Stephen Thai portfolio issuu

Page 1

STEPHEN THAI architecture student

ARCHITECTURAL PORTFOLIO



TABLE OF CONTENTS:

pg 1-4

AUDI CENTRE Barlow Motors

pg 5-8

BOAT HOUSE Inspired by Frank Lloyd Wright

pg 9-12

ARDEN CENTRAL Shopping centre/transport hub

pg 13-14

BJS TOWER Tower construction

pg 15-18

SUPER DOM-INO Shared high-rise living

12 3 45


BARLOW MOTORS

The task was to design a car showroom in the spirit of Barlow Motors (a prestigious car reseller) as if it still presently existed. It must include parking for 300 cars, a car showroom, offices and a bachlelor’s apartment.

AUDI CENTRE

Audi cars were chosen to be sold at this car showroom. Audi inspired the design of the showroom from the neon sign outside to the exterior and interior of the building. Audi is highly facinated by technology and all things digital. As such, the facade of the building was inspired by their interest in all things digital and this is manifested in the form of pixels.

LONGITUDINAL

B3 1


Top and bottom: bachelor’s apartment. Right: Audi neon sign

L SECTION

CROSS SECTION

B2

B1

G

F1

F2

F3 2


Audi car showroom

Physical model

3


4


INSPIRED BY FRANK LLOYD WRIGHT

BOAT HOUSE The goal of the project was to design a boat house to replace the current one at Studley Park located in Kew. To meet the requirements of the brief, the boat house must also include a cafe, a restaurant and a boat renting kiosk. Furthermore, the boathouse’s design was to be inspired by Frank Lloyd Wright’s work.

5


Frank Lloyd Wright’s Fallingwater in Mill Run, Pennsylvania is the very epitome of organic architecture. I tried to follow through with that design philosophy by integrating the design with its surroundings through utilising planar structures, and making structures seem like they are floating by using dark elements underneath them.

F1 G

F2

6


7


Physical model

8


This studio involved designing a shopping centre in the Arden-Macaulay goal was to design a shopping centre that also acts as a trasport hub to the area.

In a lot of ways, this project is a lot like Melbourne Central so studies w undertaken to see what makes it work. Something vital to transport hub is the element of permeability. Looking at Melbourne Central, it is full of entry ways into and out of the shopping centre. This is one of the important things that make Melbourne Central a successful transport hub as it actually caters for the traffic of people and their movement throughout the hub. I chose to use laneways to achieve this kind of permeability throughout the site. In Melbourne, laneways were the result of the hoddle grid which were originally used as service lanes for horses and carts. Since then, they have evolved to become rich in facilities and things to do, and have therefore become interesting and full of life. Now, laneways have really become a significant part of Melbourne’s culture and identity. As seen in the plans, these laneways cut through entire lengths of the shopping centre, creating circulation as well as inbetween space for the inhabitants to linger.

9


district. The o revitalise

were bs

ARDEN CENTRAL SHOPPING CENTRE/ TRANSPORT HUB

10


ARDEN ST RESI RESI

RESI

R

BIKE RACKS R

R

R

BIKE RACKS

R

R R

C R

O

R

O

R

O

O

C R

R

C

R

R

R

R

R

R

R

UP

R

R

FOOD COURT

O

R

O

R

C

UP

DN

O

O

R

R

F

R

F R

R

F DN

R

LAURENS ST

R

RESI R

R

R

R

R

R

R

R

O

R

R

R

R

O

R

R

R

R

R

R

R

O

O RETURNS ROOM

O

O

O RETURNS ROOM

O

MEETING ROOM

R C

MEETING ROOM R C LIBRARY MEETING ROOM R

MEETING ROOM

UP R

R

R

R

R

R

R

ER TCE

O

R RESI

R

R

O

O

R

R

O C

R

R

O

O

C

RESI

RESI

O

O

UP

UP

R

R

UP

UP

RESI

R

R

BREAK AREA

BREAK AREA

R R

UP

BREAK AREA

BREAK AREA

UP

UP

GALLERY

R

R

GALLERY

UP

O

O

O

RESI

O

O

O

O

R

R

RESI

RESI O

R

O

O O

O

R

R

O

O

R

O

O

C DN

O

DN

O

RESI

RESI

O

RESI

O

O

O

O

DN

O R R

O

O

O

O

O

O

R

SPEC

BREAK AREA

UP

UP

O

O R

R

R

O

O

O O

O

MEETING ROOM

MEETING ROOM

O

RESI

RESI

O

O RESI

O

O

UP R

R

R

R

R

R

R

R

MEETING ROOM

MEETING ROOM

MEETING ROOM

MEETING ROOM RESI

RESI R DELI/SEAFOOD

BREAK AREA

UP UP

R

R

O

O

C C C C

R

R C

C

RESI

RESI

R

O

O

O C C

O

O

O R

R

R

R

R

R

R

O

RESI

RESI

R

R

RESI R

O

UP R

O

O

R

R

R

R

R

O

C

R

R

R R

RESI

RESI

R

R

R

R R R

C

CONSULTING ROOM

MEDICAL CENTRE

R

R

CONSULTING ROOM

MUNST

TICKET BOX/ CANDYBAR

UP

R

R R

DN

R CONSULTING ROOM

R

CONSULTING ROOM

MEDICAL CENTRE

R

F

DN

CONSULTING ROOM

R R

F

R R

DN R

CONSULTING ROOM

R R

R

F

R

F

R

CONSULTING ROOM

O

R R R R

R

R

R R

CONSULTING ROOM

O O

O R

R R

R

R

R

O

LOBBY AREA

LOBBY AREA UP

DN

RESI

LOBBY AREA

R R

R

O O

R R

R

R

R

UP

UP RESI

R

UP

R

F

R R

F

R

DN

O

O

R

R R

R

R

R F R

R

R

R O

R

R

R

R UP

DN

BREAK AREA

UP

UP R

R

R

O R O

R

O

R O

R

R R

RESI

R

R

O

R

UP

RESI UP

DN

R

R

R

R

C

UP

DN

R

R

UP

UP

BREAK AREA

BREAK AREA

DN

DN

R

UP

UP RESI

RESI UP

R

R

R

O

O

R

R

R

F

F

O R

FOOD COURT

C

O

UP

UP R

R

R

R O

O C

O

R R

R

UP

R

F

O

R

C

R

O

R

F

O

C

C

R

O

O

KARAOKE RESI BAR

R

R R

R

R

KARAOKE BAR

R R

R

R

O

O

R R

O

RESI

R

R

R

F

O

O

LOBBY AREA RESI

R

R

F

O

R

R

R

R

R

R F F C

R R

R

R

O

O

LOBBY AREA

LOBBY AREA R R R

C

O

RESI O

O

R

R

R

O

O

RESI

RESI

R

R

R

F

F CENTRELINK

C

R R

R R

R

R

R

R F

CENTRELINK

R

R

R

R

C

R

O

R R

R

R R

R

R R R

C

O

R

R

R

R

R

R

R

R

O

R R

F

R R

R R

O C R

O

R

R R

O

R O

R O

R

O

O

R

O

O

RESI

R

R

R O

O O

O O

RESI O

RESI O

R

R

R O

C

O

O

C

O O

O O

O

R

R

R

R

O

O C

O

O

R

R

R R

R O

RESI

O

RESI O

R

R

O

R

R

R

R

R

O

O

RESI

RESI

RESI

O

R

R

R

R R

RESI

RESI

R R O R

R

R

R

R

RESI

R

R

R

R

RESI

RESI RESI

RESI

O RESI

O R

O

R R

R

C

RESI

RESI RESI

O

O R

R

R

R

R

RESI RESI

RESI

R R R

R

BIKE RACKS

R

R

R

R R R

R

RESI

RESI

O

R

R

R

R

R

R

RESI RESI

R R

R

R

RESI

O

O

R

R PLANT ROOM

BIKE RACKS

RESI

RESI RESI

R

R R

R

R R

R

R R

RESI

RESI

RESI R R

R

R R

PLANT ROOM

PLANT ROOM

RESI

R R

R

R

R R

RESI

RESI RESI

RESI R

R R R

R R

BAKERY

O

O

O

O

O

O

O

O

O RESI

O

O

O

O

O

RESI O

O

O

O KITCHEN CHECKOUT AREA

KITCHEN KITCHEN

R

O

O RESI

RESI

O

O

R

UP

O

O

UP

UP

O

O

RESI

PLAY CENTRE

RESI

UP

UP

UP

UP

BREAK AREA

BREAK RESI AREA

BREAK AREA

UP

UP

O

PLAY CENTRE

BREAK AREA

BREAK AREA

R TROLLEY BAY

O

O O

PLAY CENTRE

UP

UP

BREAK AREA

UP

UP

UP

UP O

O

O

O

O

O

O

O

O

O

O

O

R DN

DN

DN

UP

UP

O UP

DN

UP

RESI

O

RESI UP

O

O F

F

F

F

F

UP

UP

RESI DN

DN DN

DN

R

LUNCH ROOM

LUNCH ROOM

DN FROZEN STORAGE

STORAGE

UP

RESI

DN

O UP

F

TICKET BOX/ CANDYBAR

O RESI

RESI

R

SELF CHECKOUT

UP

DN

DN

STATION ENTRY CONCOURSE

LOADING BAY R

O

O

O

O

O

O

O

O

O BREAK AREA

LUNCH ROOM O

O

O

LUNCH ROOM

LUNCH ROOM

UP

UP UP

INFORMATION OFFICE

F

UP

UP

UP O

O O

O

O O

BREAK AREA O

O

O O

O O

LUNCH ROOM

UP

UP O

O

UP O

O

O

O

O

O

O

O

O

O

O

O

O BREAK AREA

O

O

O

DN

DN DN UP

B1 VIEW FROM OFFICES

11

DN UP

DN

DN

DN UP

UP

UP

UP

DN

G

QUEENSBERRY ST

G/F1

UP

VIEW OF SHOPPING CENTRE COURTYARD

UP UP

F1

F2

O

O

O O

BREAK AREA DN

DN DN

F3

VIEW OF UNDERGROUND STATION

O

B O


RESI RESI RESI

RESI

RESI

RESIRESI

RESI RESI

RESI RESI

RESI

RESI

RESI

RESI

RESI

RESI RESI

RESI RESI

RESI

RESI RESI

RESI RESI

RESI

RESI RESI

RESI

RESI

RESI

RESI

O RESI

RESI

O

O

O

O

RESI O

O

O

O

O

O

RESI

RESI

O

O

O

O

SPECIALTY RETAIL STORE

RESI

RESI

O KARAOKE BAR

RESI

O

RESI

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

RESI

RESI

RESI

RESI O

SPECIALTY RETAIL STORE

O

O

O

O

RESI

O O

O

RESI

RESI

KARAOKE BAR

O

UP

UP

O

RESI

O

UP

O

O

UP

O

O

O

O

O

O

O

O

O

RESI

UP

O

RESI

RESI

O

UP

O

RESI

RESI

BREAK AREA

RESI

RESI

O O

O

SPECIALTY RETAIL STORE

SPECIALTY RETAIL STORE

RESI

RESI

RESI O

O

O

O

O

RESI O

O

O

O

O

RESI

RESI

RESI

O

O

O

RESI

RESI

RESI

O

O

O

O

O

O

RESI

O

RESI

O

O

O

O RESI

RESI

RESI

RESI

UP BREAK GALLERY AREA

GALLERY

SPECIALTY RETAIL STORE

SPECIALTY RETAIL STORE

O

O O

O

UP

O

RESI

RESI

O

DN

O

DN

O

O

RESI

O

O

RESI

RESI

O

DN

O

O

O

O

O

O

O

O

O

O

O

O

O

RESI

RESI

O

RESI

O

O

O

O

MEETING ROOM

MEETING ROOM

MEETING ROOM

MEETING ROOM

RESI

RESI

O

O

O

O

O

O

O

O RESI

DN

O

O

O

RESI

O

DN

UP RESI

RESI

DN

O

O

RESI

O

O

RESI

RESI

RESI

RESI O

O

O

RESI

O O

O

RESI

O

O O

MEETING ROOM

RESI

O DN

DN

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

O

RESI

RESI

BREAK AREA UP

O

O

RESI

RESI

O

O

OO

OO

OO

BREAK AREA

DN

DN DN

UP O O

OO

OO

O

BREAK AREA

O

O

O

O

RESI

LUNCH ROOM

UP UP

O

RESI

LUNCH ROOM UP

RESI

O

RESI

RESI

LUNCH ROOM

RESI

O

O

O

OO

OO

O O

BREAK AREA

DN OO

O O

OO

O

BREAK AREA

O

O

O

O

F4

VIEW OF WINTERGARDEN

12


BJS TOWER SKYSCRAPER CONTRUCTION

This was a construction oriented project which involved working together with two other students. Our goal was was to deliver a uniform and consistent look throughout the building, and more importantly, one that is interesting and challenges the typical skyscrapers that we have all become accustomed to by introducing a literal twist. Our decision to adopt a different stacking process compared to typical skyscrapers, came with a plethora of issues that we would have to account for in the future, especially when it came to the structure of our building. In the end, we opted for an external diagrid structural system.

13


14


-

Current trends are showing that Melbourne’s house prices are culminating into the new high after risi year, whereby median apartment unit rose to a record $481,000. The result is an alarming amount of r shows the increase in renting over the past 8 years and for the first time ever, over 30% of Australian renting. Is the natural response to give up on apartment living all together and for future home own into the suburbs like their previous generation did? The ultimate goal of this project is to design a sk with a certain typology that fits within the requirements that it will be demanded of in the future.

Urban Analysis

This project aims to provide high density apartment living that remains very liveable by embracing shared living elements. Firstly, the sharing concept is to embrace different people, in this case target groups, and break down the idea of a single community which, by definition is a social unit that share the same values. This will be done by moving away from the idea of a community, more towards the idea of a home where many things are shared.

Site border. No access along Adderley street due to car parking, fencing, and a steep contour.

My take on the Dom-ino system creates two different typologies:

Half the site houses train tracks, most are used for train storage. Responsible for a mostly flat site.

1: THE SUPER FLOOR. 2: THE CONTINUOUS FLOOR.

Lots of car parking along Adderley street, hindering access to the site. More car parking along Batman and Jeffcott street.

Steep contour at the intersection between La Trobe and Adderley street. 6m drop.

MsD Design stUDio 13 tutors: e. Watanabe & i. Kebel -

15

The typology embraced is Le Corbusier’s Dom-ino house where the basic idea is mass housing production: a single unit that can be repeated over and over. With this idea of mass production also comes the free plan. The free plan’s importance in a skyscraper sharing typology is that it is completely liberating: providing completely open space for sharing.

Urban Analysis

Site cutout.

Site outline.

3D context.

Roads, tram routes, Skybus. Access to site via trams is very convenient.

Points of access. Very limited due to steep contours and train tracks.

Mapped green space. Open green space is very limited.


ing nearly 9 per cent last renters. Census 2011 n households are ners to move kyscaper

SHARED HIGH-RISE LIVING

SUPER DOM-INO -

Urban - proposal Urban proposal -

-

Existing Spencer Existing street Spencer accessstreet road access road rerouted to create rerouted more to potential create more for potential for the site. the site.

Proposed carProposed park usedcar to park blockused noisetofrom block noise from frequent trainfrequent and Skybus trainservices. and Skybus Alsoservices. used Also used to bridge access to bridge from La access Trobe from street La Trobe bridge.street bridge.

Another car park, Another accessed car park, via accessed La Trobe via andLa Trobe and Adderly street Adderly to takestreet adventage to take ofadventage level difference. of level difference. Platform to create Platform access to create to lower access level.to lower level.

Retail along the Retail platform along the to attract platform theto attract the public. public.

Existing Spencer street access road rerouted to create more potential for the site.

Urban - proposal Urban proposal

Proposed car park used to block noise from frequent train and Skybus services. Also used to bridge access from La Trobe street bridge.

r

Urban proposal

Five towers for Five maximum towers for density. maximum density. Arranged to make Arranged blocked to make views blocked non- views nonexistent. existent.

Proposed car park used to block noise from frequent train and Skybus services. Also used to bridge access from La Trobe street bridge.

Lower floor isLower open floor greenisspace open with green space with programs, something programs,issomething is lacking inis is lacking in the vicinity ofthe thevicinity site. of the site.

Five towers for maximum density. Another car park, accessed via La Trobe and Arranged to make blocked views nonAdderly street to take adventage of level difference. existent. tutors: e. Watanabe tutors: e. Watanabe & i. Kebel&Platform i. Kebelto create access to lower level.

Retail along the platform to attract the public.

MsD Design MsD Design stUDiostUDio 13 13

Existing Spencer Existing street Spencer accessstreet roadaccess road rerouted to rerouted create more to create potential more forpotential for the site. the site.

and ference. el.

Proposed car Proposed park used cartopark block used noise to block from noise from frequent train frequent and Skybus train and services. Skybus Also services. used Also used to bridge access to bridge fromaccess La Trobe from street La Trobe bridge. street bridge.

MsD Design stUDio 13

Retail along the platform to attract the public.

Another carAnother park, accessed car park, viaaccessed La Trobevia and La Trobe and Adderly street Adderly to take street adventage to takeofadventage level difference. of level difference. to Platform create access to create to lower access level. to lower level. : e. Watanabe &Platform i. Kebel

Five towersFive for maximum towers fordensity. maximum density. Arranged toArranged make blocked to make views blocked non- views nonexistent. existent. tutors: e. Watanabe

Lower floor is open green space with programs, something is is lacking in the vicinity of the site.

Retail alongRetail the platform along the to platform attract the to attract the public. public.

MsD Design MsD Design stUDio stUDio 13 tutors: 13 e.tutors: Watanabe e. Watanabe & i. Kebel& i. Kebel

Five towers for maximum density. Arranged to make blocked views nonexistent.

Lower floor is open green space with programs, something is is lacking in the vicinity of the site.

& i. Kebel

Lower floorLower is openfloor green is open spacegreen with space with programs, something programs, issomething is lackingisinis lacking in the vicinity the of the vicinity site. of the site.

16


Exploded Axonometric diagrams.

-

VS One unit, 15m². Remaining 5m² goes towards communal space.

One unit, 20m². Entirely private space.

Building Design

One unit, 15m² private space. 55m² total space, with 40m² to share.

Exploded Axonometric diagrams.

MsD Design stUDio 13 tutors: e. Watanabe & i. Kebel Exploded Axonometric diagrams.

VS

Building Design

Literal spacial representation.

-

Building Design

MsD Design stUDio 13 tutors: e. Watanabe & i. Kebel

Longitude and latitude sections.

MsD Design stUDio 13 tutors: e. Watanabe & i. Kebel

Dom-ino house system...

... adopted for a skyscraper. Made possible with the structural core, and an external structure...

... creating a free plan, able to be personalised...

... dom-ino system allows different Exploded Axonometric floor types to come diagrams. together.

MsD Design stUDio 13 tutors: e. Watanabe & i. Kebel A weakness of the domino system is cumbersome vertical circulation.

17

Ramps work better as vertical circulation. Needs to be adapted.

Adjacent floors are split, creating entire ramps along them. Use the long length of the skyscraper footprint to minimise gradient. 1:12 achieved. MsD Design

Apply dom-ino system; floor plates between singular entity connecting all spaces together.

Create flat spaces between the ramps for functionality.

stUDio 13 tutors: e. Watanabe & i. Kebel

Longitude and latitude sections. CROSS AND LONGITUDINAL SECTION


-

Building Design

:200

Residential and communal space

1:200

:200

Swimming pool and gym floor

1:200

TOP-MOST: SUPER FLOOR (RESIDENTIAL), TOP: SUPER FLOOR (SHARED), BOTTOM: RENDER

e. Watanabe & i. Kebel

TOP-MOST: CONTINUOUS FLOOR, TOP: GYM/SWIMMING POOL FACILITIES, BOTTOM: RENDER

MsD Design stUDio 13 tutors: e. Watanabe & i. Kebel

18


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.