Project 4: Road Alignment. Project objectives were to place a road through the site using minimal earth excavation and to connect the proposed road to the existing roads on the site plan. The proposed road's vertical alignment and horizontal alignment as well as proposed contour lines were to be calculated and included in table format. A section of the existing terrain and the proposed road were also to be included. Trees to be removed were to be marked and replaced with new tree plantings elsewhere on the site plan. Another objective was to place a swale to act as a catchment basin for the proposed road.