Arch. Portfolio | Srishti Jain | 2016-present

Page 1

RA.LA .R C

A .L A

R C .R CR.AL.AR

PORTFOLIO

CR.AL.AR

CR.AL.AR

CR.AL.AR



CONTENTS

01

Bibliothèque

02

Ketliwala

03

Resource effective Rural school

04

Mini Secretariat, Abohar

05

Commercial Buildings

06

Rai Residence - Interiors

Design - Studio Project | 2018

Internship - Built Project | 2019

B.Arch Thesis Project | 2021

Design - Built Project | 2021

Experience at Planners Group | 2022

Experience at The Vaastu Consultants | 2023

03

06

09

16

23

28



BIBLIOTHÈQUE Academic Project | Individual |1 month | 2018 Site : Panjab University, Sector 14, Chandigarh (IN) Design - Studio Project Mentor : Ar. Priya Gupta

The campus of Panjab University is a close-knit, unified cluster of exposed brick and concrete buildings (star ingredients of Le Corbusier’s Chandigarh) intertwined with pedestrian pathways and green open spaces providing a unique environment for students to live and study. The design brief demanded a library for the university campus that shall cater to disciplines of law, arts, engineering and business. The concept of the project mainly revolved around the study of framed structures and their functionality, experimenting with a 5m x 5m RCC grid (36 squares) to carry out services, functional spaces, and overlooking gardens or balconies together.

5


DESIGN DEVELOPMENT FROM CONCEPT Inspiration : Rubix cube; Idea : to work within a grid, a cubical structure

1. 5m x 5m column grid, 36 squares

2. central 10m x 10m shaft - light

3. play of solid & void

Form development : created punctures for light, ventilation and contextual views

1.

2.

Zoning layout and schematic sections

3. grid plate (30m x 30m)

4. floor plan as per area program

B

B

atrium 1

A’

A

A’

A

B’

B’

ground floor zoning

first floor zoning

SECTION AA’

B

B

atrium 2

A’

A

6

B’

B’

second floor zoning

A’

A

third floor zoning

SECTION BB’

balconies


Library design project focusses on creating a space that not only houses books but also serves as a dynamic hub for knowledge, collaboration, and community interaction. It incorporates movable furniture, modular shelving, and multifunctional spaces that allow the library to cater to a wide range of needs, from quiet study sessions to collaborative group work.

FA C

UL TY

OF

EN

GI

NE

ER

Hence, a grid of 36 squares, 5m x 5m each was chosen. The inspiration for this design project was a Rubix cube. The motivation was to keep the design as modular as possible. Hence, almost all the area requirements were carved out in the multiples of 5. Area program was divided as follows : Faculty of business, administrative and standard facilities of a library like printing room, librarian office etc. were provided on the ground/ main floor Faculty of law - first floor Faculty of arts - second floor Faculty of engineering - third floor

IN

G

D HIR

FLO

T

FA C

UL TY

N

LA

P OR

N

LA

OF

P OR

AR TS

D ON

FLO

C

SE

Each floor had its independent meeting rooms for group discussions/ group study, assistant librarian office, computer chamber and washroom facilities. Punctures in the building envelope balconies were made to enhance visual experience by merging indoors and outdoors, mainly in quite reading and collaborative meeting rooms.

FA C

UL TY

N

OF

LAW

T IRS

F

LA RP

O

FLO

atriums toilet shaft electrical shaft u-shaped punctures reverse stepping at rear facade rectangular punctures on facade punctures near the reading zones

AD FACU MI NI LTY O STR AT F BU IO SIN N FA ESS CIL ITIE S

N

LA

P OR

D UN

FLO

O

GR

7


KETLIWALA KIOSK DESIGN Built on site | Practical project | 2 months | 2019 Site : Elante Mall, Chandigarh (IN) Design firm : The Elements Partners : Ar. Anant Mann & Ar. Siddhartha Wig

Ketliwala provides refreshment services to visitors in Elante Mall, Chandigarh (IN). The client for this kiosk design project wanted to re-create the rustic ambience of an “Indian chai tapri” (tea stall). They wanted the design to be simple and appealing. As Architectural Intern (during 7th Semester), I studied logistics behind the design of a kiosk, its structure and services. My major role was to work on the abstraction and development of design, along with preparation of its construction drawings and coordination on site. Workshop visits were frequent to check assembly and development of the kiosk structure. Special focus was given on joinery, finishes and appearance of the kiosk as it had to engage with primary stakeholders (service providers and customers) in the hospitality realm. LVL + 12'-6" (FALSE CEILING)

LVL + 2'-2"

12'-6"

32" LED DISPLAY SCREEN (28"X 15.5") LVL + 6"

POSTER DISPLAY (21"X 33") LVL + 3"

32" LED DISPLAY SCREEN (28"X 15.5") LVL + 6"

32" LED DISPLAY SCREEN (28"X 15.5") LVL + 6"

POSTER DISPLAY (21"X 33") LVL + 3"

BRANDING (10"X 26.75")

LVL + 9'-0"

32" LED DISPLAY SCREEN (28"X 15.5") LVL + 6"

LVL + 1'-3" LVL +- 0

LVL +- 0

LVL + 5'-1"

BRANDING (10"X 26.75")

LVL +- 0 POSTER DISPLAY (21"X 33") LVL + 3"

POSTER DISPLAY (21"X 33") LVL + 3"

LVL + 2'-2"

LVL +- 0

LVL +- 0

LVL + 3'-6"

LVL + 1'-6"

2'-11 3/4"

LVL + 1'-6"

LVL + 1'-6"

LVL + 1'-9"

3'-2 1/2"

LVL + 1'-9"

5'-0"

LVL + 6'-0"

8'-0"

5'-0" 26'-4"

3'-2"

2'-0"

1'-3 1/2"

LVL + 0 (FFL)

Front elevation ‘A’ showing the proposed outlook of the design ELEVATION A LVL + 12'-6" (FALSE CEILING)

LVL + 2'-2"

32" LED DISPLAY SCREEN (28"X 15.5") LVL + 6"

POSTER DISPLAY (21"X 33") LVL + 3"

32" LED DISPLAY SCREEN (28"X 15.5") LVL + 6"

32" LED DISPLAY SCREEN (28"X 15.5") LVL + 6"

POSTER DISPLAY (21"X 33") LVL + 3"

BRANDING (10"X 26.75")

LVL + 1'-3" LVL +- 0

LVL +- 0

LVL +- 0

LVL + 1'-6"

CHEST FREEZER 23" x 26" x 35" (Top Opening)

CHEST FREEZER 23" x 26" x 35" (Top Opening)

DISPLAY CHILLER 20" x 24" x 54" (Front Opening)

LVL + 1'-9"

8

LVL + 6'-0"

LVL + 3'-6"

LVL + 1'-6"

LVL + 1'-9"

Elevation ‘B’ showing the proposed design behind the main counter elevation ELEVATION B

LVL + 9'-0"

32" LED DISPLAY SCREEN (28"X 15.5") LVL + 6"

LVL + 5'-1"

BRANDING (10"X 26.75")

LVL +- 0 POSTER DISPLAY (21"X 33") LVL + 3"

POSTER DISPLAY (21"X 33") LVL + 3"

LVL + 2'-2"

LVL +- 0

LVL + 1'-6"

LVL + 0 (FFL)


STORAGE (LOCKED)

CHEST FREEZER 23" x 36" x 25" (Top Opening)

UNDER COUNTER CHILLER 54" x 28" x 34" (Front Opening)

2'-11" 4"

6"

6" DEEP LEDGE 6" DEEP LEDGE

UNDER COUNTER UNDER COUNTER CHILLER CHILLER 54" x 28" x54" 34"x 28" x 34" (Front Opening) (Front Opening)

3"

2'-4"

2'-4"

2'-0"

12MM TILE12MM FIXED OVER TILE FIXED OVER 12MM WATERPROOF PLY 12MM WATERPROOF PLY FIXED OVER 1"x1" MS 1"x1" MS FIXED OVER PIPE SECTION FRAME FRAME PIPE SECTION

CHEST CHEST FREEZERFREEZER 23" x 36" x23" 25"x 36" x 25" (Top Opening) (Top Opening) 3'-0"

2'-10" 4"

2'-4" 3'-0"

2'-10" 4"

2' LONG LED 2' LONG PROFILE LED PROFILE TASK LIGHTING TASK LIGHTING

2'-0"

1'-8"

2'-0"

8"

2'-0"

3"

7'-0"

2'-0"

2'-0"

7'-0"

X

CHEST FREEZER 23" x 36" x 25" (Top Opening)

DISPLAY CHILLER 20" x 24" x 54" (Front Opening)

STORAGE

STORAGE

STORAGE

GREASE TRAP (50 LTRS. CAP.)

STORAGE FOR HELMETS / MOPS (LOCKED)

B

C E

4" DIA 4" DIA PIPE CHIMNEY CHIMNEY PIPE

Transverse sectionSECTION YY’SECTION showing details of the kiosk Y-Y" Y-Y"

Transverse section XX’ showing details of the kiosk SECTION SECTION X-X" X-X"

STORAGE FOR DB, UPS AND BATTERY (LOCKED)

6" DEEP BALCONY 6" DEEP BALCONY

2'-4"

2'-4"

2'-4"

4" HIGH PLATFORM MADE IN 1"x1" 4" HIGH PLATFORM MADE IN 1"x1" MS PIPE FRAME, WITH MS PIPEFINISHED FRAME, FINISHED WITH 12MM WATERPROOF PLY AND PLY AND 12MM WATERPROOF 12MM TILES OVER IT OVER IT 12MM TILES

Y

2'-5"

DISPLAY POSTER DISPLAY POSTER (21"X 33") (21"X 33")

2'-0"

2'-11" 4"

2'-0"

2'-2"

2'-2"

12'-6"

12'-6"

6" 1'-8"

12MM TILE12MM FIXED OVER TILE FIXED OVER 12MM WATERPROOF PLY 12MM WATERPROOF PLY FIXED OVER 1"x1" MS 1"x1" MS FIXED OVER PIPE SECTION FRAME FRAME PIPE SECTION

3'-0"

UNDER UNDER COUNTERCOUNTER STORAGESTORAGE

Z

1'-1"

10" 5'-0"

5'-0"

2'-1 1/2" 1'-5 1/2" 3" 1'-6"

1'-6"

UNDER UNDER COUNTERCOUNTER STORAGESTORAGE

2'-0" 2'-0" 1" THK GRANITE 1" THK GRANITE

3'-0" 3'-0"

4'-2"

4'-2"

2'-9"

CHIMNEY CHIMNEY

4"

2'-9"

1" THK 1" THK 2'-5" GRANITE GRANITE

2'-4"

1'-9" 1'-9" 1" THK GRANITE 1" THK GRANITE 3'-0"

4"

4" DIA 4" DIA CHIMNEY CHIMNEY PIPE PIPE

OVERHEAD OVERHEAD STORAGESTORAGE

8"

1" THK GRANITE 1" THK GRANITE

COVE COVE LIGHTINGLIGHTING

BACK-LIT BACK-LIT SIGNAGE SIGNAGE WOODEN WOODEN PLANK (8'-0" PLANK x 2'-6"), (8'-0" HUNG x 2'-6"), HUNG FROM THE FROM FALSE THE CEILING FALSE CEILING USING 1" DIA USING MS 1" PIPES DIA MS PIPES

WOODEN WOODEN BOX FOR BOX FOR 32" LED DISPLAY 32" LED DISPLAY SCREEN (28"X 15.5") SCREEN (28"X 15.5")

5"

2'-4"

5"

2'-11"

1'-2"

1'-2"

1" THK 1"2'-11" THK GRANITE GRANITE

121" x 121" WOODEN 121" x 121" WOODEN SECTION SECTION FRAME WITH FRAME WITH 12MM COMMERCIAL 12MM COMMERCIAL PLY FIXEDPLY OVER FIXED IT OVER IT

121" x 121" WOODEN 121" x 121" WOODEN SECTION SECTION FRAME WITH FRAME WITH 12MM COMMERCIAL 12MM COMMERCIAL PLY FIXEDPLY OVER FIXED IT OVER IT

2'-1"

2'-1"

2'-2"

2'-2"

3"

BACK-LIT BACK-LIT SIGNAGE SIGNAGE WOODEN WOODEN PLANK (8'-0" PLANK x 2'-6"), (8'-0" HUNG x 2'-6"), HUNG FROM THE FROM FALSE THE CEILING FALSE CEILING USING 1" DIA USING MS 1" PIPES DIA MS PIPES

LANTERNLANTERN

FRP DETAIL FRP DETAIL

10"

1'-1"

1'-4"

1'-4" 2'-1 1/2" 1'-5 1/2"

5'-0"

5'-0"

PLASTER PLASTER OF PARISOF PARIS MOULDING DETAIL DETAIL MOULDING

1 kg ABC TYPE FIRE EXTINGUISHER

LOCKED DRAWERS

SPACE FOR DUSTBIN

STORAGE

STORAGE

SANDWICH PREP. CHILLER 36" x 28" x 38" (Front Opening)

F

STORAGE

A Z'

Y'

Interaction of various stakeholders captured in a snapshot of kiosk at present

X'

Plan layout @ LVL + 1’-6” (below the counter)

Popularity of Ketliwala at Elante Mall (at present) 9


10


RESOURCE EFFECTIVE RURAL SCHOOL Academic Project | Individual | 10th Semester | 2021 Site : Village Kutlupur, Jalandhar, Punjab (IN) B.Arch Thesis Project Mentor : Ar. Priya Gupta

Many rural schools often reflect an unkept, dilapidated image, that may not be healthy or inviting. Dimly lit classrooms, broken benches, plaster flaking, foul-smelling washrooms, besides the questionable mid-day meals and dilemma of a teacher as to what she should teach a class of students on different academic levels. Resulting from the issue of unkept, dilapidated rural govt. schools offering limited educational infrastructure, the thesis aims at investigating an alternate approach to school campus design. Hence, the thesis attempts to create a school campus where children can learn and grow in enhanced learning environments (indoor and outdoor) shifting from the mainstream instruction-based learning to interaction based one, designed through a low-cost approach. An architecture programme which provides infrastructure that fits well in the govt’s budget, and leaves funds for quality education programme. This aids the govt. to spend less on construction and more on quality of education. The thesis aims at re-igniting the sensitivity towards locally-sourced tradtional materials for building construction purposes and proposes a campus model to improve the broken and under-maintained condition of rural school buildings.

11


ABOUT THE SITE Location : Village Kutlupur, Basti Danishmandan, Jalandhar district, Punjab Access : via main Gakhal road (main connectivity road) and is 8km away from Jalandhar city. The site is adequately distanced from the main road through a drain running parallel on the main road. Proposal : by the Punjab Govt., 5 acres of land is allotted for Govt. Senior Secondary School and 1 acre for RUDSET (Rural Development and Self Employment Training) Institute. FARMLAND

FARMLAND

FARMLAND

SITE 6 ACRES Towards Gakhal Village

Towards Jalandhar City

KUTCHA ROAD 3M WIDE (SECONDARY ROAD)

WATER DRAIN 3M WIDE (SEASONAL NAHLA)

ACCESS via ROAD (4 wheelers)

X’

GAKHAL ROAD 4.5 M WIDE (MAIN ROAD)

X

ACCESS via ROAD (4 wheelers)

ACCESS via DRAIN BRIDGE (2 wheelers)

BASTI DANISHMANDAN

SITE CONTEXT : The land parcel within red boundary is the proposed site.

SITE ANALYSIS Villages Western winter winds Dominant NE winds SW monsoon winds

SITE Greens - buffer

Secondary road

Bastis

Climatic influence : helped to devise building orientation and fenestrations, landscaping pattern BAKUL TREE ht. = 15-20m BAKUL TREE width = 10-15m ht. = 15-20m width = 10-15m NEEM TREE ht. = 15-30m NEEM TREE width = 15-25m ht. = 15-30m width = 15-25m

12

Main road

Access

Sunpath

MANGO TREE ht. = 15-30m MANGO TREE width = 10-15m ht. = 15-30m width = 10-15m

BAKUL TREE ht. = 15-20m width = 10-15m

Access

Access

GULMOHAR TREE ht. = 8-15m width = 10-15m

AMALTAS TREE ht. = 10-12m NEEM TREE width 5-10mthe main road Traffic influence : access to site is detached=from ht. = 15-30m width = 15-25m KACHNAR TREE ht. = 6-12m width = 3-6m

GULMOHAR TREE MANGO TREE ht. = 8-15m TREE GULMOHAR ht. = 15-30m width = 10-15m ht. = 8-15m width = 10-15m width = 10-15m AMALTAS TREE ht. = 10-12m AMALTAS TREE width = 5-10m ht. = 10-12m width = 5-10m ARJUNA TREE KACHNAR TREE ht. = 20-25m ht. = 6-12m KACHNAR TREE width = 15-20m width = 3-6m ht. = 6-12m width = 3-6m ASHOKA TREE ht. = 6-9m ASHOKA TREE Local, seasonal vegetation : for site landscaping width = 3-5m ht. = 6-9m width = 3-5m KIKAR TREE ht. = 4-7m KIKAR TREE width = 5-8m ht. = 4-7m

ASHOKA TREE ht. = 6-9m width = 3-5m KIKAR TREE ht. = 4-7m width = 5-8m MULBERRY TREE ht. = 10-15m width = 5-10m


SCHOOL Block 1 : Admin Block 2 : Multi-purpose area Block 3 : Multipurpose Hall Block 4 : Labs Area Block 5 : Library Cluster 1 : Pre-school Cluster 2 : Primary wing Cluster 3 : Middle wing Cluster 4 : Sr. Sec. wing Block 8

RUDSET INSTITUTE Block 6 : RUDSET Block Block 7 : RUDSET Cafe Block 8 : Staff Hostel

Block 7

Block 6 RUDSET ENTRANCE

Block 5

Block 2

Block 3

Parking

Cluster 4 Assembly area

Block 1

SCHOOL ENTRANCE

Cluster 3

Cluster 1

Cluster 2 Block 4

SITE PLAN : Overlay of pedestrain pathways, building blocks, and landscaping . Distinct division between School campus and RUDET campus yet sharing common facilites.

13


VISION FOR THE PROJECT Level i. Design level : Enhance Learing Spcaes Solution : promoting outdoor learning, flexible, versatile, welcoming spaces, familiar looking & connected campus Classroom oriented

Instruction-based

Concept Flexibilty

Interaction-based

Concept Versatility

Translation Triangular furniture : multiple combinations possible

Concept Familiar looking elements

Translation Partitions : expansion of space

Translation “mudda” & “durries”-seating furniture Concept Versatility

Translation Open plan : changing utilities & functions

to promote participation of local craftspersons

Campus Planning oriented

Concept Familiarity

Concept Scale

Translation “satths”

Translation single storey, spacious, formal entrance

Concept Connected-ness Familiarity

Translation courts

Concept shaded pathways

Concept Connected-ness Patterned

Translation natural trails with climbers & creepers

Translation garden pathways

Concept Visual stimuli via Color

Concept Open-ness

Translation ornamental plants & trees

Translation play areas, sand pits & gardens

Level ii. Construction level : Reduce the life cycle impact of the building Solution : adopting a resource conscious approach (construction materials, techniques) and formulating a set of resource-effectivity parameters to test the construction process 14


Level iii. Form finding of Classroom Blocks : Enhancing Learning Environments

i. Courtyard space : to increase wall sharing; outoor gathering space is composed from building form

ii. C-shaped clusters : breaking up of mass to allow circulation and create visuals on site

iv. Zoning : individual L-pockets are composed to contain a large open air theatre (OAT) in center. Connectivity is achieved within pockets & with the OAT.

iii. Divided 2 C-clusters : to make 4 L-blocks for preschool, primary, middle & senior sec. classes. Each block has its own outdoor congregational space.

v. Iteration : L-pockets are staggered for efficient planning of building blocks

DESIGN PROPOSAL S

SCHOOL // SENIOR SEC. CLUSTER PLAN (CLUSTER 4) The idea was to create independent clusters for different levels of education, along with providing their separate recreational zones.

CLASS 12

CLASS 11

CLASS 12

Satth becomes the central attraction for each classroom cluster - sheltered seating S’

SECTIONAL ELEVATION SS’

CLASS 11

15


SCHOOL // PRE-SCHOOL CLUSTER PLAN (CLUSTER 1 & 2) CLASS 1

P1’

CLASS LKG

Gulmohar trees with their satths are identity of the school campus

P2

P2’ CLASS UKG

CLASS NURSERY

P1

One-point perspective view from middle school cluster towards lab area

SECTIONAL ELEVATION P1-P1’

SECTIONAL ELEVATION P2-P2’ 16


RUDSET INSTITUTE // BLOCK 6 & 7

Cluster 3 Block 7 Block 8

Parking

RUDSET ENTRANCE

SCHOOL ENTRANCE

9.

Block 6

Block 2

Block Block 11

Block 3

Cluster 1

Assembly zone

Cluster 2

Block 5

Cluster 4

9.

Block 4

1. Waiting 2. Director’s office 3. Reception / Office 4. Staff room 5. Public utilities 6. Studios 7. Courtyard 8. Open workshops 9. Closed workshops 10. Sunken court 11. RUDSET Cafe

8.

RUDSET Institute marked in red on keyplan 8.

6.

10.

7. 6.

T1

11.

6.

T1’

Courtyard in RUDSET Institute with Kachnar tree 5.

2.

6.

3.

4.

1.

Cafeteria admist the sunken outdoor seating

SECTIONAL ELEVATION T1-T1’

Circular toilets with green walls & central atriums female faciliy (left); male facility (right)

Common garden pathway between School & RUDSET campuses with computer lab (left) and workshop area (right). A natural trail ornamented with seasonal climbers & creepers prevents heat of summer sun & allows warmth of winter sun.

17


MINI SECRETARIAT Consultancy Project | 3 months | 2021 Site : Abohar, Rajasthan (IN) Associate : Ar. Deepanshu Garg

The Mini Secretariat is a Government complex designed for the Municipal Corporation of Abohar, Rajasthan (IN). The complex has been mapped out using passive design strategies. The building holds together various departments of the local administration and facilities that have been spread organically all over the city. The project is a step towards providing a one-stop government platform to the local public. As Junior Architect in the duo, my major role was to work on the details, working drawings and building envelope design. Under the guidance of my senior, I evolved the design of the building block by dividing given facilities into two buildings - a four storey building for Administrative Departments and a state of the art, single storey Town Hall building.

18


ABOUT THE SITE Location : Old Water Works campus, Abohar, Punjab. About 1.5 km from Tehsil Complex, Abohar. Access : via Abohar road (main road) & Waterworks road (secondary road) The local steppe type site has a natural, gradual slope towards top left corner of the complex. The proposed complex will consist of East-West oriented, state-of-the-art Town-hall building and Mini Secretariat building which uses building offset, boundary platation and plantation as noise buffers.

Traffic analysis : orange - heavy traffic, deep yellow - mild traffic

S

ENTRANCE

TSR

S’

SITE PLAN : two building blocks on site

PLINTH LVL + 0.6M GROUND LVL ± 0M

SITE SECTION S-S’ : conjunction of Administration block with Town-hall at the porch

19


Y1' Y2'

X1

X1'

Y2

Y3'

Y1

X2

X2

GROUND FLOOR PLAN PLAN LAYOUT GROUND FLOOR Y3

FIRST FLOOR PLAN LAYOUT

SECOND FLOOR PLAN LAYOUT 20


MINI SECRETARIAT BUILDING

ROOF LVL + 19.1M FOURTH FLOOR LVL + 15.4M THIRD FLOOR LVL + 11.7M SECOND FLOOR LVL + 8.0M FIRST FLOOR LVL + 4.3M PLINTH LVL + 0.6M GROUND LVL ± 0M

SECTION X1-X1’

LVL + 22.15M The idea was to organise the facilities in a simple manner for easy access and user circulation. Administrative ROOF ROOF departments are segregated floor-wise with respect to the ranking of the officers, i.e., most of the clerical staff is LVL + 19.1M LVL + 19.1M kept on lower floors and high ranking officers have their cabins on upper floors. This segregation was done to FOURTH FLOOR FOURTH FLOOR direct user-flow and to achieve efficient user-accessibility. LVL + 15.4M LVL + 15.4M MUMPTY

THIRD FLOOR LVL + 11.7M

THIRD FLOOR LVL + 11.7M

SECOND FLOOR LVL + 8.0M

SECOND FLOOR LVL + 8.0M MUMPTY LVL + 22.15M FIRST FLOOR ROOF LVL + 4.3M LVL + 19.1M

FIRST FLOOR LVL + 4.3M

ROOF LVL + 19.1M

PLINTH LVL + 0.6M FOURTH FLOOR GROUND LVL ± 0M LVL + 15.4M

PLINTH LVL + 0.6M

FOURTH FLOOR LVL + 15.4M

GROUND LVL ± 0M

SIDE ELEVATION THIRD FLOOR LVL + 11.7M

THIRD FLOOR LVL + 11.7M

SECOND FLOOR LVL + 8.0M

SECOND FLOOR LVL + 8.0M

FIRST FLOOR LVL + 4.3M

FIRST FLOOR LVL + 4.3M

PLINTH LVL + 0.6M

PLINTH LVL + 0.6M

GROUND LVL ± 0M

GROUND LVL ± 0M

SECTION Y2-Y2’

SECTION Y1-Y1’

Column

Projecting slab Infill wall

Concrete structural fin

2” X 5” MS members tying Structural Fins

DETAIL - STRUCTURAL FIN

Beam (as per structure)

Opening

DETAIL - BALCONY 21


THIRD FLOOR LVL + 11.7M SECOND FLOOR LVL + 8.0M FIRST FLOOR LVL + 4.3M

MINI SECRETARIAT BUILDING

PLINTH LVL + 0.6M GROUND LVL ± 0M

ROOF LVL + 19.1M FOURTH FLOOR LVL + 15.4M THIRD FLOOR LVL + 11.7M ROOF LVL + 19.1M SECOND FLOOR

LVL + 8.0M FOURTH FLOOR LVL + 15.4MFIRST FLOOR

LVL + 4.3M THIRD FLOOR LVL + 11.7M PLINTH LVL + 0.6M

GROUND LVL ± 0M SECOND FLOOR LVL + 8.0M

FRONT ELEVATION

FIRST FLOOR LVL + 4.3M PLINTH LVL + 0.6M GROUND LVL ± 0M

MUMPTY LVL + 22.15M ROOF LVL + 19.1M

ROOF

The fenestrations are designed to main- LVL + 19.1M FLOOR tain a state-of-the-art facade and to maxi-FOURTH LVL + 15.4M mise natural lighting in spaces for most THIRD FLOOR LVL + 11.7M part of the working day. Concrete Fins are added to enhance SECOND FLOOR LVL + 8.0M verticality of the linear structure and to FLOOR zest up a brutalist-modern feature to the FIRST LVL + 4.3M building facade. PLINTH LVL + 0.6M

FOURTH FLOOR LVL + 15.4M THIRD FLOOR LVL + 11.7M SECOND FLOOR LVL + 8.0M FIRST FLOOR LVL + 4.3M PLINTH LVL + 0.6M GROUND LVL ± 0M

GROUND LVL ± 0M

SIDE ELEVATION

SIDE ELEVATION

ROOF LVL + 19.1M FOURTH FLOOR LVL + 15.4M THIRD FLOOR LVL + 11.7M SECOND FLOOR LVL + 8.0M FIRST FLOOR LVL + 4.3M PLINTH LVL + 0.6M

REAR ELEVATION

22

GROUND LVL ± 0M

ROOF LVL + 19.1M


TOWN HALL BUILDING

CONFERENCE LVL + 6.0M

BANK LVL + 3.9M

PLINTH, LVL + 0.6M CONFERENCE LVL + 6.0M GROUND, LVL ± 0M

FRONT ELEVATION

BANK LVL + 3.9M

CONFERENCE LVL + 6.0M PLINTH, LVL + 0.6M BANK LVL + 3.9M GROUND, LVL ± 0M

PLINTH, LVL + 0.6M CONFERENCE LVL + 6.0M GROUND, LVL ± 0M BANK LVL + 3.9M

CONFERENCE LVL + 6.0M

PLINTH, LVL + 0.6M BANK GROUND, LVL ± 0M LVL + 3.9M

REAR ELEVATION

PLINTH, LVL + 0.6M CONFERENCE LVL + 6.0M CONFERENCE LVL ± 0M LVL +GROUND, 6.0M BANK LVL + 3.9M BANK LVL + 3.9M

The Town Hall is designed with a double-height conference hall in the centre, surrounded by a single storey bank facility and corridor on its sides.

CONFERENCE PLINTH, LVLLVL + 0.6M + 6.0M

PLINTH, LVL + 0.6M GROUND, LVL ± 0M BANK GROUND, LVL ± 0M LVL + 3.9M

CONFERENCE PLINTH,LVL LVL++6.0M 0.6M

SECTION Y3 - Y3’

GROUND, LVL ± 0M

BANK LVL + 3.9M

PLINTH, LVL + 0.6M GROUND, LVL ± 0M

CONFERENCE LVL + 6.0M

BANK LVL + 3.9M

PLINTH, LVL + 0.6M

SECTION X2 - X2’

GROUND, LVL ± 0M

23


COMMERCIAL I.T. BUILDINGS Practical projects | Work experience | 6 months | 2022 Projects : Seasia & Allengers Design firm : Planners Group Partner : Ar. Vikram Malik

As Graduate Architect, I was responsible for the planning, designing and interiors of the two mentioned projects : Seasia & Allengers. Both are commercial, I.T. buildings and my major role was to prepare design layouts, 3D visualizations and plans which incorporate structural, technical, conceptual and aesthetical aspects for the same. My learning included the understanding of building materials, core & shell structure design, layout of services, staircase details and the elevational aesthestics of the shell of the structure. Along with these projects, to broaden my acumen, I was also exposed to work on residential as well educational projects during my time at the firm.

24


SEASIA PLOT NO-i-29

1.83M HIGH BOUNDARY WALL

BASEMENT LINE ZONING LINE

TWO WHEELER PARKING P-12

SURFACE PARKING (P-11) 5650 x 4885

MUMTY TOP

1 UP

PARKING P- 8 TWO WHEELER 1

3

5

UP

PLOT NO-i-23

LVL ± 0.00

SKY LIGHT 1 3000 X 1200 SKY LIGHT 1 3000 X 1200 SKY LIGHT 1 3000 X 1200

600MM ARCH. ELEMENT AT FOURTH FLOOR ROOF

600MM ARCH. ELEMENT AT FOURTH FLOOR ROOF

PARKING -P4a

BASEMENT LINE

P-10

OUTER FACE OF COLUMN GRID -8

ZONING LINE

PARKING P-3 TWO WHEELER

LVL + 24100

LVL + 27900 FROM R.LVL.

1.83M HIGH BOUNDARY WALL

TWO WHEELER PARKING P-5

LVL + 27900

600MM ARCH. ELEMENT AT FOURTH FLOOR ROOF

TWO WHEELER PARKING P-3

OPEN TERRACE

800MM FIFTH\ TYPICAL FLOOR ROOF PROJ.

UP

LVL + 5100

BALCONY

LVL ± 0.00

1

3

Solar Panels (minimum 50 kilo watt)

PLOT NO-i-24

LVL + 24100

P-10

SKY LIGHT 1

6000mm WIDE FIRE TENDER MOVEMENT

P-10 PARKING P-6 TWO WHEELER 5 6

TERRACE

LVL + 27900

LVL + 35000 FROM R.LVL.

LVL + 36250

800MM ARCH. ELEMENT AT FIFTH FLOOR ROOF

PARKING P-7

TWO WHEELER

LVL + 24100

LVL + 36200

LVL + 27900

TANK TOP

LVL + 37400

LIFT TOP

TWO WHEELER PARKING P-2

600MM ARCH. ELEMENT AT FIFTH FLOOR ROOF LVL ± 0.00

Ground coverage achieved : 33.6% (permissible : 40%)

TWO WHEELER

LVL + 37750

LVL + 36250

TWO WHEELER PARKING P-1 P-10 PARKING

1000MM SIXTH FLOOR

ZONING LINE ROOF PROJ. BASEMENT LINE

LIFT TOP

LVL + 24100 FROM R.LVL.

800MM SIXTH FLOOR ROOF PROJ.

6 5

1

3

P-10

PARKING P-9

FIRE REFUGE TERRACE

LVL + 31450

Front setback : 9m Rear, Side setbacks : 6m (permissible : unlimited) FAR achieved : 2.3

LVL + 27900

UP

LVL ± 0.00

6000mm WIDE FIRE TENDER MOVEMENT

PLOT NO-i-25

Located in Sector-83 (Plot I-24), Alpha City, Mohali, Seasia has a site area of about 4000 sq.m. (1 Acre). As one enters the site, a check-post (about 10sq.m.) is placed at the gate. Green garden acts as a noise buffer between the building lobby and outside traffic on road.

1.83M HIGH BOUNDARY WALL

Seasia was conceived as a glass building with experimental elevational bands placed at 70 degrees from the horizontal on the left and right facades of the building. The architecture resonates within the architectural bye-laws of Chandigarh.

600MM TAPER ARCH. ELEMENT

6000-ZON

1800MM ROOF PROJ.

1800MM ROOF PROJ.

ZONING LINE

TERRACE

LVL + 5100 FROM R.LVL.

LVL ± 0.00

LVL ± 0.00

1800MM GROUND FLOOR ROOF PROJ.

LVL ± 0.00

1200MM GROUND FLOOR ROOF PROJ.

6000mm WIDE FIRE TENDER MOVEMENT SURFACE PARKING (P-12) 33490 X 1500

6000mm WIDE FIRE TENDER MOVEMENT

MUMTY-2 LVL+ 2.60M

BASEMENT LINE ZONING LINE

LVL ± 0.00

AMENITY AREA OAS- 2 6145X6565

BASEMENT LINE

D5

MAIN ENTRY GATE

W15

W15

RAIN WATER HARVESTING 2100 X 3000 X 3000 EFFECTIVE DEEP

DESILTING CHAMBER

LVL + 150

AMENITY AREA OAS- 1 11100 X 32925

SURFACE PARKING (P-14) 2770 x 3450

BASEMENT LINE AMENITY AREA

6000mm WIDE ROAD

BASEMENT LINE

SKY LIGHT 2 3000 X 1200

SUNKEN SLAB

SURFACE PARKING (P-13) 10110 x 39500

BASEMENT LINE

ZONING LINE

No. of Floors : 9 (+1 terrace & +1 basement)

BOUNDARY WALL (0.915m solid+0.915m railing)

ROAD 80'-0" WIDE

AMENITY AREA OAS- 3 3450 X 2770

EXTERNAL ROAD LVL - 150MM

SITE PLAN 25


SEASIA 1

PENTHOUSE

25

DV1

S2

DV1

V1

STAIRCASE LIFT LOBBY 12

W6

V1

S2

27

DV1

TREAD=300MM RISER=146MM

EXTENDED OFFICE

SG2 12

W6

OFFICE

SERVER OFFICE

TREAD=300MM RISER=146MM

LIFT WELL

2

0

S2 LVL +1500MM

HANDICAPPED TOILET

OFFICE

S2

28

STAIRCASE

V2

FEMALE TOILET

SG3

14

13

MALE TOILET

LIFT LOBBY 16

0

D7

S2

26

LIFT LOBBY

V2 HANDICAPPED TOILET

V1

PANTRY

Green

14

13

MALE TOILET

15

1

OFFICE D7

S2

26

2

FEMALE TOILET

PANTRY

13

OFFICE

TREAD=300MM RISER=146MM

STAIRCASE

DV1

14

14

13

2

14

0

12

PLINTH LVL + 1500MM

12

W6

V2 HANDICAPPED TOILET

S2

TREAD = 300MM RISER = 150MM

S2

26

MALE TOILET

PASSENGER LIFT

FEMALE TOILET

TREAD = 300MM RISER = 146MM

FIRE STAIRCASE

OFFICE

TREAD=300MM RISER=146MM

26

13

14

13

LIFT LOBBY

V2 HANDICAPPED TOILET

JANITOR

FIRST FLOOR LVL + 5700MM

V1

PANTRY

2

1800mm high Boundary wall

12

W6

2

FEMALE TOILET

TREAD = 300MM RISER = 146MM

12

Railing

OFFICE

S2

26

MALE TOILET

14

13

14

13

TREAD=300MM RISER=146MM

W2

TREAD = 300MM RISER = 150MM

GD2

MALE TOILET

JANITOR

1200mm High Railing as/detail

12

W6

14

FIRE STAIRCASE

150mm thk Brick bat Coba over 180 mm RCC slab

LIFT LOBBY

LIFT LOBBY

V2 HANDICAPPED TOILET

26

12

S3:50 mm screed over 180 mm RCC slab.

STAIRCASE

PANTRY

2

SECOND FLOOR LVL + 9500MM

V1

S2

FIRE STAIRCASE

1200mm High Railing as/detail

LIFT WELL

2

FEMALE TOILET

PANTRY

TREAD = 300MM RISER = 146MM

2

3

1

RECEPTION LOBBY

W2

SG

S2: 40 mm floor finish over 75 mm PCC over 180 mm RCC slab

0

1800mm high Boundary wall

PLINTH LVL +1500MM

-5

Internal Road LVL +600 (Front)

LIFT LOBBY

-9

RAMP DOWN Front boundary wall footing as\ structure

-18

-11

FIRE STAIRCASE

-10

-9

-21

-28

-28

TWO WHEELER PARKING

LVL -3150MM

SURFACE PARKING

-8

BASEMENT

STAIRCASE

TREAD = 300MM RISER = 150MM

LVL -2700MM

BASEMENT FLOOR FINISH LVL - 3150MM

1200mm High Railing as/detail

STAIRCASE

DV1

13

OFFICE

S2

26

MALE TOILET

26

12

TERRACE

14

13

TREAD=300MM RISER=146MM

14

FIRE STAIRCASE

THIRD FLOOR LVL + 13300MM

V2 HANDICAPPED TOILET

S2

TREAD = 300MM RISER = 146MM

2

1200mm High Railing as/detail

V1 FEMALE TOILET

PANTRY

13

1200mm High Railing as/detail

W10

GYM

26

2

26

12

S2

STAIRCASE

DV1

FIRE STAIRCASE

FOURTH FLOOR LVL + 17100MM

12

W6

S2

TREAD = 300MM RISER = 146MM

2

W9

W8 MEDITATION ROOM

LIFT LOBBY

V2 HANDICAPPED TOILET

14

13

14

2

26

12

1200mm High Railing as/detail

TOILET

V1 FEMALE TOILET

PANTRY

FIRE STAIRCASE

FIFTH FLOOR LVL + 20900MM

TOILET

TREAD=300MM RISER=142MM

STAIRCASE

DV1

TREAD = 300MM RISER = 146MM

2

1200mm High Railing as/detail

S2

12

14

13

12

SIXTH FLOOR LVL + 24700MM

MALE TOILET

26

FIRE STAIRCASE

1200mm High Railing as/detail

FEMALE TOILET

STAIRCASE

V2

V5 SHOWER CUBICAL

TREAD = 300MM RISER = 142MM

2

SEVENTH FLOOR LVL + 28500MM

1200mm High Railing as/detail

W9

S2

S2

14

13

12

PENTHOUSE W9

W6

25

FIRE STAIRCASE

1200mm High Railing as/detail

W6

D1

TREAD = 300MM RISER = 142MM

PENTHOUSE

V2

V1

14

13

2

EIGHTH FLOOR LVL + 32050MM

Green

8

7

150mm thk Brick bat Coba over 180 mm RCC slab

25

FIRE STAIRCASE 12

EXTERNAL ROAD LVL ± 0.00

6

W12

MUMTY TERRACE LVL + 35600MM

INTERNAL ROAD LVL + 600MM

5

4

3

2

150mm thk Brick bat Coba over 180 mm RCC slab

MUMPTY LVL + 38350MM

BASEMENT

TREAD = 300MM RISER = 150MM

PUMP ROOM Under ground water tank Floor Finish LVL - 2850 MM

LVL -2700MM LVL -3150MM

LVL -3150MM

LIFT PIT

1

2

3

4

5

6

7

8

Longitudinal section : showing the play of balconies at the rear, staircase wells and office spaces within the building

Front view showing glass envelope of Seasia

Right and left facades showing the rhythm of angular elevational bands (angle = 70 deg.), each floor plate highlighted by white horizontal bands to add character to building elevation 26

NOTE : All drawings and visuals are a subject of copyright to Planners Group.


ALLENGERS

45720 [150']

PLOT NO- i-59

115

45375 AMENITY OPEN SPACE 45.375 X 6.185M (A1) LVL +300MM

1.83m HIGH BOUNDARY WALL

230

1.83m HIGH BOUNDARY WALL

3000 METER RM 3.0X3.02M

3020

ZONING LINE 6000MM WIDE DRIVEWAY FOR FIRE TENDER MOVEMENT LVL +300MM

BASEMENT LINE 2750mm wide Architecture elments

3000 3000

3000

00

0 R3

SURFACE PARKING (P6) 8325x4885

R3 00 0

SURFACE TERRACE (LVL +7700 FROM PARKING (P7) 16130x4885 FIRST FLOOR) LVL +300MM

3000

LVL +300MM

1.83m HIGH BOUNDARY WALL (0.915m high 230mm brick wall, 0.915m high railing)

PLOT LINE

UP

SKYLIGHT 2500X1500

TERRACE(LVL + 30800 FROM FIRST FLOOR)

6000mm WIDE ONE WAY RAMP DN (SLOPE 1:10)

TERRACE (LVL +26950 FROM FIRST FLOOR) TERRACE(LVL + 30800 FROM FIRST FLOOR)

SKYLIGHT 2500X1500

TERRACE (LVL +39800 FROM FIRST FLOOR)

BASEMENT LINE

GREEN BELT

MUMTY ROOF LVL +42450 MM FROM FIRST FLOOR

BASEMENT LINE

SKYLIGHT 2500X1500

TWO WHEELER PARKING (P8) 5885X26500 LVL + 300MM

UP

7600mm WIDE RAMP (SLOPE 1:10)

LIFT SHAFT ROOF LVL +40350 MM FROM FIRST FLOOR

TWO WHEELER PARKING (P8) 26600X5885

LVL +300MM

TERRACE(LVL +7700 FROM FIRST FLOOR) 2750mm wide Architecture elments

LVL -2350MM

TERRACE LVL +39700 MM FROM FIRST FLOOR

PROJECTION

OPEN TO SKY LANDING (6000x7200)

TERRACE(LVL +26500 FROM FIRST FLOOR)

PROJECTION

7200mm WIDE 2WAY RAMP DOWN TO BASEMENT -1 (SLOPE 1:8)

LIFT SHAFT ROOF LVL +40350 MM FROM FIRST FLOOR

FRONT ADJOINING ROAD 30500 mm (100'-0") WIDE LVL ± 0.00

PROJECTION TERRACE (LVL +7700 FROM FIRST FLOOR)

SURFACE PARKING (P5) 5920x40685

SKYLIGHT 2500X1500

98095 [321'-10"]

TWO WHEELER PARKING (P8) 5885X26500

6000MM WIDE DRIVEWAY FOR FIRE TENDER MOVEMENT LVL +300MM

LVL +300MM

BASEMENT LINE

TERRACE (LVL +7700 FROM FIRST FLOOR)

TERRACE (LVL +26950 FROM FIRST FLOOR) TERRACE(LVL + 30800 FROMFIRST FLOOR)

2750mm wide Architecture elments

FROM BASEMENT >>

SKYLIGHT 2500X1500

LVL +300MM

0

LVL +300MM

ZONING LINE

SPACE FOR HANDICAPPED PARKING\ SURFACE PARKING (P3) 11545x5000 LVL +300MM

0 00

R

3000

SURFACE PARKING (P2) 12600x5000 LVL +300MM

TERRACE (LVL +7700M FROM FIRST FLOOR)

3000

7650

PROJECTION

0 30

SURFACE PARKING (P4) 5920x25000

TERRACE (LVL +30800 FROM FIRST FLOOR)

SURFACE PARKING (P1) 5885x7650

6000MM WIDE DRIVEWAY FOR FIRE TENDER MOVEMENT LVL +300MM

TERRACE (LVL +35300 FROM FIRST FLOOR)

1.83m HIGH BOUNDARY WALL (0.915m high 230mm brick wall, 0.915m high railing)

SKYLIGHT 2500X1500

R3

No. of Floors : 11 (+1 terrace & +2 basements)

6000mm WIDE ONE WAY RAMP UP (SLOPE 1:10)

3000

Ground coverage achieved : 38.4% (permissible : 40%)

LVL +300MM SKYLIGHT 2500X1500

BASEMENT LINE

(permissible : 1.2) FAR achieved : 0.89

TERRACE (LVL +30800 FROM FIRST FLOOR)

SKYLIGHT 2500X1500

DOWN TO BASEMENT

Front setback : 9m Rear, Side setbacks : 6m

5885

6000MM WIDE DRIVEWAY FOR FIRE TENDER MOVEMENT LVL +300MM

Located in Sector-83 (Plot I-54), Alpha City, Mohali, Allengers has a site area of about 4600 sq.m. (1.14 Acre). As one enters the site, a check-post (about 10sq.m.) is placed at the gate. Green garden acts as a noise buffer between the building lobby and outside traffic on road.

99060 [325']

Allengers was conceived as a geometric symphony in air designed as a podium and tower building with experimental elevational boxes jutting out at a height of about 12m from ground level so that the tower doesn’t feel like a tower. The architecture resonates within the architectural bye-laws of Chandigarh.

PLOT NO. i-55 ; SITE AREA = 1.09 ACRE

1 2

3000

6000MM WIDE DRIVEWAY FOR FIRE TENDER MOVEMENT LVL +300MM

BASEMENT LINE

6000mm WIDE RAMP UP (SLOPE 1:10)

MAIN GATE AMENITY OPEN SPACE (A2) LVL +300MM

CHECK POST

1.83m HIGH BOUNDARY WALL (0.915m high 230mm brick wall, 0.915m high railing)

39930 [131

']

MAIN ENTRY / EXIT

GREEN BE

LT

RAIN WATER HARVESTING 3000 X 2100 X 3000 EFFECTIVE DEEP

PLOT LINE

"]

'-5

50

80

6 [2

FRONT ADJO

SITE PLAN

NOTE : All drawings and visuals are a subject of copyright to Planners Group.

INING ROAD 30479mm (1 00'-0") WIDE LVL ± 0.00

27


ALLENGERS

PLOT LINE AMENITY OPEN SPACE 45.375 X 6.300M (A1) LVL +300MM

ZONING LINE 0

1

6775

METER RM 3.0X3.02M TERRACE HEIGHT LVL+2750 from adjoin Road lvl)

2

5675

2.1

5820

3

4

7425

7425

5 5675

6925

6000MM WIDE DRIVEWAY FOR FIRE TENDER MOVEMENT LVL +300MM

1

BASEMENT LINE

SURFACE PARKING (P7) 16130x4885

5675

LVL +300MM

1 SURFACE PARKING (P6) 8325x4885

W=3000, T=300, R=150

K

1200MM WIDE PROJECTION LVL +4050

5675

K

1 2 3

W=1520mm T=300mm R=144.75mm

-9

F.D1

3050mm WIDE FIRE LOBBY

SLD/W

FIRE DUCT 1200x665

HOSE REEL

LVL +300MM

DN

900

8000

165

G

LADIES TOILET (7725 X 3490) D3

D4

WC-915 WC-915 WC-915 WC-915 X1550 X1550 X1550 X1550

DUCT 835X 1435

HANDICAP TOILET 2200X2300

D2 JANITOR 820X 1435 WC-909 WC-908 WC-908 X1550 X1550 X1550 D3

DUCT 835X 1435 D3

6000MM WIDE DRIVEWAY

BASEMENT LINE

OPEN TO SKY LANDING 6000X7200 LVL -2350MM

D4

GENTS TOILET (7725 X 3500)

W6'

150mmX1100mm HIGH RAILING

G.4

FD

ELECTRICAL ROOM

W6'

7200mm WIDE 2WAY RAMP DOWN TO BASEMENT -1 (SLOPE 1:8)

UP

LVL +300MM

H

FIRE LIFT 02 2300X2050

FIRE LIFT 01 2300X2050

150mmX1100mm HIGH RAILING

UP

9000

F.D2

LVL +750MM

150mmX1000mm HIGH R.C.C PARAPET WALL

SKYLIGHT 2500X1500

SURFACE PARKING (P5) 5920x40685

2850MM WIDE PROJECTION LVL +4050

9600

D.L.

150mmX1000mm HIGH R.C.C PARAPET WALL

MAIN STAIRCASE 6595X3640 DN

F.D

DUCT 1800x900

1000mm high railing

-1

G

F.1 F

10

UP

ELEC.DUCT 1575x900

1800MM WIDE PROJECTION

1 W=1520mm T=300mm R=150mm

W7

SERVICE LIFT 01 2300X2300

LIFT 02 2300X2300

HANDICAP LIFT 2300X2300

LIFT CAR 1600X1600

LIFT CAR 1600X1500

LIFT CAR 1600X1500

9000

150mmX1100mm HIGH RAILING

4165

F.D1

5435

G.4

6000MM WIDE DRIVEWAY FOR FIRE TENDER MOVEMENT LVL +300MM

SKYLIGHT 2500X1500

H

8000

6000MM WIDE DRIVEWAY

4165

STILT PARKING LVL +750MM

F.1 F

900

8000

2850MM WIDE PROJECTION LVL +4050

6000mm WIDE ONE WAY RAMP UP (SLOPE 1:10)

I

9600

SKYLIGHT 2500X1500

5435

SURFACE PARKING (P8) 5885x26500

I

STILT PARKING LVL +750MM

150mmX1000mm HIGH R.C.C PARAPET WALL

SKYLIGHT 2500X1500

BASEMENT LINE

150mmX1000mm HIGH R.C.C PARAPET WALL

LVL +300MM

J

150mmX1000mm HIGH R.C.C PARAPET WALL

1000MM HIGH RAILING

150mmX1000mm HIGH R.C.C PARAPET WALL

150mmX1000mm HIGH R.C.C PARAPET WALL

150mmX1000mm HIGH R.C.C PARAPET WALL

8000

FROM BASEMENT >>

J

BASEMENT LINE

UP

F.D2

UP

W6'

W=1520mm T=300mm R=150mm 1

E

ELEC.DUCT 1575x900

W=1500 T=300 R=144.75

D.L

4835 0

-9

1000mm high railing MAIN STAIRCASE 6595X3600

FIRE DUCT 1800x900

1800MM WIDE PROJECTION LVL +4050

-1 DN

7200mm WIDE RAMP UP (SLOPE 1:10)

9000

LVL +750MM

7200MM WIDE DRIVEWAY

SLD/W

DN

3050mm WIDE MAIN LOBBY F.D1

4165

F.D

E

Drinking Water Fountain

1800MM WIDE RAMP WIDE SLOPE 1:12

1000MM HIGH RAILING

1000MM HIGH RAILING

UP

150mmX1000mm HIGH R.C.C PARAPET WALL

3 1

SURFACE PARKING (P2) 12600x5000

1

UP

300MM WIDE PROJECTION LVL +4050

WIDTH = 6525mm TREAD = 300mm RISER = 150mm

LVL +300MM

A1

5675 0

5820 1

8000

BASEMENT LINE

2.1

A

5850

7425 (R1) 2

4760

4755

6775

8000 A1

E

A 1575

C

B

SPACE FOR HANDICAPPED PARKING\ SURFACE PARKING (P3) 11545x5000 LVL +300MM 1

ZONING LIN

6000MM WIDE DRIVEWAY FOR FIRE TENDER MOVEMENT LVL +300MM

Double glazing unit glass was used to minimise sun-glare, increase noise insulation, and increase thermal comfort within the office spaces.

7500

BASEMENT LINE

2850MM WIDE PROJECTION LVL +4050

ENTRANCE LOBBY LVL +750MM

D

Floors 1-10 have a typical open floor layout to accomodate office spaces. Public amenities, staircases, and lifts are designed and provided according to the architectural standards.

5675

SURFACE PARKING (P1) 5885x7650

6000MM WIDE DRIVEWAY FOR FIRE TENDER MOVEMENT LVL +300MM

150mmX1000mm HIGH R.C.C PARAPET WALL 150mmX1000mm HIGH R.C.C PARAPET WALL

150mmX1000mm HIGH R.C.C PARAPET WALL

2850MM WIDE PROJECTION LVL +4050

LVL +300MM

SURFACE PARKING (P4) 5920x25000

ZONING LINE

LVL +300MM

SKYLIGHT 2500X1500

RECEPTION LOBBY LVL +750MM

LANDING

ZONING LINE

5675

B

SKYLIGHT 2500X1500

BASEMENT LINE

8000 7500

C

DOWN TO BASEMENT -1

6000mm WIDE ONE WAY RAMP DN (SLOPE 1:10)

D

150mmX1000mm HIGH R.C.C PARAPET WALL

8000

150mmX1100mm HIGH RAILING

SURFACE PARKING (P8) 5885x26500

Cleaner's Sink

150mmX1000mm HIGH R.C.C PARAPET WALL

SKYLIGHT 2500X1500

E.4

10

F.D1

1000MM HIGH RAILING

E.4

SKYLIGHT 2500X1500

9000

4835

LVL +300MM DN

Some part of the Stilt floor was used in the reception lobby and entrance lobby, rest was spared for vehicular parking.

3

7425 AMENITY OPEN SPACE (A2) 4 LVL +300MM (T2)

6925 (R2)

5675 5

(T1)

PLOT LINE

STILT FLOOR LAYOUT 28

NOTE : All drawings and visuals are a subject of copyright to Planners Group.


ALLENGERS

View of the right facade of Allengers building

Left facade visualisation showing juxtapsoition of two elevational boxes

A visualisation of Reception lobby NOTE : All drawings and visuals are a subject of copyright to Planners Group.

29


RAI RESIDENCE INTERIORS Practical project | Work experience | 7 months | 2023 Role : Architect Design firm : The Vaastu Consultants Principal Architect : Ar. Harish Saini

A classical, modern home for a family of 5 members, based in the Pleasanton city of California, the Rai residence is a luxurious home with interiors that remind of the culturally rich Rajasthani havelies in India. The team at Vaastu Consultants was mainly responsible for the interior design of the building. The entire building of the residence was designed by a local architecture firm, Louie Leu Architect Inc. My role as Architect required me to develop architectural drawings for the interior design concepts, their working drawings and technical charts for cost modules; being actively involved with material and product selection. The experience at Vaastu Consultants broadened my knowledge of interior design and helped me flourish my skill for detailed work.

30


BATH 1

BEDROOM 1

CLOSET 1 KITCHEN

BATH 2

7 BEDROOM 2

6

4

POWDER ROOM 2

5

HALLWAY

POWDER ROOM 1 DINING Cove Light

MAIN FLOOR PLAN : False ceiling layout

FOYER

1

TEMPLE

LIBRARY

3

Cove Light

2

1. The residence main door welcomes into a foyer that leads to the library (door on left) & formal dining area (right)

3. The library

NOTE : All drawings and visuals are a subject of copyright to The Vaastu Consultants.

2. The formal dining area

4. The formal living area is flanged by one staircase on each side and focusses on the fireplace in the middle.

31


5. The Great room is the informal living room of the family. This room merges into the outdoors and is suitable for large house gatherings.

6. The lavish and luxurious Bar is also designed on a similar concept of serving function into the outdoors (semi-circular hung window).

7. The Kitchen, heart of the residence

A colour scheme of whites and beiges was used to make rooms look spacious

32

Sitting room (upper floor): Indian rajasthani culture is reflected through wallpapers and wall mouldings

NOTE : All drawings and visuals are a subject of copyright to The Vaastu Consultants.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.