MEP Coordination for Residential Buildings
Challenges and Solutions
Residential buildings need MEP systems and equipment to function at optimum performance for residential occupants’ comfort.
MEP coordination for residential units is crucial for:
General Contractors
MEP Contractors
Construction Companies
Fabricators
Challenges faced during design, fabrication and installation of MEP systems
Groundwork
Spatial Planning
Construction
Safety
Operations
Optimum installation and functioning of MEP systems in residential buildings requires:
Interdisciplinary coordinated MEP models
Precise documentation and Modelbased shop drawings
Visualization of spatially coordinated MEP systems
Accurate cost estimates
Database for future operations and maintenance
4
Solutions to Overcome MEP Coordination Challenges
Space allocation for MEP equipment
The Challenge Absence of accurate load calculations or unused space Adding buffer load of 10% to 20% to cover minor alterations Placement of large MEP equipment to avoid soft clashes
The Solution Coordinated BIM MEP 3D models drive higher visualization to calculate exact load Accurate and information-packed architectural 3D models help MEP teams create an efficient layout to fabricate and install MEP equipment Soft clashes can be minimized with proactive clash resolution in the early design stage
Precise MEP Spatial Coordination
The Challenge Inaccurate routing of MEP equipment or systems Absence of spatially coordinated MEP designs Flawed or inefficient documentation
The Solution Coordinated MEP BIM models facilitate higher collaboration 3D BIM models help multiple teams visualize design intent and constructability based on 3D walkthroughs Updates and modifications reflected in real-time keeps the documentation process updated and sorted Streamlined project documentation reduces project turnaround time and builds greater consistency
Clash-free LAYOUT and INSTALLATION
The Challenge Uncoordinated and clash-ridden drawings diminish required fabrication and installation quality Neglecting MEP equipment interferences early in the design phase leads to rework, project delays, and cost overruns
The Solution MEP coordination resolves clashes in the preconstruction stage leading to reduced rework and delays Enhanced coordination between HVAC, electrical and plumbing equipment improves project constructability Accurate MEP layouts are site-ready and facilitate better equipment routing leading to hassle-free installation
Model visualization and representation
The Challenge Lack of visualization of MEP equipment and elements for fabrication and installation Higher complexities with CAD-based drawings
The Solution Visualization of multiple MEP systems and equipment with coordinated BIM-models lead to a well-distributed layout Model-extracted shop and schematic drawings drive accurate and quality fabrication backed by higher construction clarity
Coordinated MEP 3D model at LOD 400 saves cost and time An architectural engineering firm saves cost and time by ensuring hassle-free installation of MEP components for a residential building in the US, with MEP coordinated drawings.
Learn how
Make your MEP project clash-free and achieve exceptional cost savings.