268
292
8.7%
Prescott Valley
187
563
201.3%
Verde Valley
310
334
7.8%
Sedona
45
On-Line Delivery
-100.0%
1,194
1,864
56.1%
538
660
22.7%
4,245
5,066
19.3%
Off-Site
Total
-
Source: YC Office of Institutional Effectiveness and Research
ASF
SPACE NEEDS ANALYSIS FALL 2013 & FALL 2023 300,000 250,000 200,000 150,000 100,000 50,000 ‐ PRESCOTT CAMPUS
VERDE VALLEY CAMPUS
PRESCOTT VALLEY CAMPUS
CAREER & TECHNICAL EDUCATION CENTER
EXISTING AVAILABLE ASF
254,598
63,586
14,353
92,020
SPACE NEED FALL 2013
250,476
46,939
16,129
69,587
SPACE NEED FALL 2023
245,597
60,840
76,061
97,224 Yavapai College Campus Master Plan | 55
Campus-by-Campus Recommendations Summary: Prescott Campus Proposed Expansions A. Surface Parking Lot 280 Spaces
A B
B. Event Center and
C
Multi-purpose Field C. Multipurpose Facility
F
Locker Rooms NARTA Facilities D. Open Music Labs Storage D
E. Lecture Hall F. Residence Halls
Legend Existing Building Building Renovation Proposed Building Parking Area
56 |  Yavapai College Campus Master Plan
E
A SURFACE PARKING LOT - 280 SPACES The recommended surface parking lot of 280 spaces will replace the spaces displaced by the development of the Event Center and Multipurpose Field. The parking is recommended to be installed to the west of the Event Center to keep the student-focused spaces closer to the center of campus and to allow a green space network to be enhanced tieing the new development to the remainder of the existing campus.
B EVENT CENTER AND MULTIPURPOSE FIELD The recommended Event Center and Multipurpose Field will serve the College on many levels. The space needs analysis identified a shortfall in athletic and recreational space on campus. Yavapai College has a solid reputation as a very competitive soccer program having won seven National titles in the past 25 years. This development would allow the team to practice and play on campus thus boosting student and community involvement alike.
C MULTIPURPOSE FACILITY Throughout the planning process the demand for a larger, flexible gathering space, in addition to the existing community room, was evident. The master plan recommends a new multipurpose facility to be built in conjunction with the Event Center and Multipurpose Field. The new building would house a divisible multipurpose room, additional locker room facilities, training space for NARTA and weight room for the college. The placement of this facility in relation to the dorms and Event Center will create a student commons and outdoor recreation space. Careful planning of the building and site will allow for an indoor/outdoor connection between the building and thus enhancing the use of both.
The recommendation is for a lit synthetic field due to the multiple activities and year-round uses being envisioned. The field can also be used for musical performances, marching bands, graduation and other ceremonies. In addition, the field can be rented out in conjunction with the dorms for summer camps and other programs. The initial development would include locker rooms and a concession area to support the activities on the field. These are envisioned to be built under the stands to localize construction activities. The abandoned dorms provide a relatively flat site for construction of such a large open space.
Yavapai College Campus Master Plan  | 57
Campus-by-Campus Recommendations Summary: Prescott Campus Proposed Expansions D OPEN MUSIC LABS AND STORAGE The music program at Yavapai College continues to grow and be a source of pride for the campus with its focus on the arts. The existing facility contains only one large rehearsal space, which is shared between both instrumental and vocal disciplines. This results in the search for rehearsal space, which often extends to the community room, making it unavailable for the community at large as was originally intended. The Campus Master Plan recommends the addition of a proper rehearsal space, with attention to the acoustical requirements needed for such a space. Because Building 15 is shared with some visual arts programs, storage is also an identified need for the two programs. Land exists immediately adjacent to the existing Building 15 making this the ideal location for expansion.
E LECTURE HALL Another need identified by the master plan was a 200-300 seat lecture hall. This space would alleviate pressure on the community room and provide a place on campus for guest lectures and lecture series. It could also accommodate smaller performances that the Performing Arts Center is too large to hold. The space would have tiered seating and be acoustically designed for a variety of events. The location adjacent to the Performing Arts Center and attached to the Library and community room is at the heart of the community focused portion of the campus. Close proximity to the music building allows instruments and other props to be easily transported.
58 |  Yavapai College Campus Master Plan
F RESIDENCE HALLS Additional residence halls are recommended to be built over the life of the master plan to accommodate both the loss of Supai Hall and the migration of the NARTA program from Prescott Valley to the Prescott Campus. NARTA attracts students from all over the state who require housing. Because the students tend to be older, apartment style housing is recommended for the new halls as opposed to the typical dormitory style housing. The housing would be placed adjacent to the existing housing and in close proximity to the food service in Building 3. An extension of the green space network on camps will further tie the new halls to the remainder of campus.
Yavapai College Campus Master Plan  | 59
Campus-by-Campus Recommendations Summary: Prescott Campus Proposed Renovations and Relocations 1. Renovate for University Transfer Center 2. Renovate Nursing Space for NARTA 3. Renovate for Student
3
Activity Space
2
15. Renovate Art/Music
1
19. Relocate TELS and Renovate Learning 15
Commons
19
29. Convert to Business Center 31. Expand OLLI
31
32. Relocate Instructional Support
32 Legend Existing Building Building Renovation Proposed Building Parking Area
60 |  Yavapai College Campus Master Plan
29
1 RENOVATE FOR UNIVERSITY TRANSFER CENTER Building 1 already houses the advising space and several smaller spaces for various institutions of higher education. The Master Plan recommends moving the NAU and ODU spaces to this building and combining them with the spaces for other institutions creating a consolidated University Transfer Center. This would make all transfer options available to students in one location near advising and the main public access for the college.
2 RENOVATE NURSING SPACE FOR NARTA As the Nursing Program moves to the Prescott Valley location, space will be vacated on the second floor of Building 2. The Master Plan recommends renovating this space to accommodate the NARTA program which will be moving from Prescott Valley to Prescott. Utilizing this space will allow the NARTA program to maintain its own identity while also integrating it into the campus. The location above the athletic spaces and adjacent to the proposed housing makes it ideal for NARTA which will use both amenities regularly.
15 RENOVATE ART/MUSIC Building 15 currently contains space for both the music and arts programs. With the recommended addition of rehearsal space, there is opportunity to look at the organization of the building as a whole making it more suitable for all the various programs sharing space. One major need identified during the master plan process was the need for additional storage space for the music program.
19 RELOCATE TELS AND RENOVATE LEARNING COMMONS The master Plan recommends relocating TELS to Building 19 to make space for student activity in Building 3 and to build on the synergy of the TELS program offerings with the library and computer commons. Over the life of the Master Plan the reference section of the library will diminish but the need for group and individual study spaces will expand. Renovating the current space in conjunction with the addition of the lecture hall will allow Building 19 to serve both the student and public populations located at the heart of campus.
3 RENOVATE FOR STUDENT ACTIVITY SPACE Building 3 already houses the student dining and student club space making it the ideal location for the student activity space identified by the space needs analysis. Pairing the interior space with development of the adjacent outdoor space will provide a variety of settings in which students can engage and interact with one another. The proximity to the residence halls and classroom buildings make this a natural student hub.
Yavapai College Campus Master Plan  | 61
62 |  Yavapai College Campus Master Plan
Campus-by-Campus Recommendations Summary: Prescott Campus Proposed Renovations and Relocations 29 CONVERT TO BUSINESS CENTER Building 29 will be available for conversion to a business center when NAU moves to the University Transfer Center in Building 1. The building already contains several smaller office and conference spaces around a central open space so very little work would be required to convert it to a business center. The location in the administrative section of campus ties the business center to the economic development mission of the college.
31 EXPAND OLLI Building 31 is currently shared between OLLI and ODU. The master plan recommends dedicating the whole building to OLLI when ODU moves to the University Transfer Center in Building 1. Yavapai College is well ahead of the national average in serving life-long learning opportunities. The strong partnership with the OLLI program will be enhanced with this expansion. The location of this building on a relatively flat part of campus makes for easier access by patrons.
32 RELOCATE INSTRUCTIONAL SUPPORT The lower level of Building 32 is underutilized. The master plan recommends relocating Instructional Support to this location to enhance the faculty ties to the administration. This move will also open more space in Building 3 for student activities.
Yavapai College Campus Master Plan  | 63
Campus-by-Campus Recommendations Summary: Prescott Campus Proposed Open Space Enhancements and Wayfinding Improvements 1. Rough Rider Plaza 2. NARTA Training Zone 3. Central Commons 4. Yavapai Gateway Plaza
1
5. Student Center Quad
2
5
3 4
Legend Central Campus Scuplture Garden Athletics/Recreation High Activity Zone Small Gathering Space Pedestrian Circulation Vehicular Circulation
64 |  Yavapai College Campus Master Plan
OPEN SPACE ENHANCEMENTS The Prescott Campus makes a striking first impression with beautifully maintained open spaces throughout the site and an impressive sculpture garden near the entry. Upon additional review, it appears that there are several ways to further improve upon the existing open space network. The campus currently lacks a strong hierarchy of open spaces that provide people with diverse seating choices. There are many small, secluded gathering areas throughout campus, but very few high activity open space zones. Without these spaces, the Prescott Campus has a tendency to feel empty and less inviting to potential students and visitors. An opportunity exists to create five high activity open space zones in strategic areas of the site to enliven the campus. Each space should be of a slightly different character with a variety of seating and shade options, landscaping, and paving designs. The following text provides a brief summary of the proposed vision for each space:
1 ROUGH RIDER PLAZA A plaza is proposed adjacent to the main entry to the event center and multipurpose field. This space will allow for gathering before and after functions, as well as an opportunity to be programmed for special events.
2 NARTA TRAINING ZONE With NARTA’s move to the Prescott Campus, a space for outdoor training is needed. This proposed space is appropriate due to its level grade and location adjacent to NARTA’s recommended academic space. Its centralized location will activate the center of campus when in use.
3 CENTRAL COMMONS This area serves as the center of campus between academics and student housing. It presents a unique opportunity to develop this area as a casual gathering spot that students can use for informal recreation
4 YAVAPAI GATEWAY PLAZA Nearly all visitors to campus pass through this space on their way to their destination. A plaza already exists in this location, but without shade or seating it does not encourage people to linger. It is recommended that this area be redesigned and celebrated as the “gateway” to campus.
5 STUDENT CENTER QUAD This area is located directly outside of the dining hall and naturally serves as a gathering space for students. An improvement in amenities in this area could make it an even more inviting space through the addition of moveable tables and chairs, an outdoor fireplace, and increased shade.
WAYFINDING IMPROVEMENTS Concerns were raised by constituents regarding challenges faced when navigating the campus. The following recommendations outline a series of relatively simple strategies that will help improve overall wayfinding: • Direct motorists to 1 or 2 key points on campus such as PAC and Building 1, then provide more detailed signage in those locations • Provide an overall campus map in a central location • Enhance pedestrian connections to naturally improve wayfinding • Ensure all buildings are signed on all sides from both a vehicular and pedestrian viewpoint Yavapai College Campus Master Plan | 65
Campus-by-Campus Recommendations Summary: Verde Valley Campus Proposed Expansions and Renovations EXPANSIONS 1. Greenhouses L
2. Surface Parking Lot 20 Spaces RENOVATIONS L. Renovate for Agriculture Programs O. Renovate for Winery and Tasting Room
Legend Existing Building Building Renovation Proposed Building Parking Area
66 |  Yavapai College Campus Master Plan
1
O
2
1 GREENHOUSES The Campus Master Plan recommends the construction of greenhouses on the Valley Verde campus to accommodate the move of the agriculture programs from the Chino center. These would replace the greenhouses currently at the Chino center and take advantage of the land available on the Verde Valley campus. As the viticulture and enology programs grow over the life of the master plan, the greenhouses could be shared between the programs.
2 SURFACE PARKING LOT - 20 SPACES Once Building O is renovated for the winery and tasting room, additional visitor parking adjacent to the building will be required. Because the building is slightly removed from campus and already had some parking, the identified need is limited to 20 additional spaces.
L RENOVATE FOR AGRICULTURE PROGRAMS Building L currently houses the Nursing program. As the program migrates to the Prescott Valley campus, the master plan recommends renovating this building for use by the agriculture programs relocating from the Chino center. As laboratories already exist in Building L, the addition of the agricultural classes will virtually recreate the Chino Valley Center’s main building.
O RENOVATE FOR WINERY AND TASTING ROOM Building O is already being renovated for a winery and tasting room as part of the development of the viticulture and enology programs. The renovation, schedule to be complete by the time the master plan report is issued, is identified in the master plan report due to its significant impact on the development of the Verde Valley campus as a center for excellence for these programs.
Yavapai College Campus Master Plan  | 67
Campus-by-Campus Recommendations Summary: Verde Valley Campus Proposed Open Space Enhancements and Wayfinding Improvements 1. Verde Valley Pavilion
2
Plaza
3
2. Southwest Wine Center Outdoor Terrace 3. Walking Trail
1
Improvements
Legend Central Campus High Activity Zone Small Gathering Space Pedestrian Circulation Vehicular Circulation
68 |  Yavapai College Campus Master Plan
OPEN SPACE ENHANCEMENTS The Verde Valley Campus also makes a good first impression with very well maintained landscaping and open spaces. The dramatic mountain views to the northwest provide a spectacular backdrop for this campus. This natural feature is taken advantage of in several outdoor spots, but has even more potential to define the identity of campus and frame vistas. Due to the compact composition of the Verde Valley Campus, the open space network is primarily confined to the core of campus. Fingers of open space radiate out from this central space to connect to existing parking areas on the perimeter of campus. Building entries are oriented towards this central open space, naturally energizing the area with pedestrians. An opportunity exists to enhance the open space corridors by improving the pedestrian connections and by increasing the number of small seating areas positioned along these walkways. The Verde Valley Campus provides a greater variety of seating options when compared to the Prescott Campus, but still has an opportunity to increase the diversity of outdoor furniture to create interest on campus. The existing outdoor pavilion is already well established as a high activity zone on campus. There is potential to further enhance this area to make it an even more dynamic outdoor space. An opportunity also exists to create an outdoor gathering space near the Southwest Wine Center. The following text provides an overview of the vision for each of these areas:
1 VERDE VALLEY PAVILION PLAZA The existing pavilion is a wonderful outdoor space located in the heart of campus. The Pavilion Plaza builds upon this amenity by proposing an open space around it that plays off the features already in place within this area. Tables and chairs with shade structures can make this a more inviting space and allow activities within the pavilion to spill out into the adjacent open space areas.
2 SOUTHWEST WINE CENTER OUTDOOR TERRACE The recent opening of the Southwest Wine Center presents new and exciting opportunities for attracting visitors to campus. The creation of an outdoor terrace adjacent to the facility would provide an inviting space for people to relax and enjoy wine and mountain views. This space also presents programming opportunities for small concerts and educational demonstrations.
3 WALKING TRAIL IMPROVEMENTS Improvements to upgrade the existing trail system will enhance the recreational offerings on campus and serve as an extension of campus open spaces. It will also help strengthen community connections.
WAYFINDING IMPROVEMENTS During the master planning process, wayfinding was not as significant an issue at Verde Valley as it was at Prescott. The biggest issue facing Verde Valley is the challenge faced by motorists trying to find the campus from Old Jerome Highway. Signage is needed at the corner of Black Hills Drive and Old Jerome Highway to guide visitors to the campus entry. Yavapai College Campus Master Plan  | 69
Campus-by-Campus Recommendations Summary: CTEC Proposed Expansions and Renovations 1. Surface Parking Lot 3
88 Spaces 2. Renovate Classrooms/ Labs
2
3. Expansion for Classrooms/Labs
70 |  Yavapai College Campus Master Plan
1
1 SURFACE PARKING LOT - 88 SPACES The current CTEC parking lor is nearing capacity. As the programs grow over the life of the master plan, additional parking will be needed to accommodate the growth. Because the current building and parking lot occupy the available land capacity, additional adjacent land will have to be acquired for the expanded parking needs.
3 EXPANSION FOR CLASSROOMS/LABS A growth of over 40% was identified for the CTEC programs over the life of the master plan. Due to the available space within the current facility, the need for expansion is limited. A space on the east side of the facility has been identified for this expansion as the building occupies much of the site. This space is also adjacent to space inside the facility that is available for development, thus making it very flexible.
2 RENOVATE CLASSROOMS/LABS An opportunity was identified in the master planning process to renovate the existing CTEC facility to create a better flow between the classroom and lab spaces. Students in this facility learn in the classroom and then immediately apply those skills in the lab or field. Some available space exists in the northeast corner of the facility for build-out allowing other spaces to be reorganized. The space needs analysis also identified the need for offices and student activity space as those programs grow. In order to enhance the student experience access to faculty, student services and student activity space is required. Opportunities exist to build on the existing partnerships developed with JTED (Joint Technical Education), mining companies and local businesses.
Yavapai College Campus Master Plan  | 71
Campus-by-Campus Recommendations Summary: Prescott Valley Center Proposed Phase 1 Organization The current Prescott Valley locations have limited growth potential given the current level of population growth in this area of the county, growth in the college is anticipated. In keeping with the principles of creating centers of excellence, consolidating cost intensive programs and building partnerships within the region, the recommendation is to sell the existing properties and acquire land on which to build a new campus. This campus will focus on allied health and nursing while still offering general education. The location of the new campus is critical to the community and college alike. Ideally the new campus would be in the northeast section of Prescott Valley to limit commuter time from both Prescott and Verde Valley. Building on the partnership with Yavapai Regional Medical Center (YRMC), it would be beneficial to all parties to locate central to YRMC in order to strengthen the relationship and offer medical professionals on-going training. The Phase 1 development will focus on the academic core with classrooms, laboratories and simulation labs to serve these focus programs and general education. Office and support space would be required as well as student services, student life, learning center and common space to create a functioning center. The Phase 2 development would expand to a campus adding a library, recreation, additional support and student housing. Eventually a clinic could be added to enhance the community outreach and student development. The list on the following page shows the progression of the campus.
72 |  Yavapai College Campus Master Plan
Parking Student Services
Student Life
Classrooms
Offices
NAU/ Yavapai
Support
Academic Core
Laboratories Learning Center
Simulation Lab Common Space
Parking
Campus-by-Campus Recommendations Summary: Prescott Valley Campus Proposed Phase 2 Organization Planned Growth of a New Campus Recreation
1. Instructional Classrooms 2. Instructional Laboratories 3. Faculty Offices
Student Services
Parking
Classrooms
5. Common Spaces 7. Campus Support
Clinic
Offices
10. Administrative Offices
Support
Academic Core
NAU/ Yavapai
Parking
Laboratories Learning Center
8. Library 9. Recreation
Student Life
Library
4. Student services 6. Learning Center
Parking
Student Housing
Common Space
Parking
Simulation Lab Plant
11. Community Outreach Yavapai College Campus Master Plan  | 73
Campus-by-Campus Recommendations Summary: Sedona Center Proposed Migration
74 |  Yavapai College Campus Master Plan
MIGRATION OPPORTUNITY The current Sedona center was not designed as a classroom building although the college has made a valiant effort to function within this facility. Furthermore the college does not own the land immediately adjacent to the building making expansion or reconfiguration nearly impossible. Therefore, the recommendation is for the college to lease a space closer to the center of town to continue to serve primarily the OLLI students who attend classes at the current location. The college will explore potential partnership opportunities within the Sedona development community.
Yavapai College Campus Master Plan  | 75
76 |  Yavapai College Campus Master Plan
Implementation
78 |  Yavapai College Campus Master Plan
Implementation Overview The following section presents a framework to guide implementation of the Campus Master Plan. When the master planning process began, the college already had a few initiatives under way. The first page documents those projects currently under construction or recently completed in order to represent a complete picture of current ongoing improvements. The remainder of the implementation was broken down into three periods: short term, mid term and long term. The periods suggest a prioritization for proposed initiatives to occur on campus. Each of these periods was given a time range to allow the college to shift projects within a given period as funding becomes available. The master planning team worked closely with College leadership to develop a Phasing and Cost Matrix to accompany each phase of the plan which is also included in this document. The matrix outlines general project costs for each item included in the Campus Master Plan. Careful consideration has been taken to ensure that the phasing order makes strategic use of Yavapai College’s resources and reflects an appropriate sequencing. A final recommendation of the Campus Master Plan, is to establish an Implementation Team to help facilitate implementation of the initiatives outlined in this report. The team should be comprised of a diverse group of Yavapai College constituents. It is recommended that the team meet on a regular basis to maintain momentum and provide guidance on all projects.
Priority projects focus on enhancing the student experience in an effort to improve recruitment, retention, and student success Within the short-term phase, emphasis is placed on renovations to existing facilities Each phase includes a range of project types and sizes Critical Path projects require additional consideration in order to appropriately sequence related initiatives Projects not highlighted in critical path slides can happen independently and at any point during master plan timeframe
Yavapai College Campus Master Plan  | 79
Under Construction Yavapai College Campus Master Plan and Capital Improvements Phasing and Matrix Phasing and CostCost Matrix Type
(DRAFT)
Project Name
*Project Size
Unit Cost
*Project Size
Projects Type
Project Name
Campus
**Estimated Total
**Estimated Projected Construction Costs Unit Cost
*Project Size
***Estimated Total
Project
UNDER CONSTRUCTION
R = RENOVATION
R
Building O: Conversion to Southwest Wine Center
R
Performing Arts Center Elevator
R
Marapai Residence Hall plus Site Improvements
Prescott
27,189
GSF
D
Supai Residence Hall (2014)
Prescott
29,404
GSF
Verde Valley
3,454
Prescott
$1,900,000.00
GSF
$750,000.00
LS
$4,500,000.00 Subtotal
E - EXPANSION
NC - NEW CONSTRUC D = DEMOLITION
$175,000.00
O = OPEN SPACE IMP
$7,325,000.00
P = PARKING W = WAYFINDING
SHORT-TERM R
A = PROPERTY ACQU
Building 1: 1st Floor for University Transfer Center
R Building 1st Floor for Student Activity Center Campus Plan Capital Improvements Campus Master Master Plan3: and and Capital Improvements R Building 15: Art / Music Updates Matrix (DRAFT) Matrix Matrix (DRAFT) (DRAFT) R
CTEC: Classroom and Laboratory Renovation
E
*Project *Project Size Size CTEC: Classroom and Laboratory Expansion
*Project *Project Size Size
Projects Projects E Building 15: Open Music Labs/Storage Expansion Projects
NC Multi-Purpose Field with Locker Rooms and Concessions Capital Capital Improvements Improvements NC Residence Hall (apartment-style) Project Name Campus Project Campus Project Name Name Campus O General Open Space Improvements - Phase 1 *Project Size Unit *Project Size *Project Size Size Unit Cost Cost *Project Size Size *Project *Project *Project Size Unit Cost Cost O *Project Size General Open Space Improvements - Phase 1 Unit
ON ON ON
3,600
GSF
$150.00
Prescott
2,560
GSF
$150.00
$384,000.00
Prescott
21,226
GSF
$150.00
$3,183,900.00
CTEC
29,313
GSF
$150.00
$4,396,950.00
Prescott
*Project Size *Project *Project Size Size
Unit Cost
**Estimated **Estimated Total Total
Unit Unit Cost Cost CTEC Unit Cost
**Estimated Total **Estimated Total 4,425 GSF
$1,548,750.00
$275.00
$1,017,500.00
4,200 GSF/LS
$300.00
$2,560,000.00
PrescottUnit Unit Cost Cost
***Estimated 30,000 GSFTotal ***Estimated Total
$225.00
$6,750,000.00
Unit Cost
***Estimated Total
Verde Valley
1
LS
P = PROPERTY SALE
L = LEASE SPACE
A = PROPERTY ACQUISITION
W = WAYFINDING
P = PARKING
D = DEMOLITION
NC - NEW CONSTRUCTION
E - EXPANSION
RSubtotal = RENOVATION $7,325,000.00 E -- EXPANSION EXPANSION10,000 E GSF E EXPANSION E - EXPANSION NC NC --- NEW NEW CONSTRUCTION CONSTRUCTION NC NEW CONSTRUCTION NC - NEW CONSTRUCTION D$150.00 = DEMOLITION DEMOLITION $540,000.00 D = $540,000.00 D = D$150.00 = DEMOLITION DEMOLITION $150.00 $540,000.00 O = OPEN SPACE IMPROVEMENTS $150.00 $384,000.00 O$150.00 = OPEN OPEN SPACE SPACE IMPROVEMENTS IMPROVEMENTS $384,000.00 O = GSF O$150.00 = OPEN SPACE IMPROVEMENTS $175,000.00 $384,000.00 GSF $7,325,000.00 P$150.00 = PARKING PARKING 4,905 $3,183,900.00 $7,325,000.00 P = GSF Prescott GSF $7,325,000.00 P = PARKING $150.00 $3,183,900.00 GSF $7,325,000.00 P = PARKING $150.00 $3,183,900.00 GSF W$150.00 = WAYFINDING WAYFINDING $4,396,950.00 GSF Prescott W = 3,631 $4,396,950.00 GSF W = GSF W$150.00 = WAYFINDING WAYFINDING $150.00 $4,396,950.00 GSF A = ACQUISITION $350.00 $1,548,750.00 A$350.00 = PROPERTY PROPERTY12,000 ACQUISITION GSF Prescott GSF A = PROPERTY ACQUISITION $1,548,750.00 GSF A$350.00 = PROPERTY ACQUISITION $1,548,750.00 GSF L = LEASE SPACE $540,000.00 $275.00 $1,017,500.00 L = LEASE SPACE $540,000.00 GSF Prescott Valley L 100,000 $1,017,500.00 GSF = $540,000.00 GSF L$275.00 = LEASE LEASE SPACE SPACE $540,000.00 $275.00 $1,017,500.00 GSF P$300.00 = PROPERTY SALE $2,560,000.00 $384,000.00 R = RENOVATION
2,560 2,560 21,226 21,226 21,226 29,313 29,313 29,313 4,425 4,425 4,425 3,700 3,700 3,700
1
O = OPEN SPACE IMPROVEMENTS
Fees, FFE, Etc. GSF = Gross Square Feet $1,900,000.00 Verde 3,454 GSF L Valley New Sedona Center Location $1,900,000.00 SF = Square Feet Sedona Verde Valley 3,454 (Lease) GSF Verde Valley 3,454 GSF $1,900,000.00 $1,900,000.00 Verde Valley 3,454 GSF *** E stimated Total Construction Costs Shown Reflect 2013 Prices. LF = Linear Foot $750,000.00 Prescott LS $750,000.00 Prescott LS $750,000.00 Prescott LS Prescott LS A 2% Cost Escalation Average Per Year,$750,000.00 For Each Phase, Will LS = Lump Sum $4,500,000.00 Prescott 27,189 GSF oor for University Transfer Center $4,500,000.00 Prescott 3,600 GSF Prescott 27,189 GSF oor for University Transfer Center Need To Be Applied. Reference “The ENR Building And Prescott 3,600 GSF Prescott 27,189 GSF $4,500,000.00 oor for University Transfer Center Prescott 27,189 GSF Prescott 3,600 $4,500,000.00 GSF oor for Student Activity Center Prescott 29,404 GSF Construction Index” As A Guide. $175,000.00 MID-TERM Prescott 2,560 $175,000.00 GSF Prescott 29,404 GSFCost $175,000.00 Prescott 2,560 GSF Prescott 29,404 GSF oor for Student Activity Center
Project Type Legend
LS **Estimated Projected Construction **Estimated Construction **Estimated Projected Projected Construction P ersion to Southwest Wine Center $1,900,000.00 Verde Valley 3,454 GSF New Surface Parking Lot near Events Center Prescott 280 $1,900,000.00 SPACES ersion Costs Verde 3,454 GSF ersion to to Southwest Southwest Wine Wine Center Center $1,900,000.00 Verde Valley Valley 3,454 GSF Costs W enter Elevator Elevator $750,000.00 Wayfinding Improvements - Phase 1 Prescott LS Prescott 1 LS enter $750,000.00 Prescott LS enter Elevator $750,000.00 Prescott LS Campus Unit Cost ***Estimated Total W e Hall plus Site Improvements $4,500,000.00 *Project Size Wayfinding Improvements Phase 1 Prescott 27,189 GSF Campus Unit Cost ***Estimated Total *Project Size Size Verde Valley 1 $4,500,000.00 LS e Prescott 27,189 GSF Campus ***Estimated Total *Project e Hall Hall plus plus Site Site Improvements Improvements $4,500,000.00 Campus Unit Cost Cost ***Estimated Total PrescottUnit 27,189 GSF *Project Size ** Campus EstimatedLocation Projected Construction Costs Are Listed. DoPrescott Valley Project Type Legend Hall (2014)Notes: $175,000.00 A Project Type Legend New Prescott Valley Prescott 29,404Costs GSF 80 ACRES Prescott 29,404 GSF Hall (2014) $175,000.00 Project Type Legend Project Type Legend Hall (2014)* Project Size Abbreviations: $175,000.00 29,404 GSF Not Include Land Prescott Prices, Design, Moving Cost, Administrative RSubtotal = RENOVATION RENOVATION Subtotal $7,325,000.00 A R = CTEC Expansion CTEC $7,325,000.00 R = RENOVATION 1 ACRES
Prescott Prescott 29,404 GSF oor for Student Activity Center Prescott 29,404 GSF Prescott Subtotal R Music Subtotal Building 31: Expand OLLI Prescott Subtotal Music Updates Updates Prescott Subtotal Music Updates Prescott R m and Laboratory Renovation CTEC Building 29: Conversion to Business Center m and Laboratory Renovation CTEC m and Laboratory Renovation CTEC E College m and and Laboratory Expansion Building Campus 19: Lecture Hall (200-300 seat)CTEC m Expansion 80 | Yavapai Master Plan CTEC m and Laboratory Laboratory Expansion CTEC $150.00 Prescott 3,600 GSF NC n Music Labs/Storage Expansion New Prescott Valley Center $150.00 Prescott Prescott 3,600 - Phase GSF 1 Development n Music Labs/Storage Expansion $150.00 Prescott Prescott 3,600 GSF $150.00 n Music Labs/StoragePrescott Expansion 3,600 GSF Prescott $150.00 d with Locker RoomsPrescott and Concessions 2,560 GSF
P = PROPERTY SALE
**Estimated Projected Construction **Estimated Construction **Estimated Projected Projected Construction Prescott 3,700 GSF Costs Costs Costs
**Estimated **Estimated Total Total **Estimated **Estimated Total TotalPrescott
L = LEASE SPACE
$350.00
Prescott *Project Size *Project *Project Size Size
$540,000.00
Project Type Legend $100,000.00 Project Project Type Type Legend Legend R= = RENOVATION $250,000.00 R R = RENOVATION RENOVATION E - EXPANSION $4,000.00 $1,120,000.00 E E -- EXPANSION EXPANSION NC -- NEW NEW - CONSTRUCTION $75,000.00 NC NC - NEW CONSTRUCTION CONSTRUCTION D = DEMOLITION $75,000.00 D= = DEMOLITION DEMOLITION D O = OPEN SPACE IMPROVEMENTS O O= = OPEN OPEN SPACE SPACE IMPROVEMENTS IMPROVEMENTS P= = PARKING PARKING P P = PARKING W = WAYFINDING W W= = WAYFINDING WAYFINDING ASubtotal = PROPERTY PROPERTY ACQUISITION $22,001,100.00 A = A = PROPERTY ACQUISITION ACQUISITION L = LEASE SPACE L= = LEASE LEASE SPACE SPACE L P = PROPERTY SALE P P= = PROPERTY PROPERTY SALE SALE
$150.00
$735,750.00
$150.00
$544,650.00
$275.00
$3,300,000.00
$300.00
$30,000,000.00
Phasing and Cost Matrix (DRAFT) Type
Project Name
*Project Size
Short Term: 0–3 years Yavapai College Campus Master Plan and Capital Improvements Type
Project Name
Phasing and Matrix Phasing and CostCost Matrix UNDER CONSTRUCTION
R Type R
(DRAFT)
Verde Valley
Project Name
R D
Supai Residence Hall (2014)
Type
3,454
*Project Size
Performing Arts Center Elevator
Projects Marapai Residence Hall plus Site Improvements
Unit Cost
*Project Size
***Estimated Total
R = RENOVAT
Building O: Conversion to Southwest Wine Center
GSF
Unit Cost
*Project Size
Prescott
27,189
$1,900,000.00
**Estimated Total
$750,000.00
E - EXPANSIO
NC - NEW CON
GSF
**Estimated Projected Construction $4,500,000.00 Costs
GSF
$175,000.00
O = OPEN SPA
LS
Prescott
Project Name
Prescott
29,404
Campus
*Project Size
Unit Cost Subtotal
***Estimated Total $7,325,000.00
D = DEMOLITI
P = PARKING
W = WAYFIND
UNDER CONSTRUCTION SHORT-TERM
R = PROPERT RENOVAT A
R
O: 1st Conversion Southwest Wine Center Building 1: Floor for to University Transfer Center
R
Performing Center Building 3: Arts 1st Floor forElevator Student Activity Center
R
Marapai Residence Hall Updates plus Site Improvements Building 15: Art / Music
Prescott
27,189 21,226
GSF
D R
Supai Residence Hall CTEC: Classroom and(2014) Laboratory Renovation
Prescott CTEC
29,404 29,313
E
CTEC: Classroom and Laboratory Expansion
E
Building 15: Open Music Labs/Storage Expansion
Verde Valley Prescott Prescott
SHORT-TERM NC Multi-Purpose Field with Locker Rooms and Concessions R NC
R P
E W
CTEC: Classroom and Laboratory Renovation New Surface Parking Lot near Events Center
*Project *Project Size Size
*Project *Project Size Size CTEC: Classroom and Laboratory Expansion Wayfinding Improvements - Phase 1
Projects Projects E Building 15: Improvements Open Music Labs/Storage W Wayfinding - Phase 1 Expansion Projects
A CTEC Expansion Project Campus Project Name Name Campus O General OpenCenter SpaceLocation Improvements L New Sedona (Lease)- Phase 1 *Project Size Unit *Project Size *Project Size Size Unit Cost Cost *Project Size Size *Project *Project *Project Size Unit Cost Cost O *Project Size General Open Space Improvements - Phase 1 Unit
*Project Size *Project *Project Size Size
GSF
$150.00
$1,900,000.00 $540,000.00
2,560
LS GSF
$150.00
$750,000.00 $384,000.00
$150.00
$4,500,000.00 $3,183,900.00
GSF
$150.00
$175,000.00 $4,396,950.00
O = OPEN SPA
$7,325,000.00 $1,548,750.00
P = PARKING
E= - EXPANSIO L LEASE SP
NC NEW CON P = -PROPERT
D = DEMOLITI
CTEC
4,425
GSF
Prescott
3,700
GSF
$275.00
$1,017,500.00
W = WAYFIND
$300.00
$2,560,000.00
A = PROPERT
$150.00 $225.00
$540,000.00 $6,750,000.00
L = LEASE SP
$150.00-
$384,000.00 $100,000.00
P = PROPERT
$150.00-
$3,183,900.00 $250,000.00
$150.00 $4,000.00
$4,396,950.00 $1,120,000.00
4,200 GSF/LS 3,600 30,000 GSF
Prescott Verde Valley
*Project Size *Project *Project Size Size
3,454 3,600
Subtotal $350.00
Prescott Prescott
Building 1: Hall 1st Floor for University Transfer Center Residence (apartment-style)
NC Multi-Purpose Field with Locker Rooms and Concessions A New Prescott Valley Campus Location and and Capital Capital Improvements Improvements NC Residence Hall (apartment-style) Project Name Campus
RUCTION RUCTION RUCTION
Campus
**Estimated Total
**Estimated Projected Construction Costs
Projects
R Building 1stSpace Floor for Student Activity Center O General Improvements - Phase 1 ge Plan and Capital Improvements ge Campus Campus Master Master Plan3:Open and Capital Improvements R Building 15: Art / Music Updates O General Open Space Improvements - Phase 1 Cost Matrix (DRAFT) Cost Cost Matrix Matrix (DRAFT) (DRAFT)
me me me
Unit Cost
*Project Size
2,560 1
Prescott Prescott CTEC Prescott
GSF LS
21,226 GSF 1 LS 29,313 GSF 280 SPACES
Unit Unit Cost Cost
**Estimated **Estimated Total Total
**Estimated Total Unit Cost Cost **Estimated CTEC Unit 4,425 GSF Prescott 1 LSTotal Projected **Estimated Construction Construction **Estimated Projected **Estimated Projected Construction Prescott 3,700 GSF Costs Verde Valley LS Costs 1
Costs
Prescott Prescott Valley Prescott CTEC Unit Unit Cost Cost
4,200 80 GSF/LS ACRES ***Estimated 30,000 GSFTotal 1 ACRES ***Estimated Total ***Estimated Total 1 LS 10,000 GSF
Unit Cost
Verde Valley Sedona
**Estimated **Estimated Total Total **Estimated **Estimated Total TotalPrescott
P = PROPERTY SALE
L = LEASE SPACE
A = PROPERTY ACQUISITION
W = WAYFINDING
P = PARKING
O = OPEN SPACE IMPROVEMENTS
D = DEMOLITION
NC - NEW CONSTRUCTION
E - EXPANSION
R = RENOVATION
Project Type Legend
1 LS **Estimated Projected Construction **Estimated Construction **Estimated Projected Projected Construction P Conversion to Southwest Wine Center $1,900,000.00 Verde Valley 3,454 GSF New Surface Parking Lot near Events Center Prescott 280 $1,900,000.00 SPACES Conversion Costs Verde 3,454 GSF Conversion to to Southwest Southwest Wine Wine Center Center $1,900,000.00 Verde Valley Valley 3,454 GSF Costs W Arts Center Center Elevator Elevator $750,000.00 Wayfinding Improvements - Phase 1 Prescott LS Prescott 1 LS MID-TERM Arts $750,000.00 Prescott LS Arts Center Elevator $750,000.00 Prescott LS Campus Unit Cost ***Estimated Total W esidence Hall plus Site Improvements $4,500,000.00 *Project Size Wayfinding Improvements Phase 1 Prescott 27,189 GSF Campus Unit Cost ***Estimated Total R Building 31: Expand*Project OLLI Size *Project Verde Valley 1 $4,500,000.00 LS Prescott 4,905 GSF esidence Prescott 27,189 GSF Campus ***Estimated Total esidence Hall Hall plus plus Site Site Improvements Improvements $4,500,000.00 Campus Unit Cost Cost ***Estimated Total PrescottUnit 27,189 GSF *Project Size Size **Campus Estimated Projected Construction Costs Are Listed. DoPrescott Valley Project Type Legend dence Hall (2014)Notes: $175,000.00 A Project Type Legend New Prescott Valley Location Prescott 29,404 Costs GSF R Building 29: Conversion to Business Center 80 ACRES Prescott 3,631 GSF Prescott 29,404 GSF dence Hall (2014) $175,000.00 Project Type Legend Project Type Legend dence Hall (2014)* Project Size Abbreviations: $175,000.00 29,404 GSF Not Include Land Prescott Prices, Design, Moving Cost, Administrative RSubtotal = RENOVATION RENOVATION 1 ACRES Subtotal $7,325,000.00 A R = CTEC Expansion E Building 19: Lecture Hall (200-300 seat) CTEC $7,325,000.00 R = RENOVATION Prescott 12,000 $7,325,000.00 GSF Fees, FFE, Etc. GSF = Gross Square Feet RSubtotal = RENOVATION E -- EXPANSION EXPANSION10,000 $1,900,000.00 Verde 3,454 GSF L Valley New Prescott Sedona Center Location (Lease) $1,900,000.00 SF = Square Feet Sedona GSF Verde Valley 3,454 - Phase GSF 1 Development NC Valley Center Prescott Valley E 100,000 GSF Verde 3,454 GSF E $1,900,000.00 E -- EXPANSION EXPANSION $1,900,000.00 Verde Valley Valley 3,454 GSF *** E stimated Total Construction Costs Shown Reflect 2013 Prices. LF = Linear Foot NC -- NEW CONSTRUCTION $750,000.00 Prescott LS NC NEW CONSTRUCTION $750,000.00 Prescott LS NC New NAU Yavapai Campus NC NEW CONSTRUCTION $750,000.00 11,000 GSF Prescott LS Prescott LS A 2% Cost Escalation Average Per Year,$750,000.00 For Each Phase, WillPrescott Valley NC - NEW CONSTRUCTION LS = Lump Sum D$150.00 = DEMOLITION DEMOLITION $4,500,000.00 Prescott 27,189 GSF 1st Floor for University Transfer $540,000.00 D = $4,500,000.00 Prescott 3,600 GSF Prescott 27,189 GSF NC Center Greenhouses Verde Valley 7,500 GSF 1st Floor for University Transfer Center $150.00 $540,000.00 Need To Be Applied. Reference “The ENR Building And D = DEMOLITION $4,500,000.00 Prescott 3,600 GSF Prescott 27,189 GSF D = DEMOLITION $4,500,000.00 1st Floor for University Transfer Center $150.00 $540,000.00 Prescott 27,189 GSF Prescott 3,600 GSF O = IMPROVEMENTS 1st Floor for Student Activity Center $384,000.00 Prescott 29,404 GSF Construction Cost Index” As A Guide. O$150.00 = OPEN OPEN SPACE SPACE IMPROVEMENTS $175,000.00 MID-TERM Prescott 2,560 $175,000.00 GSF Prescott Prescott 29,404 GSF NC Events Center with Multi-Purpose Room and NARTA Training Center $175,000.00 13,250 GSF 2,560 GSF Prescott 29,404 GSF 1st Center $384,000.00 O = IMPROVEMENTS O$150.00 = OPEN OPEN SPACE SPACE IMPROVEMENTS 1st Floor Floor for for Student Student Activity Activity Center $150.00 $384,000.00 Prescott 29,404 GSF Prescott Prescott 2,560 $175,000.00 GSF Subtotal $7,325,000.00 P$150.00 = PARKING PARKING 4,905 $3,183,900.00 R :: Art / Music Updates Subtotal $7,325,000.00 P = Building 31: Expand OLLI Prescott 21,226 GSF Prescott GSF O General Open Space Improvements Phase 2 Subtotal $7,325,000.00 P = PARKING 1 $3,183,900.00 LS Art // Music Music Updates Updates $150.00 $3,183,900.00 Prescott 21,226 GSF Subtotal = PARKING : Art Prescott 21,226 $7,325,000.00 GSF Verde Valley P$150.00 W = WAYFINDING R assroom and Laboratory Renovation $150.00 $4,396,950.00 CTEC 29,313 GSF W = WAYFINDING Building 29: Conversion to Business Center 3,631 GSF O General Open Space Improvements Phase 2 Prescott 1 LS assroom and Laboratory Renovation $150.00 $4,396,950.00 W = WAYFINDING CTEC 29,313 GSF W$150.00 = WAYFINDING assroom and Laboratory Renovation $4,396,950.00 CTEC 29,313 GSF A = ACQUISITION E assroom and and Laboratory Laboratory Expansion Expansion $350.00 $1,548,750.00 A$350.00 = PROPERTY PROPERTY12,000 ACQUISITION Building 19: Lecture Hall (200-300 seat)CTEC 4,425 GSF Prescott GSF O General Open Space Improvements A = PROPERTY ACQUISITION assroom $1,548,750.00 CTEC 1 LS CTEC 4,425 GSF A$350.00 = PROPERTY ACQUISITION assroom and Laboratory Expansion $1,548,750.00 CTEC 4,425 GSF L$275.00 = LEASE LEASE SPACE SPACE $150.00 $540,000.00 Prescott 3,600 GSF NC 5: Open Music Labs/Storage Expansion $1,017,500.00 L = New Prescott Valley Center $150.00 $540,000.00 Prescott 3,700 GSF Prescott 3,600 - Phase GSF 1 Development P Parking Expansion Prescott Valley 100,000 GSF CTEC 88 SPACES 5: Open Music Labs/Storage Expansion $275.00 $1,017,500.00 L = LEASE SPACE $150.00 $540,000.00 Prescott 3,700 GSF Prescott 3,600 GSF L = LEASE SPACE $150.00 5: Open Music Labs/StoragePrescott Expansion $275.00 $1,017,500.00 3,600 GSF Prescott 3,700 $540,000.00 GSF P$300.00 = PROPERTY SALE $2,560,000.00 $150.00 $384,000.00 ose Field with Locker RoomsPrescott and Concessions 2,560 GSF
$350.00-
$1,548,750.00 $75,000.00
$275.00-
$1,017,500.00 $75,000.00
$300.00-
$2,560,000.00-
$225.00-
$6,750,000.00-
Project Type Legend $100,000.00 Project Project Type Type Legend Legend R = RENOVATION RENOVATION $250,000.00 Subtotal $22,001,100.00 R R= = RENOVATION E - EXPANSION $4,000.00 $1,120,000.00 E E -- EXPANSION EXPANSION NC -- NEW NEW - CONSTRUCTION $75,000.00 NC NC - NEW CONSTRUCTION CONSTRUCTION D = DEMOLITION $75,000.00 $735,750.00 D$150.00 = DEMOLITION DEMOLITION D = O$150.00 = OPEN SPACE IMPROVEMENTS $544,650.00O O= = OPEN OPEN SPACE SPACE IMPROVEMENTS IMPROVEMENTS P$275.00 = PARKING PARKING $3,300,000.00 P = P = PARKING W = WAYFINDING $300.00 $30,000,000.00 W W= = WAYFINDING WAYFINDING A$300.00 = PROPERTY PROPERTY ACQUISITION ACQUISITION Subtotal $22,001,100.00 $3,300,000.00 A = A = PROPERTY ACQUISITION L = LEASE SPACE $2,062,500.00 L$275.00 = LEASE LEASE SPACE SPACE L = P$300.00 = PROPERTY SALE $3,975,000.00 P P= = PROPERTY PROPERTY SALE SALE
$150.00-
$735,750.00 $100,000.00
$150.00-
$544,650.00 $250,000.00
$275.00 $3,300,000.00 - College Campus $100,000.00 Yavapai Master Plan | 81 $30,000,000.00 $352,000.00
$300.00 $4,000.00
Building 15: Open Music Labs/Storage Expansion
Prescott
3,700
NC
Multi-Purpose Field with Locker Rooms and Concessions
Prescott
4,200 GSF/LS
NC
Residence Hall (apartment-style)
E
Prescott
30,000
Mid Term: 3–7 years Yavapai College Campus Master Plan and Capital Improvements O
General Open Space Improvements - Phase 1
O
General Open Space Improvements - Phase 1
Prescott
P
New Surface Parking Lot near Events Center
Prescott
W
Wayfinding Improvements - Phase 1
Prescott
Verde Valley
Phasing and Matrix (DRAFT) W and Wayfinding Improvements - Phase 1 Phasing CostCost Matrix Type A
Verde Valley
Project Name
*Project Size
New Prescott Valley Campus Location CTEC Expansion
L
New Sedona Center Location (Lease)
Type
1
$1,017,500.00
$300.00
$2,560,000.00
$225.00
$6,750,000.00
-
$100,000.00
LS
-
$250,000.00
$4,000.00
$1,120,000.00
LS
-
$75,000.00
1
LS
-
80
ACRES
1
ACRES
1
10,000
Campus
$275.00
LS
280 SPACES
CTEC Sedona
Project Name
GSF
Unit Cost
*Project Size
Prescott Valley
Projects
A
1
GSF
-
$75,000.00
**Estimated Total
-
**Estimated Projected Construction Costs
GSF
*Project Size
-
-
Subtotal Unit Cost
$22,001,100.00 ***Estimated Total
Project
MID-TERM UNDER CONSTRUCTION R
Building 31: Expand OLLI O: Conversion to Southwest Wine Center
R E R
R = RENOVATION
Prescott Verde Valley
4,905 3,454
GSF
$150.00
$735,750.00 $1,900,000.00
Building 29:Arts Conversion to Business Center Performing Center Elevator
Prescott
3,631
GSF LS
$150.00
$544,650.00 $750,000.00
Building LectureHall Hallplus (200-300 seat) Marapai 19: Residence Site Improvements
Prescott
12,000 27,189
GSF
$275.00
$3,300,000.00 $4,500,000.00
NC - NEW CONSTRUC D = DEMOLITION
NC D
New Valley SupaiPrescott Residence HallCenter (2014)- Phase 1 Development
Prescott Valley Prescott
100,000 29,404
GSF
$300.00
$30,000,000.00 $175,000.00
NC
New NAU Yavapai Campus
Prescott Valley
11,000
GSF
$300.00 Subtotal
$3,300,000.00 $7,325,000.00
P = PARKING
NC
Greenhouses
Verde Valley
7,500
GSF
$275.00
$2,062,500.00
W = WAYFINDING
Prescott
13,250
GSF
$300.00
$3,975,000.00
A = PROPERTY ACQU
Verde Valley Prescott
1 3,600
LS GSF
$150.00-
$100,000.00 $540,000.00
L = LEASE SPACE
Prescott
1 2,560
LS GSF
$150.00-
$250,000.00 $384,000.00
P = PROPERTY SALE
CTEC Prescott
1 21,226
LS GSF
$150.00-
$100,000.00 $3,183,900.00
$4,000.00 $150.00
$352,000.00 $4,396,950.00
NC Events Center with Multi-Purpose Room and NARTA Training Center SHORT-TERM O R
General Open Improvements - PhaseCenter 2 Building 1: 1stSpace Floor for University Transfer
Improvements - Phase 2 Building 1stSpace Floor for Student Activity Center Campus Plan and Capital Improvements Campus Master MasterGeneral Plan3:Open and Capital Improvements O General Open Improvements R Building 15: ArtSpace / Music Updates Matrix (DRAFT) Matrix Matrix (DRAFT) (DRAFT) P Parking Expansion O R
R
W E
CTEC: Classroom and Laboratory Renovation
*Project Size *Project Wayfinding Improvements - Phase 2 *Project Size Size CTEC: Classroom and Laboratory Expansion
Projects W Wayfinding - Phase 2 Expansion Projects E Building 15: Improvements Open Music Labs/Storage Projects
S Sell Existing Prescott Valley Facilities NC Multi-Purpose Field with Locker Rooms and Concessions Capital Capital Improvements Improvements S Sell ExistingHall Sedona Center NC Residence (apartment-style) Project Name Campus Project Campus Project Name Name Campus S Sell Existing Chino Valley Facilities - Phase 1 O General Open Space Improvements *Project Size Unit *Project Size *Project Size Size Unit Cost Cost *Project Size Size *Project *Project *Project Size Unit Cost Cost O *Project Size General Open Space Improvements - Phase 1 Unit
ON ON ON
E - EXPANSION
*Project Size *Project *Project Size Size
CTEC
88 SPACES 29,313 GSF
Unit Cost Unit Cost Cost Prescott CTEC Unit
**Estimated Total **Estimated **Estimated Total 1 LSTotal 4,425 GSF
$350.00-
$75,000.00 $1,548,750.00
$275.00-
$75,000.00 $1,017,500.00
4,200- GSF/LS
$300.00-
$2,560,000.00-
***Estimated - Total 30,000 GSF ***Estimated Total
$225.00-
$6,750,000.00-
**Estimated Projected Construction **Estimated Construction **Estimated Projected Projected Construction Verde Valley 1 LS Prescott 3,700 GSF Costs Costs Costs
Prescott Valley Prescott *Project Size *Project *Project Size Size
Sedona Unit Prescott Unit Cost Cost Unit Cost
***Estimated Total
Chino Valley Verde
1-
**Estimated **Estimated Total Total **Estimated **Estimated Total TotalPrescott
-
LS
Fees, FFE, Etc. GSF = Gross Square Feet $1,900,000.00 O General OpenCenter SpaceLocation Improvements Verde 3,454 GSF L Valley Verde Valley New Sedona (Lease) $1,900,000.00 SF = Square Feet Sedona Verde Valley 3,454 GSF - Phase 3 Verde Valley 3,454 GSF $1,900,000.00 $1,900,000.00 Verde Valley 3,454 GSF *** E stimated Total Construction Costs Shown Reflect 2013 Prices. LF = Linear Foot $750,000.00 O General Open Space Improvements Prescott LS - Phase 3 Prescott $750,000.00 Prescott LS Prescott LS $750,000.00 Prescott LS A 2% Cost Escalation Average Per Year,$750,000.00 For Each Phase, Will LS = Lump Sum $4,500,000.00 P Center New Surface Parking27,189 Lot near Southwest Wine Center Prescott 27,189 GSF Verde Valley oor for University Transfer $4,500,000.00 Prescott 3,600 GSF Prescott GSF oor Center Need To Be Applied. Reference “The ENR Building And Prescott 3,600 GSF Prescott 27,189 GSF $4,500,000.00 oor for for University University Transfer Transfer Center Prescott 27,189 GSF Prescott 3,600 $4,500,000.00 GSF $175,000.00 W Wayfinding Improvements Phase 3 oor for Student Activity Center Prescott 29,404 GSF Construction Index” As A Guide. $175,000.00 MID-TERM Prescott 2,560 $175,000.00 GSF Prescott Prescott 29,404 GSFCost Prescott 2,560 GSF Prescott 29,404 GSF oor for Student Activity Center
P = PROPERTY SALE
L = LEASE SPACE
A = PROPERTY ACQUISITION
W = WAYFINDING
P = PARKING
D = DEMOLITION
NC - NEW CONSTRUCTION
E - EXPANSION
2,560 2,560 21,226 21,226 21,226 29,313 29,313 29,313 4,425 4,425 4,425 3,700 3,700 3,700
RSubtotal = RENOVATION $7,325,000.00 E -- EXPANSION EXPANSION10,000 1 LS E GSF E EXPANSION E - EXPANSION NC NEW CONSTRUCTION 1 LS NC -- NEW NEW CONSTRUCTION NC NC - NEW CONSTRUCTION CONSTRUCTION D$150.00 = DEMOLITION DEMOLITION 20 SPACES $540,000.00 D = $540,000.00 D = D$150.00 = DEMOLITION DEMOLITION $150.00 $540,000.00 O = 1 $384,000.00 LS O$150.00 = OPEN OPEN SPACE SPACE IMPROVEMENTS IMPROVEMENTS $150.00 $384,000.00 O = OPEN SPACE IMPROVEMENTS GSF O$150.00 = OPEN SPACE IMPROVEMENTS $175,000.00 $384,000.00 GSF $7,325,000.00 P$150.00 = PARKING PARKING 4,905 Verde Valley P 1 LS $3,183,900.00 $7,325,000.00 P = GSF Prescott GSF $7,325,000.00 = PARKING $150.00 $3,183,900.00 GSF $7,325,000.00 P$150.00 = PARKING $3,183,900.00 GSF W$150.00 = WAYFINDING WAYFINDING GSF Prescott W = 3,631 $4,396,950.00 GSF $150.00 $4,396,950.00 W = WAYFINDING GSF W$150.00 = WAYFINDING $4,396,950.00 GSF A = ACQUISITION $350.00 $1,548,750.00 A$350.00 = PROPERTY PROPERTY12,000 ACQUISITION GSF Prescott GSF A = PROPERTY ACQUISITION $1,548,750.00 GSF A$350.00 = PROPERTY ACQUISITION $1,548,750.00 GSF L = LEASE SPACE $540,000.00 $275.00 $1,017,500.00 L = LEASE SPACE $540,000.00 GSF Prescott Valley L 100,000 $1,017,500.00 GSF = $540,000.00 GSF L$275.00 = LEASE LEASE SPACE SPACE $540,000.00 $275.00 $1,017,500.00 GSF P$300.00 = PROPERTY SALE $2,560,000.00 $384,000.00 R = RENOVATION
Prescott Prescott 29,404 GSF Prescott oor for Student Activity Center Prescott 29,404 GSF Subtotal W Wayfinding R Music Subtotal Building 31: Improvements Expand OLLI - Phase 3 Prescott Subtotal Music Updates Updates Prescott Subtotal Music Updates Prescott R m and Laboratory Renovation CTEC Building 29: Conversion to Business Center m and Laboratory Renovation CTEC m and Laboratory Renovation CTEC E College m and and Laboratory Expansion Building Campus 19: Lecture Hall Plan (200-300 seat)CTEC m Expansion 82 | Yavapai Master CTEC m and Laboratory Laboratory Expansion CTEC $150.00 Prescott 3,600 GSF NC n Music Labs/Storage Expansion New Prescott Valley Center $150.00 Prescott Prescott 3,600 - Phase GSF 1 Development n Music Labs/Storage Expansion $150.00 Prescott Prescott 3,600 GSF $150.00 n Music Labs/StoragePrescott Expansion 3,600 GSF Prescott $150.00 d with Locker RoomsPrescott and Concessions 2,560 GSF
O = OPEN SPACE IMPROVEMENTS
Project Type Legend
LS **Estimated Projected Construction **Estimated Construction **Estimated Projected Projected Construction P ersion to Southwest Wine Center $1,900,000.00 Verde Valley 3,454 GSF New Surface Parking Lot near Events Center Prescott 280 $1,900,000.00 SPACES ersion Costs Verde 3,454 GSF ersion to to Southwest Southwest Wine Wine Center Center $1,900,000.00 Verde Valley Valley 3,454 GSF Costs LONG-TERM W enter Elevator Elevator $750,000.00 Wayfinding Improvements - Phase 1 Prescott LS Prescott 1 LS enter $750,000.00 Prescott LS enter Elevator $750,000.00 Prescott LS R Building 19: Improvements Transform Library into Learning Commons Campus Unit Cost ***Estimated Total W e Hall plus Site Improvements $4,500,000.00 *Project Size Wayfinding Phase 1 Prescott 30,000 GSF Prescott 27,189 GSF Campus Unit Cost ***Estimated Total *Project Size Size Verde Valley 1 $4,500,000.00 LS e Prescott 27,189 GSF Campus ***Estimated Total *Project e Hall Hall plus plus Site Site Improvements Improvements $4,500,000.00 Campus Unit Cost Cost ***Estimated Total PrescottUnit 27,189 GSF *Project Size ** Campus Espace stimated Projected Construction Costs Are Listed. DoPrescott Project Type Legend R Building 2: Renovate for NARTAPrescott Hall (2014)Notes: $175,000.00 A Project Type Legend New Prescott Valley Location Prescott 12,500 GSF Prescott 29,404Costs GSF Valley 80 ACRES 29,404 GSF Hall (2014) $175,000.00 Project Type Legend Project Type Legend Hall (2014)* Project Size Abbreviations: $175,000.00 29,404 GSF Not Include Land Prescott Prices, Design, Moving Cost, Administrative RSubtotal = RENOVATION RENOVATION NC Expansion to Prescott Valley Center - Phase 2 Development Subtotal $7,325,000.00 A Prescott Valley R 25,000 GSF R = CTEC Expansion CTEC 1 ACRES $7,325,000.00 = RENOVATION
1
Project Type Legend $100,000.00 Project Project Type Type Legend Legend $44,869,900.00 RSubtotal = RENOVATION RENOVATION $250,000.00 R R= = RENOVATION E - EXPANSION $4,000.00 $1,120,000.00 E E -- EXPANSION EXPANSION NC -- NEW NEW - CONSTRUCTION $75,000.00 NC NC - NEW CONSTRUCTION CONSTRUCTION $150.00 $4,500,000.00 D = DEMOLITION $75,000.00 D= = DEMOLITION DEMOLITION D O$150.00 = OPEN SPACE IMPROVEMENTS $1,875,000.00 O O= = OPEN OPEN SPACE SPACE IMPROVEMENTS IMPROVEMENTS $7,250,000.00P$290.00 = PARKING PARKING P = P = PARKING $100,000.00W = WAYFINDING W W= = WAYFINDING WAYFINDING $250,000.00 ASubtotal = PROPERTY PROPERTY ACQUISITION $22,001,100.00 A A= = PROPERTY ACQUISITION ACQUISITION $4,000.00 $80,000.00 L = LEASE SPACE L= = LEASE LEASE SPACE SPACE L
O = OPEN SPACE IMP
P = PROPERTY SALE P P= = PROPERTY PROPERTY SALE SALE
$75,000.00
$150.00-
$75,000.00 $735,750.00
Subtotal $150.00
$14,205,000.00 $544,650.00
$275.00
$3,300,000.00
$300.00
$30,000,000.00
Total
D = DEMOLITION
$81,076,000.00
D = DEMOLITION D = DEMOLITION
NC NC NC NC NC O NC O O O O P O W P W Type W S W S S S S Type S
Prescott Valley Prescott Valley Verde Valley
New Prescott Valley Center - Phase 1 Development Greenhouses New NAU Yavapai Events Center with Campus Multi-Purpose Room and NARTA Training Center
Prescott Valley Prescott Verde Valley Verde Valley
Greenhouses General Open Space Improvements - Phase 2 Events with Multi-Purpose Room and NARTA Training Center GeneralCenter Open Space Improvements - Phase 2
Prescott Prescott Verde Valley CTEC
Long Term: 8–10+ years Yavapai College Campus Master Plan and Capital Improvements General General Open Open Space Space Improvements Improvements - Phase 2 General Open Space Improvements - Phase 2 Parking Expansion
Prescott CTEC CTEC Prescott
General Open Space Improvements Wayfinding Improvements - Phase 2 Parking Expansion Wayfinding Improvements - Phase 2
Phasing and Matrix (DRAFT) Phasing and CostCost Matrix
CTEC Verde Valley *Project Size Prescott Prescott Valley Verde Valley Sedona
Project Name Wayfinding Improvements - Phase 2
Sell Existing Prescott Valley Facilities Wayfinding - Phase 2 Projects Sell ExistingImprovements Sedona Center Sell Valley Facilities Sell Existing Existing Prescott Chino Valley Facilities Sell Existing Sedona Center
Prescott Valley Chino Valley Sedona Campus
Project Name
Sell Existing Chino Valley Facilities
11,000 100,000 7,500 11,000 13,250
GSF GSF GSF GSF GSF
7,500 1 13,250 1 1 1
GSF LS GSF LS LS LS
--
-
-
*Project Size
Chino Valley
R
Building 19: Transform Library into Learning Commons O: Conversion to Southwest Wine Center
R Building 19:toTransform Library into Learning Commons NC Expansion Prescott Valley Center - Phase 2 Development R Marapai Residence Hall plus Site Improvements R Building 2: Renovate space for NARTA O General Open Space - Phase 3 D Supai Residence Hall Improvements (2014) NC Expansion to Prescott Valley Center - Phase 2 Development O General Open Space Improvements - Phase 3 O General OpenParking Space Improvements - Phase 3 Center P New Surface Lot near Southwest Wine O General Open Space Improvements Phase 3 W Wayfinding Improvements - Phase 3 SHORT-TERM P New Surface Parking Lot near Southwest Wine Center W Wayfinding Improvements - Phase Transfer 3 R Building 1: 1st Floor for University Center W Wayfinding Improvements - Phase 3 R Building 3: 1st Floor for Student Activity Center W Wayfinding Improvements - Phase 3 R Building 15: Art / Music Updates
ge ge Campus Campus Master Master Plan Plan and and Capital Capital Improvements Improvements Cost Matrix (DRAFT) Cost Cost Matrix Matrix (DRAFT) (DRAFT) R
me me me
CTEC: Classroom and Laboratory Renovation
*Project Size *Project *Project Size Size CTEC: Classroom and Laboratory Expansion
E NOTES Projects Projects E Building Open Music Labs/Storage Expansion Projects * PROJECT SIZE 15: ABBREVIATIONS: NC GSF = GROSS SQUARE Multi-Purpose Field withFEET Locker Rooms and Concessions NOTES =SIZE SQUARE FEET *Name PROJECT ABBREVIATIONS: NC SF Residence Hall (apartment-style) Project Campus Project Campus Project Name Name Campus GSF = GROSS SQUARE FEET O General Open Space Improvements - Phase 1 SF = SQUARE FEET *Project Size Unit *Project Size *Project Size Size Unit Cost Cost *Project Size Size *Project *Project *Project Size Unit Cost Cost O *Project Size General Open Space Improvements - Phase 1 Unit
and and Capital Capital Improvements Improvements
Unit Cost
RUCTION RUCTION RUCTION
-Subtotal
-$44,869,900.00
-
-
***Estimated Total
-
D = DEMOLITI
Subtotal
$44,869,900.00
D = DEMOLITI R = RENOVAT
$150.00
$4,500,000.00 $1,900,000.00
E - EXPANSIO
Prescott Prescott Prescott Valley Prescott
12,500 30,000 25,000 27,189
LS GSF GSF GSF
$150.00 $150.00 $290.00
$1,875,000.00 $750,000.00 $4,500,000.00 $7,250,000.00 $4,500,000.00 $1,875,000.00 $100,000.00 $175,000.00 $7,250,000.00 $250,000.00
NC - NEW CON
12,500 1 29,404 25,000 1
$150.00$290.00-
GSF LS GSF GSF LS
Subtotal
$4,000.00--
1 SPACES LS 20 1 LS 1 LS 20 SPACES 1 LS 3,600 GSF 1 LS 2,560 GSF 1 LS 21,226 GSF
CTEC
29,313
Unit Cost Unit Cost Cost CTEC Unit
$7,325,000.00
$4,000.00$150.00 Subtotal $150.00 $150.00
$100,000.00 $80,000.00 $250,000.00 $75,000.00 $80,000.00 $75,000.00 $540,000.00 $75,000.00 $14,205,000.00 $384,000.00 $75,000.00 $3,183,900.00
$150.00
$4,396,950.00
Total Subtotal
GSF
**Estimated Total **Estimated Total **Estimated Total 4,425 GSF
$81,076,000.00 $14,205,000.00
**Estimated Projected Construction **Estimated Construction **Estimated Projected Projected Construction Prescott 3,700 GSF Costs Costs Costs
$350.00
$1,548,750.00
$275.00
$1,017,500.00
4,200 GSF/LS
$300.00
$2,560,000.00
PrescottUnit Unit Cost Cost
***Estimated 30,000 GSFTotal ***Estimated Total
$225.00
$6,750,000.00
Prescott
Unit Cost
Total
***Estimated Total
Verde Valley
1
**Estimated **Estimated Total Total **Estimated **Estimated Total TotalPrescott
LS
1
O = OPEN SPACE IMPROVEMENTS
Project Type Legend
Fees, FFE, Etc. GSF = Gross Square Feet $1,900,000.00 Verde 3,454 GSF L Valley New Sedona Center Location $1,900,000.00 SF = Square Feet Sedona Verde Valley 3,454 (Lease) GSF Verde Valley 3,454 GSF $1,900,000.00 $1,900,000.00 Verde Valley 3,454 GSF *** E stimated Total Construction Costs Shown Reflect 2013 Prices. LF = Linear Foot $750,000.00 Prescott LS $750,000.00 Prescott LS $750,000.00 Prescott LS Prescott LS A 2% Cost Escalation Average Per Year,$750,000.00 For Each Phase, Will LS = Lump Sum $4,500,000.00 Prescott 27,189 GSF 1st Floor for University Transfer Center $4,500,000.00 Prescott 3,600 GSF Prescott 27,189 GSF 1st Floor for University Transfer Center Need To Be Applied. Reference “The ENR Building And Prescott 3,600 GSF Prescott 27,189 GSF $4,500,000.00 1st Floor for University Transfer Center Prescott 27,189 GSF Prescott 3,600 $4,500,000.00 GSF 1st Floor for Student Activity Center Prescott 29,404 GSF Construction Index” As A Guide. $175,000.00 MID-TERM Prescott 2,560 $175,000.00 GSF Prescott 29,404 GSFCost $175,000.00 Prescott 2,560 GSF Prescott 29,404 GSF 1st Floor for Student Activity Center
P = PROPERTY SALE
L = LEASE SPACE
A = PROPERTY ACQUISITION
W = WAYFINDING
P = PARKING
D = DEMOLITION
NC - NEW CONSTRUCTION
E - EXPANSION
RSubtotal = RENOVATION $7,325,000.00 E -- EXPANSION EXPANSION10,000 E GSF E EXPANSION E - EXPANSION NC NC --- NEW NEW CONSTRUCTION CONSTRUCTION NC NEW CONSTRUCTION NC - NEW CONSTRUCTION D$150.00 = DEMOLITION DEMOLITION $540,000.00 D = $540,000.00 D = D$150.00 = DEMOLITION DEMOLITION $150.00 $540,000.00 O = OPEN SPACE IMPROVEMENTS $150.00 $384,000.00 O$150.00 = OPEN OPEN SPACE SPACE IMPROVEMENTS IMPROVEMENTS $384,000.00 O = GSF O$150.00 = OPEN SPACE IMPROVEMENTS $175,000.00 $384,000.00 GSF $7,325,000.00 P$150.00 = PARKING PARKING 4,905 $3,183,900.00 $7,325,000.00 P = GSF Prescott GSF $7,325,000.00 P = PARKING $150.00 $3,183,900.00 GSF $7,325,000.00 P = PARKING $150.00 $3,183,900.00 GSF W$150.00 = WAYFINDING WAYFINDING $4,396,950.00 GSF Prescott W = 3,631 $4,396,950.00 GSF W = GSF W$150.00 = WAYFINDING WAYFINDING $150.00 $4,396,950.00 GSF A = ACQUISITION $350.00 $1,548,750.00 A$350.00 = PROPERTY PROPERTY12,000 ACQUISITION GSF Prescott GSF A = PROPERTY ACQUISITION $1,548,750.00 GSF A$350.00 = PROPERTY ACQUISITION $1,548,750.00 GSF L = LEASE SPACE $540,000.00 $275.00 $1,017,500.00 L = LEASE SPACE $540,000.00 GSF Prescott Valley L 100,000 $1,017,500.00 GSF = $540,000.00 GSF L$275.00 = LEASE LEASE SPACE SPACE $540,000.00 $275.00 $1,017,500.00 GSF P$300.00 = PROPERTY SALE $2,560,000.00 $384,000.00 R = RENOVATION
2,560 2,560 21,226 21,226 21,226 29,313 29,313 29,313 4,425 4,425 4,425 3,700 3,700 3,700
**Estimated Total $75,000.00
Unit Cost
LS **Estimated Projected Construction **Estimated Projected Construction **Estimated Projected Construction P Conversion to Southwest Wine Center $1,900,000.00 Verde Valley 3,454 GSF New Surface Parking Lot near Events Center 1/13/2014 Prescott 280 $1,900,000.00 SPACES Conversion Costs Verde 3,454 GSF Conversion to to Southwest Southwest Wine Wine Center Center $1,900,000.00 Verde Valley Valley 3,454 GSF Costs W Arts Center Center Elevator Elevator $750,000.00 Wayfinding Improvements - Phase 1 Prescott LS Prescott 1 LS Arts $750,000.00 Prescott LS Arts Center Elevator $750,000.00 Prescott LS 1/13/2014 Campus Unit Cost ***Estimated Total W esidence Hall plus Site Improvements $4,500,000.00 *Project Size Wayfinding Improvements Phase 1 Prescott 27,189 GSF Campus Unit Cost ***Estimated Total *Project Size Size Verde Valley 1 $4,500,000.00 LS esidence Prescott 27,189 GSF Campus ***Estimated Total *Project esidence Hall Hall plus plus Site Site Improvements Improvements $4,500,000.00 Campus Unit Cost Cost ***Estimated Total PrescottUnit 27,189 GSF *Project Size **Campus EstimatedLocation Projected Construction Costs Are Listed. DoPrescott Valley Project Type Legend dence Hall (2014)Notes: $175,000.00 A Project Type Legend New Prescott Valley Prescott 29,404 Costs GSF 80 ACRES Prescott 29,404 GSF dence Hall (2014) $175,000.00 Project Type Legend Project Type Legend dence Hall (2014)* Project Size Abbreviations: $175,000.00 29,404 GSF Not Include Land Prescott Prices, Design, Moving Cost, Administrative RSubtotal = RENOVATION RENOVATION Subtotal $7,325,000.00 A R = CTEC Expansion CTEC $7,325,000.00 R = RENOVATION 1 ACRES
Prescott Prescott 29,404 GSF Prescott 1st Floor for Student Activity Center Prescott 29,404 GSF Subtotal R :: Art Subtotal Building 31: Expand OLLI Prescott Subtotal Art /// Music Music Updates Updates Prescott Subtotal : Art Music Updates Prescott R assroom and Laboratory Renovation CTEC Building 29: Conversion to Business Center assroom and Laboratory Renovation CTEC assroom and Laboratory Renovation CTEC E assroom and and Laboratory Expansion Expansion Building 19: Lecture Hall (200-300 seat)CTEC assroom CTEC assroom and Laboratory Laboratory Expansion CTEC $150.00 Prescott 3,600 GSF NC 5: Open Music Labs/Storage Expansion New Prescott Valley Center $150.00 Prescott Prescott 3,600 - Phase GSF 1 Development 5: Open Music Labs/Storage Expansion $150.00 Prescott Prescott 3,600 GSF $150.00 5: Open Music Labs/StoragePrescott Expansion 3,600 GSF Prescott $150.00 ose Field with Locker RoomsPrescott and Concessions 2,560 GSF
--
**Estimated Projected Construction -$75,000.00Costs
GSF
Verde Valley Verde Valley Prescott Prescott Prescott Verde Valley Prescott
$100,000.00 $75,000.00 $352,000.00 $75,000.00
3,454 30,000
Verde Verde Valley Valley Prescott Prescott
*Project Size *Project *Project Size Size
$100,000.00 $100,000.00 $250,000.00 $352,000.00
$2,062,500.00 $100,000.00 $3,975,000.00 $250,000.00
Verde Valley Prescott
Prescott Verde Valley Prescott Prescott Valley Prescott
*Project Size *Project *Project Size Size
-$4,000.00-$4,000.00-
LONG-TERM UNDER CONSTRUCTION LONG-TERM R Building 2: Arts Renovate for NARTA Performing Centerspace Elevator
$30,000,000.00 $2,062,500.00 $3,300,000.00 $3,975,000.00
$275.00$300.00-
1 SPACES LS 88 1 LS 1 LS 88 SPACES 1 LS *Project 1 SizeLS 1LS --
$300.00 $275.00 $300.00 $300.00
$81,076,000.00
D = DEMOLITI
O = OPEN SPA P = PARKING
W = WAYFIND
A = PROPERT
L = LEASE SP
D DEMOLITI P = PROPERT
D = DEMOLITI
D = DEMOLITI
Project Type Legend $100,000.00 Project Project Type Type Legend Legend R= = RENOVATION $250,000.00 R R = RENOVATION RENOVATION E - EXPANSION $4,000.00 $1,120,000.00 E E -- EXPANSION EXPANSION NC -- NEW NEW - CONSTRUCTION $75,000.00 NC NC - NEW CONSTRUCTION CONSTRUCTION D = DEMOLITION $75,000.00 D= = DEMOLITION DEMOLITION D O = OPEN SPACE IMPROVEMENTS O O= = OPEN OPEN SPACE SPACE IMPROVEMENTS IMPROVEMENTS P= = PARKING PARKING P P = PARKING W = WAYFINDING W W= = WAYFINDING WAYFINDING ASubtotal = PROPERTY PROPERTY ACQUISITION $22,001,100.00 A = A = PROPERTY ACQUISITION ACQUISITION L = LEASE SPACE L= = LEASE LEASE SPACE SPACE L P = PROPERTY SALE P P= = PROPERTY PROPERTY SALE SALE
$150.00
$735,750.00
$150.00
$544,650.00
$275.00 $3,300,000.00 Yavapai College Campus Master Plan | 83 $30,000,000.00
$300.00
Key Project Sequencing Critical Path Projects: Most of the recommendations can be implemented at any time, however the projects listed here require carfeul consideration due to the sequencing involved. Each project triggers something of domino effect allowing another recommendation to be implemented. Each recommendation spans over more than one period in the Phasing and Cost Matrix. The following pages outline the sequence required to implement each of these recommendations.
University Transfer Center Student Activity Center New Prescott Valley Location
84 |  Yavapai College Campus Master Plan
Key Project Sequencing: University Transfer Center (3,600 GSF in Building 1) Relocate ODU from Building 31 to Transfer Center
Renovate Building 31 for OLLI expansion
Relocate NAU from Building 29 to Transfer Center
Renovate Building 29 for Business Center
Renovate 3,600 GSF within Building 1 for Transfer Center
The University Transfer Center is a critical component to the college’s ongoing success in preparing students for future educational opportunities. The goal of consolidation was identified early in the Master Planning process. Consolidating the various University transfer programs into Building 1 will allow students to receive both advising and transfer opportunities in the same building, thus streamlining the process.
It will also free up space elsewhere on campus to allow the successful and growing OLLI program to expand in Building 29 where it is currently housed. The OLLI staff have simply outgrown their current setting and have started to impinge on the learning space. The recommended expansion would allow OLLI to offer more in-person enrollment and enrichment opportunities.
In addition, a business center can be created within the existing Building 29 footprint to facilitate more strategic partnerships and economic development. Building 29 is located at the southeast corner of the campus, close to the administration but slightly removed from the academic core, thus making it an ideal location for a business center focused on community outreach and partnerships.
Yavapai College Campus Master Plan  | 85
Key Project Sequencing: Student Activity Center (1st Floor of Building 3) Relocate TELS to underutilized space in Building 19
Relocate Instructional Support offices to Building 32
The space needs analysis identified underused classroom space on the second floor of Building 19 and a shortage of student activity space on campus. Relocating Teaching and eLearning Support (TELS) to Building 19 will enhance the synergy between the library, computer commons and the TELS program.
86 |  Yavapai College Campus Master Plan
Renovate 1st Floor of Building 3 for enhanced Student Activity Center
A similar underutilization of office space was identified in Building 32, allowing Instructional Support to be relocated. While this will move the instructors farther from their office space, it will allow a more robust student activity center to be created within Building 3, which already houses the food service and student life space.
Creating more space for students to congregate, learn from each other outside the classroom and have a space to call their own will build the student culture and encourage opportunites for students to stay on campus.
Yavapai College Campus Master Plan  | 87
Key Project Sequencing: New Prescott Valley Location The most ambitious recommendation of the Master Plan involves the development of a new center, and eventually campus, in Prescott Valley. The first logical step is to identify a site and acquire land for the present and future needs. The location chosen will be critical to the success of the new center. With the geographical challenges of the area, the Master Plan recommends the new location to be in the northeast portion of Prescott Valley in order to limit commuter times for all students traveling from both sides of the mountain to the center. The Master Plan recommends the first buildout to be a robust one to accommodate the entire nursing and allied health offerings of the College, along with EMS/EMT, in order to capitalize on the synergy of these programs. General Education would also move from the current Prescott Valley building to the new location. With the consolidation of all these program, student services would also be required. Space would also be built to accommodate the existing NAU Yavapai campus currently located adjacent to the library. This space, as it is now, would be dedicated to NAU Yavapai. Relocating the NAU Yavapai space to the new Prescott Valley center would allow the opportunity for its future growth. 88 | Yavapai College Campus Master Plan
Acquire land for future PV Campus
• • • •
Design and Build Phase 1 – 100,000 GSF Nursing/Allied Health EMS/EMT Gen Eds / ESL Minor Student Services
Design and Build NAU Yavapai– 11,000 GSF
Design and Build Phase 2 – 25,000 GSF
• Expand Gen Eds • Enhance Student Services/ Support
Sell existing Prescott Valley and Chino facilities
Relocate existing PV programs to new PV (minus NARTA/AJS)
Renovate 2nd Floor of Building 2 for NARTA/ AJS programs
Relocate Nursing from Prescott and Verde Valley to new PV location
Renovate Building L for Chino programs
Following construction of the new cetner, the existing Prescott Valley programs and the Nursing and Allied Health programs from Prescott and Verde Valley would migrate to the new location. This, in turn, would free up space on the Prescott campus or NARTA/AJS to move to the second floor of Building 2 and for agriculture to move from Chino to Verde Valley. The existing Prescott Valley and Chino Valley centers could then be sold to fund phase 2, transforming Prescott Valley from a center to a campus complete with full student services, expanded general education, library, recreation and possibly student housing.
Relocate NARTA/AJS to Building 2 on Prescott Campus
Relocate Chino programs to Building L on V V Campus
Yavapai College Campus Master Plan  | 89