2
3
SOFIA JASSIM [PORTFOLIO] Part 1: BArch Hons.
A-A [YEAR 2 / PROJECT 1-3]
A
2 1 [ABOVE]
3
A
[YEAR 2 / HYBRID]
PROJECT 1 Housing for the 3rd Age PROJECT 2 Market Hall PROJECT 3 Nursery GROUND FLOOR PLAN
[YEAR 3 / PROJECT 1-2]
PROJECT 1 Food Kiosk PROJECT 2 Public House HAND DRAWINGS [Building designs within context]
The Elysian Fields
[YEAR 3 / PROJECT 2]
ELEVATION
Bioreinery Hotel WAT ER SUP PLY
ROOF PLAN REFINERY PROCESS HOTEL SERVICE STRUCTURAL SUPPORT
REC OVE RED
HEA T
OIL WAS TE
UEL BIOF
[YEAR 3 / PROJECT 3]
DIAGRAM [The Building’s Process]
proj symbol bottom riht small for each one? APPROACHING STATION ENTRANCE
[YEAR 3 / PROJECT 3]
PROCESS MODEL
[YEAR 3 / PROJECT 3]
THE DREAM WORLD
[YEAR 3 / PROJECT 3]
STATION APPROACH
[YEAR 3 / PROJECT 3]
TERRACE BAR UNDER HOTEL POOL
A
B
B
A
GROUND FLOOR PLAN
[YEAR 3 / PROJECT 3]
A-A
+
+
=
TOTTENHAM COURT ROAD CROSRAIL [Hawkins Brown Architects] Due for completion 2016
[YEAR 3 / PROJECT 3]
B-B