1 minute read
PROJECT 2 – ‘The Plaza
ST DUNSTAN’S 2021 FUTURE DEVELOPMENTS
There are three projects which we would love to complete by September 2021, whilst we still have contractors on site. If we can fundraise sufficient money to deliver these projects, it would prove significantly less disruptive to the pupils and far more cost effective.
PROJECT 1 –The Performing Arts Centre (PAC)
1
Built on the footprint of the old Design and Technology workshops and Science Block, we have plans to build a fabulous new theatre, music practice rooms, recital room and rehearsal studios.
Cost – £1m
2
3
PROJECT 2 – ‘The Plaza’
We would like to landscape the centre of our College into a captivating outdoor hub, where a parade square for the CCF doubles up as a performance venue, with recreational seating positioned within trees and gardens, and where a bandstand and outdoor theatre supports our Performing Arts Department and annual Summer Festival.
Cost – £1m
PROJECT 3 –The Sport and Leisure Centre
Our Stanstead Road site needs expanding and enhancing. The designs see the relocation of Fives into the heart of this building and dramatically improve the changing facilities and classrooms.
Cost – £2m