Southern Peninsula
GET YOUR
FREE TV GUIDE
Caring for local families for over 40 years www.rosebudfunerals.com.au
123 Jetty Road, Rosebud
INSIDE!
Ph: 5986 8491
An independent voice for the community
Your weekly community newspaper covering Safety Beach to Portsea
FREE
Wednesday 22 November 2023
For all advertising and editorial needs, call 03 5974 9000 or email: team@mpnews.com.au www.mpnews.com.au
Two missing after mid-air crash over bay POLICE and emergency services personnel stand by on Sunday as the search continues for a plane that crashed into the sea offshore from Mount Martha. Picture: Yanni
TWO people, including MasterChef TV cameraman James Rose, were still missing yesterday (Monday) after a mid-air collision over Port Phillip between ex-military planes on Sunday off Mount Martha. The two-seater aircraft were reported to be conducting a formation flight over the bay when they collided. One plane plunged into the water while the second, also with two people on board, flew back to Essendon Airport. Family members of the two men in the missing aircraft waited at Mount Martha Life Saving Club Sunday night as a search and rescue mission continued about 11 kilometres offshore. It is believed the Viper S-211 Marchetti jet planes were operated by Jetworks Aviation, which describes itself as “Australia’s most modern civilian fighter jet fleet” and offers 45-minute, two jet fighter formation flights for $7750. The Australian Transport Safety Bureau is investigating the collision, which occurred at about 1.45pm. Some wreckage was recovered late on Sunday, including a beacon floating device and a tyre. ATSB transport safety investigators are conducting interviews, retrieving all available recorded data, and gathering weather, aircraft maintenance, operator procedure and pilot information and documentation. A report into the accident will be released early next year. The ATSB is calling for witnesses or anyone with footage of the accident to contact investigators via the website or on 1800 011 034. Liz Bell
Budget cuts end travel plans Keith Platt keith@mpnews.com.au PLANS to improve Mornington Peninsula road and rail services came to a sudden halt last week with the federal government announcing cuts of more than $300 million from infrastructure projects. The move means the cancellation of both the Jetty Road, Rosebud overpass and the electrification of the train service from Frankston to Baxter. The $225 million promised by the previous Coalition government to duplicating and electrifying the line to Baxter came nowhere near to the estimated $1.5 billion needed. Infrastructure Minister Catherine
King said the federal government said the infrastructure cuts included “projects that were not realistically going to be delivered with the funding available … [or] that do not align with Commonwealth or state and territory priorities”. However, $57.5 million will stay in the budget to upgrade the Western Port Highway along with $43.5 million for commuter car park upgrades on the Frankston line. The recommendation to drop the peninsula’s rail and road projects followed a review into uncompleted infrastructure projects ordered by the Labor federal government. “The independent strategic review found that the Infrastructure Invest-
ment Program inherited from the former Coalition government was undeliverable,” King said. Quick to voice concerns over the fate of the projects were Flinders MP Zoe McKenzie, Mornington Peninsula Shire mayor Cr Steve Holland and CEO of the Committee for Frankston and Mornington Peninsula. McKenzie said it was a disgrace and an insult to residents that the peninsula had “again been neglected by Labor”. “The most called for road upgrade on the Mornington Peninsula is the Jetty Road overpass, and this completely out of touch government has cancelled the project and cut the funding,” McKenzie said.
Cutting off the rail money was a “visionless stunt and an embarrassing about face” by the Prime Minister Anthony Albanese and Dunkley MP Peta Murphy who had both backed the rail extension before being elected to government. Holland said the “withdrawal of $300 million set aside” to extend the rail line to Baxter (“a vital first step towards extending the metropolitan train service all the way to Hastings”) and upgrade the Mornington Peninsula Freeway, was “deeply unfair and incredibly disappointing”. He said both commitments had been “dependent on matching funds from the Victorian government”. “At the very least, I call on the fed-
eral government to ensure this funding stays on the Mornington Peninsula and is spent on other projects,” Holland said. Sinclair said the Committee for Frankston and Mornington Peninsula was disappointed with the cuts, and would “be seeking clarification from the government about where they do plan to invest in critical infrastructure in our region over coming years”. “At a time when the state government has allocated nearly $30 million in this year’s state budget for the Port of Hastings and its plans for a renewable energy terminal, improving public transport and the rail line between Frankston and Hastings has never been more crucial,” he said.