List of chemicals/products used on site PRODUCT NAME: Wabo FlameGuard II Blanket Chemical Family: Refractory Fiber Link to MSDS:https://wbacorp.com/public/userfiles/WaboFlameGuardIIBlanket_MSDS.pdf
JOB HAZARD ANALYSIS
Product name: Sikaflex® ‐ 1A
Link to MSDS: https://usa.sarnafil.sika.com/downloads/repository/submittal/productdata/Sikaflex%C2%AE1A.pdf
Skanska/Balfour Beatty Project: Microsoft Parking Garage 07 95 00- Seismic Joint Covers
MICROSOFT CAMPUS MODERNIZATION PROJECT
Job Hazard Analysis Company: Spectrum Specialty Builders
Crew: 2
JHA #: 01
Activity: Fire Barrier Installation
Jobsite: MSCM
SBB Reviewers:
Superintendent: Dan Pridemore
Foreman: Dan Grekoff
Competent Person: Robin Pridemore
Date: 9-30-20
(Describe the tasks/steps in order)
(Describe hazards before controls are implemented)
(Describe all control measures that will be put in place to make them safe)
TASKS/STEPS
HAZARDS - CONSEQUENCES
CONTROLS (SAFEGUARDS)
Step 1.
Trip hazard
Place fire barrier at correct depth
Engineering Control: Administrative Control
PPE Step 2.
PHOTO OR SKETCH
Flying debris
Gloves
Engineering Control:
Drill steel angle Administrative Control
Step 3.
Flying debris Hearing loss
Roto-hammer concrete
PPE Eye protection Engineering Control: Administrative Control PPE Eye protection/ear protection
Step 4. Set Fastener (completes install)
None
Engineering Control: Administrative Control PPE
Page 1 of 2
Revised Nov 2019
MICROSOFT CAMPUS MODERNIZATION PROJECT Step 5.
Engineering Control:
Administrative Control
PPE
Tool and Equipment To Be Used For This Task Drill motor and rotor hammer Required Training none Reviewed and Approved by Name Foreman: Super: EHS:
Signature
Required PPE Eye and ear protection Date
Name Foreman: Super: EHS:
Signature
Date
Crew Review I have read and understand the contents of the job hazard analysis and the controls required to mitigate the risks from the idenitified hazards Signature Date Name Name Signature 10-19-20 Joe Radke 10-19-20 Dan Grekoff
Page 2 of 2