PORTFOLIO
WORKS FROM 2018-2022
SELECTED
GUANGQUAN SUN
D. o. B: Place: E-mail: Contact:
Guangquan Sun instagram.com/ii_guangquan_sun/ linkedin.com/guangquan_sun/
06/09/1996 Wuxi, China guangquan.sun@mail.polimi.it +39 3312524520
CONTENTS
FROM IDEAL CITY TO NATURE
02
03
REBINGDING
POETRY OF WATER
04 STEPPED LAND
05 TIME n
06 GUILD TO PARK
01
A NARRTIVE POEM FOR SABBIONETA
NEW PAVILION DESIGN
INTEGRATED DESIGN IN VILLA ADRIANA
AN URBAN MARKET BASED ON TIME AND SPACE
BREWERY FACTORY RENOVATION
REGENERATION OF THE HISTORIC TOWN
FROM IDEAL CITY TO NATURE A NARRTIVE POEM FOR SABBIONETA
2022 SUMMER
Design a new civic and visitor center next to the convent and church on the north side of sabbioneta. The relationship between the old church, the monastery and the city interface, the natural interface and the old wall is handled through the connection of the building.
Team Work with Zongwei Dou, Lan Luo, Pinwen Zhang
Role in team: Design (20%), Technical Drawings (30%), Modeling (70%)
Tutor: Borsotti Marco, Di Luzio Giovanni, Lombardini Nora, Lorenzi Angelo
/01
Of The Wall
8 Collage Of Impression In Sabbioneta Evoltion
Of Squares
Piazza Libreria Grande: 5 Accessibility
Piazza ducale:
Piazza D’Armi:
Accessibility
8
4 Accessibility 9 T-Shape Road Network Accessibility
Take geometric control lines of the church, and close the surface at the end of the roads.
Take the direction of the damaged city wall as a control line, define the second volume.
Using a ramp to connect the two volumes, creat ing a city-to-nature narrative.
Take the column grid of the church entrance as a modulus, apply it to the new structure.
10 Generation
11 Footprint Of All The City
12 Axonometric View
13
0m 10m5m 14 Groud Floor Plan 1:200
0m 10m5m 15 First and Second Floor Plan1:200
1 2 3 4 6 5 1 Lobby 2 Reception 3 Lecture Hall 4 Courtyard 5 Backstage 6 Storage 10m0m 5m 16 Groud Floor Plan 1:100
+4.00m +2.00m 0.00m +3.00m +7.00m 7 8 9 10 11 7 Library 8 Workshop 9 Kitchen 10 Cafeteria 11 Outdoor Platform 10m0m 5m 17 First And Second Floor Plan 1:100
+8.00m +22.00m +12.50m 18 The Main Façade
±0.00m +7.00m +14.00m 19
±0.00m +4.00m 20 Sections
Section A-A 1:100 21
±0.00m +3.00m +7.00m +14.00m ±0.00m +4.00m Section B-B 1:100 Section D-D 1:100 22 Sections
+3.00m ±0.00m +7.00m +3.00m +7.00m Section C-C 1:100 Section E-E 1:100 23
24
Rendering Of Cafeteria Pavilion
and
of the Cafeteria Pavilion
1 2 3 4 5 6 7 1 EPDM waterproof layer 3 mm 2 Square concrete brick 150x150 mm 3 Reinforced boonding layer 100 mm 4 Rockwool insulation sliding layer 70-100 mm 5 Concrete construction wall 200 mm 6 Wire rope 20 mm 7 Wooden frame 80x100 mm 25 Detail
Façade
26 Renderings
27 Models
REBINGDING NEW PAVILION DESIGN
2021 SPRING
Design of the new pavilion at Piazza D’Arco. The building acts as a new volume connecting the politecnico di mantova campus in a historical context with the surrounding dwellings.
Team Work with Melis Oguz, Quanning Jia, Yajun Cao Role in team: Design (50%), Technical Drawings (50%), Rendering (100%)
Tutor: Luigi Spinelli, Eduardo Soutode Moura with Nunograçamoura, João Pedro Falcãode Campos, João Mendes Ribeiro
/02
Existing
buildings Mounuments Lake 30 Site Wall elements campus palazzo d'arco dwellings Courtyards Context Analysis
The plaza space is divided by par allel control lines perpendicular to the surrounding building façades, thus defining the proportions of the new building volume, in harmony with the proportions of the buildings within the historic area.
The building volume is defined by a control line perpendicular to the main entrance of the Palazzo D’Arco and the arch on the east side of the square.
In the end, we used these control lines to generate three volumes that define three square spaces: a public activity square, a campus activity square, and a semi-private square.
Dwellings Blocks Extract Translate
31 Scheme Generation Wall Reference
0 5 10 m 0 25 50 m 32 Master Plans
2 4 65 3 7 8 9 1 10 11 12 1.Main square 2.Exhibition 3.Entrance 4.Lobby 5.Cafe 6.Toilet 7.Passageway 8.Workshop 9.Courtyard 10. Entrance of school 11. Lobby 12.Study room VICOLO SANT'AMBROGIO PIAZZA D'ARCO PALAZZO D'ARCO MANTUA POLITECNICO DI MILANO MANTOVA CAMPUS VIA PORTAZZOLO VIA DOMENICO FERNELLI 0 2.5 5 m 33 The Ground Floor Plan
A A A A 0 m 10 m5 m 0 m 10 m5 m 2 3 4 1 2 3 1 1.Academic hall 2.Exhibition 3.Workshop 4.Terrace 1.Terrace 2.Roof paltform 3.Corridor First Floor Plan Roof Plan 34 Other Plans
A A B B 0 m 10 m5 m 0 m 10 m5 m Section A-A Section B-B 35 Sections
Axonometric
36
Atmosphere
37 Detail
Wall Detail Design
1.Steel bar
2.Special designed perfprated brick
3.Steel plate welded with steel bars
4.Insulation layer
5.Standard bricks with three layers
6.Steel beam
7.Steel panel and concrete 10cm
8.Mebran
9.Mineral wood 4cm
10.Geotextile 0.5cm
11.Gravel 5cm
12.Steel beam
13.Galvanized steel and concrete 10cm 14.Mortar 2cm
15.Stone flooring 3cm
Component of the wall
16.Gravel 30cm
17.Concrete floor 20cm
18.Concrete slope 8cm
19.Geotextile 0.5cm
20.Mebran 1cm
21.Geotextile 0.5cm
22.Sand 3cm
23.Mortar 2cm
24.Stone flooring 3cm
38
39 Renderings
POETRY OF WATER INTEGRATED DESIGN IN VILLA ADRIANA
2021 SUMMER
The project is located in Villa Adriana in Tivoli, Rome, and is divided into three parts: landscape, architecture and visual design. Water, as an im portant element, is used in the design, among which, the building is part of a thermal bath.
Team Work With Lan Luo, Xue Liu, Zhida Zhang, Zongwei Dou, Xinzhu Li Role in team: Design (30%), Technical Drawings (50%), Rendering (60%)
Tutor: Pier Federico Caliari
/03
Of Villa Adriana
Villa Adriana is located in Tivoli, on the east side of Rome. It is surrounded by crops and residential areas.
The diagram shows the location rela tionship between Villa Adriana and the surrounding important buildings
River Aniene connects Tivoli from north to south and Villa Adriana, to providing water for it.
42 Context
Landscape Generative Axes Landscape Infrastructures
The hotel, restaurant and parking lot in the area were planned, and the ancient city gate of Villa Adriana is reused to form a whole with the landscape.
Using different waterscape settings, the landscape corridor and the water ele ments of Villa Adriana are connected as an integration.
The agriculture, olive planting, cypress and rural grass in the area were replanned as part of the landscape prom enade.
43
44 Master Plans Of Landscape
0m N 100m 200m 400m 45
Landscape Nodes
Through the three landscape nodes of Antinno Square, Macau Tower and Tourist Center, a land scape promenade connecting the external road and Villa Adriana is formed. Antinno Square, as the entrance to the landscape promenade, refers to the water features of Villa Adriana. The observation tower serves as the visual center of the entire land scape promenade, and at the same time, the visitor center also combines circular geometric elements and water elements. These three nodes form a se quence of landscapes in which visitors can feel the atmosphere of ancient Rome.
Antinoo Square
46
Macau Tower Tourist Center
47
Section Of Antinoo Square
Section
Of Macau Tower Section Of
Tourist Center
0 50 m25 0 50 m25 0 50 m25 48 Sections Of Landscape
49 Thermal Bath Design
50 Generative Axis Generative Elements
51 Proportion
52 Ground Floor Plan
53 Roof Plan
Section A-A Section B-B 0 m 10 m5 m 0 m 10 m5 m 54 Sections Of Thermal Bath
55 Renderings
Of Visual Design
56 Concept
57 Renderings
/04
STEPPED LAND BREWERY FACTORY RENOVATION
2019 WINTER
The unique structure and materials of this workshop are a kind of art integrating history and architecture. The aim is to make a new spatial form through stairs and ramps in order to let people experience the history of this beer factory more easily. Meanwhile, with the entry of new activities, it will be able to attract tourists from all over the world in the future, thus having a positive impact on the revival of the whole historic area.
Individual Work
Tutor: Lifeng Lin
10MIN CIRCLE20MIN CIRCLE 5MIN CIRCLE zero SITE Villa Zarri 43°33′35″N 11°21′14″E Bolognina Castel Maggiore Shopping Centre Education Hotel Bolognina-padova Highway Channel Navile Linea di cintura Railway 0.5 km 1.0 km 2.0 km N 1.5 km 2.12km Distance to Castel Maggiore 6.38km Distance to Bologna 8168m² Site Area 60 Site Analysis
The Process Of Brewery
Malt silo&malt mill
Mash/ Lauter/ Brew kettle Hop back
The complex pro cess of brewing beer is presented to the people as the core of the en tire building.
Filtration
Fermentation tanks Cooling
Increase the com mercial value of the region through restaurants, beer shows, souvenir shops, bars and wine tastings.
Carbonation Bottles Packaging Deliver
1578 1786 World War 2 After World War 2 1956 Now Future
61 Historic Timeline
Transformation Of Stairs&Ramps
Traffic Function Brewery Exhibition Beer Bar Beer Storage Stairs+Steps=Show Stairs+Steps=Rest Bar and Theater Ramp+Steps=Exhibition 62 Typology Of Stairs&Ramps
01.Villa Zarri Beer Shop 06.Entrance 11.Tasting Room 02.VIP Room 07.Laboratory 12.Staff Room 03.Tasting Area 08.Restaurant 13.Workshop 04.Performance Area 09.Reception Room 14.Preparatory Room 05.Bars &Pubs 10.Barley Storage 15.Rest Room 01 02 03 06 07 08 0912 13 14 15 10 11 04 05 0 20 m10 63 Ground Floor Plan
06.Restaurant 05.Exhibition Ramp 04.Multifunctional Steps 03.Mini Bar 02.Cassette Deck 01.Tasting Room 02 03 04 05 06 0 20 m10 64 First Floor Plan
02 03 01 04 04.Restaurant 03.Tasting Area 02.Cassette Deck 01.VIP Room 0 20 m10 65 Second Floor Plan
D-D
SECTION
SECTION C-C SECTION B-B SECTION A-A 66 Sections
67 Models
/05
TIME n
AN URBAN MARKET BASED ON TIME AND SPACE
2019 SUMMER
Time is the 4th dimension existing beyond 3-D.In this design, we aim to apply time to the design of architectural space. Through the intervention of time, the functional density of architectural space is increased. Differ ent people will be able to use the same space at different time, which can not only solve the urban density explosion caused by the rapid urban renewal to some extent, but also enhance the communication between the residents of the new and old cities.
Team Work With Sixuan Song, Xiaoyao Ma Role in team: Design (60%), Technical Drawings (60%), Rendering (40%)
Tutor: Le Luo
Old
Residence
Superior
Residence
Shopping
Centre Hospital Parking Fa-zang Temple
Site High-rised
Buildings
Landscape 70 Site Analysis
High-rised Residence
Old Longtang
The site is located in Shanghai Fuxing Middle Road. There are many old Shanghai alleys around the site. After the hall was gradually demolished, high-rise residential buildings and high-rise office buildings and various commercial complexes are built. There is a sharp contrast between the old and new buildings.
71
Behavior Analysis
1980 2000 2009 2019 TIME 2 5am Get Up 6am Market 8am Take child to school 10am Rest 1pm Read 1pm Relaxation 5pm Dinner 5pm Dinner 7pm News 8.30pm Sleep 1am Sleep23pm Rest8.30pm Exercise7pm Social6pm Off duty3pm Meeting12pm Noon break9am Work7am Get up 4 6 8 10 12 14 16 18 20 22 24 7.00:Get up 6.00:Market 8.00:Take child to school 10.00-11.00:Chat with neighbors 14.00:Relaxation 23.00:Rest&Reading 20.30:Exercise 14.00-16.00:Meeting 19.30:Bar&Social 8.30:Breakfast We have summarized the daily activities of the two groups within 24 hours. It can be seen from the figure that there is a big time difference in the lives of people living in different living environments. And the living habits of the two groups are different. Restaurant Cinema Gym Comm. Television Cook Restaurant Cinema Gym Comm. Television Cook Restaurant Cinema Gym Comm. Television Cook Restaurant Cinema Gym Comm. Television Cook 72 Activity Evolution
Strategy And Concept
Less Activety Space
Increase commercial and residential integration
High prices
Increase activity space for Longtang's Residence
Old Residence New Residence Commercial Area
Split
Public inefficient buildings
Include multiple functions in one space
Space = Volume x Time
Redefine the concept of space by adding a time dimension to the volume. Through the design in the time dimension, the functional density of the same space can be increased, that is, the space is given a variety of reasonable functions in different time periods, so that different groups of people can use the same space in different activities. Converting the high density in the original urban expansion to the high density in the time dimension is conducive to solving a series of problems in the city.
73
6:00 Market 6:00 Market 6:00 Passway 6:00 Communication 6:00 Passway 9:00 Communication 9:00 Studio 21:00 Living Room 9:00 Fitness 21:00 Party/Pub 12:00 Passway 15:00 Children Activities 9:00 Communication 9:00 Relax 15:00 Children Activities 15:00 Children Activities 19:00 Square Dancing 21:00 Performance 9:00 Exhibition 15:00 Reading 17:00 Study Hall 12:00 Restaurant 17:00 Night Market 21:00 Pub 9:00 Reading 12:00 Restaurant 17:00 Night Market 21:00 Night Market 74 Typology In Time & Space
1 1 2 2 3 3 4 4 75 Building Generation
Typical Plans
22:00 Night Pub 19:00 Performance 14:00 Exhibition 22:00 Night Pub
10:00 Communication 12:00 Restaurant 22:00 Night Pub
15:00 Kids Activities 17:00 Night Market 18:00 Square Dancing
12:00 Restaurant 12:00 Restaurant 9:00 Lecture
21:00 Theater 21:00 Pub
Ground Floor Plan 1:500
76
12:00 Restaurant 13:00 Education 18:00 Restaurant 21:00 Night Pub
14:00 Exhibition 21:00 Night Pub 10:00 Exhibition 6:00 Passway 7:00 Market 13:00 Meeting 14:00 Kids Activities
10:00 Meeting 13:00 Office
21:00 Theater 10:00 Reading
Third Floor Plan 1:500
77
14:00 Exhibition
Typical Plans
22:00 Night Pub
18:00 Square Dancing
12:00 Restaurant 12:00 Restaurant 9:00 Lecture
12:00 Restaurant 22:00 Night Pub
17:00 Night Market
18:00 Meeting
14:00 Meeting 6:00 Passway 21:00 Theater
10:00 Artist Studio 10:00 Office
14:00 Exhibition 14:00 Lecture 10:00 Exhibition 10:00 Office
Six Floor Plan 1:500
21:00 Theater 21:00 Pub
19:00 Performance
78
7:00 Market 13:00 Meeting 14:00 Kids Activities 18:00 Restaurant 21:00 Night Pub
Night Pub
13:00 Office
21:00 Theater 10:00 Reading
10:00 Office
14:00 Meeting 21:00 Theater 14:00 Exhibition
15:00 Kids Reading
10:00 Office 10:00 Artist Studio
10:00 Office
13:00 Education
Ninth Floor Plan 1:500
10:00 Meeting
14:00 Exhibition 21:00
10:00 ExhibitionPassway
79
80 Section
81
The use of comics and collages shows the super position of functions of the same space at different times. For example, it can be used as a vegetable market during the day and can be turned into a bar or a screening room at night. The apartment can be used as an office during the day and a private space at night.
82 Internal Collages
The Market Roof Garden
Night Pub
Office-living House
83
/06
GUILD TO PARK REGENERATION OF THE HISTORIC TOWN
2018 WINTER
The old town with the history of Ming and Qing dynasties as the main part of Yangzhou contains rich cultural landscape and cultural relics. In recent years, with the acceleration of urbanization, the old city gradually derailed from the new city, resulting in a series of problems such as the lack of public space and the decline of vitality of the old town. On the basis of this, we aim to design a Community Park in Si’an Guild area with a sentient and thermal mode of city ‘update’, trying to create more com fortable environment for the surrounding residents.
Team Work With Shiqi Zhao, Qing Pan, Yu Tao Role in team: Design (40%), Technical Drawings (60%), Rendering (50%)
Tutor: Jianxin Zhang
1.8 km 1.6 km 1.2 km 32°23′24″N 119°26′24″E 1:5000 Yangzhou Ancient Canal Yangtze River 0.8 km 0.4 km 0 km 0.4 km 0.8 km 1.2 km 1.6 km Historical and cultural district Landscape Heritage preservation building Ancient canal Reserved building Demolition SITE • OLD TOWN • NEW CITY CENTER N S W E 86 Context Of The Site
1620s Before 1949 1949 1953 1970s NOW We talk for salt business here. We are businessman.This place is private! Severe situation! We need hosiptal! Doing exercises! Shortage of supplies.This guild will still be a hosiptal. People dismantle partsof the guild to build a school... The old Nanmu hall has being transformed to a Diving Platform. We also have diving champion in this place. The Guanglin Primary School is going to be exploited as a commerce center. We have no place to do exercise. 2029 Prediction Birth rate Natural growth rate Mortality rate Reside School Market Offices Shopping Post office Middle& old aged Middle& old aged Middle& old agedYoung aged Young aged Young agedChild Child Child Parking Opera Fitness Reading Exhibition RecreationChess Square dance Cultural palace Public bath 1989 2009 2029 20091989 1989 2009 2029 1962 -30% 0 42000 70000 0 42000 70000 0 42000 70000 40% 7% 4% 3% 1% 5% 2% 10% 0 94 Age 0 94 Age 0 94 Age 2029 Prediction Birth rateNatural growth rate Mortality rate Reside School Market Offices Shopping Post office Middle& old aged Middle& old aged Middle& old aged Young aged Young aged Young aged Child Child Child Parking Opera Fitness Reading Exhibition Recreation Chess Square dance Cultural palace Public bath 1989 2009 2029 2009 1989 1989 2009 2029 1962 -30% 0 42000 70000 0 42000 70000 0 42000 70000 40% 7% 4%3%1% 5%2% 10% 0 94Age 0 94Age 0 94Age 87 Historical Evolution Demographic Structure & Activities
OLD TOWN
Significantly Aging
Simple&crude
Thin
Service
Old Town
Urban study
Park
Historcial buildings
Insufficient public areas
Communication space Service space Activities space
Building Form
Step 2 Step 3
Embed community park in the old town to stimulate the vitality of the old town.
Planning Generation
First, divide the buildings in the site into several parts.
Reorganize the boundaries to make it more complete.
The new building ex tracts the roof form of the surrounding ancient buildings and recombines them to be presented in harmony with the surrounding historical buildings.
Use steel structures which are easy to as semble and can be recycled if necessary in the future.
Increase the entrances to makeit easier for residents to reach the park and contact the new and old town.
Add various activities space and facilities that are needed for the park.
展示空间 SITE
Community
Mode Environment Architecture People
living
historical memory
+
+ Office + Dining Homestay + Historcial visit Historcial Buildings Reuse Improve Facilities Existing Problems Strategies
Exhibition space
Lack of repair
Step 1
88 Strategy
Axonometric Atmosphere
Finally have a place to play when I go back to my grandma’s house! This entrance is really convenient. This tree is a childhood tree Nanmu Hall is really spectacular! Our Chamber of Commerce has offices here! The otherside is a nice Park!Sun’s House has been internet celebrity homestay now!! Look!!This is the previous Si’an Guild! We like traditional opera!! We can get to the park from here. Dady, I want to go to the urban study to read^-^! Our seniors finally have local activities. Let's go to the park for fitness. Today, I invite friends to have lunch I studied here in the past. Let’s play basketball!! The front is the parking lot,very convenient!! Sun’s House Jia’s Garden /Historcial Building /Cultural relics protection /Cultural relics protection Si’an Guild Gatehouse Si’an Guild Nanmu Hall /Cultural relics protection Half Moon Guild /Cultural relics protection 89
New buildings /Steel Structure Historical building renovation /Steel and wood structure Cultural relics protection reuse /Reserved wooden structure Elderly Fittness Parking Repast Nursing home Community service Homestay Climbing plant system Trees and shrubs system Office/Meeting 0:00 2:00 4:00 6:00 8:00 10:00 12:00 14:00 16:00 18:00 20:00 22:00 Sleeping Time Sleeping Time Sleeping Time Sleeping Time Salt culture visit Children's play Indoor activities Outdoor activitiesUrban Study Lunch Market Breakfast Children Elderly Young Tourist Chess Read Fitness Homework Cultural relic protection Community park Slide Interest development Walking Opera watch Square dance Homestay Pingpong Afternoon tea Chatting basketball Morning exercise Chamber of Commerce Office 90 Harmony of olds&news Activities Circulation Ecological System Presentation Of One Day Activities
91 Site Memory/ Spirit Of The Place
04 01 02 03 05 06 09 08 07 11 12 10 92
garage
plaza
house
park
Center
stage
study
01.Parking
02.Basketball court 03.Tree
04.Tea
05.Restaurant 06.Pocket
07.Vendor
08.Children’s activities 10.Opera
11.Offices 12.Urban
13.Community service 14.Historical square 15.Si’an Guild Gatehouse 16.Homestay Ground Floor Plan 1:500 06 16 13 15 14 93 The Main Plan
01 03 02 01 01. Office 02. Tea house 03.
Community service
04.
The Nanmu Hall 05. Si’an Guild Gatehouse
06. Children’s activities 07. Parking garage 94 Sections
Section A-A 04 05 07 06 Section B-B Section C-C 95
Traditional tiles
Roof
Shedthins tiles
Sole timber Flying-rafter
Double glazing
Isolated subframe for window
Partition wall Light steel keel
Double glazing
Isolated subframe for windows
Floor interlayer
Profiled steel sheet floor
Suspended ceiling Sound insulating sheet
96 Construction Details
Tree
plaza Basketball court
Opera
stage
Children’s activity court
Elderly Center Rest platform
97 Collages Of
Activities