COMERCIAL AREA carvoeiro _ algarve _ portugal
Š
LOCATION
©
2
PLOT
©
3
LOTEAMENTO ALVARÁ 6/87
©
4
IDEAS
©
5
IDEAS
©
6
IDEAS
©
7
IDEAS
©
8
OPTION A CONTAINERS – FROM 400€ TO 600€ PER SQ METER
©
9
OPTION A CONTAINERS
©
10
ESTIMATED
1.354.000,00 €
1.1
CONSTRUCTION - TRADITIONAL WAY
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
900
657.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
900
657.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
1.2
CONSTRUCTION - OPTION A - CONTAINERS
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
500
365.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
500
365.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
©
770.000,00 €
11
OPTION B STEEL STRUCTURE – FROM 800€ TO 1000€ PER SQ METER
©
12
OPTION B STEEL STRUCTURE
©
13
OPTION B STEEL STRUCTURE COMBINED WITH WOOD LAYER
©
14
OPTION B STEEL STRUCTURE COMBINED WITH PLASTER BOARD
©
15
OPTION B STEEL STRUCTURE COMBINED WITH PLASTER BOARD
©
16
ESTIMATED
1.354.000,00 €
1.1
CONSTRUCTION - TRADITIONAL WAY
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
900
657.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
900
657.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
1.3
CONSTRUCTION - OPTION B - STEEL STRUCTURE
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
900
657.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
900
657.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
©
1.354.000,00 €
17
OPTION C WOOD STRUCTURE – FROM 500€ TO 700€ PER SQ METER
©
18
OPTION C WOOD STRUCTURE
©
19
OPTION C WOOD STRUCTURE
©
20
ESTIMATED
1.354.000,00 €
1.1
CONSTRUCTION - TRADITIONAL WAY
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
900
657.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
900
657.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
1.4
CONSTRUCTION - OPTION C - WOOD STRUCTURE
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
600
438.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
600
438.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
©
916.000,00 €
21
OPTION D PREFAB CONCRETE – FROM 700€ TO 800€ PER SQ METER
©
22
OPTION D PREFAB CONCRETE – SIT URBAN MODULS
©
23
ESTIMATED
1.354.000,00 €
1.1
CONSTRUCTION - TRADITIONAL WAY
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
900
657.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
900
657.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
1.5
CONSTRUCTION - OPTION D -PREFAB CONCRETE
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
750
547.500,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
750
547.500,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
©
1.135.000,00 €
24
OPTION E NUDURA SYSTEM
©
25
OPTION E NUDURA SYSTEM
©
26
ESTIMATED
1.354.000,00 €
1.1
CONSTRUCTION - TRADITIONAL WAY
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
900
657.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
900
657.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
1.6
CONSTRUCTION - OPTION E - NUDURA SYSTEM
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
1200
876.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
1200
876.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
©
1.792.000,00 €
27
COSTUMIZATION
©
28
CONSTRUCTION PLANNING
©
29
OPTION 1
1st phase of construction
2nd phase of construction Existing building
Š
30
OPTION 2
1st phase of construction
2nd phase of construction Existing building
Š
31
ESTIMATED 1.354.000,00 €
1.1
CONSTRUCTION - TRADITIONAL WAY
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
900
657.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
900
657.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
1.2
CONSTRUCTION - OPTION A - CONTAINERS
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
500
365.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
500
365.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
1.3
CONSTRUCTION - OPTION B - STEEL STRUCTURE
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
900
657.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
900
657.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
1.4
CONSTRUCTION - OPTION C - WOOD STRUCTURE
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
600
438.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
600
438.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
1.5
CONSTRUCTION - OPTION D -PREFAB CONCRETE
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
750
547.500,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
750
547.500,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
1.6
CONSTRUCTION - OPTION E - NUDURA SYSTEM
1.1.1
MAXIMUM COVERED AREA GROUNDFLOOR
1
730
1200
876.000,00 €
1.1.2
MAXIMUM COVERED AREA FIRSTFLOOR
1
730
1200
876.000,00 €
1.1.3
GLOBAL INFRASTRUCTURES
VG
1
40000
40.000,00 €
©
770.000,00 €
1.354.000,00 €
916.000,00 €
1.135.000,00 €
1.792.000,00 €
32
CREDITS
ARQUITECTA
JOANA PINTO – TLM. (+351) 912 608 528 E-MAIL: studioartejoana@gmail.com DIRECTOR CRIATIVO ARNOLD AARSSEN – TLM. (+351) 962 042 933 E-MAIL: arnoldaarssen@studioarte.info STUDIO ARTE QUINTA DO SABUGUEIRO SITIO DO CANINE 8300-022 SILVES - PORTUGAL t: (+351) 282 445 776 f: (+351) 282 445 776 web: www.studioarte.info facebook: https://www.facebook.com/Studio.ArTe.Silves?fref=ts issuu.com/studioarte