Share the Success - Second Ave Subway

Page 1

Share the Success SpecPlug

Fast Setting Hydraulic Cement

SpecPlug: Second Avenue Subway Contractor: Schiavone/Shea/Skanska Designer: DMJM Harris/ARUP Joint Venture Supplier: RAW Equipment - Flushing, NY $17 Billion Project

New York City

Over 100 feet below the Manhattan skyline, tunnelling continues for Phase 1 of the new Second Avenue Subway line. Skanska Construction uses SpecChem’s “SpecPlug” to quickly stop the flow of ground water into the tunnels. Fast-setting, water-tight and durable, SpecPlug’s performance helps keep this historic project on schedule. SpecChem provides the most comprehensive concrete chemical systems in the industry. For more information call your local SpecChem sales professional. 866.791.8700 or www.specchemllc.com

SpecPlug

Fast setting hydraulic cement • Sets in 3-5 min • Nonshrink/ just add water • Makes durable water tight repairs • Sets/bonds fast to stop flowing water

Follow us

facebook.com/specchemllc twitter.com/specchemllc

Made in America

Contact your SpecChem professional for more information. 1511 Baltimore Ave, Suite 600 | Kansas City, MO 64108 | P. 816.968.5600 F. 816.561.4029 | www.specchemllc.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.