Stéphanie Menard Portfolio

Page 1

2008-2021 STEPHANIE MENARD ARCHITECTURE PORTFOLIO



Through the following selection I wanted to show this diversity of projects but also my will to conceive simple architectures that are legible in their volume and uses. I believe in an architecture that encompasses as many parameters as it can in a logical, innovative and generous concept. In this architecture, the construction is a core research in order to achieve the poetry. A building is a set of constructive and technical details that should be precisely solved respecting the project’s identity, the expected atmosphere. Each creation of space is a chance to trigger uncommon interactions between human and his environment, to raise his awareness on body-feelings through construction : load, luminosity, materiality, rhythm. The selection displays this attention of being more conscious about our senses, about our presence in a place. The power of images and memories is a running subject in my endeavour too. Analysing the existent and how it is perceived by inhabitants, collecting pictures that have a strong atmosphere or emotion... All those collections are tools to refer further by analogy. In facts images and visions are made of feelings that can be transferred and interpreted in a new architecture with its volumes, its materiality and its relations to surroundings. 3 /55



2008-2021 STEPHANIE MENARD ARCHITECTURE PROTFOLIO

12

POPPINS HOUSE living

PATHOS living

PETITE CEINTURE living

Hollyday house to build by yourself LANCIEUX, FRANCE

House for a disturbed character next to the railway RENNES, FRANCE

Home for 100 students, artists and immigrants PARIS 13RD, FRANCE

2010 P. GRESHAM, ENSAB

2011 P. GRESHAM, ENSAB

2010 WITH ADELIE QUENOT P. BENSOUSAN, ENSAB

5 /55


LTFBIS landscape

LOOSEFIT matter

FASHION INCUBATOR public

Multi Bus stop BELVAUX, LUXEMBOURG

Exploration of garnment movement

Temporary Workshops for fashion designers GOTHENBURG, SWEDEN

2012 WITH J. PONOMAREFF & Y. ROCHE COMPETITION 3RD PRIZE

2012 CHALMERS UNIVERSITY

2012 CHALMERS UNIVERSITY

VELUX matter

EESA re-use - public

ANALOGY essay

Use lights as a material that reveals time-lapse

Art-school rehabilitation and extension RENNES, FRANCE

Architecture and landscape approach in J.Ishigami’s work

2012 CHALMERS UNIVERSITY

2013 L. LOTTI, ENSAB

2013 G. AZAR, ENSAB

Stéphanie MENARD portfolio


FESTIVAL essay

DEVIATION landscape

PSYCHO public

How do inhabitants change their perception and uses of urban spaces through cultural events ?

Daniel Buren’s work of art construction LANRIVAIN, FRANCE

Research on space imprints on body and mind balance - center for disabled persons

2013 J. VAJDA, ENSAB

2013 COLLECTIVE WORK

2013 P. GRESHAM, ENSAB

16

HEALTH CENTER public

UN JARDIN SUR LE QUAI landscape

LIGET public

Construction of a new health-center BAUGÉ, FRANCE

Inner city Marina VALENCIENNES FRANCE

Museum of music BUDAPEST, HUNGARY

2013 KRAFT ARCHITECTS

2014 COMPETITION

2014 ATELIER 56S

7 /55


22

PUBLIC LIBRARY re-use - public

NURSERY re-use - public

HOUSE CSL living

Media-Library in a rural town ST-PIERRE-DE-PLESGUEN, FRANCE

Rehabilitation and extension of a nursery BAIN-DE-BRETAGNE, FRANCE

Transformation and extension of an old couple’s house CESSON-SÉVIGNÉ, FRANCE

2014 ATELIER 56S

2015-2016 ATELIER 56S

2014-2016 ATELIER 56S

26

RE-USE essay

BELVÉDÈRE landscape

HOUSE MMM living

Learning from existing constructions and its rehabilitation

Overview onto the vineyard CHATEAU-THÉBAULT, FRANCE

2015 R. KERVALLA,ENSAB

2015 ATELIER 56S

Ground-floor-family house in a parcelling project MELESSE, FRANCE

Stéphanie MENARD portfolio

2016 ATELIER 56S


PIERRE BLANCHE urban planning

HOUSE BD re-use

DINARD living

Introduce 100 houses in a woody slope BOURG-DES-COMPTES, FRANCE

Transformation of a Barn into a Ecological house BRUZ, FRANCE

27 apartments in three buildings DINARD, FRANCE

2015-2016 ATELIER 56S

2016 ATELIER 56S

2016- 2017 J. CHOUZENOUX ARCHITECTURE

34

OFFICES SGL re-use

MARBEUF living

POTERIE living

Transformation of an open space into smaller offices SAINT-GRÉGOIRE, FRANCE

30 apartments RENNES, FRANCE

120 Apartments and a parc RENNES, FRANCE

2016- 2017 J. CHOUZENOUX ARCHITECTURE

2016- 2017 J. CHOUZENOUX ARCHITECTURE

2016-2017 J. CHOUZENOUX ARCHITECTURE

9 /55


38 44

RIED A Housing

NEUMATT 360° Highrises

JELMOLI Interior Design

137 Apartments Köniz (BE), Switzerland

1st Prize, for one Highrise and a parking Competition for the center development «Neumatt» Spreitenbach, Switzerland

2nd Prize competition for redesigning the beauty department of Jelmoli Zurich, Switzerland

2017 HILDEBRAND

2018 HILDEBRAND

2018 HILDEBRAND

48 52

ONE TREE Installation

WEINBERGSTRASSE Housing

RIED B Housing

Proposal for the 17th Swiss Pavillion of the Architecture Biennale Venise, Italy

5 Doulbe-familly-houses Dietikon, Switzerland

218 Apartments Köniz (BE), Switzerland

2018 HILDEBRAND

2018 HILDEBRAND

2019 HILDEBRAND


INSEAD University

TRIANGLE Highrise

INSEAD Campus Renewal Fontainebleau, France

Office tower + Hotel and retails Paris, France

2019-2020 HEZOG & DE MEURON

2020 HEZOG & DE MEURON

11 /55


00 00 sketch a holiday house that works as Marry Poppins’ bag 01 transversal section simple volume that is completely used

01


2010 Student project Lancieux, FRANCE With Adélie Quénot

DIY HOLIDAY HOUSE

Holidays are an idealistic time to break free, get out of routine. Even if that phaseshift is a fantasy, holidays show a will of living differently. A desire of letting go. Immerse into nature, with a lower degree of comfort supplies : what we want is to spend most of our time outside. Indoor still useful as a shelter to sleep, wash yourself and cook... And even all those activities can be transferred outside. We let more room to unexpected moments and don’t stop an activity because it’s time to lunch. Family times are more often and more relaxed. Everything seems to be suspended. We pay more attention to our body feelings and what we really need : feelings. Sun burns our skin, and our feet’s arch walking on the sand, Waves leaks our ankles, warmer and colder, Lawn tickle our toes injured by the rocks, ... Even our ground attraction changes. We happen to lay down a bit everywhere, no matter if there is a beach chair next to us, we prefer to feel our body weight on the soft sand, lawn... No decoration doctrine in the house, every discovery finds its place. The minimum required only. We already took too much in the car when we were still under the influence of eagerness. Mobility is part of the notion of getting out. This mobility has to continue in the way of living at the holiday house. The tiny unit should adapt to different activities, needs of space and weather. Limits between outside and inside should be blurred. It’s more like a platform that is more or less opened, more or less empty.. 13 /55


DO IT YOU R SEL F

02

PLANCHER 6 Pilotis 24 Vis de 25cm 2 Poutres 25x15x1066 11 Poutres secondaires 25x6x480 22 Sabots 88 Vis 8cm 20 Tasseaux 4x4 100 Vis 3cm 14 Panneaux médium 245x106x2 4 Rouleaux de liège 490x106x8 8 Panneaux médium 240x100x2 24 panneaux médium 120x100x2 800 Vis 8cm

Visser les sabots sur les 2 poutres principales Visser les 20 tasseaux sur les 11 poutres secondaires Poser les 11 poutres dans les sabots et visser les Retourner l'ensemble Placer et clouter l'isolant de la partie chauffée Placer et visser ensuite les 8 panneaux de médium par dessus Placer et visser les 14 autres panneaux de fond de caisson Retourner de nouveau l'ensemble et placer le sur les pilotis Visser les pilotis au plancher. Placer les 8 panneaux de médium dans la partie chauffée et les 24 autres petits sur les terrasses

Noti c e d e c o n st ru c t i o n PORTIQUES

Pour un portique extérieur :

5 Poteaux 242x15x6 5 Poteaux 392x15x6 6 Poteaux 242x24x6 6 Poteaux 392x24x6 20 Traverses d'appui 100x24x6 45 Traverses d'appui 100x15x6 6 Traverses d'appui 106x15x6 260 Chevilles 22 Plaques de fer 5x20x0,3 132 Vis 8cm 11 Arbalétriers 20 Etretoises 100x24x6 80 Chevilles 22 Plaques de fer jonction haute 132 Vis 4cm 22 Plaques de fer jonction basse 132 Vis 4cm

À terre, encastrer les deux poteaux (24x6) avec l'arbalétrier et visser les plaques de fer associées Enfoncer les chevilles dans les entretoises et traverses d'appuis Encastrer-les dans les endroits prévus à cet effet Positionner le portique dans la première mortaise. Placer et visser les plaques de fer au niveau de la jonction portique/plancher Répéter l'opération pour chaque portique ATTENTION : Les poteaux des portiques intérieurs ont une section moins longue (15x6)! et possèdent un plus grand nombres de traverses d'appuis.

ISOLATION PARTIE CHAUFFÉE Toit 8 Panneaux médium 267,5 x100x4 4 Rouleaux de liège 535x100x10 24 Equerres175x5x5 176 Vis de 3cm 352 boulons Mur Bas 2 Panneaux médium 235x103x2 2 Panneaux médium 235x106x2 2 Équerres 235x4x4 2 Rouleaux de liège 235x103x5 2 Rouleaux de liège 235x106x5 Mur Haut 2 Panneaux médium 385x103x2 2 Panneaux médium 385x106x2 2 Équerres 385x4x4 2 Rouleaux de liège 385x103x5 2 Rouleaux de liège 385x106x5 12 Tasseaux 200x2x2

Partie Mobile 18 Rouleaux 144 Vis 3cm 18 Crochets

Pour une baie :

2 Cadres 2 fenêtres 80 Vis 5cm

Tout d'abord, installer la fenêtre triangulaire : Placer le cadre en fer et visser-le Glisser et visser la fenêtre dans le cadre

ATTENTION : panneaux de médium de 103cm de large sur les extrémités et les panneaux de 106 au milieu

Portes Fenêtres

Ensuite, installer les portes fenêtres : Visser le rail au sol Faire glisser le bloc portes fenêtres de façon à ce que l'élément à deux portes soit du côté bas de la structure. Ouvrir les fenêtres et visser le cadre dans les rails en haut et en bas. Répéter l'opération une seconde fois.

4 Portes fenêtres 2 Rails 30 Vis 5cm

Isolation du toit : Visser les équerres sur les arbalétriers Accéder au toit, positionner et visser les boulons aux panneaux de médium. Dérouler et fixer les planches de lièges avec les vis.

MEUBLE CUISINE / SALLE DE BAIN 1 Panneau médium 218x150x2 1 Panneau médium 218x150x4 3 Poteaux 218x8x6 4 Équerres 8x8 2 Panneaux médium 219x214x 2 2 Panneaux 219x80x2 2 Panneaux 219x60x2 70 Chevilles 8 Équerres 3x3

Partie fixe chauffée : Placer et visser sur les tasseaux horizontaux les 2 toiles sur chaque mur extérieur Placer et visser la toile du toit Capuchonner les vis Partie mobile : Pour le toit, placer et visser les rouleaux entre les arbalétriers dans la partie la plus haute de la structure Pour les murs, placer et visser les rouleaux entre les arbalétriers, juste au dessus des traverses d'appuis

Côté Salle de Bain 1 Planche 134x60x3 1 Planche 134x30x2 1 Planche 60x60x3 8 Équerres

ATTENTION : Ne vous trompez pas dans les dimension et le positionnement des rouleaux!

Positionner le panneau (218x150x2) au sol, comme indiqué sur le plan Fixer les poteaux au sol avec les équerres Enfoncer les chevilles sur les panneaux verticaux et encastrer sur les poteaux Fixer les au sol avec les équerres. Placer et visser sur les poteaux les deux panneaux de cloison Amener le panneaux (218x150x4) sur l'ensemble et visser-le

Placer et visser les équerres aux endroits indiqués Glisser les planches dessus Pour la colonne de la cuisine, placer les chevilles aux endroits souhaités et glisser les planches.

Côté Cuisine 1 Plan de travail 150x60x3 2 Planches 150x60x2 2 Planches 150x30x2 20 Équerres 3 Planches 62x60x2 12 Chevilles

MEUBLE LIT

MEZZANINE 1 Panneaux 248x218x3 1 Planche 248x15x2 1 Planche 200x15x2 10 Chevilles 15 Clips 30 Vis 2cm 5 Barres 250cm, Diam 3cm 40 Vis 4cm

Fenêtre Triangle

Positionner les panneaux de médium du côté extérieur de la structure Visser-les sur les poteaux

Dérouler et clouter les planches de liège sur les panneaux de médium aux mêmes dimensions Visser les tasseaux horizontalement, deux à chaque extrémités et les derniers au centre

TOILES Partie Fixe 1 Toile 600x430 toit 1 Toile 430x420 grand côté 1 Toile 430x270 petit côté 150 Vis 3cm + capuchons

Isolation des murs :

Fixer les barres de fer entre le meubles précedement monté et et sur l'axe des traverses d'appuis à 225cm de haut. Au sol, enfoncer les chevilles aux planches de rebord Encastrer-les au panneau Retourner-les et visser les clips Clipser l'ensemble aux barres de fer

Éléments 3 Panneaux 218x110x3 1 Panneaux 218x110x2 1 Planche verticale 110x90x1 1 Planche verticale 100x75x1 4 Équerres 210x4x4 4 Roues 10cm de haut 2 Planches 218x10x2 2 Planches 106x10x2 20 Chevilles 64 Vis 4cm 1 Fillet 218x200

À plat, visser les deux panneaux des extrémités aux équerres d'angle Visser les roues à la planche basse Relever l'ensemble et visser les panneaux-lit Glisser dans les rainures les deux panneaux verticaux Enfoncer les chevilles dans les planches restantes et encastrer sur le panneaux le plus haut

PLAN 1.50 Pour le rattachement au réseau d'eau et réseau électrique, veuillez contacter un plombier et un électricien. Des adresses sont disponibles ci-dessous : Monsieur Dufil, électricien Avenue des Volts 33425 CABRILLE Monsieur Siphon, plombier Rue de la Fuite 65890 ROBINETVILLE De plus si la nécéssité d'un menuisier vous parait utile, vous pouvez contacter : Monsieur Mortaise, menuisier Boulevard du Chambranle 23649 TOURNELAVIS

Stéphanie MENARD portfolio

YOU DID IT . Stéphanie MENARD . Adélie QUÉNOT . MEKE ARCHITECTS . ENSAB 2010 .


03

04 03 Installation instructions a Do It Yourself structure like the IKEA concept 05 model units are gathered in small groups separated by existent edges 04 model staggered plan to open view on the field and the water 05 collage community on holiday

05

15 /55


00

00 ground-plan diagram lines stretched between the lake and the corner


2014 Liget Competition Budapest, Hungary Within ATELIER 56S office In charge of conception and renderings

LIGET BUDAPEST

The project is designed with a clear will to offer a wide ranging experience of music, both intellectually and emotionally. It opens up the curiosity and the creativity through body experiences of music. The museum is located into the greenery and close to the lake. It has to be really attractive, catching the eye from the pathway, but it also has to be respectful regarding the landscape and the woodland atmosphere. The two major concerns of the project are to create a place that represents music metaphorically and a building that merges with the landscape. The building deals with monumental and human scale at the same time : monumental scale is a way to trigger the awareness of visitors. The particular atmosphere presents in places like churches or libraries creates a really quiet environment where you can focus easily. Inside large walls, little rooms are specific in their volume and covers to create several sound situations. This duality brings a real freedom to visitor who can compose his own journey as if he was composing music. He has both a sense of rhythm and of flow. It’s like playing freely music on a given tempo. Small rooms echo to others like on Paul Klee’s painting Fuge in Rot, 1929. That is a kind of polyphony where visitor takes part in. 17 /55


01

01 ground floor and sections in between walls 02 rendering overall bird-view 03 rendering from the hall going to the underground auditorium 04 rendering the outdoor auditorium by night 05 rendering from the corner to the entrance hall


03

04

05

02

19 /55


06

07

06 section through one “wall” 07 axonometry energy and water systems 08 rendering entrance hall 09 rendering room for exhibitions

Stéphanie MENARD portfolio

10 rendering view from the path along the lake


08

09

10

21 /55


00

01


2015-2016 Construction Cesson-Sévigné, FRANCE Within ATELIER 56S office In charge of the project and construction

HOUSE FOR A COUPLE

A 70 years old couple ask the studio to design the extension of the little inherited house. At that present time, they were living in a large home surrounded by matured trees in a wide garden. The new house is located in a corner of a 60’s allotment project. Intimacy and wide landscape overviews are an old story for the couple since they have decided to move. The major concern of the project is to keep the feeling of privacy and fluidity they had before. In order to give more place to day-rooms, night-rooms are removed from the existing house into the extension. The passage in between works as a threshold that preserves intimacy of bedrooms. Each entity is then design as an open plateau where all rooms are linked together: hinged doors are all-height and all-width so that floor and ceiling are not interrupted when opened. The long shape closes the inner garden. That allows to open widely on the greenery as if it was a patio. The raw look made of black wood panels and concrete structure contrasts radically with the existing classical white house. 23 /55


StĂŠphanie MENARD portfolio


03

00 floor-plan square like plan of the existing house and its long rectangular extension 01 elevations major elevations of the extension 02-05 picture Š J.Gonzalez view from the garden

02

04

05

25 /55


00


2015 Competition Chateau-Thébault, France Within ATELIER 56S office In charge of conception and renderings

BELVÉDÈRE

Belvedere is a piece of a tourist route of the regional winery landscape. The strong identity of Chateau-Thébault is linked to its bedrock that grasps geological, historic and winery particularities. Belvedere anchors on that laden bedrock and jump into the air to re-discover the landscape. It counterpoises on rock so that it levitates over clouds and river flow. That’s a transition between the dramatic feature of the pedestal and the softness of the air. Visitor starts his route from the closed place of the church and town-hall, and discovers progressively the panorama on the valley. Once he arrives at the back-place of the town-hall, two ways of contemplation are offered : he can rests at the rostrum, having a framed view of the front cliff, or, he has a wideopened and vertiginous view walking on the belvedere. The structure creates the frame for the rostrum, spaces are linked to each other. The looping form offer a continuous route to gaze at the landscape in movement. It differs from traditional diving-like platforms but offers the feeling of emptiness as well. The lower platform is designed as a meeting point for groups listening to a guide. Little events like reading tales could even take place there, taking advantage of the remarkable natural scenery. 27 /55


01

previous page 00 ground plan going from the village to landscape and back 01 section overall view of the platform on the cliff 02 rendering view from the other bank


02

29 /55


03

04

StĂŠphanie MENARD portfolio


03 section a gentle slope to enhance the elevation feeling

05

04 section 2 levels that offer a different point of view on the landscape 05 model diagrams lower platform offers a framed view upper platform gives a large horizon 06 floor plan looping course

06

31 /55


07

08

09

StĂŠphanie MENARD portfolio


07 rendering events could take place on the lower platform 08 rendering illumination by night 09 rendering “jumping into the void� look of the structure 10 rendering merging with nature and emptiness

10

33 /55


00


2016-2017 Construction Rennes, FRANCE Within CHOUZENOUX ARCHITECTURE Work in pairs on conception and drawings

120 APARTMENTS

The whole project is composed of 2 entities : 120 apartments and a senior residence. It is located at the junction of 3 areas that each have a particular atmosphere. Individual houses face the south side of the project. A park with old trees follows the east limit whereas parking and offices occupy the north-east corner. The master plan was designed in collaboration with urban city planners. The challenge was to keep the sense of a garden while constructing a dense residential complex. A pedestrian route crosses the site from west to east in order to open new access on the park and separates the site in two programmatic sets. The senior residence takes place on the south part of the mail. Apartments are gathered in 4 blocks on the north part. The ground plan follow a north-south direction : two bands separated by a planted and flooded garden. That organization allows a two-directional permeability. Each apartment building is a series of plateaus with spinning balconies so that each room accesses to a large exterior space, enjoying surrounded greenery. The last storey stops the series. It takes the all-width of the other plateaus and is designed as rooftop houses. 35 /55


01

previous page 00 ground plan 3 buildings accessible from the central parc 01 elevations linear balcony to be largely open on the parc 02 rendering bird-view of the inhabited roof 03 rendering view from the senior residence’s roof all renderings: Š POLTRED studio


02

03

04

37 /55


00 Elevation Two towers instead of one

00

1.200 @ a0 mb 18 07 10


2018 Competition 1st Prize Spreitenbach, Switzerland Within HILDEBRAND, Zurich

HHW

Client: Losinger Marazzi AG Author: HILDEBRAND & Ruprecht Architekten Team: Judit Chapallaz, Carla Ferrer, Nicolas Girardin, Stephanie Ménard, Matthew Bailey, Silas Buecherer, Stefan Rueckert Landscape architect: Balliana Schubert Landschaftsarchitekten Engineer: Wh-p Ingenieure AG | Fire-protection: Gruner | Facade-planer: gft | Facade technique: Transsolar | Wood-engineer: Pirmin Jung | Visualisation: space communication GmbH | BIM-advisers: Kaulquappe Procedure:1. Prize for two Highrises, invited Competition for the center development of “Neumatt” Size: 38’400 m² GF 39 /55


01

04

01 Ground-floor Commercial area 02 Floor-plan Low-price apartments 03 Floor-plan Comfort apartments 04 Model Towers and parking (buildings on the left) 05 Diagram Repartition of price-categories Green: Low-price Pink: Standard Blue: Comfort


02

03

05

41 /55


11

09 Rendering 2 Towers on the top of the western lobby 10 Rendering Interior-view from the lobby 11 Floor-plan Regular floor-plan Standard 12 Model Facade variations with price-categories StĂŠphanie MENARD portfolio


12

43 /55


00


2018 Competition 2st Prize Zurich, Switzerland Within HILDEBRAND, Zurich

JELMOLI

Since its opening in 1899, as the first department store on Zurich’s famous Bahnhofstrasse, Jelmoli remains to this day the preeminent fashion house of the city. The entrance space and cosmetic department has gone through several transformations during the last century. It is defined by a forest of structural columns and ad-hock display areas. HILDEBRAND was asked to rethink their beauty department on the ground floor. We emphasized the quality of feeling inside a forest and created a «beauty landscape» with vertical green elements to help people navigate through the building. Columns, now trees, support counters which are shaped by movement of the visitor who finds himself immersed in a vivid scenery of discovery. Client: Jelmoli Zürich Author: HILDEBRAND Team: Stéphanie Menard, Yuichi Kodai, Daiki Awaya Procedure: 2nd Prize, invited competition Budget: 1.3 Mio. CHF Surface: 1’500 m² BGF 45 /55


01

02

Kundendienst

00 Concept-model Organic shapes wrapped around the pillars

Kundendienst

Produktregal

Produktregal Kundendienst

01 axonometrie Counter exemple

Kundendienst Kundendienst

Spezielle Produkte Spiegel und Beleuchtung

Produktregal

Digitale Signatur Grafische Kunst

Kundendienst

03 model counters

StĂźtze

z.B Creme

z. B ParfĂźm

z.B Kosmetik

Promotionszone

Service

02 plan counters

Produkte

04 model Project of an organic landscape


03

04

47 /55


00 Situation plans Green-fingers in between the houses

00


2018 Project development Dietikon, Switzerland Within HILDEBRAND, Zurich

WEINBERGSTRASSE

Client: Property One Partners AG Author: HILDEBRAND Team: Daniel Sasama, Sarah Lechner, Stéphanie Menard Procedure: 1. Prize, Invited competition Surface: 2’463  m² GF Planing: Building application decembre 2018 49 /55


02

03


01

04

05

01 Perspective 02 Underground 03 Ground-floor 04 1st floor 05 2nd floor

51 /55


00 100 100

90

100

100

100

180

600.61

90

100

100

90

100

100

100

100

90

100

90

100

100

100

90

100

100

90

100

100

100

90

100

90

100

100

100

100

90

100

100

90

90

100

100

100

100

100

100

90

100

90

25

67

3.78

6.69

7.95


2019 Project development Köniz, Switzerland Within HILDEBRAND, Zurich

RIED B

Client: Migros Pensionskasse, Marti Gesamtleistungen AG Author: HILDEBRAND & Ruprecht Architekten Team: Carla Ferrer (ph11-21) | Thomas Hildebrand | Rafael Ruprecht | Daniel Sasama | Matthew Bailey | Rossella Dazio | Benoît Delaloye | Filip Gebac | Stéphanie Menard | Meret Wildbolz Landscape architect: Rotzler Krebs Partner, Winterthur (ph 11-21) | Weber + Brönnimann (ph 32-53) Procedure: 1. Prize, invited competion Budget BKP 1-9: 80.0 Mio. CHF Size: 33’700 m² GF Planing: 2016–2019 | Building application: March 2019 | Execution-plans: 2019–2021 53 /55


00 Situation plan 6 buildings around a collective courtyard 01 Floor plan Regular floor-planmodule 02 Section 2 side-apartments between the courtyard and the Green-fingers 03 model

01


02

03

55 /55


04 material-palette Green fingers side 05 Facade Introvert facade on the green-fingers Loggia, facade on the green-fingers

05

06 sketch Introvert facade on the green-finger

04

06

StĂŠphanie MENARD portfolio


07 material-palette Courtyards side 08 Facade Courtyard constructions for collective spaces Balcony on the courtyard

08

09 Model Extrovert facade on the courtyard

07

09

57 /55



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.