Final Master Project presentation

Page 1

s

FMP

REACTIVATE THE ABANDONED reviving the liquid pattern along Naviglio Grande

MASTER IN URBAN VISION AND ARCHITECTURAL DESIGN 2012-2013 final master projects


ANASTASIA PUDYAKOVA Russia

Course Leader/Francesca Vargiu Scientific Advisor/Gianandrea Barreca Project Leader/Chiara Quinzii in sponsorship with Bayer Material Science, Lattonedil, Stiferite in partnership with Impossible living


ENERGETIC CONNECTOR bringing activities from past to future

This project offers a possible way for development of abandoned property, as well as the answer to the question about the relationship between architectural volumes and landscaped spaces, to create a new green area for leisure purposes along one of the most famous canal in Milan – Naviglio Grande. The aim of the project directed to revive existing abandoned lots and buildings by renovated and interpreted activities, coming from the past.


CONTEXT


CONTEXT/SITE LOCATION AND WATER SYSTEM NAVIGLIO MARTESANA

S.CRISTOFORO PORTA GENOVA F.S.

A

ADD

LA

NDE

RO

TI

MB

A NAVIGLIO GR

CI

NO GLIO

NAVI SE PAVE

The area is located in the south-western part of Milan. The site is a linear piece of land stretching from Porta Genova station until San Cristoforo station. The site bounded by water canal of Naviglio Grande and railway track. The Naviglio Grande was the most important of the Milan “navigli”.


CONTEXT/PAST/NAVIGLIO GRANDE/WATER USE

NAVIGATION

IRRIGATION

SPORT ACTIVITIES

1. Weight transportation (working period 1272-1979)

1. Preliminary planned for irrigation

1. Canoeing (Canottieri Milano founded in1890)

2. Passenger transportation

2. Watermill

2. Swimming (la Rari nantes founded in 1895) -”Cimento invernale”

swimming in cold water in january

-”maratona Abbiategrasso”

18 km marathon


CONTEXT/PAST/NAVIGLIO GRANDE/LAND USE

CASCINE

PROMENADE

LAUNDRY

1. Farmhouses this tradition gives the area a complex of environmental identity which is clearly perceived by people.

2. Public space as an element of urban space and opportunity for social relations and as limits of recreation space.

3. Daily work specific place or construction located close to the water


CONTEXT/FUTURE/PARCO EXPO 2015

S.CRISTOFORO PORTA GENOVA F.S.

EXPO 2015 project site

VIA D’ACQUA project site

The Via d’Acqua project will become permanent route through green areas, with pedestrian and cycling paths. This way will connect all the green zones from the Expo area to the city across the Naviglio Grande, generating one of the biggest urban park in Europe.


CONTEXT/FUTURE/VIA D’ACQUA AND CANALS SYSTEM NAVIGLIO MARTESANA

EXPO 2015

NAVIGLIO GRANDE

DARSENA NAVIGLIO PAVESE

O

BR

M

Project proposed redesign of canals, new ponds, fountains, etc. The waterway will be navigable from the dock and in the future navigation is up to the Expo site.

LA

LEGEND waterways included into EXPO park project covered canals irrigation network water basins


CONTEXT/DENSITY GRADIENT EXPO 2015

DUOMO PORTA GENOVA F.S. S.CRISTOFORO

LEGEND urban grain existing green area green area proposed to be redesign by EXPO 2015


CONTEXT/RAILWAY AND METRO SYSTEM

P.TA GARIBALDI

MILANO CENTRALE

CADORNA

PORTA GENOVA F.S. S.CRISTOFORO LEGEND metro line MM1 metro line MM2 metro line MM3 metro line MM4 metro line MM5 railway railway station projected railway railway planned to deconstruction

Another infrastructural border of the site is train track. It comes from suburban area and leads to one of the most central train station, Porta Genova.

4

MM

P.TA ROMANA

CANOTTIERI


ANALYSIS


ANALYSIS/PROJECT SITE PORTA GENOVA F.S.

S.CRISTOFORO

0 100 200 300 400 500m

satellite view


ANALYSIS/GENERAL INFORMATION total area ..........370 000 sqm built up area .....18 % empty area .......82 % length ................4 200 m width .......from..34 m..to..210 m

PORTA GENOVA F.S.

w

e vie

sit real

S.CRISTOFORO F.S.

ew

te vi

sche

c si mati

4,2 IGL

NAV

E

AND

R IO G

km


ANALYSIS/accessibility LEGEND tram line suburban train line bike line pedestrian pathway bus line public transport stops

PORTA GENOVA F.S. and MM2 CANOTTIERI F.S.

S.CRISTOFORO F.S. and MM4

5.

IO IGL

NAV

E

AND

GR

4. 2.

3.

1 km 0.3

0.5

km

2 km

1.

PEDESTRIAN BRIDGES 1.

2.

3.

4.

5.


ANALYSIS/BUILT UP AREA

tu hitec

arc

eter

erim ral p

5. parking plot + wall 4. warehouses 3. small residential buildings

DE

AN

R IO G

L

VIG

NA

2. empty area + high-rise buildings 1. spontaneous vegetation + construction designed by Aldo Rossi

FRAGMENTATION SAMPLES 1.

2.

3.

4.

5.


ANALYSIS/ABANDONED AND PARTLY USED BUILDINGS

tu hitec

arc

eter

erim ral p

5.P.ta Genova station 4. water tower 3. farmhouse

N

1.

RA

IO G

GL AVI

2. warehouse

E ND

1. construction designed by Aldo Rossi

2.

3.

4.

5.


ANALYSIS/FUNCTIONS

ra

ectu

it arch

er

imet

per onal

ti

func

5. transportation hub 4. parking area

ter

ime l per

3. commercial area 2. residential and sport area

L

VIG

NA

1.

DE

AN

R IO G

1. no function

2.

3.

4.

5.


ANALYSIS/PUBLIC FACILITIES LEGEND sport club market cafe/restaurant church train station

ra

ectu

it arch

er

imet

per onal

ti

func

5. transportation hub 4. parking area

ter

ime l per

3. commercial area 2. residential and sport area

L

VIG

NA

san cristoforo 1.

DE

AN

R IO G

1. no function

restaurant 2.

sport club 3.


ANALYSIS/USERS LEGEND

tourists residents sportsmen

eter

erim ral p

u

itect

arch

ti

func

er

imet

per onal

eter

rim s pe user

1.

2.

3.


ANALYSIS/SPORTSMEN TYPOLOGY LEGEND

rowers and swimmers cyclists and runners tennis players

eter

erim ral p

u

itect

arch

ti

func

er

imet

per onal

eter

rim s pe user

swimmers 1.

rowers 2.

runners 3.

cyclists 4.

tennis players 5.


ANALYSIS/SUMMARY positive architecture

_S.Cristoforo church as an architectural heritage _Naviglio Grande

negative _Built up typology does not allow to get full visual perception _Area is full

of ruins

_Existing lighting does not emphasize the site benefits

functions

_Sport development

_Half of area is not

nature

_Presence of additional water elements Presence of spontaneous gardening _A lot of green areas

_Absence of shadows

_Full of open spaces

_Partly the shape of area is very narrow _Area has no

spatial

_Green area is

used

not organized

visual connection

Accessibility

_High level of public transportation system _Sufficient amount of parking lots

_Existing pedestrian bridges located on the large distances _Area has no sidewalks


CONCEPT


CONCEPT/STRATEGY io n funct

renovation and interpretatio n

timeline

2015 EXPO

1179

Navigli system

NOWADAYS

1272-1979

navigation for commercial aims, irrigation, cascines

XIX-XX cen.

mostly unused and abandoned

FUTURE

energy efficient, sustainable urban landscape.

water dedicated for fishermen, swimmers, boats for excursions, for relaxation in a pleasant atmosphere.

In the past, the Naviglio Grande was in very wide use, and very popular among the local population for recreation and sports. Now, some activities still exist, but they need to be renovate and supplement by the other.


CONCEPT/PROGRAM WHAT ? 1. Bringing identity

HOW ? 1.

Reactivating abandoned building

+

set up new function + using sustainable design

2.

Reactivating empty space

+ 2. Bringing energy

creating agricultural area + creating linear park

1.

Developing dinamic landscape

+

creating additional water elements + improving green area

2.

Improving sport

+ creating new sport facilities + continuing existing bike line

3.

Attracting people

+ constructing new pedestrian bridges + improving public facilities


CONCEPT/PROGRAMM WHAT ? 1. Bringing identity

HOW ? 1.

Reactivating abandoned building

+

set up new function + using sustainable design

2.

Reactivating empty space

+ 2. Bringing energy

creating agricultural area + creating linear park

1.

Developing dinamic landscape

+

creating additional water elements + improving green area

2.

Improving sport

+ creating new sport facilities + continuing existing bike line

3.

Attracting people

+ constructing new pedestrian bridges + improving public facilities


CONCEPT/PROGRAM LEGEND

Urban food market

proposed reactivation point

View point

proposed reactivation area

Sport school and restaurant Rehabilitation sports center Park pavilion Aquarium and fishing club

4. Porta Genova station 3. farmhouse DE

LIO

VIG

NA

AN GR

2. service building and warehouse

1. construction designed by Aldo Rossi Filling area of energetic facilities related to the water, which will create the intensity and connect the city with the rest of its territory.

and water tower


CONCEPT/PROGRAMM FOR LAND REACTIVATION

WATER

+ SPORT

PRIVATE INVESTORS

Lands should be reactivated by investor, who will take care about the building. Area should contain public space with water bodies and sports ground.


CONCEPT/PROGRAMM FOR LAND REACTIVATION

WATER

+ SPORT

PRIVATE INVESTORS

Aquarium and fishing club - fishing farm/fishing ponds - sports ground/playground

Rehabilitation sports center and park pavilion - ponds/fountains - sports ground/playground

Sport school and restaurant - fountains/wetlands - sports ground/playground

View point and urban food market - streams/waterfalls - sports ground/playground


CONCEPT/COMPONENTS OR REACTIVATION AREA 1,2

2. Rehabilitation sports center

1. Aquarium and fishing club

wetlands

playground

and park pavilion

agriculture

ponds

green

sports ground

ponds

agriculture

playground

sports ground

green

fountains


CONCEPT/COMPONENTS OF REACTIVATION AREA 3,4

3. Sport school and restaurant

green

playground

wetlands

sports ground

4. View point and urban food market

agriculture

waterfalls

playground

fountains

agriculture

sports ground

fountains

green


PROJECT DEVELOPMENT


PROJECT DEVELOPMENT/AREA 2

canottieri san cristoforo canottieri olona canottieri milano

building for reactivation

satellite view


PROJECT DEVELOPMENT/AREA 2/FACILITIES

rowing

estetical center

swimming

tennis

basketball parking

?

canoueing cources

water polo

gym bar restaurant

diving

athletic soccer


PROJECT DEVELOPMENT/PROGRAM

rowing swimming

tennis

basketball

REHABILITATION SPORTS CENTER

water polo

diving

athletic soccer

Members of sports clubs are involved in international or local competitions. However inadequate fitness levels and skill or overuse can lead to injury. For this reason the existence of a center, where athletes can get a proper care, is highly desirable.


PROJECT DEVELOPMENT/PROGRAM FEASIBILITY

canottieri milano

REHABILITATION SPORTS CENTER

canottieri olona

WHy ? MOST COMMON ROWING INJURIES - low back pain + lumbar disk hermination - knee pain - rib stress fracture - extensor tenosinovitis of the wrist

canottieri san cristoforo

The center can be used by rowers and other athletes as well as people with problems of the spine and joints.


PROJECT DEVELOPMENT/REHABILITATION SPORTS CENTER/FUNCTIONAL ZONING

DIAGNOSTIC AND MANUAL therapy AREA

- treatment - massage - ultrasound ADMINISTRATION AREA

- offices - technical rooms - staff rooms

WET physiotherapy AREA COMMON AREA

DRY physiotherapy AREA

- playing room - physical exercises room

- cafeteria - resting area - circulation space

- aquatic terapy - hydroterapy - mineral bath

The functional areas are designed according to the necessary procedures required for rehabilitation after rowing injuries.


PROJECT DEVELOPMENT/TECHNICAL DRAWINGS/GROUND FLOOR LEGEND Common area

N-W N-E

1. entrance 2. cloack room 3. cafeteria 4. men’s changing room 5. women’s changing room 6. inner circulation space

20 19

Dry physiotherapy area

7. kinesitherapy room 8. multifunctional sports hall

18 17

A

A1

17

16 1

0,000

4

15

9

17 20

0 5 00

D

19

0,000

7

8

6

C 0 7 00

0,000

00 19 0

B 0 7 00 0 4 00

A

A2

1

S-W

0

4

0 4 00

2

12

0 4 00

3

0 4 00

4

0 4 00

5

0 4 00

6

0 4 00

7

0 4 00

8 A1

0 4 00

0 4 00 0 4 00 0 16 4 00 00 0 15 104 0 4 00 0 0 14 4 0 0 13 4 00 0 12 4 00 11 10 A 9

0 4 00

17

0 4 00

18

0 4 00

19

0 4 00

20

0 4 00

21

0 4 00

22

0 4 00

23

16

20m

0 4 00

0 4 00

24

25

LEGEND Wet physiotherapy area 9. entrance 10. hydromassage room 11. individual pool 12. individual pool 13. japanese bath 14. Kneipp bath 15. sauna

Administration area

S-E

8

3

5

21

17

A2

13

-1.250

18

21

-0.600

10 +0.750

18 N-W

14

12

11

16

2

0,000

S-W

18

18

16. staff room 17. staff changing room 18. technical room 19. storage 20. first aid room 21. office

0 4 00

26

27

N-E

S-E


PROJECT DEVELOPMENT/TECHNICAL DRAWINGS/FIRST FLOOR LEGEND Common area

N-W N-E

1. circulation area 2. waiting space

Diagnostic area

3. examination room 4. senior physician room

Treatment area

5. ultasound room 6. electrotherapy room 7. mineral bath room 8. acupuncture room 9. massage room

A

A1

A2 7

8 9

N-W 6 5

S-W 3

0 4 70

D

C 00 19 0

0 7 00

B 0 7 00 0 4 00

A

A2

1

S-W

0

4

0 4 00

2

S-E

8

12

16

20m

0 4 00

3

0 4 00

4

0 4 00

5

0 4 00

6

0 4 00

7

2 1

2

0 4 00

0 4 00 0 4 00 4 0 0 16 4 0 00 0 15 104 0 4 00 0 0 0 14 4 0 13 4 00 0 12 4 00 0 0 0 11 4 10 A 9 8

A1

0 4 00

17

0 4 00

18

0 4 00

19

0 4 00

20

0 4 00

21

0 4 00

22

0 4 00

23

0 4 00

24

0 4 00

25

0 4 00

26

27

N-E

S-E


PROJECT DEVELOPMENT/ DOUBLE HIGHT COMMON AREA


PROJECT DEVELOPMENT/TECHNICAL DRAWINGS/SECTIONS+DETAILS Section A2-A2

+8,520 +6,000

DET. A

multifunctional sports hall

wet physiotherapy area

DET. B

saunas

±0,000

4 000

1

4 000

2

4 000

3

4 000

4

4 000

5

4 000

6

4 000

7

4 000

8

4 000

9

4 000

10

4 000

11

4 000

12

4 000 4 000 104 000

13

DET. A (ventilated façade+window unit) OUT

IN

14

4 000

15

4 000

16

4 000

17

4 000

18

4 000

19

4 000

20

4 000

21

4 000

22

4 000

23

existing concreate block wall

IN

OUT

35

27

existing concreate block wall

pavement

inner wall finishing

floor heating system

window unit (8+14+8mm)

section A2-A2; details DET. A, B

26

50

waterproof membrane

100

25

4 000

STIFERITE SK PANEL 100mm

external cladding

90

24

4 000

DET. B (ventilated façade+ground) STIFERITE SK PANEL 100mm

150

4 000

floor slab

150 100

90


PROJECT DEVELOPMENT/SPORTS HALL


PROJECT DEVELOPMENT/TECHNICAL DRAWINGS/SECTIONS+DETAILS Section A-A

Section A1-A1

DET. C

+5,200 +3,740

reception

+8,520

+8,520

+6,000

+6,000

+0,200

+3,000

staff changing

+3,000

DET. D

±0,000

±0,000

5 000

7 000

5 000

7 000

7 000

19 000

D

C

19 000

B

A

D

DET. C (roof structure)

C

B

A

DET. D (north-west wall structure)

OUT

roof window

OUT

IN

metal profile

window unit

LATTONEDIL SOLARPAN PLUS 120mm

windowsill 20mm

existing steel beams 50mm

plaster STIFERITE SK PANEL 100mm

37

waterproof membrane

waterproof membrane existing concreate block wall

120

50

IN

inner wall finishing inner roof finishing

existing roof steel structure

sections A-A, A1-A1; details DET. A, B

7 000

100

150


PROJECT DEVELOPMENT/NORTH-EAST CORNER VIEW


PROJECT DEVELOPMENT/TECHNICAL DRAWINGS/ELEVATIONS North-west elevation

4 000

27

4 000

26

4 000

25

4 000

24

4 000

23

North-east elevation

4 000

22

4 000

21

4 000

20

4 000

19

LATTONEDIL SOLARPAN PLUS 120mm

4 000

4 000

4 000

4 000

4 000

4 000

4 000

18

4 000

17

4 000

16

4 000

15

4 000

14

4 000

13

4 000

12

4 000

11

10

4 000

4 000

4 000

4 000

4 000

4 000

4 000

4 000

9

4 000

8

4 000

7

4 000

6

4 000

5

4 000

4

4 000

3

4 000

4 000

4 000

4 000

4 000

4 000

4 000

4 000

4 000

2

7 000

1

A

7 000

B

5 000

C

D

STIFERITE SK PANEL+STEEL SHEETS for VENTILATED FAÇADE

STIFERITE SK PANEL 100mm

DOUBLE GLAZING (8mm+8mm+8mm) + inner shutter

4 000

4 000

4 000

4 000

4 000

4 000

5 000

7 000

7 000

19 000

1

2

3

4

5

6

South-east elevation 0

4

8

12

16

20m

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

D

C

B

A

South-west elevation


PROJECT DEVELOPMENT/VISUALIZATION


PROJECT DEVELOPMENT/PHASE 1/MASTERPLAN and ACCESSIBILITY

alc cav

LEGEND 1. fountain alley 2. play ground 3. sports ground 4. ponds 5. urban beach 6. parking green area water existing trees new trees road bike line walkway

ro

ata

Priv

il Mo

0 10 20 30 40 50m

lino

tel uin

oG

em

y

gli

Gu

ada Far

via

1

Gra

via

o ovic

od

via L

N

nde

2

ta lk rain s in wa 10 m ristoforo t to S.C

i

lzaia

aA strad

lio avig

Na

e→

rand

oG vigli

ilan oM

5 4

tion

enz Lor

1

no

1

3

6

eva -Vig

i

ay M

railw

lk in wa 15 m 4 stop to MM

6 2

lano

on aD

avi

2

walk 5 min /tram stop s to bu


PROJECT DEVELOPMENT/AREA 2/SECTIONS Section 1-1 walkway

water transport stop/resting platform

agricultural fields

sports ground

existing sidewalk pond

Naviglio Grande 19.50 m

1.80 m

7.00 m

14.50 m

2.70 m

12.00 m

1.00 m

Section 2-2 agricultural fields

playground

water fitness center

central alley

urban beach

fountains existing road

Naviglio Grande 13.00 m

8.00 m

18.80 m

5.00 m

5.00 m

11.20 m

12.00 m


PROJECT DEVELOPMENT/AREA 2/MASTERPLAN LEGEND 1. rehabilitation sports center 2. park pavilions 3. sport clubs

3

1

2

The organic layout of vegetal mass has been turned into geometrical patterns. These patterns are able to change size and proportions to accommodate new plants, water or functions.


PROJECT DEVELOPMENT/AREA 2/MASTERPLAN/PHASES

PHASE 3

PHASE 1

PHASE 2

PHASE 1: area adjacent with the Rehabilitation center must be reactivated by the building owner and contain required components such as: water elements, open sport facilities and public green area. PHASE 2: area adjacent with the park pavilions can be asked to be reactivated by the local population and enthusiastic gardeners and contain components such as: water elements and agricultural area. PHASE 3: area belongs to existing sport clubs and residential buildings can be asked to be reactivated by themselves and contain components such as: water elements and public green.


PROJECT DEVELOPMENT/ACTIVE LEISURE AREA


PROJECT DEVELOPMENT/ACTIVE LEISURE AREA


THANK YOU


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.