CONSTRUCTION PORTFOLIO stefan_van heerden
2192396
CONTENTS project_1.4 project_1.4_rework project_2.5 + sketch design project_3.1 & 3.1 rework project_3.2 & 3.2 rework
TSITSIKAMMA SHELTER project_1.4
TSITSIKAMMA SHELTER PROCESS WORK
Process Work - Project 1 - Tsitsikamma Shelter
PAGE 6
PAGE 7
PAGE 8
PAGE 9
1:50 STRUCTURE MODEL
TSITSIKAMMA SHELTER project_1.4_final submission
1 4
A
RENOSTERVELD
A
191
B
SITE ACCESS TO
190
4823
1
KWIKOT 150l, insulated on the exterior with geyser blanket
189
2 3373
JoJo Slimline Water tank mounted on a platform (supply water Hot/Cold)
3
exterior insulated electric geyser for storing heated water. solar panel heats up water within geyser
16.83°
2
188
3
1687
0.5mm dove grey chromadek 686 CORRUGATED roof sheeting
1686
1
indiginous forest
6 Green = Waist water/grey water
7
reverse osmosis system built within the counter top(refer to diagram on page 2)
2851
5
solar module for generating electricity, providing electricity for fixtures and the exterior geyser
1267
JoJo Slimline Grey Water storage tank mounted on a low platform
1584
23.53°
616
4
616
187
Red = hot water from geyser (⌀22mm UPVC pipe) Blue = Supply water from storage tank (⌀22mm UPVC pipe)
4823
4 186
5 6
185
7
Green = Grey water from fixtures (⌀50mm UPVC pipe) Grey water used recycled and will flow into sub surface emmitters under the surface and interact with the roots of nearby plants, working as soil water
A
B
184
N
INDIGENOUS FOREST
1
1
Site Plan
4
A 12:00 PM
1 : 100
Note for Drawings: 5:25 PM
W
N
Purpose of issue: Working Drawings
restricted zone
General Notes(for all sheets): 1. FIGURED DIMS ONLY NO-SCALING 2. WORKS TO COMPLY WITH SABS BUILDING 7:33 AM
renosterveld
ACCESS PLATFORM SHELTER
30 June
REGULATIONS 3.CONTRACTORS RESPONSIBILITY TO VERIFY ALL
RESERVE PATHWAY S
LEVELS, HEIGHTS AND DIMENSIONS ON SITE.
E
4. READ IN CONJUNCTION TO ENGINEERS DRAWINGS, PLUMBERS SPECIFICATIONS AND
2 4
Locality Plan 1 : 5000
river
Client Details:
Tsitsikamma Nature Reserve (EC) STEFAN VAN HEERDEN
indigenous forest
ELECTRICIANS SPECIFICATIONS.
Sun Path (WINTER)
Site Plan (Roof Plan)
F. Joubert (087 543 8890)
2192396
1
TIMBER SHELTER
2020/06/03 9:52:22 AM
N
A
-149
B
REVERSE OSMOSIS SYSTEM (stage 5) AND FAUCET DIAGRAM (installed in cupboard to purify water)
ACCESS PLATFORM to reserve park pathway
7.
5004 4823
1539
30
1
2912
205
27
27
timber deck
4823
A
Ground Floor Plan 1 : 50
1. 2. 3. 4. 5. 6. 7. 8.
Sediment pre-filter Carbon block Carbon block (2) TFC membrane Carbon post filter
Sink Hot water line Cold water line 6mm tubing from feed RO component (Sediment prefilter, Carbon block) Bladder tank Long Reach drinking faucet Grey (used) water
3676
3373
1686 1687 616
4 5 3162
10201
2
6
1584
190
205 ⌀50mm grey water pipe
1. 2. 3. 4. 5.
1 4
4998
Note for water supply system (hot/cold): Rain water will be captured on the roof, the un-purified water will travel from the gutter to the JoJo SLimline water tank, the water will then move from the water tank into the osmosis system or into the exterior geyser, the solar panel will be used to heat up the water within the geyser, Refer to plumber and wet service engineer specifications.
900 SA PINE timber railing, basic detailing for post and handrails
A
B
7
STEFAN V HEERDEN Ground Floor Plan
2192396
2
TIMBER SHELTER
2020/06/03 9:52:22 AM
whb
COMPONENTS:
3
grey water connected to grey water tank for repurpusing (⌀50mm UPVC pipes) Reverse osmosis system built into the counter top for water purification (Midea 5 Stage Complete Water Filtration System, refer to diagram in the top right corner)
sh
190
5.
STAGES:
2851
8 m² FFL +0000 TIMBER DECK KNOTTY PINE CEILING
114 x 50 SAP WALL STUD @ 600 centres
s
N
1
1631
⌀22mm warm water supply pipe
wc
27
6952
6649
6649
Kitchenette 2661
2661
4 m² FFL +0000 TIMBER DECK KNOTTY PINE CEILING
1618
Grey water used recycled and will flow into sub surface emmitters under the surface and interact with the roots of nearby vegetation, repurposed as soil water
190
Ablution
KWIKOT 150l, insulated on the exterior with geyser blanket, mounted on the wallface
114 x 114 SAP column supports box gutter (refer to detail on page 6)
1565
7
⌀22mm water supply pipe
190
Grey water connected to grey water tank for recycling (green) JoJo slimline grey water storage tank mounted on a low platform, refer to elevation
box gutter overhead
1593
100mm mineral wool insulation
FFL +0000 TIMBER DECK KNOTTY PINE CEILING
timber deck
Natures Head Dry composting toilet (Sepreated liquids and solids used for fertilization) toilet wont recquire vent stack
6
exterior insulated electric geyser for storing heated water. solar panel heats up water within geyser
28
18 m²
312 304
3798
3798
Living Room
190
5
6.
1 adjustable timber louvers mounted on the exterior (refer to detail on page 6) galvanised (bent sheet metal) BOX gutter overhead at a slope to redirect water into water tank
4634
8
4.
1267
190
0
10214
4
8.
31
6
28
S 1.
20mm timber deck (floor finish, interior and exterior)
VCL
JoJo Slimline Water tank mounted on a platform storing cold water (supply water Hot/Cold, blue and red) use of, ⌀22mm UPVC pipes)
3.
S
205
31
Sliding windows to be installed, preventing interferance with shading timber louvers
3
1578
1593
timber deck
Breathable membrane
2
900mm SA PINE timber railing, basic detailing for post and handrails
-15
114 x 114 SAP column (refer to A1, A3, A5, A7, B1, B3, B5 and B7)
1
A
4
SAP facia board on the corners to create weather proof seal where cladding meets
timber deck
1500
1
exterior louvers bolted onto wall stud (refer to detail on page 6)
2.
Note for electricity production and fixtures: Electricity will be produced by solar panels located in the roof, this will power all electrical components as reqcuired. Refer to electrician specifications
1
A
A
4
B
4823 619
619
619
619
619
619
619
Note for heights of SAP posts (from steel connection to OSB): A1 = B1 = 698mm A2 = B2 = 934mm A4 = B4 = 1230mm A6 = B6 = 1501mm A7 = B7 = 1745mm
619
114 x 50 SAP JOISTS @ 620 centres below floor structure (OSB/TIMBER DECK refer to detail on page 7)
Foundation and Plan 1 Substructure 1 : 50
3676
Stefan van Heerden 1 4
A
B
Foundation & Sub- Plan
2192396
3
TIMBER SHELTER
10214
6839
1687 616
1584
7
4823
A
6
2020/06/03 9:52:22 AM
N
4
SAP JOIST SEGMENTS (2)
114 x 152 SAP post connecting to concrete pier with bolted steel connection 228 x 50 SAP bearer bolted to SAP post resting within rebate (refer to page 8 for detail)
600
200 200
7
600
3162
114 x 50 SAP bracing connecting between SAP joists and SAP post transfers loads from walls and gutter to foundation refer to: A1, B1, A4, B4, A7 and B7 Bracing connected by a bolted connection
6
3
5 2851
5
1687
timber joint for joists 114 x 114 SAP BEAM (refer to page 7 for detail )
312 304
3
2
2
1584
4
1267
1
10214
3
1687
114 x 50 SAP bracing connected with a bolted connection between joist and post refer to page 7 for detail of connection
616
SAP FACIA board to protect joists and floor structure from moisture at both ends 228 x 50 SAP bearers to support the spanning structure of the joists, between column grids 1,3 and 5,7 Below joists
1267
2
SAP JOIST SEGMENTS (1)
5363
CONCRETE PIER @ MIN 15MPA @ 28 das, 200 x 200 x 400mm to engineers specifications
4851
1686
CONCRETE PAD FOUNTATION @ MIN 15MPA @ 28 days, 600x600x200mm to engineers specifications
1686
1 1686
1
1
2
3
4
5
6
7
6839 1686
1687
1686
616
1990
6
6
1579
1584
Eurolux O403 Silicon Solar Module 75 x 50 SAP purlins @ 1500 centres
4310 Wall Plate Height
vapour control layer
1 handle for operating horizontal louvers (refer to detail on page 6)
8 m²
galvanised box gutter, sloped for water transfer into water tank
7
FFL +0000 TIMBER DECK KNOTTY PINE CEILING
28
1
30
6
900 SA PINE timber railing, basic detailing for post and handrails
Living Room
4
18 m² FFL +0000 TIMBER DECK KNOTTY PINE CEILING
platform from nature reserve parthway
813 x 2134 Timber door reverse osmosis system built into cupboard to purify water (refer to diagram on page 2)
Bottom of lintel 2134
Ground Floor Plan ⌀50mm grey water pipe ⌀22mm water supply pipe
0 20 mm timber deck (interior and exterior floor finish) 100mm mineral wool insulation
ES
2 7
2365
7
⌀22mm warm water supply pipe
OR SE RVIC
Bottom of box gutter
900 SA PINE timber railing, basic detailing for post and handrails
s
FFL
AREA F
3960
4310
W5 Kitchenette
114 x 50 SAP beam 100mm mineral wool insulation 20mm plywood finish on interior shiplap cladding for exterior finish 2816 x 380 timber window vapor control layer 114 x 50 SAP lintel over door
3960
16.83°
32
38 x 38 SAP brandering @ 400 centres 76 x 19 timber cornice Knotty pine ceiling board breathable membrane
23.53°
0.5mm dove grey chromadek 686 CORRUGATED roof sheeting
3
TIMBER JOINT FOR JOISTS (refer to page 7 for detail)
7
NGL
1
Section A-A 1 : 50
STEFAN V HEERDEN Sections A-A
2192396
4
TIMBER SHELTER
2020/06/03 9:52:24 AM
3960
Roof Ridge
152 x 50 SAP rafter @ 600 centres
350
2
1584
350
1
1267
1
2
3
4
5
6
A
7
1 4
B
A
4823 6839 1686
1687
304312
1267
1584
205 mm SAP facia board
Roof Ridge JoJo slimline water tank for rainwater storage (downpipe from gutter leads directly into tank.
4310 23.53°
0.5mm dove grey chromadek 686 CORRUGATED roof sheeting
W5
16.83°
205 mm SAP facia board 15 x 94 shiplap cladding
Bottom of box gutter
SAP facia board on the corner of the wall to provide seal where cladding meets 900mm SA PINE timber railing, basic detailing for post and handrails
2365
27
exterior geyser
27
Bottom of lintel 28
27
2134
1
timber railing
s s
⌀22mm water supply pipe
⌀22mm warm water supply pipe
⌀50mm grey water pipe
NGL
Ground Floor Plan 0
1
SAP FACIA board to protect joists and floor structure from moisture at both ends
4
timber railing
JoJo slimline water tank for grey water storage
JoJo Slimline Water tank mounted on a platform
1
A
NGL
West 1 : 50
JoJo Slimline Grey Water storage tank mounted on a low platform
Grey water used recycled and will flow into sub surface emmitters under the surface and interact with the roots of nearby vegetation, repurposed as soil water
2
South
STEFAN V HEERDEN Elevations 1
1 : 50
2192396
5
TIMBER SHELTER
2020/06/03 9:52:24 AM
4310
timber louvers on exterior (refer to detail on page 6)
1
0.5mm dove grey chromadek 686 CORRUGATED roof sheeting
20 mm PLYWOOD
VAPOUR MEMBRANE
Breather membrane
galvanised roofing screws
galvanised roofing screws
205mm SAP FACIA board
76 x 50 SAP PURLIN @ 1500 centres
15 x 94 SHIPLAP cladding (exterior finish)
100mm MINERAL WOOL insulation
100mm ISOTHERM insulation
114 x 50 SAP LINTEL
3
76 x 50 SAP PURLIN @ 1500 centres
4
5
304
vapour membrane 152 x 50 SAP RAFTER @ 600 centres
38 x 38 SAP brandering @ 400 centres
38 x 38 SAP BRANDERING @ 346 centres Knotty pine ceiling nailed to 38 x 38 SAP brandering 76 x 19 TIMBER CORNICE 100mm MINERAL WOOL insulation
38 x 38 SAP BRANDERING 114 x 50 SAP WALLPLATE @ 346 centres 30 mm PLYWOOD Knotty pine ceilingboard nailed to (3) 38 x 38 SAP brandering 76 x 19 TIMBER CORNICE 30 mm PLYWOOD 20mm PLYWOOD 228 x 50 SAP BEAM Vapor control Layer spans from wall to wall 20mm OSB Adjustable timber louvers attached 38 x 38 PINE BRANDERING with a rod that is inserted within the wall rod reaches the floor level, can be operated by hand to open and close 6mm Knotty pine ceiling board the horizontal louvers (refer to page 4) 114 x 114 SAP COLUMN within wall stucture 50 X 114 SILL TRIMMER
308 x 2800 TIMBER WINDOW (sliding window)
operated by handle
THREADED ROD FASTENEDS BY NUTS, NUTS LOCATED WITHIN STRUCTURE OF THE LOUVER AND OSB ON THE INTERIOR
OPERABLE TIMBER LOUVERS OPERATED BY HAND
DETAIL OF ASSEMBLY FOR VERTICAL LOUVERS SCALE 1:25
AT APEX
APEX DETAIL
76 x 50 SAP PURLIN @ 1500 centres
312
152 x 50 SAP RAFTER @ 600 centres rafter attached to rebate within wall
152 x 50 SAP RAFTER @ 600 centres rafter inserted into wall
114 x 50 SAP BEAM
10 mm ZINC BOX GUTTER (1) 38 X 114 sap BEAM
114 x 50 SAP BEAM cut in a wedge shape, enables gutter to rest on beams (2) refer to diagram 30 mm PLYWOOD
VCL
BOX GUTTER DETAIL (SECTION A-A)
1
SCALE 1:10
2 3
AT BOX GUTTER
SCALE 1:10 228 x 50 SAP BEAM
THREADED ROD FASTENEDED BY NUTS, NUTS LOCATED WITHIN STRUCTURE OF THE LOUVER AND OSB ON THE INTERIOR
SAP FACIA BOARD
DIAGRAM EXPLAINING THE CONNECTION BETWEEN THE RAFTERS AND THE W ALL STRUCTURE
114 x 50 SAP BEAM galvanised gutter mounts onto indicated beam
DETAIL OF ASSEMBLY FOR HORIZONTAL LOUVERS SCALE 1:25
0.5mm dove grey chromadek 686 CORRUGATED roof sheeting galvanized box gutter(bent sheet metal) 228 x 50 SAP BEAM SPANNING WIDTH OF SHELTER (2x beams to ensure sufficient strenght in span) 114 x 114 SAP COLUMN
0.5 mm corrugated roof sheeting
30mm PLYWOOD 100mm MINERAL WOOL INSULATION 76 x 19 timber cornice
galvanised box gutter 30mm PLYWOOD
O
38 x 38 SAP BRANDERING
I
6mm KNOTTY PINE CEILING BOARD
114 x 50 NOGGING
BOX GUTTER CONNECTION WITH WALL DETAIL - AXO
114 x 50 SAP COLUMN 20mm OSB 20mm PLYWOOD 15 x 94 SHIPLAP CLADDING
Note: 114 x 114 Columns within wall supports the box gutter, 30mm plywood is inserted within the wall above the columns. 228 x 50 beams span across the structure to the adjacent load bearing wall. Box gutter is also supported by the ablution wall, refer to floor plan.
DIAGRAM EXPLAINING THE ASSEMBLY OF THE BOX GUTTER (1) W ITHIN ITS ENCLOSURE, GUTTER FASTENED TO W EDGED BEAM(2), W EDGED BEAM FASTENED TO PLYW OOD (3)
114 X 114 sap COLUMN
BOX GUTTER TO WALL CONNECTION DETAIL SCALE 1:10 STEFAN VAN HEERDEN CALLOUT DETAILS 1
2192396
6
TIMBER SHELTER
2020/06/03 9:52:25 AM
20 mm OSB
0.5mm dove grey chromadek 686 CORRUGATED roof sheeting galvanised roofing screws Breather membrane
1 1 100mm MINERAL WOOL insulation Breather membrane
Vapor control layer
15 x 94 SHIPLAP CLADDING exterior finish
20mm OSB 15 x 94 SHIPLAP cladding
20mm PLYWPOOD interior finish 114 x 50 SAP head trimmer
20mm PLYWOOD
I
114 X 50 SAP BEAM
20 mm TIMBER deck
114 x 50 SAP JOIST
114 x 50 SAP lintel adjustable timber louvers (refer to page 7 for detail)
813 x 2032 TIMBER door O
VCL 15 mm OSB
20 x 75 MERANTI ARCHITRAVE
20mm TIMBER DECK
813 x 2032 TIMBER DOOR
100mm MINERAL WOOL insulation 20 mm OSB
114 x 50 SAP JOIST 228 x 50 SAP BEARER 114 x 152 SAP POST
Bolted connection between post and bearer M10 bold with M10 nut fixed with a washer
LINTEL ABOVE DOOR DETAIL SCALE 1:10
4
FLOOR TO WALL CONNECTION SCALE 1:10
114 x 50 SAP BRACING 114 x 152 SAP POST
1. 114 x 50 SAP JOIST
threaded rod glued into post fixed with nut
Bolted connection between SAP bracing and SAP post, M10 bolt with M10 nut, fixed with washers.
1
CONCRETE PIER @ MIN 15MPA @ 28 das, 200 x 200 x 400mm to engineers specifications
threaded rod cast-in-place
DIAGRAM SHOW ING ASSEMBLY OF SAP BRACING AND SAP JOIST, M10 BOLT, M10 W ASHER FIXED W ITH M10 NUT
304
312 I
timber joints sits ontop of bearer O
REBATE
200
114 x 152 SAP POST
600
FOOTING AND POST DETAIL SCALE 1:10
DIAGRAM SHOW ING ASSEMBLY OF BEARER AND POST, BEARER FIXED TO POST W ITH NUTS AND BOLTS, W HILE RESTING IN REBATE
TIMBER JOINT FOR JOISTS DETAIL SCALE 1:10 STEFAN VAN HEERDEN CALLOUT DETAILS 2
VCL 15mm OSB 2 114 x 50 SAP JOIST @ 600 CENTRES 20mm OSB 114 x 152 SAP POST Bolted connection between post and bearer, M10 bolt with M10 nut, fixed with washer
1
228 x 50 SAP BEARER
114 x 114 SAP BEAM REBATE TO SERVE AS RESTING JOINT FOR JOISTS TO COVER + 10 METER SPAN
20mm TIMBER deck 3
114 x 114 SAP POST
100 mm MINERAL WOOL INSULATION
400
5
616
DIAGRAM SHOW ING ASSEMBLY OF JOISTS W ITH REBATE IN BEAM
CONCRETE PAD FOUNTATION @ MIN 15MPA @ 28 days, 600x600x200mm to engineers specifications
NGL
4
2
3 4
M10 NUT AND M10 WASHER metal round section for connection between SAP post and CONCRETE pier
3
2192396
7
TIMBER SHELTER
228 x 50 SAP BEARER RESTS WITHIN REBATE CUT INTO SAP POST 2020/06/03 9:50:08 AM
2. 114 x 50 SAP JOIST 3. 114 x 114 SAP BEAM (REBATE) 4. FIXED TOGETHER WITH SCREWS
TSITSIKAMMA SHELTER project_1.4_rework
SITE ACCESS TO
tel: 0784325590
GENERAL NOTES
184
1
3
2
185 186
1686
1687
616
6
7 solar module for generating electricity, providing electricity for fixtures and the exterior geyser
2851
616
3373 KW IKOT 150l, insulated on the exterior with geyser blanket
5
4
1584
1267
Occupancy:
H2
Design occupancy time
24 per day
7 days/week 52 weeks/year
exterior insulated electric geyser for storing heated water. solar panel heats up water within geyser
reverse osmosis system built within the counter top(refer to diagram on page 2)
Net floor area
B
B
30sqm
Lighting and power MAX energy demand
150 W/sqm
MAX energy consumption
375 kwh/sqm
1. All windows areas to be 10% of floor area of which 50% is openable. 2. Read figured dimensions in preferance to scaling. 3. All levels dimensions, heights of plinths, depths of excavations and number of steps to be finally checked and determined by contractor on site. 4. Drawings prepared on basis of surface examination on site. Walls below ground level. 5. Recommended - AB's over all windows and doors without fanlights. 6. Recommended - 2AB's to W.C's bathrooms, kitchens and servants rooms. 7. Obscure glass to servants room WC's amd bathrooms. 8. All handrails to be min 1,000mm high, ballister max 100 ccs NOTES 5 AND 6 ARE RECOMMENDED Quality of all materials and workmanship to comply with the relevant S.A.B.S specification and shall comply with the minimum standard specified in the Standard Preambles in the bills of Quantities or, in the absence of a bill of quanitities, available for perusal at the offices of the Architects. A project specification document will be issued by the Architects to elaborate on the preambles. Where the contractor finds these two documents to be conflicting this must be brought to the architect's attention before doing the work. The contractor is responsible for correct setting out of the buildings, all external and all internal walls with particular reference to boundaries, building lines, etc. The contractor is to verify levels, heights and dimensions on site and to check same against the drawings before putting any work in hand. Any discrepencies from the theoretical to be brought to the architect's attention. The contractor and all Sub-contractors are to check the details shown on this drawing for compliance with standards of best building practice (which is what is expected to be delivered) with particular reference to special requirements necessitated by local and/or on site conditions and to report any comment to the Architect. The contractor is to locate and identify existing services on site and to protect these from damage throughout the duration of the works. Any errors, discrepancies or omissions on this drawing are to be reported to the Architect immediatly.
A
A
187
1
4823
11
188
23.53°
16.83°
4823
1
The Contractor is to build in approved DPC's whether or not these are shown on drawings, to all external walls at each floor, beam or parapet level and to all windows, doors, grilled or other opening in external walls. Cavity walls to have stepped DPC's. Any quaries arising from the above must be reported to the Architect for clarification before any work is put in hand. This drawing is not to be scaled. Figures to be used at all times. Where figured dimensions are given, this must be confirmed by the Architect. Burnt clay bricks in compliance with relevant S.A.B.S code only shall be used unless specific approval is obtained from the Architect for the use of alternative type of brick.
11
Blue = Supply water from storage tank (⌀22mm UPVC pipe)
189
DRAINAGE NOTES 1. No drainage bends or junctions below floors. 2. Bends and junctions in drains to be fitted with C.E's and I.E's with marked covers at ground level. 3. Drains under building to be adequetly protected against load. 4. Waste pipes to have reseal traps and to be fully accesible over full length. 5. Bathwast 50mm internal diameter basinwaste 50 mm internal diameter. 6. Gulleys at kitchens to have a cw tap over. 7. All surfaces to comply with NBR's.
A
A
Green = Grey water from fixtures (⌀50mm UPVC pipe)
Extensive planted roof
Red = hot water from geyser (⌀22mm UPVC pipe)
PROJECT AND CLIENT DETAILS
JoJo Slimline W ater tank mounted on a platform (supply water Hot/Cold)
Grey water used recycled and will flow into sub surface emmitters under the surface and interact with the roots of nearby plants, working as soil water
190
TIMBER SHELTER FOR TSITSIKAMMA NATURE RESERVE (ISSUED FOR CONSTRUCTION)
JoJo Slimline Grey W ater storage tank mounted on a low platform
191
General Notes(for all sheets):
1
2
3
4
5
6
2
7
Locality Plan
1. FIGURED DIMS ONLY NO-SCALING 2. WORKS TO COMPLY WITH SABS BUILDING REGULATIONS 3.CONTRACTORS RESPONSIBILITY TO VERIFY ALL LEVELS, HEIGHTS AND DIMENSIONS ON SITE.
1 : 5000
4. READ IN CONJUNCTION TO ENGINEERS DRAWINGS, PLUMBERS SPECIFICATIONS AND ELECTRICIANS SPECIFICATIONS.
RENOSTERVELD
N
restricted zone
AREA CALCULATIONS Kitchenette - 8 sqm Living room - 18sqm Bathroom - 4sqm
renosterveld
ACCESS PLATFORM SHELTER
RESERVE PATHWAY
SITE PLAN 1:100 indigenous forest
Summer solstice: 21 DEC at 13:00 Winder solstice 21 JUNE at 13:00 Spring quinox = 22 SEPTEMBER at 13:00
Summer solstice: 21 DEC at 13:00 Winder solstice 21 JUNE at 13:00 Spring quinox = 22 SEPTEMBER at 13:00
river
Total area - 30 sqm
DRAWING NUMBER :
D-543-03-20
DATE
:
2020 / 04 / 01
CHECKED BY
:
J VH
DRAWN BY
:
S VAN HEERDEN
APPROVED BY DATE :
2020 / 05 / 29
ENIGNEER SIGNATURE:
.......................
OWNER SIGNATURE :
.......................
SCALES USED SHEET
: :
1:100 1:5000 1 of 7
COUNCIL DRAWINGS + sketch design project_1.2 & project_2.5
Sketch design - Project 1.2 ARPL 2000(A):
0m
2009
10m
All staircases, Roof and floor slabs according to engineers detail
15800
2
3
4
5
6
2192396
STORMWATER KERB INLET
existing sidewalk
GENERAL NOTES
new driveway
RWDP
timber pergola
Horizontal timber shading device
UP
extensive planted roof subsoil rain water harvesting
FALL
gulley
IE
900mm steel railing
UP
RE
100mm PVC-U gutter
RWDP
RWDP
ROOFLINE
1193
disabled parking
7181
RWDP
2m X 1m PHOTOVOLTAIC CELLS PLACED ON ROOF FOR ELECTRICITY PRODUCTION AND POVIDING ELECTRICITY FOR GEYSERS
ROOFLINE
RWDP
2000
SEWER MH INVERT LEVEL: 1459.5m
exterior shading louvers RWDP
A
NEW WORKSHOP
:
107m2
NEW LOADING BAY
:
11m2
NEW WORKSHOP MANAGERS OFFICE
:
10m2
NEW WELDING AREA
:
16m2
NEW BULK STORAGE
:
17m2
NEW STAFF TOILET
:
17m2
NEW GROUP INSTRUCTION AREA
:
50m2
NEW PUBLIC TOILET
:
17m2
NEW RECEPTION / LOBBY
:
66m2
NEW LIFT
:
3m
NEW LOUNGE
:
20m2
NEW KITCHENETTE
:
9m2
NEW LARGE CONFERANCE ROOM
:
23m2
NEW SMALL CONFERANCE ROOM
:
18m
TOTAL NEW GROUND FLOOR
:
401m2
1658
NEW INNOVATION HUB
FALL
water tank installed to store harvested water from roof
FALL
new 10mm vaulted corrugated roof sheeting
12835
new 10mm vaulted corrugated roof sheeting
220mm retaining wall
2009 RWDP
RWDP
in at m pe l pi ection i o s n con mm 1 10 icipal n mu
B
ll to 0 fa 1:4
NEW LARGE OFFICE
:
74m2
NEW MEDIUM OFFICE
:
32m2
NEW SMALL OFFICE 1
:
27m2
NEW SMALL OFFICE 2
:
27m2
NEW PASSAGE
:
8m2
NEW PRINT STATION
:
36m2
TOTAL NEW FIRST FLOOR
:
206m2
OCCUPANCY CLASSIFICATION OF SPACES
stub stack
GROUND FLOOR TRAP DO OR FO R ROOF ACCESS
RWDP
RWDP
FALL
RWDP
TRAP DO OR FO R ROOF ACCESS
extensive planted roof
existing tree
50mm waste pipe to stack
RWDP
898
RE
C
RWDP IE
UP 6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Staircase note: Concrete cast in situ staircase 22 risers 350mm treads, 170mm risers
22
RE
paving
RWDP
110mm soil pipe at min 1:40 fall to municipal connection
timber pergola structure around staircase
158 1:12 concrete ramp
RE
RWDP
110mm soil pipe stub stack
IE
IE
RE
RE 900mm steel railing
G1
LOUNGE
A1
SMALL OFFICE 2
G1
LARGE CONFERANCE ROOM
A3
MEDIUM OFFICE
G1
SMALL CONFERANCE ROOM
A3
WELDING AREA
D2
BULK STORAGE
J3
EQUIPMENT STORAGE
J2
LOADING BAY
J4
WORKSHOP MANAGERS OFFICE
G1
DESIGN POPULATION
67
SANITARY FIXTURES NEEDED MEN TOILETS 2
URINALS
BASINS
3
3
WOMEN TOILETS 5
Land use management
Zoning
Educational
Site area
1091m2 Permitted
Actual
Height
3 storeys
2 storeys
Coverage
60%
38%
FAR
2.0
Ground Floor Area
1100m
401m2
First Floor Area
1000m2
206m2
2
607m2
Total Area
BASINS
2000m
PROJECT AND CLIENT DETAILS
3
existing tree w di
6857
Parking space
Horizontal timber shading device
600
4 3
PROPERTY BOUNDARY
STORMWATER KERB INLET
6 5
1. No drainage bends or junctions below floors. 2. Bends and junctions in drains to be fitted with C.E's and I.E's with marked covers at ground level. 3. Drains under building to be adequetly protected against load. 4. Waste pipes to have reseal traps and to be fully accesible over full length. 5. Bathwast 50mm internal diameter basinwaste 50 mm internal diameter. 6. Gulleys at kitchens to have a cw tap over. 7. All surfaces to comply with NBR's. 8. Soil pipes to be 110mm at minimum.
existing tree
0 250
7
IE
DRAINAGE NOTES
0.6 2
workspace for workshop FALL
Any quaries arising from the above must be reported to the Architect for clarification before any work is put in hand. This drawing is not to be scaled. Figures to be used at all times. Where figured dimensions are given, this must be confirmed by the Architect. Burnt clay bricks in compliance with relevant S.A.B.S code only shall be used unless specific approval is obtained from the Architect for the use of alternative type of brick.
Date:____________/___________/_____________
* DESIGN POPULATION WILL BE ADJUSTED TO MAX 60 AC C ORDING TO THE BRIEF
Grid tied electrical system
IE
SMALL OFFICE 1
The Contractor is to build in approved DPC's whether or not these are shown on drawings, to all external walls at each floor, beam or parapet level and to all windows, doors, grilled or other opening in external walls. Cavity walls to have stepped DPC's.
Date:____________/___________/_____________
30185
9666
900mm steel railing
IE
D2
stub stack
IE
UP
WORKSHOP
Any errors, discrepancies or omissions on this drawing are to be reported to the Architect immediatly.
fl o
1 in tm e a io n p i t il p nec so n m l co 0m cipa 1 1 ni RWDP mu
l to fal :40
single stack
RE
stormwater to flow into stormwater drain
G1
Date:____________/___________/_____________
of
5
LARGE OFFICE
Date:____________/___________/_____________
n
4
A3
Date:____________/___________/_____________
TOWN PLANNING INFORMATION
FIRST FLOOR
GROUP INSTRUCTION AREA
Signature Space
re ct io
3
2190mm (h) boundary wall
2
699
1
2190mm (h) boundary wall
2
IE
15800
4100
2
Town Planner
2009
FALL
Quality of all materials and workmanship to comply with the relevant S.A.B.S specification and shall comply with the minimum standard specified in the Standard Preambles in the bills of Quantities or, in the absence of a bill of quanitities, available for perusal at the offices of the Architects. A project specification document will be issued by the Architects to elaborate on the preambles. Where the contractor finds these two documents to be conflicting this must be brought to the architect's attention before doing the work. The contractor is responsible for correct setting out of the buildings, all external and all internal walls with particular reference to boundaries, building lines, etc. The contractor is to verify levels, heights and dimensions on site and to check same against the drawings before putting any work in hand. Any discrepencies from the theoretical to be brought to the architect's attention. The contractor and all Sub-contractors are to check the details shown on this drawing for compliance with standards of best building practice (which is what is expected to be delivered) with particular reference to special requirements necessitated by local and/or on site conditions and to report any comment to the Architect. The contractor is to locate and identify existing services on site and to protect these from damage throughout the duration of the works.
CIRCULATION Date of signature
AREA SCHEDULE FIRST FLOOR PLAN 11188
11128
11188
exterior shading louvers
2m X 1m PHOTOVOLTAIC CELLS PLACED ON ROOF FOR ELECTRICITY PRODUCTION AND PROVIDING ELECTRICITY FOR GEYSERS
permable paving
0
planted surface
110mm soil pipe at min 1:40 fall to municipal connection
RWDP
1460
12835
1461
ACCESS TO BUILDING 1:12 concrete ramp
RWDP
ROOFLINE
27851mm
NEW PROPOSED INNOVATION HUB FOR THE SUTHERLAND OBSERVATORY
0
AREA CALCULATIONS
2 1
EXTI VEHICLE ACCESS (service access)
UP
RE
Solar panels to charge battery banks
600
2m X 1m PHOTOVOLTAIC CELLS PLACED ON ROOF FOR ELECTRICITY PRODUCTION AND PROVIDING ELECTRICITY FOR GEYSERS
15675
0 Parking space
250
RWDP
RWDP
new driveway
19262
16791
TRAP DO OR FO R ROOF ACCESS
FALL
new 10mm vaulted corrugated roof sheeting
FALL
10858
10643
0
FALL
0 600 Parking space
FALL
250
252 1752
1.5m SERVITUDE LINE 2190mm (h) boundary wall
460
ERF 329
C
SITE PLAN SCALE 1:100
RWDP
planted surface
1500
2190
1.5m STREET BUILDING LINE
skip area (REFUSE AREA)
RWDP
IE gutter and downpipe
runoff TRAP DO OR FO R ROOF ACCESS
1459m
gutter and downpipe
existing tree
direction of flow
VAN DER MERWE STREET
direction of flow
RE
1460m
stormwater drainage channel direction of flow to stormwater drain 1461m
1462m
runoff
water tank installed to store harvested water from roof
27,851 1461
runoff
ALL DRAWINGS TO COMPLY WITH SANS 10400
runoff
runoff
UP
runoff
DN dire ction
of flow
fall of site
665
existing tree
:
D-543-08-20
DATE
:
2020 / 08 / 01
CHECKED BY
:
J VAN DER WALT
DRAWN BY
:
S VAN HEERDEN
APPROVED BY DATE
:
2020 / 06 / 29
ENIGNEER SIGNATURE
:
..............................................
OWNER SIGNATURE
:
..............................................
SCALES USED
:
1:100
SHEET
:
1 OF 3
existing tree
STORMWATER RETICULATION LAYOUT SCALE 1:250
DRAWING NUMBER
skip area
concrete stormwater drainage channel with metal grate
B
1463m
N
gutter and downpipe
existing sidewalk
UP
KERK STREET
SCALE 1:5000
5
2122
4
1458m
runoff
STORMWATER KERB INLET
extensive planted roof
3
runoff
1464m
2190mm (h) boundary wall
RWDP
2
SEWER MH INVERT LEVEL: 1459.5m
gutter and downpipe
LOCALITY MAP (SUTHERLAND)
MUNICIPAL ELECTRICAL LINE
0
9499 10999
1
runoff
paving
1177 RWDP
JUBILEE STREET
39,144
16740
metal gate
20754
RE
ERF 328
N
39,144
ERF 327
RWDP
IE
RWDP
stormwater drain
UP
PIET RETIEF STREET
1:12 concrete ramp
STORMWATER KERB INLET
IE
HO SPITAAL STREET
449
220mm retaining wall
5m STREET BUILDING LINE
CA
AREA SCHEDULE GROUND FLOOR PLAN
street kerb
3 C03 ---
220mm retaining wall
1
39144mm
NOTES 5 AND 6 ARE RECOMMENDED
street lamp
2038
5m STREET BUILDING LINE
CD
STORMWATER KERB INLET
60 00
2
27851mm
Architects Signature
3
21
BC
1. All windows areas to be 10% of floor area of which 50% is openable. 2. Read figured dimensions in preferance to scaling. 3. All levels dimensions, heights of plinths, depths of excavations and number of steps to be finally checked and determined by contractor on site. 4. Drawings prepared on basis of surface examination on site. Walls below ground level. 5. Recommended - AB's over all windows and doors without fanlights. 6. Recommended - 2AB's to W.C's bathrooms, kitchenette. 7. All handrails to be min 1,000mm high, ballister max 100 ccs 8. All drawings to comply with SANS 10400 and SANS 204
Owners Signature
A
-810
4
concrete stormwater drainage channel with metal grate
39144mm
Civil Eng. signature
5
4970 boundaey wall
5449
Horizontal timber shading device
trol
3215
AB
Structural Eng. Signature
n re co
1805
existing sidewalk
ssu
Staircase note Cast in situ staircase 5 risers 350mm treads, 170mm risers
1414 electrical line to new DB board
3666
1.5m STREET BUILDING LINE
re to p pipe tt e pply ene r su kitch a te in m w te d 50m e loca va lv
metal gate
emergency assembly point
permeable paving
water tank installed to store harvested water from roof
MUNICIPAL METERING AND BILLING SENDING POWER TO THE GRID
0
7233
municipal shutoff valve
ELECTRICAL METER
A
1.5m STREET BUILDING LINE
27,851
2190mm (h) boundary wall
PROPERTY BOUNDARY
35 00
MUNICIPAL COLD WATER LINE
vehicle access for disabled people
PEDESTRIAN ACCESS
D 0
Site Dimensions:
existing tree
MUNICIPAL ELECTRICAL LINE
JUBILEE STREET
existing tree
8m
6m
1460
24991
1
4m
VISUAL SCALE 1:100 @ A1
KERK STREET
7181
2m
0m
5m
10m
VISUAL SCALE 1:250 @ A1
15m
20m
25m 1:250 on A1
25000 25000 450
2100
110
6540
7200
450
14900
1
2
3
2000
15800
450
4
5
6
1
2
3
4
5
6
STORMWATER KERB INLET existing trees
existing trees
MUNICIPAL ELECTRICAL LINE
pedestrian access
D
MUNICIPAL COLD WATER LINE
vehicular access
PROPERTY BOUNDARY
B
ELECTRICAL METER
PROPERTY BOUNDARY
2192396
A
water tank installed to store rainwater
1752
110
DA
RWDP
1530 6
7
8
9
Staircase note: Concrete cast in situ staircase 22 risers 350mm treads, 170mm risers
152 x 114 SAP column
2481
4
RWDP
HW
single stack
Wrapped in insulation
O.V.P
D9
DA
D18
4
DA D19 U
W13
WC
WC
4
3128
drainage channel
UP
220mm retaining wall
RWDP
W12
WC
D17
RWDP
4
W105 4
DA
RE
W17
1419
RE
IEGULLEY
IE
stub stack
new 1:12 concrete ramp
50mm waste pipe
110mm soil pipe
DA
WC
900mm steel pipe railing
55
extra work space for assembly of workshop components
stub stack
Staircase note: Concrete cast in situ staircase 7 risers 280mm treads, 180mm risers
W101
W69
DA
WC
IE
4
56
1699
1839
HW
U
HW
W67
3
WHB
IE
U
48
16 m² Tiles Ceiling board
CW
900mm steel pipe railing
horizontal shading device overhead
2
New Staff Bathroom DA
G
1.5m STREET BUILDING LINE
450 exposed concrete beam overhead
450
450
2
5385
14
110
2480
15 16
8950
1845 110
NEW LINTELS OVER
NEW LINTELS OVER
2
B.I.C
17
110
8950
4778 110
110
sliding windows
sliding windows
DA
2
110
1350
existing trees
TRAP DOOR FOR ROOF ACCESS
B.I.C
1752
450 2000
Fire Extinguisher
3 m² ? ?
1
2
3
4
5
6
7
8
9
fire escape stairway
NEW LARGE OFFICE
W52
72 m² Carpet Exposed Truss
3
TRAP DOOR FOR ROOF ACCESS
Fire Extinguisher
10 11 12 13 14 15 16 17 18 19 20 RWDP 900 mm steel pipe railing
7200
1752
110
13040
2000
15800
40mm downpipe
450
RWDP
RWDP
Staircase note: Concrete cast in situ staircase 20 risers 350mm treads, 170mm risers
timber pergola
RWDP
C
The Contractor is to build in approved DPC's whether or not these are shown on drawings, to all external walls at each floor, beam or parapet level and to all windows, doors, grilled or other opening in external walls. Cavity walls to have stepped DPC's. Any quaries arising from the above must be reported to the Architect for clarification before any work is put in hand. This drawing is not to be scaled. Figures to be used at all times. Where figured dimensions are given, this must be confirmed by the Architect. Burnt clay bricks in compliance with relevant S.A.B.S code only shall be used unless specific approval is obtained from the Architect for the use of alternative type of brick.
RWDP
A
DRAINAGE NOTES
2 3
1. No drainage bends or junctions below floors. 2. Bends and junctions in drains to be fitted with C.E's and I.E's with marked covers at ground level. 3. Drains under building to be adequetly protected against load. 4. Waste pipes to have reseal traps and to be fully accesible over full length. 5. Bathwast 50mm internal diameter basinwaste 50 mm internal diameter. 6. Gulleys at kitchens to have a cw tap over. 7. All surfaces to comply with NBR's. 8. Soil pipes to be 110mm at minimum.
12020
paving
1
PROJECT AND CLIENT DETAILS
DA WC
new 1:12 concrete ramp used for deliveries and access
FE
sliding windows
countertop
sliding windows
41
450
2
W100 3
TYPE F walls, ACCORDING TO SANS 10400, EXTERIOR WALLS REQUIRE 30min FIRE RESISTANCE AND INTERIOR PARTITION WALLS 60min FIRE RESISTANCE
W63
sliding windows
sliding windows
D46 51
2
2
W58
W59
3
W60
3
TRAP DOOR FOR ROOF ACCESS
3
W61 3
14772
2
NEW PROPOSED INNOVATION HUB FOR THE SUTHERLAND OBSERVATORY
RWDP
TRAP DOOR FOR ROOF ACCESS
vehicular access
0 600
PARKING
new 420mm composite cavity wall 230mm inner leaf and 110mm outer leaf with 110mm cavity, 85mm Polyutothane rigid insulation board
sliding windows
DOUBLE VOLUME OPENING ABOVE
2
98 m² Polished screed Exposed truss
2
6300
countertop
2
NEW W ORKSHOP
RWDP
RWDP
2
exposed concrete beam overhead
2
W62 3
exposed SAP timber truss
AREA CALCULATIONS
10999
0
960
countertop
extensive planted roof
2
250
7688
16795
sliding windows
RWDP
EMERGENCY ASSEMBLY POINT
vertical louvers
DC
Fire Extinguisher
2
RWDP
FE
2
RE
new 450mm composite cavity wall 230mm inner leaf and 110mm outer leaf R-VALUE = 4.88m2 K/W C-VALUE = 531 KJ/ m2K CR-VALUE = 662 hours
50
sliding windows
IE
20810
UP
1518
1459
4
sliding windows
4
UP
W103
FIRE MAINS
110
escape door stub stack
W66
1177
W64
15675
1159
9499
0 600
2
DA
43
44 2
B.I.C
2
exit door
DA
DA
45
46
10779
450
B.I.C
countertop
9497
NEW MANAGERS OFFICE
4055
3325
3325
110
110
2720
Battery Bank
110
2776
110
paving
1514
1 DF 58
W72
W73
W74
W75
W76
W77
W78
4
4
4
4
4
4
4
W79
W80
W81
W108
4
4
4
4
water tank installed to store rainwater
3
4
UP
RWDP
RWDP
5
extensive planted roof
Staircase note: Concrete cast in situ staircase 5 risers 280mm treads, 180mm risers
water tank installed to store rainwater
1500
1.5m SERVITUDE LINE
2
RWDP
252
RWDP
countertop
0
escape door
sub DB BOARD
2
1502
2275
3267
13 m² Polished screed Ceiling Board
9 m² Polished screed Ceiling Board overhead counter
450
NEW W ELDING AREA overhead counter
3775
11 m² Polished screed ceiling board
3325
countertop
NEW EQUIPMENT STORAGE
2
NEW BULK STORAGE
9 m² Carpet Ceiling Board
skip area
RWDP
RWDP
1752
DA
exit door
paving
1.5m STREET BUILDING LINE
3
exit door
110
110
W107
0
exit door
14772
STORMWATER KERB INLET
450
1.5m STREET BUILDING LINE
960
250
TYPE F walls, ACCORDING TO SANS 10400, EXTERIOR WALLS REQUIRE 30min FIRE RESISTANCE AND INTERIOR PARTITION WALLS 60min FIRE RESISTANCE
2
sliding windows
PARKING
PROPERTY BOUNDARY
N
Quality of all materials and workmanship to comply with the relevant S.A.B.S specification and shall comply with the minimum standard specified in the Standard Preambles in the bills of Quantities or, in the absence of a bill of quanitities, available for perusal at the offices of the Architects. A project specification document will be issued by the Architects to elaborate on the preambles. Where the contractor finds these two documents to be conflicting this must be brought to the architect's attention before doing the work. The contractor is responsible for correct setting out of the buildings, all external and all internal walls with particular reference to boundaries, building lines, etc. The contractor is to verify levels, heights and dimensions on site and to check same against the drawings before putting any work in hand. Any discrepencies from the theoretical to be brought to the architect's attention. The contractor and all Sub-contractors are to check the details shown on this drawing for compliance with standards of best building practice (which is what is expected to be delivered) with particular reference to special requirements necessitated by local and/or on site conditions and to report any comment to the Architect. The contractor is to locate and identify existing services on site and to protect these from damage throughout the duration of the works. Any errors, discrepancies or omissions on this drawing are to be reported to the Architect immediatly.
Staircase to access rooftop
new 420mm composite cavity wall 230mm inner leaf and 110mm outer leaf R-VALUE = 4.88m2 K/W C-VALUE = 531 KJ/ m2K CR-VALUE = 662 hours
LIFT
PRINT STATION
UP
2
TYPE F walls, ACCORDING TO SANS 10400, EXTERIOR WALLS REQUIRE 30min FIRE RESISTANCE AND INTERIOR PARTITION WALLS 60min FIRE RESISTANCE
D28
448
900mm steel pipe railing
35 m² Tiles Exposed Truss
DE
RWDP
C
2
Electrical conduit
NEW PRINT STATION / PASSAGE
sliding windows
26 m² Carpet Exposed Truss
3652
0
B
19
4740
NEW SMALL OFFICE 2
4840
PARKING
600
4
IE
12
extensive planted roof
5
GULLEY
11 13
RWDP 2
direction of flow
DOUBLE VOLUME OPENING ABOVE
10
paving
6
47
HW
4
12 m² Tiles Concrete Slab
A
250
DA
HW
WHB
4
4
3
18
2
W42
220mm retaining wall
7
Wrapped in insulation HW
W68
4
W51 exposed concrete beam overhead
0
50mm waste pipe
W14
9674
IE
4
W15
NEW PASSAGE
vertical louver over sliding window
450
7
31942
9718
geyser above
W16
30
450
RE
RWDP
DA
4020
4011
roofline
drainage channel to be placed on paving level to redirect stormwater into the stormwater drain
DF
110mm soil pipe to municipal sewer connection @1:40 min fall
permeable paving
450
W11
WHB
HW
4
l ipa all nic min f mu to 1:40 e pip n @ il io so m nnect 0m 11 er co s ew
W70
HW
699 450
5
geyser above HW
HW
WHB
W18
2152
4
450
RWDP
HW
WHB
TYPE F walls, ACCORDING TO SANS 10400, EXTERIOR WALLS REQUIRE 30min FIRE RESISTANCE AND INTERIOR PARTITION WALLS 60min FIRE RESISTANCE
3
8250
27
WHB
HW
HW
16 m² Tiles Ceiling Board
2
4
D15
Public Bathroom
38
3
W10
HW
DA D16
DA
RE
220 810 110 872 110 1100
8070
HW
D13
DA
2
RE
stub stack
1630 HW
2
W50
2
9666
Not Enclosed Paving ?
DA
Staircase note: Concrete cast in situ staircase 19 risers 280mm treads, 170mm risers
1500
NOTES 5 AND 6 ARE RECOMMENDED RWDP
450
3 m² ? ?
1839
450
INNER COURTYARD
cold water 6 m² supply CW Tiles Ceiling Board G
UP
3
2
3455
NEW LIFT
17 m² Carpet Concrete Slab
IE
PASSAGE
2750
NEW SMALL CONFERANCE ROOM
RE
1440
D14
D10 new 450mm composite cavity wall 230mm inner leaf and 110mm outer leaf R-VALUE = 4.88m2 K/W C-VALUE = 531 KJ/ m2K CR-VALUE = 662 hours
ESCAPE DOOR
4019
FIRE MAINS
FE
4 m² WC Tiles Ceiling Board
DA
sliding windows 2
110
450
DC
RWDP
new 420mm composite cavity wall 230mm inner leaf and 110mm outer leaf R-VALUE = 4.88m2 K/W C-VALUE = 531 KJ/ m2K CR-VALUE = 662 hours
2
450
Disabled Bathroom
FE
21 m² Carpet Exposed Truss
sliding windows
W48
5040
TYPE F walls, ACCORDING TO SANS 10400, EXTERIOR WALLS REQUIRE 30min FIRE RESISTANCE AND INTERIOR PARTITION WALLS 60min FIRE RESISTANCE
1839
D36
Fire BIC
110
110
65 m² Polished Screed Ceiling Board
DE
NEW SMALL OFFICE 1
5340
110 2765
2
1
31938
14900
Fire Extinguisher
B.I.C
FIRE WALL
W43
ipal unic in fall to m 40 m pipe @ 1: il o s on ecti mm 110 r c onn e sew
110
60
3
2000 450
450
29
B
150mm x 400mm RC beam, according to engineers specification TYPE F walls, ACCORDING TO SANS 10400, EXTERIOR WALLS REQUIRE 30min FIRE RESISTANCE AND INTERIOR PARTITION WALLS 60min FIRE RESISTANCE
Electrical conduit
DA
450
W47
8
water tank installed to store rainwater
NEW RECEPTION / LOBBY
W4
UP
1438
new concrete 300 x 300mm RC beam
STRUCTURAL COLUMN PLACED TO SUPPORT THE FLOOR SLAB SPANNING MORE THAN 8.4 METRES
19
sliding windows
2
9
17 18
sliding windows
2
450
16
4970
downpipe
1555
8950
150mm x 400mm RC beam, according to engineers specification
300 x 300mm STRUCTURAL COLUMN PLACED TO SUPPORT THE FLOOR SLAB SPANNING MORE THAN 8.4 METRES
6300
450
DB 14 BOARD
3
8085
12
new concrete 300 x 300mm RC beam
RE
4
1555
13
2
450
A
30 m² Carpet Exposed Truss
sliding windows
11
DA D5
NEW MEDIUM OFFICE
sliding windows
10
3
49 m² Polished screed Suspended concrete slab
2875
5040
NEW INSTRUCTION ROOM
110
9
15
Fire Extinguisher TYPE F walls, ACCORDING TO SANS 10400, EXTERIOR WALLS REQUIRE 30min FIRE RESISTANCE AND INTERIOR PARTITION WALLS 60min FIRE RESISTANCE
-810
110mm soil pipe
UP
8
7000
ESCAPE DOOR
vertical louver over sliding window
W44
W9
3215
RWDP
2995
6
Staircase note: Concrete cast in situ staircase 19 risers 280mm treads, 170mm risers
450
6300
sliding windows
1535
110
5
STRUCTURAL COLUMN PLACED TO SUPPORT THE FLOOR SLAB SPANNING MORE THAN 8.4 METRES
23 m² Carpet Concrete Slab
3500
sliding windows
110mm soil pipe to municipal sewer connection @ 1:40 min fall
3500
973
2765
4
sliding windows
450 2000
D4
NEW LARGE CONFERANCE ROOM
fire wall
3
7
DA
6300
2
2
6090
fire wall
2
W3
1
TYPE F walls, ACCORDING TO SANS 10400, EXTERIOR WALLS REQUIRE 30min FIRE RESISTANCE AND INTERIOR PARTITION WALLS 60min FIRE RESISTANCE
DA D1
D8
650
1559
D2
450
3
UP
DC
Battery Bank
DA
W50
DOUBLE VOLUME OPENING ABOVE
4778
stormwater channel
paving
sub DB BOARD
sliding windows
3460
1805
RWDP
sliding windows
SEWER MH INVERT LEVEL: 1459.5m
1. All windows areas to be 10% of floor area of which 50% is openable. 2. Read figured dimensions in preferance to scaling. 3. All levels dimensions, heights of plinths, depths of excavations and number of steps to be finally checked and determined by contractor on site. 4. Drawings prepared on basis of surface examination on site. Walls below ground level. 5. Recommended - AB's over all windows and doors without fanlights. 6. Recommended - 2AB's to W.C's bathrooms, kitchenette. 7. All handrails to be min 1,000mm high, ballister max 100 ccs 8. All drawings to comply with SANS 10400 and SANS 204
5m STREET BUILDING LINE
2
5340
sliding windows
DOWN PIPE
geyser above
110
counter top
9 m² Tiles Concrete slab
Battery Bank
1
16 m² Carpet Concrete slab
3738
50mm waste pipe
NEW KITCHENETTE
W2
new 1:12 concrete ramp
RWDP
ESCAPE DOOR
NEW LOUNGE
S
4019
B.I.C
1
1414
timber pergola
sliding windows
1305
G
3
3666
RWDP
5340
D3
2101
HW
UP
DA
0
920 110 1020 110 1179 110
HW
W1
2233
2 Fire Extinguisher
W46
3
GENERAL NOTES
3
15800
450
W45
5m STREET BUILDING LINE
EXISTING NGL
2000
6300
4778
DISABLED PARKING
W5
2
5 CW
450
228 x 50 SAP beam
1511
2190mm (h) boundary wall
450 3738
W37
CW
IE
450
152 x 114 SAP column
UP
RE
4
3
5m STREET BUILDING LINE
timber pergola
RWDP
2
450
450
455
1
A
450
2
RWDP
110
-810
3
11128
450
PRESSUSE CONTROL VALVE AND EXPANSION RELIEF FROM THIS POINT, SUPPLY WATER WILL REDIRECT INTO GEYSER
5m STREET BUILDING LINE
11123
4090
stormwater drain
110
12650
2100
60 00
110
4
450
7200
engineerd NGL
450
5
4970
6090
7200
3215
2190mm (h) boundary wall
MUNICIPAL SHUT OFF VALVE
1805
1.5m STREET BUILDING LINE
al w
1414
Staircase note: Concrete cast in situ staircase 5 risers 280mm treads, 180mm risers
35 00
ip unic mm 50m
pipe
MUNICIPAL ELECTRICAL LINE
5000
3666 ly supp at er
2
9850
D39
2875
D46
0
450
70
450
MUNICIPAL METERING AND BILLING SENDING POWER TO THE GRID
DO
STORMWATER KERB INLET
2190mm (h) boundary wall
PROPERTY BOUNDARY
450
3267
110
4055
110
2720
110
4400
450
15672
C
existing trees
B
GROUND FLOOR PLAN SCALE 1:100
N
15675
FIRST FLOOR PLAN SCALE 1:100
0m
2m
4m
VISUAL SCALE 1:100 @ A1
6m
8m
10m
:
107m2
NEW LOADING BAY
:
11m2
NEW WORKSHOP MANAGERS OFFICE
:
10m2
NEW WELDING AREA
:
16m2
NEW BULK STORAGE
:
17m2
NEW STAFF TOILET
:
17m2
NEW GROUP INSTRUCTION AREA
:
50m2
NEW PUBLIC TOILET
:
17m2
NEW RECEPTION / LOBBY
:
66m2
NEW LIFT
:
3m2
NEW LOUNGE
:
20m2
NEW KITCHENETTE
:
9m2
NEW LARGE CONFERANCE ROOM
:
23m2
NEW SMALL CONFERANCE ROOM
:
18m2
TOTAL NEW GROUND FLOOR
:
401m2
12295
0m All staircases, Roof and floor slabs to according to engineers detail
NEW WORKSHOP
All staircases, Roof and floor slabs to according to engineers detail
2m
4m
VISUAL SCALE 1:100 @ A1
6m
8m
10m
DRAWING NUMBER
:
D-543-08-20
DATE
:
2020 / 08 /21
CHECKED BY
:
J VAN DER WALT
DRAWN BY
:
S VAN HEERDEN
APPROVED BY DATE
:
2020 / 06 / 29
ENIGNEER SIGNATURE
:
..............................................
OWNER SIGNATURE
:
..............................................
SCALES USED
:
1:100 on A1
SHEET
:
2 OF 3
A
SITE BOUNDARY
4740
2875 r14328
7° pitch
8165
SITE BOUNDARY
B
5m STREET BUILDING LINE
C
Height under wallplate 7865
facia board
7° pitch
Height under lintel 03 5660
300
300
900mm metal pipe railing
2205
100mm gutter
100mm RWDP to storage tank
facia board
Height under downstand 5125
Horizontal shading device
535
r10799 7° pitch
3
Height under lintel 02 2800
aluminium operable louver aluminium perforated screen
First Floor Level 2500
8975
W51
3
2325
W52
5065
900mm metal pipe railing
Timber pergola
2192396
Water tank to store rainwater FFL EXTERIOR ALUMINIUM LOUVERS
W61
DA
W101
W13
W12
W11
W10
48
47
4
4
4
4
4
W9
NGL paving
Stub stack permeable backfilling
WC
SITE BOUNDARY
EAST ELEVATION A 2m x 1m photovoltaic cells placed on roof
2875
7° pitch
7.03° 1500
7° pitch
RWDP
dpc
weepholes
weepholes NEW LINTELS
dpc
400mm RC concrete vaulted roof
dpc
NEW TIMBER TRUSS
2740
r12628
4717 TRAP DOOR FOR ROOF AC C ESS
NEW LARGE OFFICE 72 m² Carpet Exposed Truss
Staircase for roof access
plastered and painted
dpc NEW LINTELS
Height under downstand 5125
535
450 x 225 RC downstand
Height under lintel 03
dpc
Height under lintel 02 2800
Performance Values: R-VALUE = 4.88m2 K/W C-VALUE = 531 KJ/ m2K CR-VALUE = 662 hours
dpc
concrete downstand
NEW 255mm CONCRETE FLOOR SLAB SPANS 9.4 metres between loadbearing walls
FFL
9370
3 B.I.C
2325
W118
2325
8950
New 450mm cavity wall with 100mm XPS insulation
2325
Horizontal adjustable louver
First Floor Level 2500
NEW TIMBER PERGOLA above ramp
18
13
DC D10
dpc
paving
NEW 100mm CONCRETE SURFACE BED
FFL
HARDC ORE FILLING
NEW CONCRETE FOUNDATION ACCORDING TO ENGINEER DETAIL
110mm soild pipe at min fall of 1:40 to municipal sewer connection
SEWER MH INVERT LEVEL 1459m
dpc dpc
N.G.L
paving
weepholes HARDC ORE FILLING
650 treads 165 risers for instruction room steps
Occupancy classification
A3
Design occupancy time
12 hours per day
Building net floor area
900mm metal pipe railing
Ground Floor Level -810
10mm corrugated roof sheeting
metal gutter
85mm XPS insulation in purlin cavity
100mm metal downpipe
10mm ceiling board
7 days per week
timber truss
52 weeks per year
wallplate
607 sqm
8165
Height under wallplate
Lighting and Power: Max energy demand
6070 W/sqm
Max energy consumption
15175 kwh/sqm
7865 900mm metal pipe railing
Height under lintel 03
growing medium according to landscape architect
Fenestration Calculations: Ground Floor:
aluminium window frame
50mm bio-degradeble molded plastic box to contain soil
85mm RIGID POLYUROTHANE INSULATION ABOVE SLAB
220mm brickwork retiaining wall
100mm RIGID EXTRUDED POLYSTYRENE (XPS) concrete upstand
Fenestration area is below 15%(14%) so it does comply with SANS 10400 requirements.
metal truss hanger attached to concrete roof
gutter
5660
450mm x 225mm RC concrete downstand
Height under downstand
R-VALUE = 4.88m2 K/W C-VALUE = 531 KJ/ m2K CR-VALUE = 662 hours
5125
100mm RIGID EXTRUDED POLYSTYRENE (XPS) deemed to satisfy according to SANS 204
Scale 1:25
SECTION A-A
2800 new 255mm RC suspended floor
2m
6m
4m
8m
The Contractor is to build in approved DPC's whether or not these are shown on drawings, to all external walls at each floor, beam or parapet level and to all windows, doors, grilled or other opening in external walls. Cavity walls to have stepped DPC's. Any quaries arising from the above must be reported to the Architect for clarification before any work is put in hand. This drawing is not to be scaled. Figures to be used at all times. Where figured dimensions are given, this must be confirmed by the Architect. Burnt clay bricks in compliance with relevant S.A.B.S code only shall be used unless specific approval is obtained from the Architect for the use of alternative type of brick.
10mm carpet
10m
1. No drainage bends or junctions below floors. 2. Bends and junctions in drains to be fitted with C.E's and I.E's with marked covers at ground level. 3. Drains under building to be adequetly protected against load. 4. Waste pipes to have reseal traps and to be fully accesible over full length. 5. Bathwast 50mm internal diameter basinwaste 50 mm internal diameter. 6. Gulleys at kitchens to have a cw tap over. 7. All surfaces to comply with NBR's. 8. Soil pipes to be 110mm at minimum.
Height under lintel 02
Typical eave detail
Exterior Circulation level
0m
Any errors, discrepancies or omissions on this drawing are to be reported to the Architect immediatly.
DRAINAGE NOTES
plaster and painted
Ground Floor Level -810
NEW CONCRETE FOUNDATION ACCORDING TO ENGINEER DETAIL
SCALE 1:100
Quality of all materials and workmanship to comply with the relevant S.A.B.S specification and shall comply with the minimum standard specified in the Standard Preambles in the bills of Quantities or, in the absence of a bill of quanitities, available for perusal at the offices of the Architects. A project specification document will be issued by the Architects to elaborate on the preambles. Where the contractor finds these two documents to be conflicting this must be brought to the architect's attention before doing the work. The contractor is responsible for correct setting out of the buildings, all external and all internal walls with particular reference to boundaries, building lines, etc. The contractor is to verify levels, heights and dimensions on site and to check same against the drawings before putting any work in hand. Any discrepencies from the theoretical to be brought to the architect's attention. The contractor and all Sub-contractors are to check the details shown on this drawing for compliance with standards of best building practice (which is what is expected to be delivered) with particular reference to special requirements necessitated by local and/or on site conditions and to report any comment to the Architect. The contractor is to locate and identify existing services on site and to protect these from damage throughout the duration of the works.
50mm screed
N.G.L -645
NEW CONCRETE FOUNDATION ACCORDING TO ENGINEER DETAIL
NEW CONCRETE FOUNDATION ACCORDING TO ENGINEER DETAIL
NOTES 5 AND 6 ARE RECOMMENDED
Exterior Circulation level
dpm
NEW CONCRETE FOUNDATION ACCORDING TO ENGINEER DETAIL
N.G.L -645
NEW CONCRETE FOUNDATION ACCORDING TO ENGINEER DETAIL
Height under lintel 01 0
7
NEW 100mm STEPPED FOUNDATION FOR SEATING
raft foundation for nonloadbearing wall
50mm waste pipe
300mm RC concrete roof
8
dpm
220mm retaining wall
External Pergola 1447
9
49 m² Polished screed Suspended concrete slab
900 mm steel railing
weephole
10
NEW INSTRUCTION ROOM
paving
weepholes
165
N.G.L
3740
NEW RECEPTION / LOBBY 65 m² Polished Screed Ceiling Board
11
3180
curtain wall
NEW LINTELS
Staircase note: Concrete cast in situ staircase 19 risers 280mm treads, 170mm risers
12
NEW LINTELS
1:12 concrete ramp
dpc
plastered and painted
2800
NEW LINTELS
560 645
dpc
2800
14
560 645
15
2800
weepholes
new 150mm x 400mm concrete beam
6090
16
645
110
2756
395
plastered and painted
6mm ceiling board
0
N.G.L
permeable backfill
5660
growing medium according to landscape architect
dpc
2740
NEW LINTELS
900 mm steel railing
Height under wallplate 7865 300
RDWP
dpc
ie
8165
2205
gutter
6.78° 1500
ROOF NOTE: NEW 0.5 mm 686 chromadek CORRUGATED ROOF SHEETING at 7° pitch NEW SA PINE TIMBER ROOF TRUSS 76 X 50mm SAP PURLINS AT MIN 1500 CENTRES 100mm ISOTHERM INSULATION BETWEEN PURLINS 10mm CEILING 235 mm facia board
5m STREET BUILDING LINE
6.78° 1500
6.27° 1500
WC
1. All windows areas to be 10% of floor area of which 50% is openable. 2. Read figured dimensions in preferance to scaling. 3. All levels dimensions, heights of plinths, depths of excavations and number of steps to be finally checked and determined by contractor on site. 4. Drawings prepared on basis of surface examination on site. Walls below ground level. 5. Recommended - AB's over all windows and doors without fanlights. 6. Recommended - 2AB's to W.C's bathrooms, kitchenette. 7. All handrails to be min 1,000mm high, ballister max 100 ccs 8. All drawings to comply with SANS 10400 and SANS 204
Height under lintel 01
Compliance data for calculations(Electrical):
2 facia board
ie
D3
3
Stub stack
All staircases, Roof and floor slabs to according to engineers detail
SCALE 1:100
C03
ie
NEW CONCRETE FOUNDATION ACCORDING TO ENGINEER DETAIL
NEW CONCRETE FOUNDATION ACCORDING TO ENGINEER DETAIL
4740
WC
WHB ie
ie 110mm soil pipe paving
B
WHB
165645
paving
C
DA
2800
DA
4
165645
W103
2800
FACEBRICK
GENERAL NOTES
1447
O.V.P single stack system
3
2190mm (h) boundary wall
3
3
58
External Pergola
water tank installed to store rainwater
EXPOSED CONCRETE VAULTED ROOF
ALUMINIUM FRAMED WINDOWS WITH SINGLE CLEAR GLASS
W62
SITE BOUNDARY
2190mm (h) boundary wall
N.G.L
face brick
5m STREET BUILDING LINE
W107
DF
First Floor Level
RC downstand
VISUAL SCALE 1:100 @ A1
PROJECT AND CLIENT DETAILS
NEW PROPOSED INNOVATION HUB FOR THE SUTHERLAND OBSERVATORY
Brick-force to be incorporated at every third course
AREA CALCULATIONS
plaster and painted
6mm ceiling board
SANS 204 / XA Calculations:
R, C and CR values of brickwork external walls: R - value for the wall:
First Floor : Fenestration area is more than 15% (21%), fenestration calculations would be needed for compliance. Required
4.48sqm K/W
C - value for the wall:
531KJ/sqm K
CR - value fot the wall:
662 hours
facebrick finish weephole 75mm x 105mm concrete lintel
Proposed
Max Conductance:
243.6
243.03
Max Solar Heat Gain:
30.45
14.61
Required R - value for the floor: R - value for the roof:
3.7 3.7
Proposed 3.7 3.7
plastered and painted R-VALUE = 4.88m2 K/W C-VALUE = 531 KJ/ m2K CR-VALUE = 662 hours dpc
1447 Height under lintel 01
75mm x 210mm concrete lintel
Typical suspended floor to wall detail Scale 1:25 230mm retaining wall 50mm downpipe
plastered and painted
0
glass curtain wall
permeable paving
N.G.L
concrete threshold
Calculations does comply with SANS 204, refer to external table for detailed calculations R values of roof and floor:
100mm RIGID EXTRUDED POLYSTURENE (XPS)
Climate zone
Zone 1 - Sutherland
Direction
Up
Required R-value 3.7 Roofing material 0.3 0.05 Ceiling R - value total: Insulation:
0.35 3.7
Max pane area
3mm
0.75 sqm
4mm
1.5 sqm
5mm
2.1 sqm
6mm
Ground Floor Level
paving
85mm expanded polyurothane insulation below surface bed
11m2
NEW WORKSHOP MANAGERS OFFICE
:
10m2
NEW WELDING AREA
:
16m2
NEW BULK STORAGE
:
17m2
NEW STAFF TOILET
:
17m2
NEW GROUP INSTRUCTION AREA
:
50m2
NEW PUBLIC TOILET
:
17m2
NEW RECEPTION / LOBBY
:
66m2
NEW LIFT
:
3m2
NEW LOUNGE
:
20m2
NEW KITCHENETTE
:
9m2
NEW LARGE CONFERANCE ROOM
:
23m2
NEW SMALL CONFERANCE ROOM
:
18m2
TOTAL NEW GROUND FLOOR
:
401m2
compacted fill
DPM 50mm sand blinding layer
-810
DRAWING NUMBER
:
D-543-08-20
DATE
:
2020 / 08 / 01
CHECKED BY
:
J VAN DER WALT
DRAWN BY
:
S VAN HEERDEN
APPROVED BY DATE
:
2020 / 06 / 29
ENIGNEER SIGNATURE
:
..............................................
OWNER SIGNATURE
:
..............................................
SCALES USED
:
1:100
SHEET
:
3 OF 3
weephole permeable backfilling
3.2 sqm Also refer to SANS 10400
107m2
:
10mm polished screed 100mm concrete surface bed
Glass Thickness
:
NEW LOADING BAY
-645
dpc below threshold
Glazing Notes:
NEW WORKSHOP
mortar fill
Exterior Circulation level
compacted fill
concrete drainage channel
depth foundation dependent on engineer detail unidisturbed earth
200 x 600 concrete footing
300 x 900 concrete footing refer to engineers detail
Typical foundation detail Scale 1:25
footing trench 1:25 on A1
MODEL & PERIMITER SECTION project_3
SKETCH DESIGN + MODEL project_3.1
Project 3.1 - Section Model Stefan van Heerden (2192396)
N
Page: 1
Model Images at scale 1:50 Mateirals: Recycled SA PINE Grey Board Moss Corrugated Cardboard
Page: 2
Page: 3
Moss
Greyboard
Recycled SA PINE
Corrugated cardbaord
Page: 4
Project 3.1 - Section Model Stefan van Heerden (2192396)
N
Page: 1
Model Images at scale 1:50 Mateirals: Recycled SA PINE Grey Board Moss Corrugated Cardboard
Page: 2
Moss Recycled SA PINE
Greyboard
Corrugated cardbaord
Page: 3
PERIMITER SECTION project_3.2
1.
Components:
ECO-WORTHY 28 Adjustable Angle Solar Panel Tilt Mount
2.
0.5mm dovegrey 686 corrugated roof sheeting
Eurolux O403 Silicon solar module
Galvanised roofing screws
228mm x 50mm SAP Beam closer between rafters
76 x 50 SAP purlins at 1500mm centres
120mm x 50mm purlin
85mm mineral wool insulation between purlins
7 deg ree
345mm facia board
pitch
8165
Marley streamline PVC-U 110x75mm gutter Marley streamline galvanised steel 110mm downpipe
3.5mm Gyproc rhinoboard at max 150mm centres
3. 7.
Height under wallplate
900mm pipe railing mounted of baseplate
152 x 50 SA PINE laminated top cord
7865
Krafft galvanised chain
152 x 50 SA PINE bracing 75mm x 105mm pre-stressed concrete lintel
Waterwise(succulint) planting for low maintenance
Seeding trays
Wispeco, crealco, 80mm skyline casement window opened with C20 actuator window opener
900mm pipe railing
GENERAL NOTES
Steel mullion 20mm Aluminium perforated screen
Extruded recycled plastic tray for soil containment
2.
6.
m20 nut
Concrete upstand
1. All windows areas to be 10% of floor area of which 50% is openable. 2. Read figured dimensions in preferance to scaling. 3. All levels dimensions, heights of plinths, depths of excavations and number of steps to be finally checked and determined by contractor on site. 4. Drawings prepared on basis of surface examination on site. Walls below ground level. 5. Recommended - AB's over all windows and doors without fanlights. 6. Recommended - 2AB's to W.C's bathrooms, kitchenette. 7. All handrails to be min 1,000mm high, ballister max 100 ccs 8. All drawings to comply with SANS 10400 and SANS 204
17.
290mm threaded rod
Permeable backfill
Marley streamline PVC-U 100 x 75mm gutter to fall outlets
45° flat F.B.O gratings out of ductile iron
152 x 50 SA PINE laminated bottom cord
NOTES 5 AND 6 ARE RECOMMENDED
75mm PVC pipe for overflow formed through coring
Galvanised truss hanger fixed to concrete upstand supporting bottom cord
11. Screen to roof upstand fixing detail:
Alumium perforated screen fixed to wall with bolted connection
300mm R.C arched roof slab off-shutter finish tied into brickwork.
4.
Marley streamline galvanised steel 160mm x 90mm gutter to fall downpipes Mineral board Control Joint
9.
Height under downstand
71 m² Carpet Exposed Truss
10.
5125
228 x 50 SA pine pergola beam Woodoc 50 sealer applied to protect timber from sun and rain
NEW LARGE OFFICE
Quality of all materials and workmanship to comply with the relevant S.A.B.S specification and shall comply with the minimum standard specified in the Standard Preambles in the bills of Quantities or, in the absence of a bill of quanitities, available for perusal at the offices of the Architects. A project specification document will be issued by the Architects to elaborate on the preambles. Where the contractor finds these two documents to be conflicting this must be brought to the architect's attention before doing the work. The contractor is responsible for correct setting out of the buildings, all external and all internal walls with particular reference to boundaries, building lines, etc. The contractor is to verify levels, heights and dimensions on site and to check same against the drawings before putting any work in hand. Any discrepencies from the theoretical to be brought to the architect's attention. The contractor and all Sub-contractors are to check the details shown on this drawing for compliance with standards of best building practice (which is what is expected to be delivered) with particular reference to special requirements necessitated by local and/or on site conditions and to report any comment to the Architect. The contractor is to locate and identify existing services on site and to protect these from damage throughout the duration of the works.
5660
85mm XPS insulation above slab
13mm Primed and Painted 2 coat plaster on interior
2192396
Height under lintel 03
Steel baseplate
150 mm engineerd soil 1/2 topsoil 1/2 compost
50mm screed 1000 micron DPM
1. 0.5mm dovegrey 686 corrugated roof sheeting 2. Marley streamline PVC-U 110x75mm gutter 3. Timber Truss, truss size according to manufacturer 4. Interior 230mm Loadbearing wall 5. 900mm steel Pipe railing 6. 300mm Vaulted concrete roof 7. Alumium top hung window (clere story) 8. 450mm exterior composite wall 9. 255mm Suspended Floor Slab 10. Window Opening 11. Alumium Perforated screen 12. Timber horizontal shading pergola over window 13. Timber Pergola to frame circulation and shade building/opening 14. 175mm Concrete surface bed 15. 150mm Concrete ramp 16. Permeable paving 17. Extruded Plastic tray for soil containment 18. Growing medium according to landscape architect 5. 19. Shading timber pergola
Height under lintel 02
19.
8.
3805
weepholes at 900 centres 228mm x 50mm SAP Beam
single clear glass
Any errors, discrepancies or omissions on this drawing are to be reported to the Architect immediatly.
228mm x50mm SAP Beam
Wispeco, crealco, 80mm skyline sliding window
SAP built in cupboard
M20 Nut
228mm x 50mm SAP supporting beam
Rebate
Galvanised fillet
B.I.C
228 x 50 SA pine pergola beam, Woodoc 50 sealer applied to protect timber from sun and rain
2800
10mm carpet 228 x 50 SA pine pergola beam
External Pergola
Corobrik Redwood brick to be plastered
Corobrik Redwood facebrick, 222 x 106 x 73, raked mortar joints 75mm brickforce every 4 courses
76 x 210mm pre stressed concrete lintel
Wall ties at typical 900mm (vertical) x 450mm (horizontal) spacing
Height under lintel 01
3740
900mm pipe railing fixed to basplate
49 m² Polished screed Suspended concrete slab
Wispeco, crealco, 80mm skyline sliding window
8
Components:
1. 2. 3. 4. 5. 6. 7. 2. 8. 9.
1447
NEW INSTRUCTION ROOM
9
Section Assembly Axonometric 1.
152 x 114 SA pine column
10
1. No drainage bends or junctions below floors. 2. Bends and junctions in drains to be fitted with C.E's and I.E's with marked covers at ground level. 3. Drains under building to be adequetly protected against load. 4. Waste pipes to have reseal traps and to be fully accesible over full length. 5. Bathwast 50mm internal diameter basinwaste 50 mm internal diameter. 6. Gulleys at kitchens to have a cw tap over. 7. All surfaces to comply with NBR's. 8. Soil pipes to be 110mm at minimum.
2500
11
Staircase note: Concrete cast in situ staircase 19 risers 280mm treads, 175mm risers
DRAINAGE NOTES
First Floor Level
shelf angle (concrete downstand) 220mm x 180mm supporting suspended floor slab
13mm Primed and Painted 2 coat plaster on interior
Any quaries arising from the above must be reported to the Architect for clarification before any work is put in hand. This drawing is not to be scaled. Figures to be used at all times. Where figured dimensions are given, this must be confirmed by the Architect. Burnt clay bricks in compliance with relevant S.A.B.S code only shall be used unless specific approval is obtained from the Architect for the use of alternative type of brick.
15.
Shading Pergola Assembly:
100mm XPS insulation
255mm concrete suspended floor 20MPA @ 28days, to enigneers specifications off - shutter finish below slab
16.
14.
140mm threaded rod
Precast concrete cill
Col Skirting SK6 SAP Untreated softwood (140mm x 22mm)
The Contractor is to build in approved DPC's whether or not these are shown on drawings, to all external walls at each floor, beam or parapet level and to all windows, doors, grilled or other opening in external walls. Cavity walls to have stepped DPC's.
13.
Corrugated Sheeting Timber truss Pop up section for hot air extraction Railings Arched Concrete Planted roof Loadbearing brickwork walls Horizontal shading device for north facade Timber pergola Vertical shading for east dacade
AREA CALCULATIONS
Modcon 0124 precast concrete coping
DA D3
3.
permeable paving
150mm concrete ramp (1:12 slope) broom finished
4.
30mm bedding aggregate
0
1000 micron DPC
N.G.L
concrete infill 10MPA at 28 days
60mm basecourse Aggregate
1000 micron DPC
-810
Col Skirting SK6 SAP Untreated softwood (3000mm x 140mm x 22mm)
175mm concrete surface bed 20MPA at 28 days, to eng. specifications
NEW PROPOSED INNOVATION HUB FOR THE SUTHERLAND OBSERVATORY (Issued for Construction)
Precast concrete cill 7
50mm polished screed
PROJECT AND CLIENT DETAILS
Window operation diagram Window is electronically operated with C20 Actuator window opener: 5.
NEW WORKSHOP
:
107m2
NEW LOADING BAY
:
11m2
NEW WORKSHOP MANAGERS OFFICE
:
10m2
NEW WELDING AREA
:
16m2
NEW BULK STORAGE
:
17m2
NEW STAFF TOILET
:
17m2
NEW GROUP INSTRUCTION AREA
:
50m2
NEW PUBLIC TOILET
:
17m2
NEW RECEPTION / LOBBY
:
66m2
NEW LIFT
:
3m2
NEW LOUNGE
:
20m2
NEW KITCHENETTE
:
9m2
NEW LARGE CONFERANCE ROOM
:
23m2
NEW SMALL CONFERANCE ROOM
:
18m2
TOTAL NEW GROUND FLOOR
:
401m2
Exterior Circulation level 230mm retaining wall
-1210
85mm XPS rigid insulation
Concrete fillet
FFL
375micron DPM 50mm sandblinding layer
Graded + poisoned compacted fill in layers of 150mm
unidisturbed earth
CONCRETE STRIP FOUNDATION @ MIN 15MPA @ 28 DAYS, 400 x 200 to engineers specification
Galvanised brick force, at every course for the foundation wall
Agricultural drain connected to stormwater drain
6.
7.
Permeable backfill
trench for foundation footing
CONCRETE STRIP FOUNDATION @ MIN 15MPA @ 28 DAYS, 900mm x 300mm to engineers specifications
N Perimiter Section Detail Scale 1:25
110mm outer brickwork leaf
8.
Dimpled drainage membrane Agricultural drain connected to stormwater drain
DRAWING NUMBER
:
D-543-08-20
DATE
:
2020 / 08 / 01
CHECKED BY
:
J VAN DER WALT
DRAWN BY
:
S VAN HEERDEN
APPROVED BY DATE
:
2020 / 06 / 29
ENIGNEER SIGNATURE
:
..............................................
OWNER SIGNATURE
:
..............................................
SCALES USED
:
1:25
SHEET
:
1 of 1
R - value for the wall: 4.48m2K/W C - value for the wall: 531KJ/m2K
9.
CR - value fot the wall: 662 hours
Roof Assembly Axonometrix
Removal of concrete with Hilti DD 120 diamond coring tool (drill), removes concrete core
Stainless steel frame (Ecoworthy 28)
45° flat F.B.O gratings out of ductile iron
Chuck
S
PV panel
PV panel
W
North
Summer solstice - 21 DEC at 13:00 78 degree altitude
Solar exposure large office clere story windows
1.
Components: 1. 0.5mm dovegrey 686 corrugated roof sheeting 2. Marley streamline PVC-U 110x75mm gutter 3. Timber Truss, truss size according to manufacturer 4. Interior 230mm Loadbearing wall 5. 900mm steel Pipe railing 6. 300mm Vaulted concrete roof 7. Alumium top hung window (clere story) 8. 450mm exterior composite wall 9. 255mm Suspended Floor Slab 10. Window Opening 11. Alumium Perforated screen 12. Timber horizontal shading pergola over window 13. Timber Pergola to frame circulation and shade building/opening. 14. 175mm Concrete surface bed 15. 150mm Concrete ramp 16. Permeable paving 17. Extruded Plastic tray for soil containment 18. Growing medium according to landscape architect 19. Shading timber pergola
2.
Formed through coring
Concrete core
0.5mm dovegrey 686 corrugated roof sheeting
Appropriate tolerance to be applied to ensure fit, 75mm +- 3mm up and down
Appropriate tolerance to be applied to ensure fit, 100mm +- 3mm up and down
Handle
ECO-WORTHY 28 Adjustable Angle Solar Panel Tilt Mount (stainless steel)
75 mm PVC-U pipe
100 mm PVC-U pipe
Winder solstice - 21 June at 13:00 34 degree altitude
Concrete upstand
Adjustable solar panel operation:
Galvanised roofing screws
Eurolux O403 Silicon solar module
r14328
228mm x 50mm SAP Beam closer between rafters 30mm x 1.6mm galvanised strapping roof tie embedded min 600mm in brickwork 120mm x 50mm purlin 345mmx 10mm NUTEC fibre cement facia board Marley streamline PVC-U 110x75mm gutter
76 x 50 SAP purlins at 1500mm centres 7 deg ree pitch
85mm mineral wool insulation between purlins 3.5mm Gyproc rhinoboard at max 150mm centres
concrete roof
Concrete coring in construction of drainage upstand: By drilling and extracting the concrete core.
45 degree FBO outlet assembly:
North
Concrete downstand
Overflow pipe assembly:
Marley streamline galvanised steel 110mm downpipe
409
Height under wallplate
Waterwise(succulint) planting for low maintenance
900mm pipe railing
Wispeco, crealco, 80mm skyline casement window opened with C20 actuator window opener
M20 nut
20mm Aluminium perforated screen
17.
m20 nut
Marley streamline PVC-U 100 x 75mm gutter to fall outlets
45° flat F.B.O gratings out of ductile iron
Quality of all materials and workmanship to comply with the relevant S.A.B.S specification and shall comply with the minimum standard specified in the Standard Preambles in the bills of Quantities or, in the absence of a bill of quanitities, available for perusal at the offices of the Architects. A project specification document will be issued by the Architects to elaborate on the preambles. Where the contractor finds these two documents to be conflicting this must be brought to the architect's attention before doing the work. The contractor is responsible for correct setting out of the buildings, all external and all internal walls with particular reference to boundaries, building lines, etc. The contractor is to verify levels, heights and dimensions on site and to check same against the drawings before putting any work in hand. Any discrepencies from the theoretical to be brought to the architect's attention. The contractor and all Sub-contractors are to check the details shown on this drawing for compliance with standards of best building practice (which is what is expected to be delivered) with particular reference to special requirements necessitated by local and/or on site conditions and to report any comment to the Architect. The contractor is to locate and identify existing services on site and to protect these from damage throughout the duration of the works.
4.
Marley streamline galvanised steel 160mm x 90mm gutter to fall downpipes
5660
Mineral board Control Joint
9.
85mm XPS insulation above slab
10.
535
Height under downstand 5125
228 x 50 SA pine pergola beam Woodoc 50 sealer applied to protect timber from sun and rain
NEW LARGE OFFICE
13mm Primed and Painted 2 coat plaster on interior
NOTES 5 AND 6 ARE RECOMMENDED
11.
Screen to roof upstand fixing detail: Perforated screen protects exposed concrete upstand.
Alumium perforated screen fixed to wall with bolted connection
r12628
2.
Solar angles: Summer solstice - 21 December at 13:00 = 80 degree altitude Winter solstice - 21 June at 13:00 = 34 degree altitude
75mm/100mm PVC pipe for overflow formed through coring 300mm R.C arched roof slab off-shutter finish tied into brickwork.
1. All windows areas to be 10% of floor area of which 50% is openable. 2. Read figured dimensions in preferance to scaling. 3. All levels dimensions, heights of plinths, depths of excavations and number of steps to be finally checked and determined by contractor on site. 4. Drawings prepared on basis of surface examination on site. Walls below ground level. 5. Recommended - AB's over all windows and doors without fanlights. 6. Recommended - 2AB's to W.C's bathrooms, kitchenette. 7. All handrails to be min 1,000mm high, ballister max 100 ccs 8. All drawings to comply with SANS 10400 and SANS 204
6. Concrete upstand
50mm screed 1000 micron DPM Permeable backfill
Galvanised truss hanger fixed to concrete upstand supporting bottom cord
GENERAL NOTES
M18, 290mm threaded rod
Extruded recycled plastic tray for soil containment
152 x 50 SA PINE laminated bottom cord
7.
Steel mullion
Bitumen waterproofing layer
72 m² Carpet Exposed Truss
19.
Height under lintel 02
single clear glass
SAP built in cupboard
Any errors, discrepancies or omissions on this drawing are to be reported to the Architect immediatly.
Diagramming explaining stormwater drainage on planted roof
Wispeco, crealco, 80mm skyline sliding 2000mm x 1500mm window
8.
Solar exposure large office north facing windows
North 228mm x 50mm SAP Beam
13.
M20 Nut 228mm x50mm SAP Beam
16.
14.
2325
3805
weepholes at 900 centres & above all openings
228mm x 50mm SAP supporting beam
10mm carpet
9375
M20 Nut
100mm XPS insulation
Col Skirting SK6 SAP Untreated softwood (140mm x 22mm)
15.
Rebate
M18, 140mm threaded rod
228 x 50 SA pine pergola beam, Woodoc 50 sealer applied to protect timber from sun and rain
Galvanised fillet
Shading Pergola Assembly: Pergola protects spaces from high sun angles during the summer but is short enought to allow for daylight to enter the space in the winter on the north facade.
2800
Components:
75mm brickforce every 4 courses
76 x 210mm pre stressed concrete lintel
Wall ties at typical 900mm (vertical) x 450mm (horizontal) spacing
1053
Corobrik Redwood brick to be plastered
1.
NEW INSTRUCTION ROOM 49 m² Polished screed Suspended concrete slab
Wispeco, crealco, 80mm skyline sliding 2000mm x 1000mm window
3740
9 8
900mm pipe railing fixed to basplate
Precast concrete cill 7
Modcon 0124 precast concrete coping
DA D3
150mm concrete ramp (1:12 slope) broom finished
Solar exposure group instruction room north facing window
permeable paving
4.
NGL
0 N.G.L
60mm basecourse Aggregate
Water stop 1000 micron DPC
-810
Col Skirting SK6 SAP Untreated softwood (3000mm x 140mm x 22mm)
Exterior Circulation level 230mm retaining wall
85mm XPS rigid insulation
12.
Glazing Notes:
375micron DPM
50mm sandblinding layer unidisturbed earth
trench for foundation footing
CONCRETE STRIP FOUNDATION @ MIN 15MPA @ 28 DAYS, 400 x 200 to engineers specification
Galvanised brick force, at every course for the foundation wall
Geotextile fabric Permeable backfill 110mm outer brickwork leaf
Waterproofing layers: 1. Elastomeric wash liquid 2. Waterproof coating (bitumen)
CONCRETE STRIP FOUNDATION @ MIN 15MPA @ 28 DAYS, 900mm x 300mm to engineers specifications
Dimpled drainage membrane
Concrete coved fillet
N Perimiter Section Detail Scale 1:25
6.
400
175mm concrete surface bed 20MPA at 28 days, to eng. specifications
Graded + poisoned compacted fill in layers of 150mm
Solar angles: Summer solstice - 21 December at 13:00 = 80 degree altitude Winter solstice - 21 June at 13:00 = 34 degree altitude Spring equinox - 22 September 13:00 = 57 degree altitude
810
concrete infill @ @ 10MPA at 28 days
Agricultural drain connected to stormwater drain
Glass Thickness
Max pane area
3mm
0.75 sqm
4mm
1.5 sqm
5mm
2.1 sqm
6mm
3.2 sqm
R - value for the wall:
4.48m2K/W
C - value for the wall:
531KJ/m2K
CR - value fot the wall:
662 hours
NEW WORKSHOP
:
107m2
NEW LOADING BAY
:
11m2
NEW WORKSHOP MANAGERS OFFICE
:
10m2
NEW WELDING AREA
:
16m2
NEW BULK STORAGE
:
17m2
NEW STAFF TOILET
:
17m2
NEW GROUP INSTRUCTION AREA
:
50m2
NEW PUBLIC TOILET
:
17m2
NEW RECEPTION / LOBBY
:
66m2
NEW LIFT
:
3m2
NEW LOUNGE
:
20m2
NEW KITCHENETTE
:
9m2
NEW LARGE CONFERANCE ROOM
:
23m2
NEW SMALL CONFERANCE ROOM
:
18m2
TOTAL NEW GROUND FLOOR
:
401m2
-1210 7.
FFL
DRAWING NUMBER
:
D-543-08-20
DATE
:
2020 / 08 / 01
CHECKED BY
:
J VAN DER WALT
DRAWN BY
:
S VAN HEERDEN
APPROVED BY DATE
:
2020 / 06 / 29
ENIGNEER SIGNATURE
:
..............................................
OWNER SIGNATURE
:
..............................................
SCALES USED
:
1:25
SHEET
:
1 of 1
8.
Also refer to SANS 10400
ALL DRAWINGS TO COMPLY WITH SANS 10400
NEW PROPOSED INNOVATION HUB FOR THE SUTHERLAND OBSERVATORY (Issued for Construction) AREA CALCULATIONS
5.
30mm bedding aggregate
PROJECT AND CLIENT DETAILS
North
1000 micron DPC
50mm polished screed
3.
Height under lintel 01
1447
11
1. Corrugated Sheeting 2. Timber truss 3. Timber purlins 4. Pop up section for hot air extraction 5. Railings 6. Arched Concrete Planted roof 7. Loadbearing brickwork walls 8. Horizontal shading device for north facade 9. Timber pergola 4. 10. Vertical shading for east dacade 11. Alumium perforated screen to protect exposed concrete. 12. Structural beam spanning length of building.
1447 152mm x 114mm SA pine column
10
1. No drainage bends or junctions below floors. 2. Bends and junctions in drains to be fitted with C.E's and I.E's with marked covers at ground level. 3. Drains under building to be adequetly protected against load. 4. Waste pipes to have reseal traps and to be fully accesible over full length. 5. Bathwast 50mm internal diameter basinwaste 50 mm internal diameter. 6. Gulleys at kitchens to have a cw tap over. 7. All surfaces to comply with NBR's. 8. Soil pipes to be 110mm at minimum.
Section Assembly Axonometric
External Pergola Corobrik Redwood facebrick, 222 x 106 x 73, raked mortar joints
Staircase note: Concrete cast in situ staircase 19 risers 280mm treads, 175mm risers
DRAINAGE NOTES
2500
shelf angle (concrete downstand) 220mm x 180mm supporting suspended floor slab
13mm Primed and Painted 2 coat plaster on interior
Solar angles: Summer solstice - 21 December at 13:00 = 80 degree altitude Winter solstice - 21 June at 13:00 = 34 degree altitude Spring equinox - 22 September 13:00 = 57 degree altitude
First Floor Level
300
228 x 50 SA pine pergola beam
255mm concrete suspended floor 20MPA @ 28days, to enigneers specifications off - shutter finish below slab
The Contractor is to build in approved DPC's whether or not these are shown on drawings, to all external walls at each floor, beam or parapet level and to all windows, doors, grilled or other opening in external walls. Cavity walls to have stepped DPC's. Any quaries arising from the above must be reported to the Architect for clarification before any work is put in hand. This drawing is not to be scaled. Figures to be used at all times. Where figured dimensions are given, this must be confirmed by the Architect. Burnt clay bricks in compliance with relevant S.A.B.S code only shall be used unless specific approval is obtained from the Architect for the use of alternative type of brick.
MODCON Precast concrete cill B.I.C
2192396
5.
Height under lintel 03
Steel baseplate
150 mm engineerd soil 1/2 topsoil 1/2 compost Seeding trays
7865
2205
152 x 50 SA PINE bracing 75mm x 105mm pre-stressed concrete lintel
300
900mm pipe railing mounted of baseplate Krafft galvanised chain
152 x 50 SA PINE laminated top cord
3.
8165
9.
10.
Window operation diagram Window is electronically operated with C20 Actuator window opener:
11.
Roof Assembly Axonometrix