Cory Moton CMIT130 11/12/2016Case Projects- Chapter 5
Case Project 5-1: Using Existing Networks
I would recommend Plains Research Institute (PRI) upgrade all of its servers to the most current Windows or Linux operating system, because PRI uses both Windows and Linux.
If that is not possible I would recommend they replace the out of date servers. I would also get ride of the current unmanaged hubs and unmanaged switches. I recommend PRIget new managed switches as an upgrade to their current system.
Switches are faster than hubs and would be more efficient. PRI would be able to connect both the chemist andbusiness managers with a single router. Using managed switches gives PRI computersupport the opportunity to manage and monitor the network as well as well as controlnetwork traffic.
https://www.solvedcollegepapers.com/product/cmit-130-cmit130-cmit-130-cks
https://www.solvedcollegepapers.com/product/cmit-130-cmit130-cmit-130-cel