Process
Working simultaneously in plan, section, elevation, and detail were critical to developing the idea at all scales of design.
25
01
02
03 04 05 06 07 08
01 02
03 04 05
14
12 13
10 11
07 09 08 09
06
Wood screw Ridge/hip capping / mono ridge capping Additional batten Angle bracket Batten Rafter Anchor bolt Wall plate
15
01
26
27
28
29
07
05
15 04 16
17
25
09 Damp-proof course 10 Red/yellow bricks 11 Peripheral reinforcement joint or capping beam)VERSION PRODUCED BY (in ANbed AUTODESK STUDENT 12 Tie between masonry 13 Masonry anchor 14 Facing bricks with white lime plaster 15 Interlocking profiled ceramic tile 16 Additional blocking for support 17 Blocking between roof framing
PRODUCED BY AN AUTODESK STUDENT VERSION
Details
06
19
23
21 22
24
20
Snow-guard mounting Snow-guard Clip Hip batten, tilting board Flashing Fascia board Sub fascia Metal plate with anchor bolt Wooden column Window Window frame Top plate
01 18
26 27 28 29
18 19 20 21 22 23 24 25
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION