Thesis First Quarter Presentation Base Board

Page 1

Steven Glassman

2 top of

Ross Island Bridge Park

South Waterfront Residential Complex bank

Secondary Nodes -Zones of experience -Transitional links -Outdoor spaces -Public-Private blending

Destination Nodes -Destination spots -Neighborhood Points of interest -Public locations

Tower Floor Plan

Water Taxi

-Point of Decision -Major activity area -Plaza space -Display for South Waterfront

G

Civic Lawn

Lawn Terraces

Rec Node

o r

Barge

v

Small Craft Tie Up

r e

Water Adventure Play Area

. t S

1/32” = 1’

Transportation Node -Street car access -OHSU Tram access -Pedestrian Bridge access -Automobile Entrance

Commercial Avenue -Avenue of Retail / Commercial -Pedestrian Friendly

Proposed Building

s

b

b i

Plaza

. t S

G Interpretive Terrace

Grasses Garden

Site Analysis

3 4

Bridge

Beach

-Residential tower located on SW corner of block to ensure river views for neighboring buildings -Low buildings form outdoor space for secondary node -C.E.E.C. building located on SE corner of block to ensure connection with pier element and separate its program from mixed-use building

Ross Island Bridge Park

Whirly Crane Kiosk

Sectional perspective of North-South Unit Layout

Terraced Lawn

Pedestrian Dock

23

24

River

Water ADventure Play Area

View Terrace Rec Node

C.E.E.C. Pier

. t S

C.E.E.C. Building

Courtyard

Playground

r e Viewing Terrace with Seating

27

28

South Elevation

Parkway

Urban Design Node Diagram

a t i h

W

Battered Corten Steel Shelf Walls

South Waterfront Greenway

k

5

Residential Tower

Kiosk

Plaza

Site Plan 1/64” = 1’

North Facade Perspective

South Facade Perspective

1” = 150’

Sectional Perspective


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.