BIM for Precast: Models Connections and Documentation

Page 1

BIM

for Precast


Precast planning and layout with conventional methods can be costly and challenging for:

Pre-casting Manufacturing Firms

Structural Designers

Concrete Contractors

Site Engineers


Paper-based or 2D CAD processes are often inaccurate or error-prone leading to:

Inaccuracies in coordination Greater drawing errors due to lack of visualization Higher modifications / rework Costly material wastage and hiccups in construction process

Let us understand the specific challenges for precast using legacy methods.


2D conventional precast techniques pose the following challenges:

Design errors with 2D CAD techniques leads to reduced constructability

Inaccurate or incomplete reports for BBS with CAD-based drawings

Uncoordinated shop drawings lead to inaccurate casting and material wastage

Higher field errors lead to greater delivery & erection time


Precast concrete design, manufacturing, scheduling, and installation becomes seamless with BIM processes and tools.


4 Ways that BIM can help Precast


1

Faster generation of reports based on clashfree and coordinated 3D models

 Quick and accurate report creation through coordinated 3D BIM

Coordinated reports for precast planning and layouts

models for manufacturing, and installation.  Extraction of quantities from bar bending schedules and bar lists through a coordinated 3D BIM model.  Typical set of structural elements from clash-free BIM models, with unique ID and erection ID for further coordination.


2

Typical list of structural elements using BIM

Coordinated BIM models help in publishing a typical list of

Detailed list of structural members for factory production

structural elements with respect to size and shape which help:  Factories to save on reusable moulds and continue production in respective batches.  Save cost and time for overall production process in factories.


3

Extraction of model-based shop drawings for improved casting efficiency

 Production of a fully coordinated 3D Rebar model with

Generate accurate shop drawings with BBS

documentation to build a comprehensive document set.

 Quick extraction and edit of shop drawings from BIM models.

 Detailed BBS (Bar Bending Schedule) from coordinated BIM models for precise casting.


4

Faster building erection with Precast concrete modeling and detailing

 Visualization of erection sequences with unique ID with precast element connections and joint design for better assembly.

Reduce onsite errors for faster erection

 Precise mapping of construction activity planning and elements related to each activity with the use of BIM.  Swift onsite erection, cost and time savings with accurate component placement, precise erection orders, and planned logistics for speedy construction.


Coordinated 3D structural model at LOD 450 saves cost and time for office building. An accurate, information-packed, and clash-free 3D Revit structure model at LOD 450 reinforced with Rebar modeling saved cost and time for a precast manufacturing project. Click here to read more: https://www.hitechcaddservices.com/case-studies/revit-structural-model-for-office-building/


Enhance the ROI of your construction project with accurate 3D model-based documentation and complete sheet setup.

Connect with our precast modeling and detailing team for cost-effective deliverables and high impact outcomes.

www.hitechcaddservices.com info@hitechcaddservices.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.