CHERRY CHREEK NORTH
V i s i o n i n g B r a n d s E x p e r i e n c e s
DENVER COLORADO
Increase in sales revenue by 16%, year-over-year, in first year
CHERRY CHREEK NORTH
V i s i o n i n g B r a n d s E x p e r i e n c e s
DENVER COLORADO
First re-design in 20 years for a vital retail district
CHERRY CHREEK NORTH DENVER COLORADO
D E N V E R ,
C O L O R A D O
Cherry Creek North is known nationally as an outdoor, premier retail, dining, and mixed‐use area located just 5 minutes from downtown Denver. Our nearly 400 businesses that make up the District are independents to internationals (74% independent), featuring a broad range of unique fashion, jewelry and home furnishing stores, spas/salons, art galleries and restaurants. In addition to retail businesses, the District is also a national and regional office center, home to two hotels, and has a growing number of residents. In 2008, the Cherry Creek North Business Improvement District
C L I E N T
(CCNBID) in central Denver undertook the first major renovation of
CHERRY CREEK NORTH BID
the 16-block mixed-use retail area in 20 years. The CCNBID, one of
S C O P E
the most popular mixed-use retail destinations in the City, became
Conceptual Design Identity and Branding Signage and Wayfinding Lighting Desing Paving
the first Colorado business improvement district to issue its own bonds when it sold $18.5 million in debt to finance the project. “The New North” project included improvements to landscaping to beautify the area and conserve water, new pedestrian lighting to enhance nighttime safety and ambiance, a new system of wayfind-
C O L L A B O R A T I O N
ing, and a new visual identity for the District, improved parking with
Design Workshop PBQA NOLTE VERTICAL FIVE
. Sharing program, 20 SmartMeters, stations for Denver’s new Bike “Art Garden Places” that promote dwell time among shoppers, and improved event infrastructure to better host the Cherry Creek Arts Festival and other events. The final element was Fillmore Plaza, which has been redesigned as a hybrid plaza to enhance pedestrian, event and retail activity. Upgraded features include special trees and landscaping, lighting,
If you believe in the long-term value of connective and targeted design in service to your success, we can deliver.
environmental graphics, street furniture and a central canopy-like shade structure.
Contact
The new plaza will provide vehicular access and will also have the
DANIEL AIZENMAN Principal daniel.aizenman@stantec.com
ability to be closed off throughout the year for events such as the Cherry Creek Arts Festival, Sidewalk Sale, Cherry Creek North Food & Wine, and other CCN activities. The design and construction costs for the entire project were funded by the BID through the sale
P
303.625.0366
C
979.739.8422 1112 Pearl Street Boulder, CO 80302 USA
of its own bonds.
V i s i o n i n g B r a n d s E x p e r i e n c e s