Architecture portfolio SofiaFernandez

Page 1

ARCHITECTURE PORTFOLIO ARCH. SOFIA FERNANDEZ


2016

CRTKL - London, UK Al Khiran Pearl (Stage 3) | Hamala Masterplan (Stage 2) | Cervahir (Stage 3) | Al Khiran Pearl (Stage 2)

2015

CRTKL - London, UK ALJ City MAsterplan (Stage 2) | Al Khiran Pearl (Stage 2) WHAT_Architecture - London Office 362/364 Old Street (Stage 1) | 76 Hampton Road (Stage 1) | 112 Green Lanes (Stage 2)

2014

ARP Arquitectos - Lisbon, Portugal Jose Dias Coelho (Stage 2) | Salitre 121 (Stage 4)

2013

ARP Arquitectos - Lisbon, Portugal Travessa dos Ferreiros (Stage 2) | Quinta Nova do Tojal (Stage 2) | Quinta dos Loios (Stage 2) Private Client Santa Luzia (Stage 4)

2012

Universidade Lusiada de Lisboa - Lisbon, Portugal Master in Architecture - Publication of the thesis : ‘The human scale and comfort in the architecture of the twentieth century’


CRTKL AL KHIRAN PEARL : MIXED USED COMPLEX : KUWAIT 2016

Al Khiran is a small village located in the south of Kuwait, approximately 100km from Kuwait City. Close to the sea and to Saudi Arabia, Al Khiran Pearl is intended as a reference point for tourism and will be the largest marina in Kuwait. Al Khiran Pearl City will be a luxury mix-used complex, composed by two residential towers, one furnished apartments tower, one 5-star hotel and one shopping mall. Surrounded by a massive landscape with long promenades, outdoor car parking and a marina for 900 boats.


CRTKL AL KHIRAN PEARL : SHOPPING MALL 2016

The Al Khiran Mall will be 75,000sqm of premium and luxury shops, and will have the most deluxe F&B in the region for everyone. Our goal is create a sustainable mall incorporated in the traditional Arabic architecture. I worked on this project as part of team and my task was preparing the architecture drawings for the SD final submission (Stage 2) and coordinate the information provided from the consultants with the architecture drawings.


CRTKL AL KHIRAN PEARL : SHOPPING MALL 2016

After SD submission the client requested us to develop the DD stage (Stage 3) for the shopping mall. My task was to coordinate the architecture drawings with the consultants information and develop detail drawings of the exterior walls and the vertical circulation (stairs, lifts and escalators) 6

C

10

AM-102

10 10

PLOT LINE

EWS-604 INS-201

EWS-604

100

50 50

AM-103

INS-203 FL-403 WPS-201 SCR-101

RFS-201

PT-301

IWS-301

SCR-501

LEVEL PLANT LEVEL

LEVEL CINEMA & FEC ROOF

EWS-301 AM-101 AM-301

SCR-201

LEVEL MEZZANINE

LEVEL ADMIN ROOF

LEVEL ADMIN ROOF

F.F.L. 27050

F.F.L. 27050

SCR-201

LEVEL GROUND FLOOR

SLAB by SHH

CLG-101

INS-201 EWS-401 BLK-301 IWS-301

500

950

5100

950

1200

F.F.L. 22550

INSULATED FULL HEIGHT MAINTENANCE ACCESS DOOR EVERY 45m

LIN-301

1400mm BEAM FROM SSH

DRS-401

SA DUCT

SLAB by SHH

Ventilation Grid Glass

Gypsum Board White Render Finish

2

Fitting Light by Scott Lighting

1 : 20

Glass by tenants

ZONE 2 - SECTION 1 - MALL 1

5

1 : 20

GENERAL NOTES All rights reserved.

All drawings and written material appearing here, constitute original and unpublished work of the Architect and may not be duplicated, used or disclosed without written consent of the Architect.

tails- 5.ROOF DETAIL 2

Notes and material designations are typical for similar conditions unless otherwise indicated.

KEY PLAN

All drawings and written material appearing here, constitute original and unpublished work of the Architect and may not be duplicated, used or disclosed without written consent of the Architect.

CallisonRTKL 25 Farringdon Street, 10th Floor KEY London EC4A 4AB T:+44(0)20 7306 0404

Notes and material designations are typical for similar conditions unless otherwise indicated.

6

ZONE 03 P4 P3 P2

CallisonRTKL

Facade wall detailsFloor 6.FLOOR JOINT 2

Do not scale from this drawing. 25 Farringdon Street, 10th All Structure/MEP elements shown in this drawings are as London 4AB per the latest SSH Structure Revit Please refer to 1 :model. 20EC4A SSH Structure drawings to confirm the structure sizes.

P1

T:+44(0)20 7306 0404

Do not scale from this drawing. All Structure elements shown in this drawings are as per the latest SSH Structure Revit model. Please refer to SSH Structure drawings to confirm the structure sizes.

A

ZONE 02

PROJECT

AL KHIRAN

Notes and material designations are typical for similar conditions unless otherwise indicated. NORTH

PROJECT

Do not scale from this drawing. All Structure/MEP elements shown in this drawings are as per the latest SSH Structure Revit model. Please refer to SSH Structure drawings to confirm the structure sizes.

7

CallisonRTKL 25 Farringdon Street, 10th Floor London EC4A 4AB T:+44(0)20 7306 0404

ZONE 02

ZONE 03

SHEET TITLE STATUS

P2 P1

1 : 20

DATE DESIGN DRAWN: 01/24/17 SHEET TITLE SCALE @ A1:

1 : 20

DRAWN BY:

Author

INTERIOR DETAILS 1

CHECKED BY:

Checker

DEVELOPMENT 56-14001 DISC

ZONE

PLOT

SERI

NO.

REV NO.

DESIGN DEVELOPMENT

PROJECT NORTH

STATUS MECCA

AL KHIRAN DESIGN DEVELOPMENT

SHEET TITLE

EXTERIOR WALLS SECTION DETAILS 1

TAMDEEN SHOPPING CENTRES

CLIENT

12/15/2016

PROJECT NUMBER

SCALE @ A1:

1 : 20

DISC

DRAWN BY:

CRTKL

CHECKED BY:

JL

DATE DRAWN:

ZONE

PLOT

56-14001 SERI

NO.

A 02 00 33 209

REVISION

1

1

REV NO.

2016-12-16 100% DD SUBMISSION

DATE

c 2012 RTKL UK Ltd

DESCRIPTION

DATE

ZONE

PLOT

SERI

Door

Screed Floor Finish

2

1 : 20

NO.

DESCRIPTION

DRAWN BY:

CRTKL

CHECKED BY:

JL

PLOT

SERI

NO.

A 02 00 33 220

ZONE 02

P3 CallisonRTKL 25 Farringdon Street, 10th Floor P2 London EC4A 4AB T:+44(0)20 7306 0404 P1

ZONE 02

B

Gypsum Board White Render Finish

6

DESCRIPTION

STATUS MECCA

DESIGN DEVELOPMENT

4

1 : 20

AL KHIRAN

Sctructure by SSH

01/02/2017 10:39:48

DESCRIPTION

Screed Floor Finish

200�

Glass

DATE DRAWN:

INTERIOR DETAILS 2

SCALE @ A1:

TAMDEEN SHOPPING CENTRES 01/25/17 1 : 20

DRAWN BY:

Author

CHECKED BY:

Checker

CLIENT

PROJECT NUMBER DISC

ZONE

DATE DRAWN:

PROJECT NUMBER

1 : 20

DISC

DRAWN BY:

Author

CHECKED BY:

Checker

ZONE

PLOT

1 : 20

DRAWN BY:

Author

CHECKED BY:

Checker

56-14001 SERI

NO.

A 02 00 34 402

REVISION

REV NO.

DATE

c 2012 RTKL UK Ltd

56-14001 TAMDEEN SHOPPING CENTRES

PLOT

01/24/17

SERI

NO.

PROJECT NUMBER

A 02 00 34 402

SCALE @ A1:

TAMDEEN SHOPPING CENTRES 01/25/17

SCALE @ A1:

DATE DRAWN:

DATE

MEP by SSH Glass

CLIENT

STATUS

CLIENT

2017-01-30 CORES ADJUSTMENTS 2016-10-07 PRELIMINARY DD SUBMISSION

SA DUCT

1 : 20

INTERIOR DETAILS 3

REV NO.

MEP by

1 : 20

MECCA

SHEET TITLE

AL KHIRAN

NORTH

P2

2

c 2012 RTKL UK Ltd Floor by Tenant Structure by SSH

34 - Z02 - SECTION E - 2PLAZA C CALLOUT ZONE - SECTION 4 -SSH MALL12

SHEET TITLE

DESIGN DEVELOPMENT DESIGN DEVELOPMENT 34 - Z02 - SECTION E - PLAZA C CALLOUT 1 MECCA

2 1

REVISION

NO.

200�

INTERIOR DETAILS 3

PROJECT

STATUS

P3 P2

SERI

Metal Grid with Access Blockwork

950x350 Screed Floor Finish

Metal SSH Frame Support

SHEET TITLE

AL KHIRAN

56-14001

PLOT

Gypsum Board White Render Finish 6

NORTH

P4

StructureSctructure by SSH by

Glass Metal Frame

PROJECT

NORTH ZONE 03

P1

P3

DATE

A

KEY PLAN

ZONE

A 02 00 34 200

Screen

Glass

Glass Metal Frame

B

ZONE 03

P4

PROJECT

ZONE 03 P4

c 2012 RTKL UK Ltd

ZONE 02

JL

B

REVISION

REV NO.

KEY PLAN

per the latest SSH Structure Revit model. Please refer to

56-14001

ZONE

Gypsum Board White Render Finish

1 : 20SSH Structure drawings to confirm the structure sizes.

P1

Do not scale from this drawing.

1 : 20

CHECKED BY:

1 : 20

Air Diffuser

Refer to MEP - SSH

Metal Plate

Glass

DISC

CRTKL

ZONE 2 - SECTION 4 - MALL 2

Jura Stone Metal Plate Finish

ZONE 2 - SECTION 4 - MALL 2

4

ZONE 2 - SECTION 4 - MALL 2

per the latest SSH Structure Revit model. Please refer to PROJECT NUMBER DATE cDRAWN: 2012 RTKL UK12/15/2016 Ltd SSH Structure drawings to confirm the structure sizes.

DISC

PLOT LINE

Notes and material designations are typical for similar conditions

A

KEY PLAN CallisonRTKLREVISION 25 Farringdon Street, 10th Floor London EC4A 4AB REV NO. DATE T:+44(0)20 7306 0404 c 2012 RTKL UK Ltd

Glass

Screen

Gypsum Board White Render Finish

Fitting Light by Scott Lighting

PROJECT NUMBER

As indicated

DRAWN BY:

Metal Screen

Ceilling Vertical Supports

Ventilation Grid Metal Support

Gypsum Board White Render Finish

1 : 20

Architect.

4

1 : 20

SERI

DESCRIPTION

Glass

ZONE 2 - SECTION 4 - MALL 2

Do not scale from this drawing. unless otherwise indicated. All Structure/MEP elements shown in this drawings are as per the latest SSH Structure Revit model. Please refer to Do not scale from this drawing. SSH Structure drawings to confirm the structure sizes. All Structure/MEP elements shown in this drawings are as

56-14001

DATE

Air Diffuser

Gypsum Board White Render Finish

Glass

unless otherwise indicated.

TAMDEEN SHOPPING CENTRES

2016-12-16

12/15/2016

SCALE @ A1:

Blockwork

Air Difuser

Light by Light Fitting Gypsum Scott Board by Scott Lighting White Render Lighting Finish

A

Gypsum Board White Render Finish

34 - Z02 - SECTION 1 - CINEMA CALLOUT 3 8 1 :220 ZONE 2 - SECTION 4 - MALL

REV NO.

c 2012 RTKL UK Ltd

a

Vertical Ceilling Support

Light by Light Fitting Scott by Scott Lighting MetalLighting Screen Metal Support Air Diffuser ZONE 2 - SECTION 4 - MALL 2

1

1

Screed Floor Finish Metal Frame Support

Screed Floor Finish Metal Frame 100% DD SUBMISSION Support

Screed Floor

500Finish

REVISION

A 02 00 33 209

JL

DESCRIPTION All Structure/MEP elements shown in this drawings are as

1 : 25

NO.

All drawings and written material appearing here, constitute GENERAL NOTES All rights reserved. original and unpublished work of the Architect and may not be CallisonRTKL duplicated, used or disclosed without written consent of the 25 Farringdon Street, 10th Floor All drawings and written material appearing here, constitute Architect. London original and unpublished work of the Architect and may not beEC4A 4AB duplicated, used or disclosed without written consentT:+44(0)20 of the 7306 0404 Notes and material designations are typical for similar conditions

A 02 00 34 400 TAMDEEN SHOPPING CENTRES

SCALE @ A1:

CENTRES

500

Gypsum Board white Render Finish

Door

DATE DRAWN:

Blockwork

Verostone Jura Cream Honed FL-01

Gymsum Board Screen

Glass

CHECKEDdesignations BY: Notes and material are typical for similar conditions Checker unless otherwise indicated.

REVISION

SECTION 1

1 : 20

CRTKL Lighting

DRAWN BY:

2

PROJECT NUMBER 01/23/17 All drawingsDATE andDRAWN: written material appearing here, constitute original andSCALE unpublished work of the Architect and may not be @ A1: 1 : 20 DISC ZONE duplicated, used or disclosed without written consent of the PLOT Architect. DRAWN BY: Author

CLIENT

PROJECT NUMBER

A 302 00 34DETAIL 401 Facade wallEXTERNAL details- 7. FLOOR JOINT WALL

8

MECCA

MECCA

DISC

GENERAL NOTES All rights reserved.

CLIENT GENERAL NOTES All rights reserved.

TAMDEEN SHOPPING CENTRES

CLIENT

P3

INTERIOR DETAILS 2

NORTH AL KHIRAN DESIGN DEVELOPMENT Facade wall details8.WHTIE CONCRETE PANELS

STATUS

AL KHIRAN

NORTH

P4

SHEET TITLE

SCALE @ A1:

a

Gypsum Board White Render

PROJECT

PROJECT NUMBER

Blockwork

Light Fitting

2

Door

Concealed Jet Nozzle SHOPPING DetailDoorTAMDEEN Gymsum Board 12/15/2016 56-14001 Light fitting Screen 1 : 20 by Scott

DATE DRAWN:

CHECKED BY:

Ceilling Vertical Support

1 : 20

Glass by Tenants

1 : 20

3

34 - Z02 - SECTION B - PLAZA B CALLOUT1 Structural Glass 1 : 20

5

TAMDEEN SHOPPING CENTRES

CLIENT

SHOPFRONT DETAILS - TYPE A1 (PLAIN GLASS)

DESIGN DEVELOPMENT

MECCA

Facade wall details- 7. FLOOR JOINT 3

1 : 20

SHEET TITLE

AL KHIRAN

1 : 20

CLIENT

SA DUCT

34 - Z02 - SECTION 1 - CINEMA CALLOUT 2

B

PROJECT

STATUS

Metal Plate

Metal Plate

SHEET TITLE

Blockwork

7

3

1 : 20

ZONE 2 - SECTION 4 - MALL 2 CABLE 1 : 20

Blockwork Metal Frame Support 34 - Z02 - SECTION B - PLAZA CALLOUT1 Gypsum Finish Gypsum BoardBWith Render Finish 5 Board White Render

ZONE 2 - SECTION 4 - MALL 2

3 NORTH

BOX ZONE 2 - SECTION 21004 - MALL 2

8

EXTERIOR WALLS SECTION DETAILS 1

Structure by SSH

Light Fitting Gypsum Board White Render

1

Metal Screen

BOX

DESIGN DEVELOPMENT EWS-604

B

STATUS

MECCA

STATUS MECCA

ZONE 02

KEY PLAN CallisonRTKL 25 Farringdon Street, 10th Floor London EC4A 4AB T:+44(0)20 7306 0404

PLAN

1 : 20

SCR-201

2100

Floor Finish by Tenants

AL KHIRAN

BEAM 800*1800 SSH

: 20 34 -4Z02 - 1SECTION 1 - CINEMA CALLOUT

KEY PLAN

All drawings and written material appearing here, constitute 02 original andZONE unpublished work of the Architect and may not be A B without written consent of the duplicated, used or disclosed Architect.

PROJECT NORTH

SCR-201

ZONE 2 - SECTION 4 - MALL 2

6

per the latest SSH Structure Revit model. Please refer to SSH Structure drawings to confirm the structure sizes.

Ceilling System Glass by Tenant

Ceilling Vertical Support

Gypsum Board White Render Finish

1 : 20

1470 Facade wall details- 8.WHTIE CONCRETE PANELS 7 Gypsum 1 : 20 Board CABLE

Verostone Jura Cream Honed FL-01

BEAM 800*1800 SSH

Glass

Gypsum Board White Render

ZONE 2 - SECTION 4 - MALL 2

LEVEL GROUND FLOOR

EWS-604 Do not scale from this drawing. 34 - Z02 - SECTIONAll 1Structure/MEP - PLAZA elements A CALLOUT 1 shown in this drawings are as

SLAB by SHH

40mm diameter Wallnut ZONE 02 Hardwood Handrail Vertical Satin Stainless SA DUCT Steel 950x350 AM-301

Air Diffuser

Extract by SSH

Metal Grid with

AM-101

Jura Stone Finish

Air Dufuser by SSH

GENERAL NOTES All rights reserved.

GENERAL NOTES All rights reserved.

Metal Frame Support

Metal Frame by SSH COLUMN Gypsum Board 1050x1500 by SHH White Render

Refer to MEP - SSH

IWS-301

Structure by SSH

Internal Floor Finish

Metal Frame by SSH

Gypsum Board White Render Finish

KEY PLAN

Gypsum Board Ceilling System

Metal Screen

KEY PLAN

1470

Gypsum Board White Render Finish

DESCRIPTION

DISC

ZONE

PLOT

56-14001 SERI

NO.

A 02 00 34 401

REVISION

REV NO.REVISION DATE c 2012 RTKL UK Ltd

DESCRIPTION REV NO.

DATE

c 2012 RTKL UK Ltd

DESCRIPTION

01/02/2017 10:25:04

Ceilling Vertical Supports

LEVEL MEZZANINE

Gypsum Board White Render Finish

a

Vertical Ceilling Support

INS-201

PLOT LINE

Do not scale from this drawing. All Structure elements shown in this drawings are as per the latest SSH Structure Revit model. Please refer to SSH Structure drawings to confirm the structure sizes.

SCR-201

LEVEL GROUND FLOOR

EWS-401 BLK-301

Jura Gold Stippled Verostone

Notes and material designations are typical for similar conditions unless otherwise indicated.

4

Floor by Tenant StructureAM-301 by SSH

1 : 20

1 : 20

Metal Screen

CallisonRTKL 25 Farringdon Street, 10th Floor London EC4A 4AB T:+44(0)20 7306 0404

Air Difuser

450� SPIGOT

PLOT LINE

PLOT LINE

All drawings and written material appearing here, constitute original and unpublished work of the Architect and may not be duplicated, used or disclosed without written consent of the Architect.

EWS-301 AM-101 AM-301

Blockwork

Light fitting by Scott Lighting SLAB by SHH

34 - Z02 - SECTION 1 - PLAZA A CALLOUT 2 AM-101

Facade wall details- 6.FLOOR 2 Access JOINT LEVEL GROUND FLOOR

6

CallisonRTKL 25 Farringdon Street, 10th Floor London EC4A 4AB T:+44(0)20 7306 0404

Notes and material designations are typical for similar conditions unless otherwise indicated.

3

Structure by SSH Gypsum Board white Render Finish

GENERAL NOTES All rights reserved.

EWS-604

Concealed Jet Nozzle DetailSCR201 Light Steel Support

ZONE 02

All drawings and written material appearing here, constitute original and unpublished work of the Architect and may not be duplicated, used or disclosed without written consent of the Architect.

1 : 20

MEP by SSH

01/02/2017 10:25:16

Verostone Jura Cream Honed FL-01

GENERAL NOTES All rights reserved.

Glass

Gypsum Board White Render

200�

1 : 20

SLAB by SHH

3

1 : 20

Glass by Tenants

Gypsum Board Ceilling System

Gypsum Board White Render Finish Jura Stone Finish

SA DUCT 950x350

5

Gypsum Board With Render Finish

1 : 50

Glass

Blockwork

MEP by SSH

200�

Structural Glass

LEVEL GROUND FLOORFacade wall details- 5.ROOF DETAIL 2

ZONE 2 - SECTION 4 - MALL 2 1 to1 :ATELIER 20 Refer ONE sheet number 1882/601

ZONE 2 - SECTION 1 - MALL 1 2 - SECTION 4 - MALL 2 ZONE

2

34 - Z02 - SHOP FRONT TYPE A1 - PLAN

4

1 : 20

Air Diffuser

Metal Louvres

800

Glass by Tenants

EWS-301 AM-101 AM-301 AM-301

Facade wall details- 4.FLOOR JOINT

a

Air Diffuser

Metal Louvres Structure by SSH

System

05/01/2017 18:18:49

SCR-201

ZONE 2 - SECTION 1 - MALL 1 1 : 20

4 Blockwork

Metal Frame Support

a

By MEP - SSH

Air difuser Gypsum Board Ceilling

Blockwork

1 : 20

Screen panels

Blockwork

SA DUCT 950x350

1

1 : 20

1

40

Air Diffuser by SSH

1 : 20

Metal Plate

SA DUCT 950x350

Screen panels

Light Fitting by Scott Lighting

Metal Frame Support

ZONE 2 - SECTION 4 - MALL 2

SA DUCT 950x350

Light Steel Support

Metal Plate

Metal Screen

Metal Frame Support

Structure by SSH

05/01/2017 18:18:49

B

LEVEL GROUND FLOOR

3

Gypsum Board White Render

1 : 20

ZONE 2 - SECTION 4 - MALL 2

1

EWS-301 AM-101 AM-301

Facade wall details- 2.CONCRET PANEL CINEMA

IWS-301

EWS604

250

200�

2

400

MEP by SSH

C

C

COLUMN 1050x1500 by SHH

Gypsum Board White Render Finish Facade wall details- 3.CONCRETE PANELS - BLACK STONE Jura Stone FinishCINEMA

Glass by Tenants

ade wall details- 1.ROOF DETAIL 1

Structure by SSH

Metal Plate

Render SCR-201 Structure by Finish SSH by by SSH LightMEP Fitting Scott Lighting Refer to MEP Metal Frame Support Light Steel Support

11

800

1233

Air difuser

Blockwork

Gypsum Board White Render Finish

SLAB by SHH

COLUMN 1050x1500 by SHH

Gypsum Board White Render

PLOT LINE

200

By MEP - SSH

INS-201 EWS-401 BLK-301

LEVEL GROUND FLOOR

SA DUCT 950x350

Metal Frame by SSH

11AM-101 AM-301

10

MEP by SSH

MEP by SSH

Structure by SSH

34 - Z02 - SHOP FRONT TYPE A - SECTION

10 Floor Finish Internal

SLAB by SHH

F.F.L. 13050

Gypsum 2 1 : 50 Verostone Jura Cream Honed Metal Plate BoardEWS-604 White FL-01

1 : 50

Strcuture by SSH

LEVEL MEZZANINE

Refer to ATELIER ONE DD Report of 161216

200�

Metal Frame Support

Ceilling Vertical Support

F.F.L. 13050

05/01/2017 18:19:02

SHEAR WALL Jura Grey Striated Verostone by SHH

400

200�

SHEAR WALL by SHH

Structure by SSH

1

Gypsum Board LEVEL MEZZANINE White Render

SCR-201

LEVEL GROUNDStainless FLOOR

SCR-201

SA DUCT 950x350

Metal Screen

EWS-301 AM-101 AM-301

Vertical Satin Steel

SLAB by SHH

LEVEL MEZZANINE

LEVEL MEZZANINE

Light Steel Support Light Fitting By Scott Lighting Concrete up stand Beam 500x500 34 - Z02 - SHOP FRONT TYPE A1 - ELEVATION

250

Beam provided from ATELIER ONE

01/02/2017 10:24:52

Gypsum Board White Render

SLAB by SHH

Jura Stone Floor

Light Fitting by Scott Lighting

SLAB by SHH

450� 200� SPIGOT

LEVEL CINEMA & FEC ROOF

Light Steel Support SCR-201

Refer to ATELIER ONE DD Report of 161216

a

Strcuture by SSH

Metal Frame Support

Light Steel Support Light Fitting By Scott Lighting Concrete up stand Beam 500x500

250

By Aterlier ONE

01/02/2017 10:25:04

SHEAR WALL by SHH

1400

CLG-101

Jura Gold Stippled Verostone

LEVEL MEZZANINE

Light Fitting by Scott Lighting Refer to MEP

IWS-301

PLOT LINE

250

603 BLK301 IWS301

BLK-301

SLAB by SHHSteel Vertical Satin Stainless

Light Steel Support

SHEARSCR-201 WALL by SHH

EWSLEVEL MEZZANINE

Metal Frame Support

By Aterlier ONE

SCR-201

PLOT LINE

Verostone Jura Cream Honed FL-01

SLAB by SHH

1500

BLK-301 IWS-301

SLAB by SHH

Refer to ATELIER ONE DD Report of 161216 LEVEL MEZZANINE

EWS-603

40mm Diameter Wallnut Harwood EWS-301 AM-101 Handrail AM-301 Satin Stainless Steel LEVEL GROUND FLOOR Brackets Vertical Satin Stainless Steal a

1100

SCR-501

IWS-301 Structural Glass 40mm diameter Wallnut SCR-201 Hardwood Handrail EWS-604 Satin Stainless Steel Brackets.

3000

BLK-301

LEVEL PLANT LEVEL

F.F.L. 19050

200�

1050

800mm BEAM FROM SSH

EWS-603

PT-301

SHEAR WALL by SHH

drawings are as per l. Please refer to SSH ructure sizes.

SA DUCT 950x350

14000

CLG-101

LEVEL PLANT

1 : 20

510

SHEAR WALL by SHH

LEVEL PLANT

4

5600

CLG-101

INS-203 FL-403 WPS-201 SCR-101

aring here, constitute rchitect and may not be written consent of the

1 : 20

SLAB by SHH

AM-103 RFS-201

ypical for similar

3

1 : 20

SLAB by SHH

Facade wall details- 4.FLOOR JOINT F.F.L. 19050

1500

INS-201

LIN-302

Facade wall details- 3.CONCRETE PANELS - BLACK STONE CINEMA

PLOT LINE

PLOT LINE

SHEAR WALL by SHH

EWS-604

2

1 : 20

PLOT LINE

AM-102

Facade wall details- 2.CONCRET PANEL CINEMA

10260

1

2100

EWS-604

SLAB by SHH

CABLE BOX

LEVEL PLANT LEVEL

Facade wall details- 1.ROOF DETAIL 1

1 : 20

LEVEL ADMIN

IWS-703

SCR-501

LEVEL PLANT LEVEL

34 - Z02 - SHOP FRONT TYPE A - Detail

3

LIN-201

400

PT-301

SCR-501

F.F.L. 13050

500

GLASS

PT-301

UPPER LEVEL GROUND MEZZANINE FLOOR

FFL:8.000 m MEZZANINE LEVEL

2100

BLK-301 IWS-301

IWS-702

SHEAR WALL by SHH

200�

EWS-603

SLAB by SHH

SHEAR WALL by SHH

EWS603 BLK301 IWS301

1400

SLAB by SHH

LIGHT FITTING BY SCOTT LIGHTING IN BETWEEN JETNOZZLES SLAB by SHH

01/02/2017 10:25:16

SLAB by SHH

LEVEL PLANT LEVEL

1000 800

BLK-301

SHEAR WALL by SHH

LEVEL CINEMA & FEC ROOF

UNINTERRUPTED 500mm CONCRETE UPSTAND FOR WATERPROOFING

CONCEALED SWIVEL JET NOZZLE DETAIL

200�

SHEAR WALL by SHH

LEVEL CINEMA & FEC ROOF

11

EWS-603

525

LEVEL CINEMA & FEC ROOF

INS-203 FL-403 WPS-201 SCR-101

10 EWS-604

EWS-604

AM-103 RFS-201

INS-201

50 50

3740

100

PLOT LINE

AM-102

PLOT LINE

PLOT LINE

3


CRTKL AL KHIRAN PEARL : RESIDENTIAL TOWERS 2016

Composed by two towers, the residential zone in Al Khiran is a luxury apartments with a view for the sea and the marina, with various set of services such as a private beach, a tennis court and a deluxe F&B, all reserved for the residents. I worked on this project as part of team and my task was preparing the architecture drawings for the SD final submission (Stage 2) and coordinate the information provided from the consultants with the architecture drawings.


CRTKL AL KHIRAN PEARL : HOTEL 2016

The Khiran Hotel is 5-star hotel provided with a gym, spa, restaurants, ballroom and deluxe guest rooms on the last floor with a sky lounge. The hotel target is the business class and also the tourism, with an 900sqm ballroom the Al Khiran wants to be an important spot for luxury venues in Kuwait. I worked on this project as part of team and my task was preparing the architecture drawings for the SD final submission (Stage 2) and coordinate the information provided from the consultants with the architecture drawings.


CRTKL HAMALA : MIXED USED COMPLEX : BAHRAIN 2016

Hamala is village in the north of the Kingdom of Bahrain. The plot sits between a main avenue and a school, the zone has a lack of retail and public spaces. For that reason our propose is to create 5 blocks of apartments with retail spaces on the ground floor, giving a souk environment. I worked on this project as part of team and my task was to design 1 of the blocks and preparing the drawings for the SD final submission (Stage 2).

PARKING B 362 SPACES

GENERAL NOTES All rights reserved. All drawings and written material appearing here, constitute original and unpublished work of the Architect and may not be duplicated, used or disclosed without written consent of the Architect. Notes and material designations are typical for similar conditions unless otherwise indicated. Do not scale from this drawing. All CallisonRTKL drawings are designed to Schematic level. The overall project will be Design and developed by Architect or Records at Detailed Design stage to conform with local rules and regulations. Coordinations between Structural, MEP, Public Health to be developed futher at Detailed Design stage by AOR.

B10 B1 STREET PARKING

STREET PARKING

B11

B2

B2

PARKING C 100 SPACES

B6 B4

B6

B2

STREET PARKING PARKING D 193 SPACES

B6

B12 B7

B3

STREET PARKING

B5

1 24/10/2016 For Information REV NO. DATE DESCRIPTION

B7

B1

B11 B6

B4

B7

B5

B12

B3

PARKING G 41 SPACES

R 15 000

B3 B9 B8

PROJECT

B9

PARKING F 327 SPACES

STREET PARKING

HAMALA CLIENT

LAMA Real Estate

CONSULTANTS

B8

SCHEMATIC DESIGN ARCHITECTS

CallisonRTKL,25 Farringdon Street, 10th Floor, London, EC4A 4AB, T:+44(0)20 7306 0404

SHEET IDENTIFICATION TITLE

SITE PLAN STATUS

Schematic Design PROJECT NUMBER

056-150040_Hamala

DATE DRAWN:

05/08/15

SCALE @ A1: DRAWN BY:

1 : 1000 JA

CHECKED BY:

JL

DRAWING NUMBER

BA-A-10000

c 2016 CallisonRTKL UK Ltd

REVISION

1

08/11/2016 15:04:33

STREET PARKING

B10

B2

PARKING E 88 SPACES

N

Q

KEY PLAN


CRTKL CERVAHIR : SHOPPING MALL : TURKEY 2016

This project is located in Istanbul, Turkey. The client requested us to make some refurbishment works in the Cevahir Shopping center, one of the largest shopping center in Istanbul. I worked on this project as part of team and my task was redesign and detailing all the sitting areas and the F&B kiosk areas along the mall.


‫‪CRTKL ALJ CITY : MASTERPLAN : JEDAAH‬‬

‫‪Located in the second largest city in Saudi Arabia, Al Jeedah want to become the capital of the economics and business of Saudi Arabia.‬‬ ‫‪ALJ City masterplan is our proposal for this new impulse. The plot is next to a highway, for that reason we decide to create a private block composed by residential, hospitality, retail and office buildings. The main goal is to provide a‬‬ ‫‪human-scale urban environment offering a distinguished bussiness and commercial experience to ALJ guests and residents.‬‬

‫‪2015‬‬

‫خدمات املرشوع‬

‫‪75‬‬

‫فكرة املخطط الرئييس للواحة‬ ‫‪44‬‬

‫خط االرتداد‬

‫موقع الحدود‬

‫خط االرتداد‬

‫موقع الحدود‬

‫موقع الحدود‬

‫موقع الحدود‬

‫خط االرتداد‬

‫تصميم املوقع العام بفكرة الواحة‬

‫‪6‬‬

‫‪42‬‬

‫املوقع العام ملدينة عبداللطيف جميل ميكن متييزه بقوة حيث‬ ‫ميتلك فراغات متفردة تتكون من الفراغ املركزي ذو التصميم‬ ‫العضوي كذلك الطريق املتعرج والطريق الدائري وشبكة‬ ‫الطرق القابلة للمرور محاور املخطط تأخذ شكل عضوي‬ ‫وتشكل حدود الواحة‬ ‫الواحة تعطي هوية االحساس باملكان وهى تشبه الحديقة‬ ‫الغامضة وتشبه مظلة منعشة للحامية من الحرارة والضوضاء‬ ‫وعناء املدينة املحيطة هى قلب اخرض واسع النطاق ملجتمع‬ ‫جديد يقدم اكرث من ‪ 3‬هكتار من الفراغات املفتوحة وتشمل‬ ‫املرافق الرتفيهية والتجارية‬ ‫الواحة عبارة عن مساحة للمشاه سهل الوصول اليها من خالل‬ ‫شبكة مسارات املشاه والفراغات التى تحتوي عىل برنامج‬ ‫مختلط من وسائل الراحة‬ ‫هذه الخدمات متثل القيم الجوهرية لعبداللطيف جميل ‪,‬‬ ‫للرتفيه والثقافة والتقاليد والدين ويتم توزيعها بشكل جيد‬ ‫عىل جميع انحاء املوقع يف مواقع اسرتاتيجية للتفاعل مع‬ ‫حديقة ذات مناظر طبيعية مثل الوادي والبنايات الشاهقة‬ ‫التى تحيط وتحدد مساحة مركزية متتع الناظر اليها‬ ‫عىل الرغم من ان الواحة هى مساحة مرتفعة اال انها ميكن‬ ‫الوصول اليها واملرور فيها من املساحات املحيطة بها‬ ‫توجد مساحة مركزية ثانوية محيطة بالنواة املركزية محددة‬ ‫بطريق رئييس دائري‬ ‫هذا الطريق الرئييس الدائري هو املسار الرئييس للمركبات‬ ‫مبدينة عبداللطيف جميل والذي يسمح بالوصول اىل كافة‬ ‫قطع االرايض‬ ‫املداخل االساسية هى بوابتني رشفيتني‬ ‫واحدة امام املكتب املركزي الرئييس يف الغرب من خالل طريق‬

‫‪43‬‬

‫االمري ماجد والبوابة االخرى امام مركز السيارات وبوتيك‬ ‫التجزئة يف الرشق عىل شارع موال نجازي‬ ‫شبكة طرق ثالثية عمودية عىل الطريق الدائري تسمح بوجود‬ ‫ممرات خالبة تعزز وضح املجال العام وخلق نوع من النفاذية‬ ‫لشبكة الطرق الخارجية ما بني الطريق الدائري وحدود املوقع‬ ‫يوجد فئة ثانية من املباين ذات االرتفاعات املنخفضة اىل‬ ‫املتوسطة من اجل ضامن حدوث انتقال تدريجي اىل االحياء‬ ‫املحيطة‬ ‫يسمح هذا االطار املكاين الفريد من نوعه مبراحل مرنة بشان‬ ‫قطع االرايض وستكون لكل قطعة ارض ظروف معينة تضمن‬ ‫االتصال مع املساحات املحيطة بها‬ ‫ومدينة عبداللطيف جميل ستكون عىل درجة عالية من‬ ‫االستدامة وتتميز باحياء عملية وذلكم بفضل كثافة عالية من‬ ‫االسعامالت والوظائف املختلطة عىل حد السواء من خالل‬ ‫تقسيم املناطق وتوزيع االستعامالت والوظائف املختلفة‬ ‫توزيعا رأسيا‬ ‫خط االرتداد‬

‫قطاع أ‪-‬أ‬ ‫قطاع مدخل الساحة‬ ‫(مرجعية)‬

‫نقاط الوصول‬

‫نقاط االرتكا‬

‫موقع الحدود‬

‫طاع ب‪ -‬ب‬ ‫طاع عريض لحديقة الرتاس‬

‫خدمات املرشو‬

‫‪68‬‬

‫نقاط الوصول‬


CRTKL ALJ CITY : HOTEL 2015

The ALJ Hotel is located right next to the hight road, it is a 4-star business hotel. With two luxury restaurants in the ground floor, one ballroom and five meeting rooms. The hotel will be a welcome for the ALJ City, in that sense the façade of the hotel assumes an important reference for the all masterplan. I worked on this project as part of a team and I was responsible for preparing the architecture drawings according with the information provided from the urban planning team. WORK IN PROGRESS ALJ CITY MASTERPLAN 2016/03/01

WORK IN PROGRESS ALJ CITY MASTERPLAN 2016/03/01

WORK IN PROGRESS ALJ CITY MASTERPLAN 2016/03/01

WORK IN PROGRESS ALJ CITY MASTERPLAN 2016/03/01

8

23

Entrance View

Proposed Hotel and WORK IN PROGRESS ALJ CITY MASTERPLAN 2016/03/01 Serviced apartments

9

Aerial View

Proposed Hotel and Serviced apartments

Street View

24

Proposed Hotel and Serviced apartments

GENERAL NOTES

All rights reserved.

2

3

4

5

6

7

8

9

All drawings and written material appearing here, constitute original and unpublished work of the Architect and may not be duplicated, used or disclosed without written consent of the Architect.

Notes and material designations are typical for similar conditions unless otherwise indicated.

1

Do not scale from this drawing.

3

4

5

6

7

8

9

WORK IN PROGRESS ALJ CITY MASTERPLAN 2016/03/01

GENERAL NOTES

All drawings and written material appearing here, 1 constitute original and unpublished work of the Architect and may not be duplicated, used or disclosed without written consent of the Architect.

2

Proposed Hotel and Serviced apartments

WORK IN PROGRESS ALJ CITY MASTERPLAN 2016/03/01

All rights reserved.

1

Entrance View

GENERAL NOTES

Notes and material designations are typical for similar conditions unless otherwise indicated. Do not scale from this drawing.

All rights reserved.

2

3

4

5

6

7

8

9

1

2

3

All drawings and written material appearing here, 6 constitute 5 original and unpublished work of the Architect and may not be duplicated, used or disclosed without written consent of the Architect.

4

A

7

8

Notes and material designations are typical for similar conditions unless otherwise indicated.

VIP PARKING

Do not scale from this drawing.

VIP PARKING

A

A

A

B

MEETING ROOM 171 m²

MEETING ROOM 163 m²

SUITE 87 m²

SUITE 87 m²

DN UP

DN

RESTAURANT 190 m²

UP

STANDARD 39 m² C

RESTAURANT 248 m²

STANDARD 40 m² STANDARD 39 m²

STANDARD 39 m²

D

BALLROOM 863 m²

E

EXECUTIVE 48 m²

From B2

CLOAKROOM

VOID

REV NO. F

DATE

HOTEL

REV NO.

APART.

DATE

F

STANDARD DESCRIPTION 40 m²

BoH 106 m² G

TOILET 95 m²

UP SERVICE SERVICE

APART.

STANDARD 40 m²

SERVICE

G

UP SERVICE SERVICE

TOILET 85 m²

APART.

UP

H

UP

Owner

BUSINESS CENTER

H

MEP 18 m²

F

2BED 142 m²

2BED 140 m²

BoH 14 m²

CLIENT

KITCHEN 181 m²

UP

OwnerSTANDARD 40 m² H

APART.

MAID 15 m²

UP 1 BED 70 m2

TERRACE 7 m²

DN

STANDARD 40 m²

1BED 70 m²

TERRACE 9 m²

1BED 70 m²

TERRACE 9 m²

STANDARD 40 m²

STANDARD 40 m²

1BED 70 m²

TERRACE 11 m²

STANDARD 40 m² H

STANDARD 40 m²

RTKL 25 Farringdon Street, 10th Floor London EC4A 4AB T:+44(0)20 7306 0404

Ground Floor

STANDARD 40 m²

PROJECT NUMBER

DATE DRAWN: SCALE @ A1: DRAWN BY: CHECKED BY:

DRAWING NUMBER

A-12000

c 2012 RTKL UK Ltd

STANDARD 34 m² MAID 15 m²

PROJECT STANDARD 40 m²

STANDARD 40 m²

STANDARD 40 m²

Project Name

DN

STANDARD 40 m²

CLIENT

Owner

SHEET IDENTIFICATION

Proposed Hotel and Project Status apartments Serviced 1st Floor STATUS

Project Number

STANDARD STANDARD 39 m² 40 m²

02/29/16

12

1 : 200 Author

Checker REVISION

TITLE

Level 01 J

STATUS

Project Status PROJECT NUMBER

Project Number

15

DRAWING NUMBER

A-12001

c 2012 RTKL UK Ltd

STANDARD STANDARD 38 m² 40 m²

DN BoH 14 m²

I

Typical Floor

DATE DRAWN:

02/29/16

SCALE @ A1: DRAWN BY:

1 : 200 Author

CHECKED BY:

Checker REVISION

01/03/2016 17:52:04

STAFF PARKING

STANDARD 40 m²

RTKL 25 Farringdon Street, 10th Floor London EC4A 4AB T:+44(0)20 7306 0404

J

01/03/2016 16:42:47

Ground Floor J

11

DESCRIPTION STANDARD STANDARD 40 m² 40 m²

STANDARD 40 m²

I

SHEET IDENTIFICATION TITLE

DATE

STANDARD STANDARD STANDARD KEY PLAN 34 m² 40 m² 40 m²

DN

I KITCHEN 603 m² I

REV NO.

STANDARD 40 m²

G SERVICE SERVICE

STANDARD 40 m²

TOILET 88 m²

STORAGE

APART.

STANDARD 40 m²

Project Name

UP DN

CLIENT

HOTEL

STANDARD 40 m²

PROJECT

G

DN

BoH 68 m²

HOTEL

EXECUTIVE 48 m²

STANDARD 40 m²

TERRACE 17 m²

UP DN

Project Name

SERVICE SERVICE

TERRACE 15 m²

MEP 18 m²

APART.

PROJECT

STANDARD 40 m²

EXECUTIVE 48 m²

F HOTEL

STANDARD 39 m²

E

KEY PLAN

HOTEL

EXECUTIVE 48 m²

STANDARD 39 m²

DESCRIPTION

HOTEL

STANDARD 40 m²

E STANDARD 40 m²

KEY PLAN

STANDARD 39 m² STANDARD 39 m²

STANDARD 40 m²

TOILET 91 m² BoH 230 m²

STANDARD 40 m² STANDARD 40 m²

STANDARD 40 m²

D

ADMIN 308 m²

C STANDARD 40 m²

MEETING ROOM 116 m²

To B2

STANDARD 39 m²

STANDARD 40 m²

D

SHOP 18 m2

DN

UP

MEETING ROOM 114 m²

RESTAURANT 327 m²

E

STANDARD 38 m²

DN

C

D

B

STANDARD 38 m²

UP

C

UP DN

Proposed Hotel and Serviced apartments

RTKL 25 Farringdon Street, 10th Floor London EC4A 4AB T:+44(0)20 7306 0404

J

SHEET IDENTIFICATION TITLE

Level 04

Design Allows Maximum Flexibility STATUS

Project Status PROJECT NUMBER

Project Number

DRAWING NUMBER

A-12004

c 2012 RTKL UK Ltd

DATE DRAWN:

02/29/16

SCALE @ A1: DRAWN BY:

1 : 200 Author

CHECKED BY:

Checker REVISION

01/03/2016 16:43:14

B

B

SUITE 80 m²

9


WHAT 112 GREEN LANES : RESIDENTIAL : LONDON 2015

900

760

5

5

4

4

FFL 3380

300

3230

W04

FFLNOTES: 3380

2.30

2.31

4

3420

3110

3090

WARDROBE

3

3

3

15 00

FFL 8960

D17

W07

1200

1255

1200

620

4890

1

W10

1

Existing structure

620

1200

1260

1200

1

3095

4890

5 m.

Proposed First floor

1

2

3

4

5 m.

Life without buildings!

Proposed structure

0

1

2

3

Proposed Second floor

4

5 m.

A

12

290

43

42

33

35

36

41

40

13

14

15

STORAGE

38

37

NEW YELOW/ RED COLOR FACING LONDON STOCK BRINCWORK TO NEW REAR ELEVATION TO MATSH EXISTING

39 BEDROOM 1

2.22

W05

27

26

16

17

18

19

20

21

24

22

23

COFFE SHOP

BATHROOM 2

D06

2.21

D05

STATUS: RIBA STA DATE: FEBRUA SCALE: 1:50 DRAWN: DPG

11 9 6 23 X 9 11 20

STORAGE

10

FFL -0305

CHECK ALL DIMENSIONS O FROM THIS DRAWING YET R WITH ALL CONSU WHAT_architecture RETAIN INFORMATION W

8 7

BATHROOM 1

6

+4

5 4

+44-20-7729-9848 T

3

info@whatarchitecture.com E

1

www.whatarchitecture.com W

info@whata

2.20

D02

2

www.whata

14 Anning S Londo

FFL -2300 14 Anning Street, Shoreditch P

1

PROPOSED 3D MODEL

London EC2A 3LQ UK

Existing structure

1675

Life without buildings! 2.31

0

2.30

2.30

Life without buildings!

1

3

4

5

0

PROJECT: B

0

248eng_112 Green Lanes_Engin London N16 9EH

Proposed Attic floor

1

2

3

4

5 m.

1

2

3

4

Life without b

5 m.

Life without buildings!

Proposed Section

NOTES:

DWG NO:

2-41A No 114

A

2.30

4

2.23

Proposed structure

No 112

B

DWG TITLE:

PROPOSED BACK ELEVATION

No 110

A No 114

B

No 112

No 110

NEW MANSARD ROOF EXTENTION WITH TILES TO MATCH EXISTING NEW PARTY WALL BUILT UP FOR A NEW MANSARD ROOF EXTENSION

NEW LEAD CLAD DORMER WITH PAINTED TIMBER SASH WINDOWS

EXISTING FRONT PITCH ROOF RETAINED WITH NEW VELUX ROOFLIGHT

PROJECT: 248eng_112 Green Lanes_Engin London N16 9EH

FRL 11650 FRL 11650

NOTES:

N 2.24

W11

W12

2.24

W13

W14

2.24

FFL 9190

2.24

FFL 9190

NEW PAINTED TIMBER SASH WINDOWS WITH GAUGED BRICK ARCHES TO MATCH EXISTING

W09

2.23

W08

2.23

FFL 6460

2.23

NEW YELLOW/RED COLOUR FACING LONDON STOCK BRICKWORK TO NEW BACK ELEVATION TO MATCH THE EXISTING

W05

2.22

W04

2.22

W09

W10

W05

W06

2.23

FFL 6460

2.22

2.22

FFL 3380

FFL 3380

W01

2.21

2.21

2.21

FFL 0000

STATUS: DATE: SCALE: DRAWN:

A

CHECK ALL DIMENSIONS ON SITE. DO NOT SCALE FROM THIS DRAWING YET READ IN CONJUNCTION WITH ALL CONSULTANT INFORMATION. WHAT_architecture RETAINS COPYRIGHT OF ALL INFORMATION WITHIN THIS DRAWING.

+44-20-7729-9848 T

CHECK ALL DIMENSIONS ON SITE. DO NOT SCALE FROM THIS DRAWING YET READ IN CONJUNCTION WITH ALL CONSULTANT INFORMATION. WHAT_architecture RETAINS COPYRIGHT OF ALL INFORMATION WITHIN THIS DRAWING.

B

D10

RIBA STAGE 2 STATUS: FFL 0000 DATE: FEBRUARY 2015 SCALE: 1:50 DRAWN: SF

RIBA STAGE 2 FEBRUARY 2015 NTS SF

A

2.21

W02

W03

D03

2.30

3

B

2.31

2

A

2.31

1

Proposed structure B

2.31

B 0

Proposed Ground floor

2.31

A

D08

FFL 0000

CHECK ALL DIMENSIONS ON SITE. DO NOT SCALE FROM THIS DRAWING YET READ IN CONJUNCTION WITH ALL CONSULTANT INFORMATION. WHAT_architecture RETAINS COPYRIGHT OF ALL INFORMATION WITHIN THIS DRAWING.

2.20

120

D09

NEW FELT ROOF TO REAR EXTENSION WITH RECONSTITUTED STONE COPING

29

7 23 X 1 12 18

STATUS: RIBA STAGE 2 DATE: FEBRUARY 2015 SCALE: 1:50 DRAWN: KT

2-50A

4890

2.30

2.31

A

GREEN LANES

DWG NO:

DWG TITLE:

1

32

34

28

2.21

www.whatarchitecture.com W

Existing structure

31

HALL

14 Anning Street, Shoreditch P London EC2A 3LQ UK

620

50

49

25

+44-20-7729-9848 T

W11

48

CORRIDOR

info@whatarchitecture.com E

14 Anning Street, Shoreditch P London EC2A 3LQ UK

D15

FCL 3150

D19

CHECK ALL DIMENSIONS ON SITE. DO NOT SCALE FROM THIS DRAWING YET READ IN CONJUNCTION WITH ALL CONSULTANT INFORMATION. WHAT_architecture RETAINS COPYRIGHT OF ALL INFORMATION WITHIN THIS DRAWING.

4890

Proposed structure

W07

30

D20

www.whatarchitecture.com W

14 Anning Street, Shoreditch P London EC2A 3LQ UK

620

900

4500

4510

info@whatarchitecture.com E

7 22 X 2 10 19

FFL 3380

RIBA STAGE 2 STORAGE STATUS: 5DATE: sqm FEBRUARY 2015 SCALE: 1:50 DRAWN: KT

+44-20-7729-9848 T

+44-20-7729-9848 T info@whatarchitecture.com E www.whatarchitecture.com W

Existing structure

770

2.22

2.30

210

1

1

D09 1160

LIVING ROOM / KITCHEN 1

ACCESS HATCH

CHECK ALL DIMENSIONS ON SITE. DO NOT SCALE FROM THIS DRAWING YET READ IN CONJUNCTION WITH ALL CONSULTANT INFORMATION. WHAT_architecture RETAINS COPYRIGHT OF ALL INFORMATION WITHIN THIS DRAWING.

CHECK ALL DIMENSIONS ON SITE. DO NOT SCALE FROM THIS DRAWING YET READ IN CONJUNCTION WITH ALL CONSULTANT INFORMATION. WHAT_architecture RETAINS COPYRIGHT OF ALL INFORMATION WITHIN THIS DRAWING.

W06

FFL 6460

STATUS: RIBA STAGE 2 DATE: FEBRUARY 2015 SCALE: 1:50 DRAWN: KT

STATUS: RIBA STAGE 2 DATE: FEBRUARY 2015 SCALE: 1:50 DRAWN: KT

1480

MAIL 900

50 49 48 47 46

15 00

4200

W02 D10

1160

KITCHEN - LIVING ROOM 2 23 sqm

44

FCL 6230

2

51

D16

KITCHEN - LIVING ROOM 1 23 sqm

47

53 52 51

46

7485

3020 120

BATHROOM 3

D17 45

2145

13880

53 54 55 56 57 58 59

BATHROOM 4 5 sqm

4310

5460

CORRIDOR 3 sqm

N

EXISTING WINDOWS RETAINED 54

52

D18

120

D15

W13

2830

F2

120

6050

D11

48 47 46

W12 BEDROOM 3 12 sqm

39 38 37 36

40 41 42 43 44 45

1030

120

F1

D12

2

W09 BEDROOM 2 9 sqm

56

8 22 X 5 6 19

W11 FFL 6460

750

W08

3860

300

2

13880

2600

23 22 21 20 19 18 33 32 31 30

24 25 26 27 28 29

D13

NOTES:

58

LIVING ROOM / KITCHEN 2

2

FFL 3380

HALL 2 sqm

59

57

3

2

D14

BATHROOM 2 5 sqm

NEW MANSARD ROOF EXTENSION WITH TILES TO MATCH EXISTING

2.24

FCL 8960

FFL 3380

120

2

PROJECT:

248eng_112 Green Lan London N16 9EH

D19

55

3

COFFEE SHOP 32 sqm

D08

D20

2.23

930

4170

FFL 000

W13

N FFL 9190

FFL 6460

2

11 10 9 8 7 6 16 15 14 13 12

PROPOSED SECTION

5

STORAGE

D05 D06

W03

2.24

1650

3600

300

3

3

4

NEW LEAD CLAD DORMER WITH PAINTED TIMBER SASH WINSOWS

NOTES:

N

4

3

NEW FELT ROOF TO MANSARD ROOF EXTENSION

248eng_112 Green Lanes_Engin London N16 9EH FRL 11650

5

NOTES: FFL 3380

4

1

PROJECT:

248eng_112 Green Lanes_Engin London N16 9EH

5

W05

13880

290

BATHROOM 1 sqm D07

1

PROPOSED ATTIC FLOOR PLAN

PROJECT:

5

N

BEDROOM 1 16 sqm

D04

410

DWG TITLE:

PROPOSED SECOND FLOOR PLAN

740

DWG TITLE:

FFL 6460

STORE 18 sqm

3

2

N

4070

4520

FFL 000

4

4

900

248eng_112 Green Lanes_Engin London N16 9EH

NOTES:

4

2-24B

2.30

D03

900

2-30A

DWG NO:

B

DWG TITLE:

PROPOSED 4890 FIRST1590 FLOOR PLAN PROJECT:

248eng_112 Green Lanes_Engin London N16 9EH

1680

W01

PROPOSED 1390 1000 GROUND FLOOR PLAN PROJECT:

5

5

300

5

1000

2-23B

D09

2.30

900

900

A

2.31

900

B

DWG TITLE:

2.31

1490

2.30

A

DWG NO:

DWG NO:

2-22A

2.31

B

1680

1000

2-21A DWG TITLE: 5190

5190 900

DWG NO:

DWG NO:

2.30

2.31

A

B

2.30

2.31

A

Located in the council of Stroke Newington on the North of London, this project is a refurbishment and an extension of a three storey detached house. The client own the property. I worked on this project as part of a team and I started on this project in the early stage. We’ve done the survey (Stage 0) and then prepared all the drawings for the planning application (Stage 1). This project allowed me to work with the London housing regulation.

B

info@whatarchitecture.com E www.whatarchitecture.com W

14 Anning Street, Shoreditch P London EC2A 3LQ UK

+44-20-7729-9848 T info@whatarchitecture.com E www.whatarchitecture.com W 14 Anning Street, Shoreditch P London EC2A 3LQ UK

0

1

2

3

4

5 m.

Life without buildings!

0

1

2

3

4

5 m.


ARP

2014

JOSE DIAS COELHO : RESIDENTIAL : LISBON

This project is located in the old town of Lisbon. Our proposal is a junction of an existing building and a new one. This is a five storey building with a good transport service and to follow the tradition of the borough we create a public passage to a commercial small building that end in a nice courtyard. I had to redesign the interior space of the two buildings with special attention to the regulation required for building refurbishment. I participated on the development of the architecture project and later I made the 3D model in Revit.

Site Plan

Ground Floor Plan

Section A

Section B

First Floor Plan

Typical Floor Plan

Roof Floor Plan


SF

2014

First Floor

SANTA LUZIA : DETACHED HOUSE : FUNCHAL

This detached house was own by a private client and it was located in Funchal, Madeira. It is a two storey detached house with beautiful view for the sea and yard in the background. The client asked me to follow the construction and to choose all finishes. I decided to use a 3D model made on Revit to show to the client the results of my choices, and also to measure and calculate the costs. With this project I learned how to communicate with the contractor and how to deal with the client’s budget.

Second Floor

Section


ARP

2013

QUINTA NOVA DO TOJAL : MIXED USE COMPLEX : SINTRA

This project is located in a town 30km a away from Lisbon. The council own the plot and proposed us to create a small development to cover the lack of public spaces in the zone. The location was a challenge for this project, the terrain has different heights. And to avoid to many stairs and ramps we create two platforms where the 10 block of flats sits. The complex is composed by 10 buildings each one with large retail shops on the ground floor. The apartments goes from 1-bedroom flat to 4-bedroom flat. I was responsible to drew the apartments of every building, under the supervision of the senior designer. I also made the 3D model in Revit for the visuals.

Ground Floor Plan (Shops)

Site Plan

First Floor Plan (Entrance)

Floor Plan Standard

Sections

Flat Type 1

Flat Type 2

Flat Type 3


sofiasilvafernandez@gmail.com

07598148285

pt.linkedin.com/in/fernandezsofia/pt


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.