Multiline 150 Fascia Setout Guide

Page 1

Multiline 150 Fascia Set Out Details - Metal Roofs

Soffit bearer fitted to RH side of rafter viewed facing the building

IMPORTANT Leave off the bottom purlin or batten until fascia is fitted. To avoid bird-proofing problems it should just clear the fascia.

Framing Drop Height

Fascia Drop Height

10mm Clearance

Soffit width - 5mm

Gable End Detail

10mm Clearance

15mm


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.