LIVESTRONG Sporting Park Construction Update

Page 1

From:

Nick Roberts

Office: Kansas City Date:

5.25.11

Re:

Sporting Kansas City Project Update – Week of 5.25.2011

To: David Ficklin - OnGoal Rory O’Connor – OnGoal Lee Turner – OnGoal Andy Heitmann – Turner Dave Dudzik - Turner Brandon Valdez-Turner Nick Durand - Turner

Current Activities this Week: Site/Playing field/Bowl: Figureas seat installation is nearly complete. All landscaping is nearly complete. Ticket Booth has been set. Concrete Flatwork: Plaza flatwork will be complete. Plaza colored concrete is complete. Masonry: Plaza wall block is ongoing. Plaza fence installation is ongoing. Stone: Cast stone installation is ongoing. Steel: Stair handrail is ongoing. NW equipment pad screen wall steel is ongoing.

Ticket Booth has been set.

Roofing and Sheet metal: Installation of perforated panels is complete. Plaza Portal panels are ongoing. Polycarbonate: VIP canopy polycarb is ongoing. Metal Stud Framing/Drywall/Ceilings: All project drywall will be complete. Glass/Doors/Hardware: Mechoshade installation is complete. Plaza directory signage. Building the Future


MEP: TV installation is nearly complete. Prozone camera installation is complete. DAS installation is ongoing. Stadium light aiming is ongoing. Plaza device installation is ongoing. Painting: Supporter’s Club painting will be complete. Painting of Concourse columns is ongoing. Sealing of A-Line corridor is ongoing.

POS system complete in Concessions.

Tile/Carpet/Finishes: Shield Club acrylic panels will be complete. Victory Suite carpet installation is ongoing. Food Service: The Health Inspection license for the entire building has been received. Signage: Directory signage throughout is ongoing. Ad panels are ongoing. Plaza signage is ongoing. Livestrong Sporting Park sign has been set.

Supporter’s Club large projector screen.

Completion: The building TC of O has been received. Projected Activities occurring next Week: Completion: Final C of O to be received. All work-in-place items to be complete.

Flag poles have been installed. Building the Future


Additional Photos

Carpet installation in Victory Suite.

Field Club TV’s.

North elevation landscaping.

VIP Canopy polycarb install.

DJ booth installation in Supporter’s Club.

Livestrong Sporting Park signage.

Building the Future


Burning lights in Plaza.

NW equipment pad screen wall.

Portable food service carts.

Plaza stair handrail.

East gate entry.

Metal panel/canopy at North Portal.