Š 2016 Stanley Leung - Aon Center, Chicago, December 2016
S TA N L E Y K A C H U N L E U N G
Architecture . Planning . Spatial Design
Por tfo l i o 912.507.7563 stanleyleungkc@gmail.com issuu.com/stanleyleungkc
Š 2018 Stanley Leung - St Grancois Xavier St, Montreal, December 2017
S TA N L E Y K A C H U N L E U N G
Architecture . Planning . Spatial Design PHONE: 912.507.7563
2016-2018 (E st. June)
2010-2014
Savannah College of Art and Design Savannah, GA, USA
Central Saint Martins London, UK
Master of Architecture
B.A (Hons) Archite c ture
CGPA: 3.92
EMAIL: st an l e y l e u ng kc@g mai l. c om
RIBA Part 1
PROFESSIONAL EXPERIENCE
PORTFOLIO: issuu. com / st an l e y l e ung kc
Summer Intern
LINKEDIN: l i n ke d in . com / in / st an l e y l e ung kc
LANGUAGES: English - Cantonese - Mandarin (Chinese)
SKILLS Professional
EDUCATION
Personal
Photoshop
Coordination
Illustrator
Communication
InDesign
Te a m Wo r k
AfterEffects
Leadership
Sketchup Pro
Responsible
Enscape (VR Render)
Dedication
Maxwell
Craftmanship
Revit
Critical Thinking
BlueBeam
Creativity
Au t o C A D
Conceptualization
ArcGIS Online
Persistenc y
Microsoft Office Mac + PC Systems Shopdrawing Review Material Submissions C onstruction Drawings
Gresham Smith & Partners Nashville, TN, US J u n 2 0 1 7 - Au g 2 0 1 7
A r c h i te c t u r a l G r a d u a te Aedas Hong Kong, HK O c t 2 0 1 4 - Au g 2 0 1 6
Summer Intern
M.Arch candidate, well-traveled with international exposures and experience in both professional work and education.
REFERENCE SHANNON HO Director at Aedas Ltd. e: shannon.ho@aedas.com
M ICHE LE Mc M IN N Senior Interior Designer at Gresham Smith & Partners e: michele_mcminn@gspnet.com TIM DE BU SE Senior Architect at Gresham Smith & Partners e: tim_debuse@gspnet.com SC OT T SINGE ISE N Thesis Chair/ Professor at Savannah College of Art and Design e: ssingeisen@scad.edu
Main Scope | Construction & Administration Responsiblities | Construction drawing preperation . Shop Drawings Review . Material Submission Review . Site Inspectations . Site Report . Coordination wtih sub-consultants, constractors, clients . Hotel Licensing . Design Studies . BOH Planning . Preliminary Design Proposal . Main Scope | Team Support Responsibilities | Physical Study Model . Computer Model . Construction Drawing Preperation . Material Sourcing . Design Studies . Preliminary Design . Scheduling . Team Support .
The Oval Partnership Hong Kong, HK Ju l 2011 - S ep 2011
TEACHING EXPERIENCE Graduate Mentor Savannah College of Art and Design Savannah, GA, US Sep 2017- Current
Te a c h i n g A s s i s t a n t
PROFILE
Main Scope | Preliminary Design Responsibilities | Construction Drawing Preperation . Interior Renderings . BIM Studies . Preliminary Programming Studies . Project Planning . Preliminary Design Proposal . Traffic Studies . Presentation Renderings . Publication Renderings .
Savannah College of Art and Design Savannah, GA, US Mar 2017 - May 2017
Main Scope | Mentoring Responsibilities | Two mentees . 3 meeting on weekly basis . Realization in Potential . Improve GPA . Time Management . Scheduling . Study Tips . Tutorials . Non-Academic Affairs Support . Professional Experience Sharing . Main Scope | Class Support Responsibilities | Lead Multiple Class Sessions . Makeup Class Sessions . Class Material Preperation . Tutorials . Student support .
QUALIFICATIONS LEED GA
WELL AP
Expected - March 2018
Expected - 6 months within new-hire
ACHIEVEMENTS Honors Fel l owship S chol arship Savannah College of Art and Design 2016-2018
Internati ona l Stu d ent S chol arship Savannah College of Art and Design 2016-2018 Winning Project - CSM x Redbull Architectural installation Competition
Central Saint Martins & Redbull 2012
Š 2017 Stanley Leung - Simmon Hall, Montreal, December 2017
2 0 1 6 - 2 0 1 8 S e l e c t e d Wo r k
Contents 01 02 03 04 05 06 07 08 09 10 11 12 13 14
Museum of Ref le ction + Savannah College of Art and Design The Shell + Savannah College of Art and Design MLK Urb an Rene wa l + Savannah College of Art and Design Urb an D wel l er + Savannah College of Art and Design P i g e o n To w e r + Central Saint Martins Leather Ln Scaffolding Envelop + Central Saint Martins R e g e n t ’s C a n a l V i s i t o r C e n t r e + Central Saint Martins The Parisian Macau + Aedas Aqua Gravity + Aedas C a m b o d i a Tw i n To w e r + Aedas D r e a m To w e r + Aedas Ramsey Solutions Headquarter + Gresham Smith and Partners Circle South + Gresham Smith and Partners A r t Wo r k
M
Musuem of Ref le ction
01
“Architecture is the very mirror of life. You only have to cast your eyes on buildings to feel the presence of the past, the spirit of a place; they are the reflection of society.” - I. M. Pei
Located at Charleston, SC, a historical city with a disjointed waterfront, the well planned historical city did not extend till the waterfront. Just 100 yards away from the city market of Charleston is the waterfront, however it’s not made known or felt like it while you’re in the city. The lack of visual cue that indicates the waterfront is the main reason for it. Obsessed with the historical city and buildings in Charleston, the city showed resistance in accepting contemporary architecture. The Museum of Charleston is designed with three main concepts: the reflection of the city’s pass, reflection of individuals, and reconnection to the environment. A journey of narrative that leads the audience into awareness from the surrounding, to self-awareness within themselves. This project investigates the architectural setting that
creates and illustrates a strong spiritual connection between users and their environment. Designing moments within the architectural setting of this building with the goal of stimulation of senses, touches, visuals, sounds, and spatial awareness.
Savannah College of Art and Design Year: Winter - Spring 2017
Project Location: Charleston, SC, USA Type: Museum
M | 01
. Means of Gathering .
. Initial Conceptualization .
M | 01
M | 01
Key Narratives Key Narratives
Key Key Narratives Narratives
. Key Narratives .
. Manipulation & Reflection .
M | 01
SPATIAL STUDY . SpatialFORM Form Study .
Acting as the gate-way to the Museum of Charleston and the first implementation of the concept of reflection, nine pillars each with the face slightly shifted and aligned to the direction of the church where the tragic Charleston shooting happened in 2015 that took nine lives.
The dialogue between a building and people happens in a moment, a touch, a shadow, a motion, a scene. That one moment, when time feels irrelevant, connected spiritually, just you and the surrounding space.
M | 01
T he
Shel l
02
“With one leap, the wolf seizes its prey, but the turtle, which is endowed by nature with unusual alacrity when it wants to withdraw head, limbs and tail into its house, is quicker than the wolf. For the famished wolf, it is now nothing but a stone on the road.” - The Poetics of Space - Shells. P.133
A turtle has only known one corner of its shell, one where he hides and escape reality. Little does the turtle knows what’s behind that corner of his armour he sees. The mystery of the shell is one that the turtle will never find out. This installation reverse engineered the shell and the plated armour of the turtle, instead of inside looking out, the audience becomes the turtle that inhabits the shell by stepping forward as they become one with the shell and activates the chained mechanism within. Wonders can be found, and mystery can be realized with the surprises hidden underneath the heavy armoured shell, a secret that a shell never expose. By creating an outer shell like an armour, the interior was created with layers of ribs holding dispensers contained with water replicates the complex biological system of a turtle. A foot pedal was installed as the audience, being the turtle, to active the shell and physically become a part of the shell. The foot pedal triggering air pressure to the water dispenser allows few water droplets to drop into a container at the bottom of the shell’s interior, the ripples are magnified by the spot life showing dances of lights. A shell was generally understood as dark and silence, inside the reversed turtle, a melody plays harmoniously in rhythm with the water drops and dancing ripples amplified by the lights. The exterior of the shell with the sense of impenetrable armour creates a strong contrast against the soft interior with the quality of water and melody as the audience becomes the turtle and explores the imagination of a shell.
Savannah College of Art and Design Year: Fall 2017
Project Location: Savannah, GA, USA Type: Architectural Installation
M | 02
. Time & Space .
M | 02
. Materials & Costing .
MLK Urban Renewal
03
The group project MLK URBAN REVEWAL is located at Martin Luther King Jr. Blvd in Savannah, our zone ranges from the 34th street from the north to Victory Drive on the south. This project integrates with the concept proposal of a light rail system in Savannah, the light rail system is included within the urban design running through MLK as the main artery to connect to the rest of the city. This project tackles the existing social, urban de fabrication and displacement issues. I and my teammate Abraham Arregui approached the project by looking through history, connecting the successful aspects from the past as well as the present, to introduce a renewal proposal that will resolve or ease the tension within the zone. Taking inspiration from the famous marshlands around Savannah and connecting our zone to a neighbouring artist district – the Starland district – we tackled the issues with three main ideas. A motor school, that would allow existing garages which were seen as a negative impact on the urban fabric, but actually brings opportunity for teenagers to make a living for themselves. A wetland park, acting as an urban retreat as well as a stormwater retreat to help out the occurring flood problems within the area, the big body of water also acts as an agent with water’s calming quality that would ease the tensions in the harsh cityscape. Starland Walk that connects the motor school, wetland park to the neighbouring Starland District provides a niche with galleries and affordable artist studio and further promotes the energization of an improving Savannah.
Teammate: Abraham Arregui
Savannah College of Art and Design Year: Fall 2016
Project Location: Savannah, GA, USA Type: Urban Design
M | 03
In relation to surrounding context and existing urban fabric, it was critical to address the main existing issues from social, urban setting, programs. The project then shifts to finding a solution through the past, while integrating existing programmes to ensures the renewel urban design proposal provides an opportunity for future instead of as a means of further displacement in through gentrification.
. Future of Urban Identity Loss .
M | 03
MLK Program & Circulation Studies
To resolve the harsh urban setting, a transition between softscape and hardscape with pavement designs help ease the visual tensions, it furthers soften the urban environment to create a more welcoming and family-friendly district.
Re
i nt
Ur
ro
ba
Sto
du
cin
nR
rm
ec
gw
re a
W at e
etl
tio
rR
an
na
etr
ds
lS
ea
Taking inspiration from marshland surrounding Savannah, introducing a marshland park to the heart of Savannah with a bigger body of water that the city is lack of, enables the water to act as a psychological agent in creating a calming effect to the neighbouring area. Furthermore, the marshland park will act as a stormwater retreat to relief the flood-prone area.
pa
pa
ce
ce
in
Re
ur
t re
ba
nf
ab
ric
at
t
. Urban Wetland Retreat .
M | 03
“Destruction breed creation. Preserve the past and design for tomorrow.”
Hurricane Matthew in Oct of 2016 caused big damage to the city of Savannah, many of the treasured live oaks were destroyed. By collecting these debris that would otherwise be disposed, this debris is given a second life as a site model that reflects our spirt of our project. Presenting new opportunities of Savannah’s future while reflecting and preserving the core values and history of Savannah.
Ur b an
D wel l er
04
“At the enchanted metropolitan twilight I felt a haunting loneliness sometimes, and felt it in others--poor young clerks who loitered in front of windows waiting until it was time for a solitary restaurant dinner--young clerks in the dusk, wasting the most poignant moments of night and life.� - F Scott Fitzgerald, F. Scott Fitzgerald's The Great Gatsby
As urbanization progression continues to ramp up in every corner of the world, population density in major cities skyrocketed. The built environment in cities surrounds the concept of profit generation and capitalism, the decision of moving into cities essentially made people tide into the system of labour in one form or another. Disputes arise between people as resources and space became scarce due to the inevitable by-product of scarification in urbanization. In a metropolis, urban dwellers became physically closer to one another, however, the repeating scenes and routine numb the senses and meaning of relationships between individuals. People became closer in the process of urbanization, yet also further apart than ever. This architectural short film explores the concept of the repetitiveness, confinement, and the relationship between people to build environment, as well as between people, in a modern metropolis. Urb an
C l i c k
D wel l er
o r
S c a n
Savannah College of Art and Design Year: Winter 2018
Imag ine
C l i c k
o r
S c a n
Project Media: Motion Media Type: Architectural Short Film
M | 04
M | 04
M | 04
© 2017 Stanley Leung - Saint Joseph’s Oratory of Mount Royal, Montreal, December 2017
2010-2 0 1 3 S el e c te d Wor k
U
Pi g e on
To w e r
05
Pigeons, or “rats with wings” that are often maligned as a risk to public health, are the bird that Londoners love to hate. Although it is known that pigeons help clean the streets by consuming what’s thrown on the street, people still hate them due to various reason. The knowledge towards pigeons is limited in modern days sociality as pigeon no long play as important of a role as they did in old times. The Pigeon Tower provide a platform and space for people to understand the bird again through a relaxed environment. From observation of growth and life cycle of pigeon through pathway circulating around the main tower to interacting with the bird through pigeon racing on the two cantilevered platforms. This building provides a step by step interaction with the hated pigeon to allow people to slowly learn to appreciate the bird once again. Besides being an educational building, the Pigeon Tower also act as a social gathering spot and reconnection to the city's famous Regent's Canal. The building contains cafe and dining, as well as leisure, sports equipment rental.
Central Saint Martins Year: First Year - 2011
Project Location: London, GB, U.K Type: Educational
U | 05
06
L eather Ln Scaffolding Envelop
The Leather Ln Scaffolding Envelop is an experimental architectural proposal in altering the urban fabric with alternative temporary facades. Taking inspirations from the temporary scaffolding in existing constructions within Leather Ln, this project aims to present a new form of architecture that extends the connection between a building to its surrounding context. By using the strategy used in scaffolding, the design contains two layers of fabrication, the inner layer that provides an unusual geometry to a traditional Victorian style building. The outer layer extends from the top of the building and cantilever over the street to create a temporary shading that changes up the streetscape in Leather Ln. The experimental design was reflected in a scaled down model that was showcased in Central Saint Martin’s annual architecture student showcase.
Central Saint Martins Year: Second Year - 2012
Project Location: Leather Lane, London, G.B, U.K Type: Experimental Architecture
U | 06
07
R e g e n t ’s C a n a l V i s i t o r C e n t r e
Abandoned floating platforms in the Regent’s Canal becomes a life oasis for wildlife. Birds use these platform as nest where they would be undisturbed by human activities. Fishes use these platform as shelters and feed on algae that grow on them. Fishes attract birds, an eco-system emerged in this forgotten platform. The Visitor Centre of Regents Canal takes inspiration of this independent cycle of the abandoned floating platform and chain reactions between different elements. The building is designed to be closely related to its surrounding context, gaining attraction to the water of the canal while attracting visitors from the bridge level, street level, and water level. The Regent’s Canal Visitor Centre contains three levels, main entry level act as a recreational rooftop with landscaping, a staircase leads to the main floor of the building where it contains office space and educational galleries, the building slopes between levels to create a smooth transition between the 1st floor and the main gallery space located below water surface. The basement floor below water level contains an educational media room with glass walls the sinks below the water, allowing the light to travel through the water and into the space to create a rippling lighting effect that would fascinate children.
Central Saint Martins Year: Second Year - 2012
Project Location: Regent’s Canal, London, G.B, U.K Type: Visitor Centre
U | 07
. Circulation Illustration .
U | 07
© 2016 Stanley Leung - E Monroe St, Chicago, December 2016
Professiona l E xp er ienc e
P
The Parisian Macao
08
The Parisian Macao is a luxury hotel in Cotai, Macau, China owned by Las Vegas Sands, which has a half-scale Eiffel Tower as one its landmarks. The hotel officially opened on 13 September 2016. As a member of Aedas Macau team, the lead consultant for the Parisian Macau project, I was a part of the Hotel Tower team of 5. The Hotel Tower team covers all construction and administration work from Level 6 pool deck to the 37th floor of the hotel tower that contains high roller casino room and presidential suite. During my first year in the team, I have supported my team in various design studies, construction and programme planning, BOH design and detailing throughout the construction phase. On the second year of my time in Aedas, I was responsible for a work package that covers an F&B and its kitchen at Level 6 pool deck, as well as the semi FOH toilets that services the pool deck. Weekly responsibility involves shopdrawing review, material submissions, construction drawing preparation, material sourcing and spec, site inspections and reports, weekly progress meeting with clients, sub-consultants, and contractors. Furthermore, I was appointed as a key member in support to my director through the hotel licensing process that includes preparation of all drawings of overview and enlarged plans of the property.
Aedas Scope: Construction & Administration Status/ Year: Operational - September 2016
Location: Macao, China Programme: Hospitality - Casino Resort Client: Las Vegas Sands Corp.
P | 08
Credit: Image by The Parisian Macau
1. READ IN CONJUNCTION WITH DRAWING "AED120054-00_TC-A_0010" FOR GENERAL NOTES. "AED120054-00_TC-A_0011" FOR LEGENDS AND ABBREVIATION. 2. REFER DRAWING SHEET "25XX" SERIES FOR EIFFEL TOWER. 3. REFER DRAWING SHEET "51XX" SERIES FOR ENLARGED STAIRCASE PLANS AND SECTIONS. 4. REFER ELEVATOR INDICATION PLAN "AED120054-00_TC-A_5200" FOR DRAWING SHEET NUMBER OF ENLARGED ELEVATOR SECTIONS. 5. REFER ESCALATOR INDICATION PLANS "AED120054-00_TC-A_5300-XX" FOR DRAWING SHEET NUMBER OF ENLARGED ESCALATOR SECTIONS. 6. LINEN CHUTE SECTIONS REFER DRAWING SHEET "53XX" SERIES. 7. REFER DRAWING SHEET "18XX" SERIES FOR KEY TO FITTING OUT INFORMATION.
7
093013 CT11 5175
093013 CT11
COLOR: BRANCO NEVE
200
1200
1300
1826
2600
COLOR: BRANCO NEVE
200
1225
1275
1826
FCL
L
K
2600
P3
NPL
Rev.
Date
450
FFL
FFL D
D
CR2807
CR2807
C4 /63D10-4
ELEVATION 1
J
2000 EQ.
21.MAR.2016 INCORPORATED CR2146, CR2807, CR2919 & FOR CLARIFICATIONS 10.NOV.2015 FOR GENERAL REVISION, INCORPORATED CR1126, CR2146, CR2211 & CR2296 03.AUG.2015 FOR GENERAL REVISION, INCORPORATED CR1252, CR1419, CR1666 & FOR CLARIFICATIONS 19.JUN.2015 FOR GENERAL REVISION, INCORPORATED CR1592 & CR1556
EQ.
EQ.
500
FCL
M
S
1. READ IN CONJUNCTION WITH DRAWING "AED120054-00_TC-A_0010" FOR GENERAL NOTES. "AED120054_0011" FOR LEGENDS AND ABBREVIATION. 2. REFER TO GA PLANS FOR WALL TYPES, WALL OPENING TAGS (e.g. DOOR, WINDOW, SHUTTER...etc.) 3. REFER FINISHES SCHEDULE FOR INTERIOR FINISHES. 4. REFER TO AED120054-00_TC-A_MRS-003 FOR FOH LAVATORY MATERIAL REFERENCE SPECIFICATIONS 5. WALL TILES JOINTS TO ALIGN WITH FLOOR TILES.
P3
B1 /63D10-2
PL02
EQ.
S1
P3
6.5
102113
100
8.5
450
P3
8
EQ.
P3
D
C4 /63D10-4
ELEVATION 1
P3
Description
Rev.
B.5
Avenida Xian Xing Hai No.105 Centro Golden Dragon 7 andar D, Nape, Macao
2575
545
1310
500 EQ.
1300
P3
B
AP01
1700
2200
200 1900
25
3350
975
P3
FE
Drawn by
Checked by
DUW / BL
SHA / FJ
25
3325
Issue Date
1:100 @ A1
21.MAR.2016
CR2807
M
EQ. EQ. EQ. CR2807
D
A1 FOH LAVATORY "06C109" & "06C111" ELEVATIONS
EQ.
1800 1000
D3 /63D10-1
D
A3 /63D10-3
ELEVATION 4
ENLARGED FOH SECTOR C ELEVATION - LEVEL 06
2000
2600
EQ. 2000
FFL
D
Rev.
Drawing Number
100
EQ.
LC / JY
Scale
Drawing Title
750
EQ.
1900
FFL
Approved by
1600
EQ.
1600 2600
PARTIAL GA FLOOR PLAN - LEVEL 06 - SECTOR C
K
PLANTER
A1/63D10-1
7075
FCL
1000
1690
Drawing Title
EMERGENCY PHONE
800
1050
A1/63D10-7
2750
500
A1/63D10-7
C
P3
200
4050
FCL
102800 WD01
B.5
COLOR: BRANCO NEVE
C
P3
J
P3
M
SUPER EVENT BOX
PLANTER
A2/63D10-1
Zone
093013 CT11
P3
B.5
COLOR: BRANCO NEVE
D
CR2807
Drawn by
Checked by
SSC
SHA / F
Scale
A3 /63D10-3
ELEVATION 4
1:50 @ A1 Drawing Number
D
AED120054-00_T
A2 FOH LAVATORY "06C110" & "06C112" ELEVATIONS
Computer file AED120054-00_TC-A_2006
A3/63D10-1
Discipline
ARCHITECTURAL
P3
500
093013 CT11
B1 /6310-2
C.5
2890
Status
FOR TENDER & CON
ELEVATION 3
2000
2000
34.90 34.60
PLANTER
1725
Project Title
Zone
3500
C D PLANTER
PLANTER WALL TYPICAL TOW=36.00(TL)
HAND DRYER
38/F Tw 100 Ho Kowloo T +85 F +85
1200
A5 /63D10-1
ELEVATION 3
ARCHITECTURAL
C
2400
PLANTER WALL TYPICAL TOW=35.35(TL)
875
FFL
A2 /63D10-1
AED120054-00_TC-A_2006 -C
A4/63D10-1
3025
1700
2600
2600
P3
B.5
785 2000
FFL
Discipline
1000
METAL GATE REFER TO LANDSCAPE DETAIL
FE
1160
1050
FCL
P3
34.70 34.60 3000
PLANTER PLANTER
2625
5175
1200
300
PLANTER WALL TYPICAL TOW=36.00 (TL)
PLANTER WALL TYPICAL TOW=35.35(TL)
7
Lang 1826
FCL
C.1
4265
PLANTER
1550 380
PLANTER WALL TYPICAL TOW=36.00(TL)
COLOR: BRANCO NEVE
7.3
7/F One Kowloo T +85 F +85
P3
FOR TENDER & CONSTRUCTION
3800
PLANTER
1530
2600
EQ.
2600
EQ. 100
200
310
150
3025 150 150 1000
1000
2000
2650
2000
2100
6.5
093013 CT11
PL02
Status
CLEANSING POINT
AP02
2430
1425
COLOR: BRANCO NEVE
102113
P3
Project Title
34.9 34.8
2000
2000
P3
Langdon Seah
CONC. PLINTH 150 H. AFFL
1000
4100
1000
FE
8/F Gra 138 Sh Shatin, T +85 F +85
Parso (Asia
PLANTER WALL TYPICAL TOW=38.075 (TL)
1005
1310
M
CR2807
AECO
CR2807
ELEVATION 2
093013 CT11
38/F Two Landmark East, 100 How Ming Street, Kwun Tong, Kowloon, Hong Kong T +852 2830 3500 F +852 2576 0416
1200
06 C 106
850
D
CR2807
1615
2500
2500
34.90 34.60
850
34.90 34.85
8565
CHEMICAL RM
Avenid N°251A AIA To T +85 F +85
D
A1 /63D10-8 D
7/F One Kowloon, 1 Wang Yuen Street, Kowloon Bay, Hong Kong T +852 2579 8899 F +852 2856 9902
3500
9225
FE
06 C 107
CR-2146
FFL
A3 /63D10-3
ELEVATION 2
475
1135
2140 1860 2140 930 930 2140 2625
850
2000
3250 1550
1350 1050
1860
1550
M
CR2807
2000
T +1 F +1
1200
FILTRATION PUMP RM
2995
2140
2900
1165
1475
1200
1475
50
M
2600
2000
ALL CONC. PLINTH 250 H. AFFL
A1 /6363 JAN
06 C 112
1200
1500
1500
2130
1160
FE
1160
1200
FE
3525
FH
M
1200
1000
T +85 F +85 macau aedas.
500 S. Los An
FFL
AECOM
ST 11A
Avenid Centro 7 anda
6980
Gens
8/F Grand Central Plaza, Tower 2, 138 Shatin Rural Committee Road, Shatin, Hong Kong T +852 3922 9000 F +852 3922 9797
3620 380
Vene
Estrada Esperan The Ve Executi T +85 F +85
Cotai Limited
Maca Servi
Parsons Brinckerhoff (Asia) Ltd.
4890
1000
960
1675
1085
690
1290
BAR
06 J 104
4580
3520
1040
06 H 105
765
1220
1085
955
4860
485
1200
3885 1455
280 1345
3765
500
F.LAV
06 J 106
MALE DRESSING
2055
06 J 105
06 C 105 2000
3325
VEST
06 C 113 1150
280
KITCHEN
675 2000
1200
1500
2600
4325
4500 645
1005
1405
3920
2475 FE
06 H 102
1300
STORAGE JROOM
H
FE
FE
2600
1925 2625
1550
C
34.90 34.60
985
2600
1370
1350
1650 2825
06 H 101
875
985
FIRST AID RM
06 C 111
1215
ERE RM
690
1200
JAN
CHANGING ROOM B
690
1200
1525
EQ
840
M
CR2807
1200 1825
1730
2390
3785
EQ
4125
1200 2300
34.90 34.85
5175 EQ
1375
CR2807
5475
5475
06 C 108
AP02
1250
AHU RM
F.LAV
06 C 110
1300
M
M
1550
AP02
3250
M.LAV
06 C 109
1200
AP02
M
960
1165
1000
2750 975
5100 1550
2000
840
1300 3600
725
2725
2400
M
CR2807
FH 150
4610
150
34.90 34.60
Avenida Comercial de Macau, N°251A-301, AIA Tower 12° andar, Macau T +853 2832 2388 F +853 2832 3222
ST 10A
12475
1300
2365
4675
1000X1000 / 3HR FRP ACCESS HATCH OPENING ABOVE
M
CR2807
1200
FE
F. LAV
875 250
1400
M
06 B 110
1400
06 C 103
CR2807
B1 /6361
2650
1840
4025
3500 150 1100 1300
AP02 130
875
200
FE
POOL SUPPORT
1000X1000/ 3HR FRP ACCESS HATCH OPENING ABOVE HR/FH/FE(C)
200
2895
1400
1400
34.90 34.85
1350
410
1850
FH
3650
120
06 C 001
FH 5345
4100
C
PL02
FCL
Macau Professional Services Ltd.
34.90 34.85
200
1450
STAIR CONNECTING CORR
150
10
CR2919
2155
1350
FAN ROOM
06 C 102 CONCRETE CURB 150mm AFFL
FH
3500
ST 5A
T +1 (213) 327 3600 F +1 (213) 327 3600
200 1000
ST T3
200
2650
150 1370
FE
500
1350
8300
ELEC
06 C 101
1350
3450
300
800 HR/FE(C)
500 S. Figueroa Street Los Angeles, CA 90071
M
CR2919
06 C 901
3200
102113
200
EQ.
M
WALKWAY
710X1000/ 3HR FRP ACCESS HATCH OPENING ABOVE
4325
FCL
Gensler
FE
093013 CT11 COLOR: BRANCO NEVE
2200
P3
A.5
300
FE
093013 CT11 COLOR: BRANCO NEVE
3325
T +853 2875 5530 F +853 2875 5531 macau@aedas.com aedas.com
T.L. OF BALUSTRADE @ +36.10
Date
P3
Venetian Cotai Limited Estrada da Baía de Nossa Senhora da Esperança, The Venetian Macao Resort Hotel Executive Offices - L2, Taipa T +853 2882 8888 F +853 2888 3382
Cotai Limited
D
P3
B.5
100
7.6
EQ.
P3
7.3
EQ.
P3
7
EQ.
P3
6.5
2600
P3
6
1700
P3
200
P3
5.8
Computer file AED120054-00_TC-A_6363-3
102800 WD01
HAND DRYER
093013 CT11
E1/63D8-2
COLOR: BRANCO NEVE
265100
SL01
COLOR: BRANCO NEVE
224000
D5 /63D8-3
102800 WR03
102800 WR03
123640 SC03
WASTE RECEPTACLE
SOAP DISPENSER
TOP OF COUNTER
062000 IH01 099123 EN03
WASTE RECEPTACLE
033300 CE01
MD-01
D3
102800 SD06
Estrada da Baía de Nossa Senhora da Esperança, The Venetian Macao Resort Hotel Executive Offices - L2, Taipa T +853 2882 8888 F +853 2888 3382
Cotai Limited
FFL
FFL SSL
SECTION VIEW
SCALE: 1:20
DETAIL OF HAND DRYER &
T +853 2875 5530 F +853 2875 5531 macau@aedas.com aedas.com
FOR FOH LAVATORY SCALE 1:10
500 S. Figueroa Street Los Angeles, CA 90071
E5 WASTE RECEPTACLE CABINET
123640 SC03
Rev.
T +853 F +853 macau@ aedas.c
D1 TIMBER MOULDING DETAIL
Gensler
Gensl
SCALE 1:2
C2
Avenida Comercial de Macau, N°251A-301, AIA Tower 12° andar, Macau T +853 2832 2388 F +853 2832 3222
Maca Servic
COUNTER TOP DETAIL
Avenida N°251A AIA Tow T +85 F +85
SCALE 1:2
AECO
8/F Grand Central Plaza, Tower 2, 138 Shatin Rural Committee Road, Shatin, Hong Kong T +852 3922 9000 F +852 3922 9797
A2 /63D10-7
SCALE 1:20
102113
PL03
A2 /63D10-7
A2 /63D10-7 123640 SC03 SPLASHBACK BEYOND
D5/63D8-3
123640 SC03 SPLASHBACK BEYOND
224000 LA01 FAUCET
FAUCET
C2 /63D10-7
224000
C2 /63D10-7
LT01
224000
WASH BASIN (LAV.) TROUGH
Discipline
C2 /63D10-7
FRONT ELEVATION VIEW
102800 BS01
064200 WP01 123200 PC01
123640 SC03 SPLASHBACK BEYOND
064200 WP01 123200 PC01
224000
SIDE ELEVATION VIEW
COLOR: BRANCONEVE
COLOR: BRANCONEVE
E
123640 SC03
224000 UR03 URINAL (INCLUDING SENSOR)
MATERIAL CODE FOR PLASTIC LAMINATE :123200 PC01
102113
E
PL03
DETAIL SECTION OF FOR FOH LAVATORY SCALE 1:10
DETAIL SECTION OF
DETAIL SECTION OF
A2 STANDARD BASIN
A3 CHILD BASIN
FOR FOH LAVATORY SCALE 1:10
FOR FOH LAVATORY SCALE 1:10
071400 WP02
PLYWOOD BACKING
* WATERPROOFING EXTEND TO MIN. 1150MM AFFL WHEN ATTACHED TO VANITY COUNTER-TOP
SILICONE TYPE SEALANT & SELF ADHESIVE TAPE @150mm c/c BOTH DIRECTION
DETAIL SECTION OF
A4 BABY STATION FOR FOH LAVATORY SCALE 1:10
A5 URINALS DETAILS
093013 CT11
6mm THK MIRROR
COLOR: BRANCO NEVE
SILICONE TYPE SEALANT & SELF ADHESIVE TAPE @150mm c/c BOTH DIRECTION
6mm THK MIRROR
093013 CT11 COLOR: BRANCO NEVE
093013 CT11
03300
MD-01
CE01
03300 MD-01
WOOD BLOCK
Drawn by
Checked by
SSC
SHA / FJ
FFL
CE01
Drawing Title
WOOD BLOCK
TYPICAL DETAILS FOR FOH LAVATO (SHEET 7)
123640 SC03
123640 SC03
Approved by
LC / JY
Scale
Issue Date
AS SHOWN @ A1
09.09.2015
E
AED120054-00_TC-A_63D10-1 Computer file AED120054-00_TC-A_63D10 (FOH LAV DETAILS)
BOTTOM SECTION (INTERFACE WITH COUNTER TOP)
071400 WP02
Rev.
Drawing Number
SCALE 1:20
PLYWOOD BACKING
WOOD BLOCK
SILICONE SEALANT (MINIMUM 2MM THK)
Drawing Title
TYPICAL DETAILS FOR FOH LAVATORY (SHEET 1)
(COLOUR: COLORADO OAK)
PLAN VIEW
A1 DISABLED BASIN
Zone
NOTES: PLASTIC LAMINATE WILL BE APPLIED TO PLYWOOD AT ALL EXPOSED SURFACE.
064200 WP01 123200 PC01
CR1972
CR1972
Discipline
ARCHITECTURAL 071400 WP02
* WATERPROOFING EXTEND TO MIN. 1150MM AFFL WHEN ATTACHED TO VANITY COUNTER-TOP
12MM THK PLYWOOD BACKING
(COLOUR: COLORADO OAK)
E
CR1972
Status
FOR TENDER & CON
SILICONE TYPE SEALANT & SELF ADHESIVE @ 150MM C/C BOTH DIRECTION
6MM THK MIRROR
093013 BT01
Project Title
PLAN / SECTION (INTERFACE WITH CERAMIC TILE)
Zone
WALL FINISH LINE
064200 WP01 123200 PC01
093013 CT11
SILICONE TYPE SEALANT & SELF ADHESIVE TAPE @150mm c/c BOTH DIRECTION 6mm THK MIRROR
ARCHITECTURAL
LT01
WASH BASIN (LAV.) TROUGH
093013 BT01
093013 CT11
38/F Tw 100 Ho Kowloo T +85 F +85
PLYWOOD BACKING
CE01
SILICONE TYPE SEALANT & SELF ADHESIVE @ 150MM C/C BOTH DIRECTION
FOR TENDER & CONSTRUCTION
FAUCET
TOP OF COUNTER
LT01
03300
PLAN / SECTION (INTERFACE WITH CERAMIC TILE)
6MM THK MIRROR Status
WASH BASIN (LAV.) TROUGH
PLYWOOD BACKING SILICONE TYPE SEALANT & SELF ADHESIVE TAPE @150mm c/c BOTH DIRECTION 6mm THK MIRROR
SILICONE SEALANT (MINIMUM 2MM THK)
FFL
224000 LA01
Langd
MD-01
WOOD BLOCK
WOOD BLOCK
20X20 S.S. ANGLE FRAME AROUND MIRROR, 2MM THK
093013 CT11
COLOR: BRANCO NEVE
224000 LA01
055000 SS01 MIN. 1mm THK. HAIRLINED FOR EXPOSED SIDE
093013 CT11 COLOR: BRANCO NEVE
MD-01
Project Title
093013 CT11
7/F One Kowloo T +85 F +85
093013 CT11 COLOR: BRANCO NEVE
093013 CT11
COLOR: BRANCO NEVE
E1 /63D10-2
Parso (Asia)
ALUMINUM CHANNEL
033300 CE01
URINAL (INCLUDING SENSOR)
E
8/F Gra 138 Sha Shatin, T +85 F +85
UN-FINISHED WALL SURFACE
CE01
Langdon Seah 38/F Two Landmark East, 100 How Ming Street, Kwun Tong, Kowloon, Hong Kong T +852 2830 3500 F +852 2576 0416
224000 UR03
A2 /63D10-7
03300
7/F One Kowloon, 1 Wang Yuen Street, Kowloon Bay, Hong Kong T +852 2579 8899 F +852 2856 9902
(COLOUR: COLORADO OAK)
093013 CT11
093013 CT11
A3 /63D10-7
UN-FINISHED WALL SURFACE
Parsons Brinckerhoff (Asia) Ltd.
099123 EN03
D5/63D8-3
T +1 ( F +1 (
AECOM
PLAN VIEW
C1 PARENT'S ROOM BASIN CABINET DETAILS A3 /63D10-7
500 S. F Los Ang
093013 BT01
Macau Professional Services Ltd.
102800 BS01
Estrada Esperan The Ven Executiv T +85 F +85
Cotai Limited
Avenida Centro 7 andar
T +1 (213) 327 3600 F +1 (213) 327 3600
01
Date
Venet
064200 WP01 123200 PC01
STEEL ANGLE FRAME FOR FIXING COUNTER TOP
NOTE: SIMILAR TO PORTA MOULDINGS #PFP2819 www.porta.com.au
Avenida Xian Xing Hai No.105 Centro Golden Dragon 7 andar D, Nape, Macao
ELEVATION VIEW
WALL
(1 : 2) (FOR GENERAL MIRROR FRAME)
Description
Venetian Cotai Limited
COLOR: BRANCO NEVE
CR1972
TOILET FRONT ELEVATION VIEW
Date
093013 CT11
COLOR: BRANCO NEVE
E
224000 LA01
B
CR1972
12MM PLYWOOD BACKING
STEEL ANGLE FRAME FOR FIXING COUNTER TOP
STEEL ANGLE FRAME FOR FIXING COUNTER TOP
Rev.
093013 CT11
COLOR: BRANCO NEVE
E
123640 SC03 THICKNESS 20MM THK
12MM PLYWOOD BACKING
071400 WP02 *WATERPROOFING EXTEND TO MIN. 1150MM AFFL WHEN ATTACHED TO VANITY COUNTER TOP
102600 SD06
SHELF SOCKET
LT01
WASH BASIN (LAV.) TROUGH
099123 EN03
SPLASHBACK BEYOND
SHELF (FOR MICROWAVE)
A1 FULL BODY MIRROR DETAIL
BOTTOM SECTION (INTERFACE WITH COUNTER TOP)
A2 MIRROR DETAIL
SCALE: 1:2
SCALE 1:2
Drawn by
Checked by
SSC
SHA / FJ
Scale
AS SHOWN @ A1 Drawing Number
A3 MIRROR DETAIL - COMPLY WITH MACAU CODE
AED120054-00_T
Computer file AED120054-00_TC-A_63D10 (FO
SCALE 1:2
1. READ IN CONJUNCTION WITH DRAWING "AED120054-00_TC-A_0010" FOR GENERAL NOTES. "AED120054_0011" FOR LEGENDS AND ABBREVIATION. 2. REFER TO GA PLANS FOR WALL TYPES, WALL OPENING TAGS (e.g. DOOR, WINDOW, SHUTTER...etc.) 3. REFER FINISHES SCHEDULE FOR INTERIOR FINISHES. 4. REFER TO AED120054-00_TC-A_MRS-003 FOR FOH LAVATORY MATERIAL REFERENCE SPECIFICATIONS 5. WALL TILES JOINTS TO ALIGN WITH FLOOR TILES.
REFER TO ELEVATION
SHOWER CURTAIN
CHANGING ROOM 093013 CT11
071400 WP02
093013 CT11
LOCK
102800 HK01
01
224000 SM03
C2 /63D10-5 02
093013 CT11
REFER TO FLOOR FINISH PLAN
REFER TO FLOOR FINISH PLAN
REFER TO FLOOR FINISH PLAN
REFER TO FLOOR FINISH PLAN
REFER TO FLOOR FINISH PLAN
102800 HK01 102800 HK01
D
102800 SA21
D
088100 GL08 224000 SM03
03
SHOWER
2mm THK. HAIRLINE S/S DIVIVER
093013 CT11
FFL
FFL
SFL
SFL
224000 SM03 102800 SD01
Rev.
Date
Description
Rev.
Date
Venetian Cotai Limited
224000 SM03
102800 SA21
Cotai Limited
C1/63D10-5
093013 CT11
Ven
Estrada da Baía de Nossa Senhora da Esperança, The Venetian Macao Resort Hotel Executive Offices - L2, Taipa T +853 2882 8888 F +853 2888 3382
HAIRLINE S/S TRAY
Avenida Xian Xing Hai No.105 Centro Golden Dragon 7 andar D, Nape, Macao
102800 SD01
T +853 2875 5530 F +853 2875 5531 macau@aedas.com aedas.com
224000 SM03
Cotai Limited
Aven Centr 7 and
071400 WP02
T +8 F +8 maca aeda
071400 WP02
Gensler
Gen
033300 CE01
A3 /63D10-7
500 S. Figueroa Street Los Angeles, CA 90071
ELEVATION VIEW "01"
ELEVATION VIEW "02"
ELEVATION VIEW "03"
500 S Los A
FLOOR DRAIN
T +1 (213) 327 3600 F +1 (213) 327 3600
PLAN VIEW
Estrad Esper The V Execu T +8 F +8
T +1 F +1
071400 WP02
Macau Professional Services Ltd.
Mac Serv
Avenida Comercial de Macau, N°251A-301, AIA Tower 12° andar, Macau T +853 2832 2388 F +853 2832 3222
D1 TYPICAL FOH SHOWER CUBICLE
AECOM
SCALE: 1:20
C1 DETAIL OF SHOWER DRAIN SCALE: 1:2
8/F Grand Central Plaza, Tower 2, 138 Shatin Rural Committee Road, Shatin, Hong Kong T +852 3922 9000 F +852 3922 9797
C2 TYPICAL DETAIL OF SHOWER CURB
Aven N°25 AIA T T +8 F +8
C4 FLOOR TRANSITION DETAIL
SCALE: 1:2
AEC
SCALE: 1:2
8/F G 138 S Shati T +8 F +8
Pars (Asi
Parsons Brinckerhoff (Asia) Ltd. 7/F One Kowloon, 1 Wang Yuen Street, Kowloon Bay, Hong Kong T +852 2579 8899 F +852 2856 9902
7/F O Kowl T +8 F +8
033300 CE01
Langdon Seah
Lan
38/F Two Landmark East, 100 How Ming Street, Kwun Tong, Kowloon, Hong Kong T +852 2830 3500 F +852 2576 0416
38/F 100 H Kowl T +8 F +8
093013 CT11
03
SILICONE SEALANT (MINIMUM 2mm THK) Project Title
C4 /63D10-5
Project Title
093013 CT11
102800
FOR TENDER & CONSTRUCTION
D
Status
093013 CT11
FOR TENDER & CO Discipline
Discipline
102800 SD01
ARCHITECTURAL
ARCHITECTURAL 088100 GL08
FS01
MATERIAL CODE FOR ALL TILES:
Status
224000 SM03 093013 CT11
NOTES: REFER TO ENLARGED LAVATORY AED120054-00_TC-A_63XX SERIES FOR SETTING OUT OF TYPICAL FLOOR TILES PATTERNS.
093013 CT11
Zone
Zone
102800 SA21
102800 HK01
071400 WP02
01
102800 GB01 D
C1 /63D10-5
02 SILICONE SEALANT (MINIMUM 2mm THK)
STEEL FRAME FOR FIXING SHOWER BENCH
Drawing Title
Drawing Title
224000 SM03
102800 SA21
102800 SD01
102800 D
TYPICAL DETAILS FOR FOH SHOWER CUBICLE (SHEET 4)
FS01
102800 GB01
102800 GB01
PLAN VIEW
A1 TYPICAL FOH DISABLED SHOWER CUBICLE
ELEVATION VIEW "01"
SECTION VIEW "02"
ELEVATION VIEW "03"
A1 TYPICAL FLOOR TILE PATTERN DETAIL
Drawn by
Checked by
SSC
SHA / FJ
Scale
AS SHOWN @ A1 Drawing Number
Approved by
LC / JY
1:10 Issue DateSCALE Rev. 22.03.2016 D
093013 CT11
TYPICAL DETAIL FOR FOH LAVAT (SHEET 5)
093013 TA01
A4 SHOWER BENCH DETAIL
092800 CB01
SCALE: 1:2
Drawn by
Checked b
SSC
SHA /
Scale
AS SHOWN @ A1 Drawing Number
AED120054-00_TC-A_63D10-4
AED120054-00_
Computer file AED120054-00_TC-A_63D10 (FOH LAV DETAILS)
C
P | 08
Computer file AED120054-00_TC-A_63D10 (
Credit: Image by The Parisian Macau
Credit: Image by The Parisian Macau
1. READ IN CONJUNCTION WITH DRAWING "AED120054-00_TC-A_0010" FOR GENERAL NOTES. "AED120054-00_TC-A_0011" FOR LEGENDS AND ABBREVIATION. 2. REFER DRAWING SHEET "25XX" SERIES FOR EIFFEL TOWER. 3. REFER DRAWING SHEET "51XX" SERIES FOR ENLARGED STAIRCASE PLANS AND SECTIONS. 4. REFER ELEVATOR INDICATION PLAN "AED120054-00_TC-A_5200" FOR DRAWING SHEET NUMBER OF ENLARGED ELEVATOR SECTIONS. 5. REFER ESCALATOR INDICATION PLANS "AED120054-00_TC-A_5300-XX" FOR DRAWING SHEET NUMBER OF ENLARGED ESCALATOR SECTIONS. 6. LINEN CHUTE SECTIONS REFER DRAWING SHEET "53XX" SERIES. 7. REFER DRAWING SHEET "18XX" SERIES FOR KEY TO FITTING OUT INFORMATION.
T-10
GR 074
GR
QQ-5
SUITE 039
6150
D-4K
P3
9010
CORR
7750
T-Q
9085
TD 051
P3
P3
T-2
P3
T-3
TYPICAL FOR K-6
P3
T-5
300
4075
3800
125 250
SUITE
3800
3445
072
GR
GR
GR
GR
GR
GR
GR
GR
GR
GR
GR
QQ-1
QQ-1
QQ-1
QQ-1
QQ-1
K-1
K-1
K-1
K-1
K-1
K-1
2030
124
126
9010
7750
1895
122
128
130
136
138
140
142
Rev.
Date
2550
P3
T-G
06 PART PLAN OF ROOM TYPE 'F-3'
AT L11 TO L20 & L22 NORTH WING
07
AT L11 TO L20 & L22 NORTH WING
08 PART PLAN OF LN STO
AT L09, L12, L15, L18 & L21
P3
P3
P3
T-7
T-9
1350
P3
B.5
975
1350
250 4275
T-C
115
P3
1500
9085
1400
Aven N°25 AIA T T + F +
300
GR
GR
GR
GR
GR
QQ-2
QQ-1
QQ-1
QQ-1
K-1
123
125
127
129
K
131
GR
GR
GR
GR
K-1
K-1
K-1
K-1
133
135
137
139
AEC
ELEC
08 TB 411
8/F G 138 Shati T + F +
900
P3
T-D
Par (As
125
250
7/F O Kow T + F +
200
Lan
250 650
38/F 100 H Kow T + F +
250
Project Title
H
P3
5
1400
Project Title
AT L21 ONLY - NORTH
H
P3
P3
875
38/F Two Landmark East, 100 How Ming Street, Kwun Tong, Kowloon, Hong Kong T +852 2830 3500 F +852 2576 0416
HR/FE(C)
Gen
Mac Serv
P3
5
P3
T-8
P3
T-9
P3
T-10
5
P3
T-7
Status
T-8
Status
FOR TENDER & CONSTRUCTION Discipline
1540 250
ARCHITECTURAL
FOR TENDER & CO Discipline
P3
05 PART PLAN OF ROOM TYPE 'F-2'
250
T + F +
3675
Langdon Seah VBR
T + F + maca aeda
500 S Los A
T-E
P3
B.5
21 TB 451
PART PLAN OF INTERCONNECTION ROOMS TYPE 'K-3' & 'QQ-3' , 'QQ-5'
1400
7/F One Kowloon, 1 Wang Yuen Street, Kowloon Bay, Hong Kong T +852 2579 8899 F +852 2856 9902
LN STO H
3875
150
P3
QQ-3
ST T1
Parsons Brinckerhoff (Asia) Ltd.
157
K-3
F-3
T-E
9085
GR
155
105
Aven Cent 7 and
CHEM DISH
4310
119
3445
P3
T-B
GR
GR
2275
K-6
8/F Grand Central Plaza, Tower 2, 138 Shatin Rural Committee Road, Shatin, Hong Kong T +852 3922 9000 F +852 3922 9797
LS H14
Estra Espe The V Execu T + F +
08 TB
250
GR
AECOM
LS H13
FE(C)
300
1840
2030
Avenida Comercial de Macau, N°251A-301, AIA Tower 12° andar, Macau T +853 2832 2388 F +853 2832 3222
FE
9560
Macau Professional Services Ltd.
LP H06
120 1400
LP H05
ELEC
08 TA 401
2435
137
P3
T-F
LP H04
F-2
6915
200
P3
T-A
T +1 (213) 327 3600 F +1 (213) 327 3600
FE(C)
305
3065
GLASS BALUSTRADE AT 1200 AFFL.
500 S. Figueroa Street Los Angeles, CA 90071
21 TB 0
1400
T +853 2875 5530 F +853 2875 5531 macau@aedas.com aedas.com
Gensler
146
HR/FE(C)
08 TA 001
FE(C)
120
H
Ven
FE(C)
FOH CORR
08 TA 002
WINDOW OF 2 NOS. 1800H x 1000W WITH MIN. OPENABLE AREA 0.5m²
Avenida Xian Xing Hai No.105 Centro Golden Dragon 7 andar D, Nape, Macao
T-8
Cotai Limited
HR/FE(C)
VEST
1400
P3
T-7
Estrada da Baía de Nossa Senhora da Esperança, The Venetian Macao Resort Hotel Executive Offices - L2, Taipa T +853 2882 8888 F +853 2888 3382
1350
P3
5
1840
AT L09, L12, L15, L18, L21 & L24
T-8
GR
5
P3
Description
Cotai Limited
P3
2550
5
P3
T-7
T-9
T-8
T-B
9560
K
2435
P3 P3
P3
T-8
P3
134
Venetian Cotai Limited
10 ROOMS TYPE 'D-4Ka' & 'QQ-5'
P3
H
5
Date
PART PLAN OF INTERCONNECTION
AT L09, L12, L15, L18, L21 & L24 P3
Rev.
T-R
PART PLAN OF INTERCONNECTION
09 ROOMS TYPE 'D-4K' & 'QQ-3' P3
132
9010
120
1375
1375
GR K-6
8110
1040
D-4Ka C)
T-7
TYPICAL FOR K-1
250
3875
1. READ IN CONJUNCTION WITH DRAWING "AED120054-00_TC-A_0010" FOR GENERAL NOTES. "AED120054-00_TC-A_0011" FOR LEGENDS AND ABBREVIATION. 2. REFER DRAWING SHEET "25XX" SERIES FOR EIFFEL TOWER. 3. REFER DRAWING SHEET "51XX" SERIES FOR ENLARGED STAIRCASE PLANS AND SECTIONS. 4. REFER ELEVATOR INDICATION PLAN "AED120054-00_TC-A_5200" FOR DRAWING SHEET NUMBER OF ENLARGED ELEVATOR SECTIONS. 5. REFER ESCALATOR INDICATION PLANS "AED120054-00_TC-A_5300-XX" FOR DRAWING SHEET NUMBER OF ENLARGED ESCALATOR SECTIONS. 6. LINEN CHUTE SECTIONS REFER DRAWING SHEET "53XX" SERIES. 7. REFER DRAWING SHEET "18XX" SERIES FOR KEY TO FITTING OUT INFORMATION. 8. 2 HR. FRP ACCESS PANEL BEHIND WC AT L09, L11, L25 & L27.
P3
T-6
TYPICAL FOR QQ-1
125
225
P3
T-4
565
037
QQ-3
P3
T-1
P3
T-9
T-A
P3
P3
P3
T-12
900
P3
T-11
ARCHITECTURAL Zone
P3
K.5
Zone
H
063
K-1A
LN STO
AT L11 TO L20 & L22 SOUTH WING
SHA / DANT
LC / JY
Scale
Issue Date
1:100 @ A1
04.SEP.2015
Rev.
P3
5
P3
P3
T-8
AED120054-00_ Computer file AED120054-00_TC-A_2008
STAIR LANDING
1. READ IN CONJUNCTION WITH DRAWING "AED120054-00_TC-A_0010" FOR GENERAL NOTES. "AED120054-00_TC-A_0011" FOR LEGENDS AND ABBREVIATION. 2. REFER DRAWING SHEET "25XX" SERIES FOR EIFFEL TOWER. 3. REFER DRAWING SHEET "51XX" SERIES FOR ENLARGED STAIRCASE PLANS AND SECTIONS. 4. REFER ELEVATOR INDICATION PLAN "AED120054-00_TC-A_5200" FOR DRAWING SHEET NUMBER OF ENLARGED ELEVATOR SECTIONS. 5. REFER ESCALATOR INDICATION PLANS "AED120054-00_TC-A_5300-XX" FOR DRAWING SHEET NUMBER OF ENLARGED ESCALATOR SECTIONS. 6. LINEN CHUTE SECTIONS REFER DRAWING SHEET "53XX" SERIES. 7. REFER DRAWING SHEET "18XX" SERIES FOR KEY TO FITTING OUT INFORMATION.
T-10
36 TC 443
P3
ST T5
TC
P3
P3
5
P3
T-7
F.5
TD
P3
T-8
P3
T-9
VEST
36 TC 047
T-10
055200 GS01
055200 GS01
SUITE
C1
055200 GS01
055200 GS01
PLAN VIEW
055200 GS01
PLAN VIEW
C5
C2 /51D2
PLAN VIEW 055200 GS01
A1/51D2
P3
T-M
P3
T-S
055200 GS01
083
ELV
S3-7m
CHEM/ DISH
STO
FE
055200 GS01
055200 GS01
C3
086
36 TD 551
055200 GS01
055200 GS01
A4 /51D2
S4-1s
FE
TOP LANDING
HALF LANDING
055200 GS01
ST T6
SUITE
SHA
Drawing Number
H
ELEC
FE
Checked b
TSL / RKY 1:100 @ A1
Computer file AED120054-00_TC-A_2008-11
P3
T-9
Drawn by Scale
H
P3
T-7
K
7750
TSL / RKY
PARTIAL GA FLO - LEVEL 08 ( LEV 22 SIMILAR ) - S
Approved by
AED120054-00_TC-A_2008-11
AT L21 ONLY - SOUTH
H
Checked by
Drawing Number
04 PART PLAN OF LN STO
AT L09, L12, L15, L18 & L21
Drawn by
36 TD 553
055200 GS01 055200 GS01
1. REFER TO L35 GA FLOOR PLAN FOR ALL SUITE TYPES' WALL TYPES AND DOOR MARKS UNO.
SUITE
A1/51D2
AT L11 TO L20 & L22 SOUTH WING
03
125
PARTIAL GA FLOOR PLAN - LEVEL 08 ( LEVEL 09, 11 TO 22 SIMILAR ) - PART PLAN 11
P3
02 PART PLAN OF ROOM TYPE 'K-1A'
PART PLAN OF INTERCONNECTION ROOMS TYPE 'QQ-3' & 'QQ-5'
Drawing Title
TC
HR/FE(C)
QQ-3
T-X
01 PART PLAN OF ROOM TYPE 'F-2'
TB
Drawing Title
VBR
104
HR/FE(C)
028
P3
TA
H
GR F-2
T-F
21 TF 551
GR
250
P3
T-W
106
QQ-5
GR
P3
VBR
GR
TYPICAL FOR QQ-1B
T-S
P3
T-S
ST T6
055200 GS01 ACS
064
GS01
S2-3
36 TD 451
LAV
36 TD 552
Rev.
Rev.
Date
Description
055200 GS01
Date
055200 GS01
Venet
Venetian Cotai Limited Cotai Limited
D
FE(C)
P3
SUITE
36 TD 056
Gensl
SUITE
ACS
P3
T-P
ELEC
36 TD 452
FE
L
SUITE
SUITE
S2-1A-C
S2-9-C
075
076
L
ELEC
FE
FE
CR2033
LN STO
AECO
7/F One Kowloon, 1 Wang Yuen Street, Kowloon Bay, Hong Kong T +852 2579 8899 F +852 2856 9902
A5
SECTION VIEW'
C3 HANDRAIL FIXING DETAIL
Langdon Seah
7/F One Kowloo T +85 F +85
Langd
38/F Tw 100 Ho Kowloo T +85 F +85
FLOOR - MOUNTED SCALE 1:10
WALL - MOUNTED SCALE 1:10
36 TD 058
Parso (Asia)
SECTION VIEW'
C5 HANDRAIL FIXING DETAIL
VOID SIDE, FLOOR - MOUNTED SCALE 1:10
C1 HANDRAIL FIXING DETAIL
VEST
8/F Gra 138 Sha Shatin, T +85 F +85
GC00
SECTION VIEW'
38/F Two Landmark East, 100 How Ming Street, Kwun Tong, Kowloon, Hong Kong T +852 2830 3500 F +852 2576 0416
E
T-Q
FE(C)
Avenida N°251A AIA Tow T +85 F +85
A2 /51D2
Parsons Brinckerhoff (Asia) Ltd.
36 TD 453 ST T8B
36 TD 555
Maca Servic
055200 GS01
055200 GS01
ACS
8/F Grand Central Plaza, Tower 2, 138 Shatin Rural Committee Road, Shatin, Hong Kong T +852 3922 9000 F +852 3922 9797
36 TD 554 FE
CR2033
055200 GS01
GC00
AECOM
36 TD 057
STO
A5
Avenida Comercial de Macau, N°251A-301, AIA Tower 12° andar, Macau T +853 2832 2388 F +853 2832 3222
BOH ELEV LOBBY
078
S2-1B-C
P3
FOH CORR
36 TD 051
T-U
077
T +1 ( F +1 (
055200 GS01
Macau Professional Services Ltd.
SUITE
T +853 F +853 macau@ aedas.c
500 S. F Los Ang
055200 GS01
500 S. Figueroa Street Los Angeles, CA 90071 T +1 (213) 327 3600 F +1 (213) 327 3600
S2-1A-C
055200 GS01 E
Gensler
060
S3-5s
Estrada Esperan The Ven Executiv T +85 F +85
Avenida Centro 7 andar
055200 GS01
T +853 2875 5530 F +853 2875 5531 macau@aedas.com aedas.com
FE(C)
FOH ELEV LOBBY
Cotai Limited
055200 GS01
Avenida Xian Xing Hai No.105 Centro Golden Dragon 7 andar D, Nape, Macao
T-T
F
P3
HR/FE(C)
T-N
F
Estrada da Baía de Nossa Senhora da Esperança, The Venetian Macao Resort Hotel Executive Offices - L2, Taipa T +853 2882 8888 F +853 2888 3382
Project Title
P3
STAIR LANDING P3
T-V
Project Title
36 TD 991
VG VG
FLAT ROOF
055200 GS01 Status
FOR TENDER & CON
Status
FOR TENDER & CONSTRUCTION P3
K.5
SUITE
069
Zone
Zone
055200 GS01
E
P3
T-R
S3-1s
ACS
T-W
VEST
GC00
LOWEST MAIN LANDING
P3
36 TD 054
ARCHITECTURAL
ARCHITECTURAL
070
S3-3s
Discipline
055200 GS01
Discipline
SUITE
ACS
GC00
E
STAIR LANDING
Drawing Title
Drawing Title
A5
ST T6
CHEM/ DISH
STO
36 TD 551
FE
36 TD 553
SUITE 064
S2-3
P3
T-X
P3
T-S
FE
ELV
36 TD 451
TYPICAL DETAILS BOH STAIRCASE (SHEET 1)
PARTIAL GA FLOOR PLAN - LEVEL 36 - SECTOR TD Drawn by
Checked by
TSL / JACC
SHA / MPCC
ACS
GC00
Issue Date
1:100 @ A1
18.DEC.2015
A1 TYPICAL DETAIL OF STAIR
AED120054-00_TC-A_2036-TD AT LOWEST MAIN LANDING SCALE 1:10 Computer file AED120054-00_TC-A_2036
SECTOR
TD
Checked by
TSL / CKKT
ROW
AS SHOWN @ A1
Rev.
L
Drawn by Scale
LC / JY
Scale Drawing Number
A2 /51D2
Approved by
Drawing Number
A2 INTERMEDIATED HANDRAIL FIXING DETAIL FLOOR - MOUNTED SCALE 1:10
A5
TYPICAL DETAIL FOR BOH STAIR STEP SCALE 1:5
P | 08
AED120054-00_T
Computer file AED120054-00_TC-A_51D1 (STA
Disclaimer: Outsourced Renderings
Disclaimer: Outsourced Renderings
Aqu a
Gr av ity
09
To provide the city of Macau with a unique and sustainable icon for the Taipa waterfront. A landmark at the project location will act as a catalyst linking the Macau CBD with the Cotai Strip. Whilst, the development itself facilitate a non-gaming, but unique leisure shopping, F&B, entertainment, culture and ecological experience for the residents and visitors of Macau. The dynamic form of the tower directly interacts with witnesses from the Macau side and responses to all bridges linking to the Taipa side. Whilst respecting the adjacent sites and the project site, the project aims to be a new gateway into Taipa. A collaboration between two teams within Aedas, our team was responsible for the preliminary form and zoning studies, as well as programme planning and proposal.
Aedas Scope: Preliminary Design Proposal Year: 2015
Location: Macao, China Programme: Mix-Use Client: Henderson Land Development Company
P | 09
Disclaimer: Outsourced Renderings
Disclaimer: Outsourced Renderings
Disclaimer: Outsourced Renderings
C a m b o d i a Tw i n To w e r
10
The 600-meter-tall twin towers in this project will be one of the top 10 super high-rise towers. With a unique observation deck on 470m high, the development will be a stunning landmark for Asia and the world and help to enhance the position of Cambodia’s business and economic influence and bring great opportunity. The design proposal is the product of two teams within Aedas, my scope within the project includes very early stage preliminary design and visualization as well as preliminary building zoning and programme planning.
Aedas Scope: Design Proposal Year: 2015
Location: Phnom Penh, Cambodia Programme: Mix-Use Client: Thai Boon Roong Group
P | 10
Disclaimer: Outsourced Renderings
D re am
To w e r
11
Dream Tower Integrated Resort consists of two 38-story towers with 7-story podium. Casino Hotel Tower offers 748 guest rooms with four types and highest 38 floor offers observatory with panoramic 360 degree view towards ocean to Hanla Mtn. Hotel Residence Tower offers 850 guest rooms with two types. Podium offers multi use programs including general lobby/ porte cochere (1F), casino (2F), Retail/ R&N (3F & 4F), BOH (5F), Amentity/ BOH (6F) and Mechanical (7F). Roof of podium offers outdoor infinity swimming pool/ deck area with adjacent F& B programs. In collaboration with HBA, Aedas was contracted to be the BOH planner of the Dream Tower. My main scope was programme and circulation planning, as well as compiling and preparing presentation diagrams proposal booklet to the client.
Aedas Scope: BOH Programme & Planning Proposal Year: 2016
Location: Jeju, South Korea Programme: Hospitality - Casino Resort Client: Lotte Tour Developement Company
P | 11
12
Ramsey Solutions Headquarter
Ramsey Solution enlisted GS&P to provide architecture, interior design and civil engineering services for a new 204,000-square-foot, six-story corporate headquarters and 15,000-square-foot employee and customer amenity center, to be located on 47 acres in the Berry Farms development. GS&P’s project team set out to create a flexible, adaptable facility that embraces Ramsey’s spirit of fiscal responsibility and budget savvy while meeting the company’s future growth requirements. The headquarters and amenity center comprise the first phase of a multi-phase development. The space will feature two live broadcast studios and a variety of webinar, blackbox and podcast studios for the company’s broadcasts. Interior features include open workstations that can accommodate more than 1,000 Ramsey Solutions employees, ample access to daylight, and numerous indoor and outdoor spaces for team gatherings, lunches and devotionals. The connector will include an 800+ seat auditorium space, a dining facility and full-service kitchen, as well as a coffee shop and bookstore for visitors. By offering a broad range of settings for a variety of work styles, the space supports flexibility, connectivity and equality among team members. The team also introduced many amenities that will help the company to attract and retain top talent, develop and promote their public personalities, and foster professional development. My main scope within the project includes handling the imagery presentation of the project. From 3D modeling to finish renderings.
Gresham Smith and Partners Scope: Design Proposal Publication Renderings Year: 2017
Location: Franklin, TN, U.S.A Programme: Corporate - Office Client: Ramsey Solutions
P | 12
C i rcl e
S out h
13
The Circle South is a hotel project that includes Retail/ F&B as well as conventional centre. The project is at an early stage; hence details cannot be listed. I was given the responsibility for managing the presentation visualization of the project. I’ve excelled in pushing a new architectural imagery language within the Corporate + Urban Design Division in GSP, multiple options were provided to the team to choose from and the new language was well received within the team.
Gresham Smith and Partners Scope: Design Proposal Renderings Year: 2017
Location: Nashville, TN, U.S.A Programme: Hospitality - Hotel Client: -
P | 13
Š 2016 Stanley Leung - Chicago Cultural Center, Chicago, December 2016
Ar t Work
A
14
A | 14
912.507.7563 stanleyleungkc@gmail.com issuu.com/stanleyleungkc
Stanley Ka Chun Leung © 2018