thesis : samskruti bhavan X sem


Boundary at south

Toward artery Site extent: 323x218 m Site area: 41,111 sqm =10.15 acres Allowable F.A.R.: 2.0 (scarcely populated) Allowable ground coverage: 55%

SITE ANALYSIS AND STUDY

Samskruti bhavan : Cultural centre

Areas includedEthnic mall Auditorium Workshop Areas Library Gallery Hostel accommodation for students Staff accommodation Mess Clubhouse for students Caretaker’s quarters

BANGALORE CITY

The site

hostel library III sem

pareprashnena IV sem

tapovana VI sem

urban planning IX sem

thesis : samskruti bhavan X sem


THE COMPLEX

GALLERY MURAL ON THE LIBRARY

AUDITORIUM

CLUBHOUSE

HOSTELS MESS


ADMIN BUILDING

GALLERY THE COMPLEX

Built up area: 6455 sq m Parking =2500 sq m F.A.R.= 6455/41111 =0.157 WORKSHOP AREAS

STUDIO INTERIORS

STAFF QUARTERS


1.TEMPLE ROAD

Drainage system, which also serves as a sidewalk is not maintained and thus is not fully functional

Currently, most of the buildings are mixed use : offices ground floor and apartments on the top. ---No parking space National highway and the state higway junction needs to redesigned in order to parking space Areas used for non – designated parking for private vehicles – unauthorised. State highway 6m wide less than 1m wide footpath. Road width varies.Needs to be expanded. A lot of houses on the state highway are abandoned for more than 15 years. TO UDUPI

N O P R O V I S I O N O F A P R O P E R D R A I N A G E S Y S T E M N A R R O W R O A D W I D T H S ( 2 M E T R E S ) V E H I C L E S P A R K E D I N F R O N T O F S H O P S A N D T H E R O A D B E I N G N A R R O W C R E A T E S A PR O B L E M F O R T R A F F I C . O L D T R A D I T I O N A L H O U S E S W I T H M I X E D U S E D E V E L O P M E N T I S PR E V E L A N T , O N E X PA N S I O N A L L T H E S E B U I L D I N GS W I L L B E D E M O L I S H E D .

TO KARKALA

The bus stand being near the junction connecting the apartment road and the NH – 66 creates a havoc for movement. The road is narrow for two way vehicular movement. The road leads to the apartment complex and hence needs to be widened to make way for free flow of pedestrian and vehicular movement. The drainage system needs to be redesigned .

TO MANGALORE

hostel library III sem

pareprashnena IV sem

5.SCHOOL ROAD - JUNCTION

The bus stand not big enough, thus people end up standing outside it. This can be problematic during rainy season.

4. STATE HIGHWAY JUNCTION

Waste is not properly disposed

Present Conditions and Areas of Concern

tapovana VI sem

2. APARTMENT ROAD

3. MARKET ROAD

3m

market road which is too narrow to serve its purpose

No garbage disposal facility Drainage covered and uncovered at various points.Uneven installation of drain covers hindering the traffic and acting as an obstacle for pedestrians and vehicles Road width insufficient for vehicular and pedestrian movement Vacant unused land Lighting inadequate A still of residents that walk on the road everyday to get to work. A drain lies half covered in the background No proper view while turning onto highway: the mouth of the road is obstructed by two building on either side. Therefore blocking out the oncoming traffic and creating a blind spot inadequate parking spaces

PADUBIDRI IS A TOWN THAT IS IN DISPUTE OVER THE ISSUE OF HIGHWAY WIDENING. THE FOLLOWING IS THE PROPOSAL PUT FORWARD TO U D U P I M U N I C I PAL I T Y.

urban planning IX sem

thesis : samskruti bhavan X sem


EXPANDED HIGHWAY WIDTH : 15M CARRIAGE WAY/1.5 M PEDESTRIAN PATHWAY/5M SERVICE LANE/15M BUFFER FOR FUTURE EXPANSION PROJECT : Development of NH66 (Kochi – Panvel) PURPOSE OF STUDY : How the highway expansion would affect the town TOTAL AREA UNDER STUDY METHODOLOGY : •Study the history of the place/how the town developed. – 484 ACRES •Physical documentation of the town, land use pattern •Traffic analysis at various important junctions, pedestrian movement, parking analysis, activity networks, relationship of the building with the road, conflict points and critical junctions. •Infrastructure of the town, growth pattern, economic trends ABSTRACT : NH66 cuts through the center of the town splitting the town in 2 . Over the years commercial areas developed along the NH and has become the main activity zone and the economic hub of the town. Expanding the NH would literally wipe out the town. SOLUTIONS : •Expanding the NH and relocating the activity network/ commercial spaces on the insides with proper pedestrian crossings and official parking spaces.

N

PROPOSAL 1: HIGHWAY EXPANSION PROJECTS • • • • • • •

Proposed land use Proposed master plan Expansion of existing NH 66 New modified internal road networks Re-location of buildings demolished due to expansion Provision for future development of facilities Provision for future expansion of national and state highway

Proposed landuse


Existing

Project-1 Project-1 is the entry to the town of Padubidiri. The Design is oriented to provide a bi directional traffic flow and a resolved junction.

Project-2 Project-2 is the junction between the state highway and the Proposed By pass. Being Situated in the central Part of town, it is one of the most important areas in town.

Project-3

Padubidiri The Existing town of Padubidiri, Begins with the Crossing of the river kamini. The existing highway divides the town into two parts, nadsal and Padsal. The Main commercial Area of the town is situated along the highway, and the industrial area is situated along the state highway. Towards the southern part of the town, Maha Ganapati Temple is located, which is of great importance to the town. Padubidiri enjoys the easy approach to the sea shore.

Padubidiri – By Pass The Proposal of padubidiri By Pass was developed, keeping in mind the future issues that might arouse due to the expansion of the current highway. The Proposed By Pass Tries to resolve some of those issues and also create better development possibilities for the town of Padubidiri.

Project-3 deals with the development of area right below the central part of town. It aims at service related developments.

Project-4 Project-4 is the exit of the town. This Exit connects the existing Highway to the proposed By Pass.

Project-5 Project-5 Is the Re-Allocation and Development of the current Market area, And Resolution of the claustrophobic Circulation in the area.


Site: Gokarn, Ka. This spiritual retreat is complete with a yoga centre, dormitories restaurants, ayurveda centre and villas. The various areas are separated by open spaces to inculcate the nature and the benefit of the ocean view. Completely hand drafted drawings and sketchup views.

hostel library III sem

pareprashnena IV sem

tapovana VI sem

urban planning IX sem

thesis : samskruti bhavan X sem


Caretaker’s Cabin

Manager’s Cabin

View from the Entrance

The Restaurant

Reception and Information Centre Physical Model

Dwelling

VIEWS OF VARIOUS UNITS


The Kund outside the main Temple that was inspiration for the design.

Pareprasnena ‘Krisna’s Lotus Feet’ Interpretation Centre for the Udupi Sri Krisna Temple Designed to look like the buildings in the vicinity, vernacular architecture played an important role in the design of this building. The gallery is shaped like Lord Krishna’s foot and it links the 2 units that include a/v rooms, restaurant, gift shop, ticketing booth and activity rooms. Site: Udupi, Karnataka

hostel library III sem

pareprashnena IV sem

tapovana VI sem

urban planning IX sem

thesis : samskruti bhavan X sem


ELEVATION OF THE SOUTH EAAST FAÇADE, SHOWING GALLERY

SECTION THROUGH THE UNITS

FRONT FAÇADE SHOWING AMALGAMATION OF TRADITIONAL AND CONTEMPORARY ARCHITECTURE


Existing building

PROPOSAL FOR EXTENSION

Project Brief: A library extension was to be designed for MIT Hostels, Manipal to accommodate students and staff after the central library of the college shut after 6:30 pm. This was hand drafted and views were generated in Sketch-up. A simple concept was applied wherein the same vocabulary of the existing hostel library was inculcated. Built Up : 300 sq. m Site: Kamath Circle, Manipal

hostel library III sem

pareprashnena IV sem

tapovana VI sem

urban planning IX sem

thesis : samskruti bhavan X sem



|

MINOR PROJECTS

Landscape design-Enclosure IX sem

Tree House design V sem

|


Enclosure design: Site: gokarn, ka • The site chosen is a contoured terrain at gokarna. • The design challenge is to create an enclosure for the various activities. • The design is executed in a way that the terrain in itself acts as an enclosure for the different activities. • The user experiences a different atmosphere within each designated space for the activity • Enclosed spaces, semi-enclosed spaces, an enclosure within an enclosure and also is extended to the different elements of lighting, walkway, roofing and other surroundings. • The decision to hollow out the ground for this enclosure was based on the fact that gokarna has a semi tropical moderate climate.. – To avoid this heat and humidity • One of the objectives was to use traditional and local materials-mother of pearl and provide the locals of the area with work

ENTRY TO THE SITE CANOPIED PATHWAY LIGHT BY FLAMING TORCHES BY NIGHT

THE TERRAIN

VIEW AT NIGHT

SITE INTERCONNECTING TUNNELS

SHELLS USED IN CANOPY

A TYPICAL UNIT

BOAT DOCK

Landscape design-Enclosure IX sem

Tree House design V sem


Site: Eshwarnagar, Manipal

The units are made of wood and secured onto the branches with metal pieces to tackle wind loads that could disturb the branches. THE ZERO ENERGY TREE HOUSE MATERIALS USED: SCRAP WOOD FROM OLD SCAFFOLD AND FORMWORK. METAL OBTAINED FROM THE UNIVERSITY AND MUNICIPAL JUNKYARDS. ALL LAVORATORIES FITTED WITH BIOTOILETS.

The tops of the units are exposed to adequate amount of sunlight for solar power

THE BIOTOILET

Landscape design-Enclosure IX sem

Tree House design V sem


|

TRAINING

Tapogiri Ashram, Himalayas

|

Last School, Auroville


GUEST COTTAGE THE DINING HALL AND MEDITATION ROOM

SADHAK BLOCK

Tapogiri Ashram Himalayas

Last School Auroville

TAPOGIRI ASHRAM is situated in the foothills of himalaya. They were partially destroyed during the 2009 earthquake. Few building were being restored and others rebuilt. All new buildings have the same language as the older ones in order to maintain the uniformity.


WRITER’S COTTAGE


ELECTRICAL LAYOUT

PLUMBING LAYOUT

FORMWORK FOR FRB ROOFING

LAST SCHOOL IS ONE OF ROGER ANGER’S PROJECTS IN AUROVILLE. IT IS AN ART SCHOOL THAT HAD BEEN DESTROYED IN THE TSUNAMI. OUR TEAM HAD TO DOCUMENT THE BUILDING AND REDO ALL THE ROOFING UNITS WITHOUT ANY ORIGINAL DRAWINGS.

ANCHORING DEVICES FOR THE ROOF

Tapogiri Ashram Himalayas

Last School Auroville


|

EXTRAS

Set design

|


KITCHENETTE

PLAN

TRANSOMS DESK

REHERSAL ROOM

LLOYDS PLACE ONLY IN ACT 2

Dramanon is an 11 year old theatre company with it's roots in the student-town of Manipal. Since 2006, we have had chapters in Bangalore & Hyderabad as well, which have grown rapidly to be amongst the most prolific theatre fraternities in these cities. Recently noted by India Today magazine as one of the "Top Emerging Theatre Companies in India", Dramanon, with it's fast-growing fan-base, is now in the process of rapidly scaling-up operations to be among the best theatre groups in the country. I worked for 6 productions with DRAMANON during college, including Comikaze 1 and 2 -the comedy fest. I designed posters, teasers, tickets and was the Head of Set Department for 5 productions.

(Operated from behind)

CLOCK

SET FOR ‘ THAT DARN PLOT’ POSTER DESIGN FOR COMIKAZE


SET FOR ‘ GOD’S FAVOURITE’

TREE (ILLUMINATED)

SCREEN INCLINED

SOFT LIGHTING OVER BAR COUNTER

DOOR 2 40”

SET FOR ‘ LAST RESORT’

25 “

5’


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.