MOUNG SUSAN HAN Selected Works, 2010-2019
CONTENTS I
: Professional Work Samples
1
2
3
4
FRANCIS POLYTECHNIC HIGH SCHOOL
68-74 TRINITY PLACE
SHRINERS FOR CHILDREN MEDICAL CENTER
38th PARALLEL NORTH
(COMMUNITY FACILITY AND OFFICE TOWER)
(LAUSD- COMPREHENSIVE MODERNIZATION)
(AMBULATORY SURGICAL CENTER & CLINICS)
CO ARCHITECTS August 2017 - July 2019 * Under Construction
PELLI CLARKE PELLI ARCHITECTS July 2016 - June 2017 * Under Construction
CO ARCHITECTS July 2013 - April 2015
01
07
13
Senior Project Honor Award-1st Place Dwell on Design 2013 exhibition Spring 2013- Senior Project
19
CONTENTS II
: Academic Design Studio
5
6
7
8
HOLLYWOOD COURTHOUSE
URBAN RIVER SANTA MONICA
FRAME HOUSE
AQUA CENTER
Interim Exhibition- Winter 2013
Interim Exhibition- Fall 2012 AIAPF Citation Award
Interim Exhibition- Fall 2011
Interim Exhibition- Fall 2010
Winter 2013- Year 5 Design Studio
Fall 2012- Year 4 Design Studio
Fall 2011- Year 3 Design Studio
Fall 2010- Year 2 Design Studio
25
29
33
37
01
FRANCIS POLYTECHNIC HIGH SCHOOL LAUSD COMPREHENSIVE MODERNIZATION PROJECT AUGUST 2017 - JULY 2019 *PROFESSIONAL WORK - UNDER CONSTRUCTION
LOCATION: Sun Valley, CA CLIENT: Los Angeles Unified School District PROJECT SIZE: Renovation- 88,900 sqft, New Construction- 175,300 sqft SERVICES: Master Planning, Programming, Architecture BUILDING USE/TYPE: Education John H. Francis Polytechnic High School was originally built in 1957, the campus modernization project includes a major site improvement of 21 acres and 175,000-sf of new core facilities. New educational facilities include state-of-the-art science instruction classrooms and new media facilities. A new gymnasium, administration building, cafeteria and library are massed and designed to reinforce the importance of the historic “polygon” they surround, which is at the heart of the site. As special-function buildings, they provide scale and hierarchy to an otherwise uniform built environment, imparting identity and legibility to the campus. CO Architects: Architect; Bernards: Design Builder (https://coarchitects.com/project/lausd-polytechnic-high-school-modernization/)
2
1
3
4
6
5
NEW FACILITIES 1. Auditorium 2. Gymnasium 3. Library,Cafeteria 4. Classroom 5. Main Admin 6. Satellite Admin THIS PAGE Aerial View of Francis Polytechnic High School
01 // FRANCIS POLYTECHNIC HIGH SCHOOL
2
VIEW
MAIN ADMIN
AUDITORIUM
VIEW
VIEW
GYMNASIUM
VIEW
LIBRARY / CAFETERIA THIS PAGE LEFT 3D AXON OF ADMIN, AUDITORIUM, GYM & LIBRARY
THIS PAGE RIGHT EXTERIOR RENDERING OF ADMIN, AUDITORIUM, GYM & LIBRARY
3
01 // FRANCIS POLYTECHNIC HIGH SCHOOL
AD3.21
3
D1
D2
26' - 9"
D3
20' - 6"
DN
30
'-
SECURE STOR. 287 SF
6
4
SHOWERS 341 SF
DF
BOILER 150 SF
DD LINE OF SKYLIGHT ABV
CORRIDOR 2733 SF
GYM EQUIPMENT STORAGE 205 SF
PA/SOUND RM MAT STOR 103 SF 103 SF
INDOOR EQUIPMENT STORAGE 205 SF
EQUIPMENT CIRCULATION 204 SF
DC ELEC 152 SF
SECURE LOCKERS 196 SF
CUSTODIAN 78 SF
IDF 85 SF
LINE OF SKYLIGHT ABV
ELEC 25 SF CUSTODIAN 64 SF
SECURE STOR 164 SF
LOCKERS 1902 SF
TEAM ROOM 486 SF
THERAPY RM 415 SF
TEAM ROOM 486 SF
GATE
5
DB
CORRIDOR 105 SF
CUSTODIAN 77 SF
0"
DF
GYM EQUIPMENT STORAGE 222 SF
INDOOR EQUIPMENT STORAGE 232 SF
EQUIPMENT CIRCULATION 189 SF
CUSTODIAN 145 SF
SOLAR CANOPY ABV
DM 1 / AD2.21A
WRESTLING CLASSROOM 1364 SF
DE
1 / AD2.21C
CORRIDOR 629 SF
1 / AD2.21D SOFFIT ABV
DA
OUTDOOR EQUIP STORAGE 205 SF
WASH/DRY 91 SF
TOWELS 96 SF
4
LOCKERS 1907 SF
4 FITNESS CLASSROOM 1395 SF
COACH OFFICE 403 SF
FACULTY RR 59 SF
SECURE LOCKERS 201 SF
CONFERENCE ROOM 325 SF
AEROBICS CLASSROOM 1558 SF
AD3.11
FACULTY SHOWER 260 SF
12' - 4"
RESTROOMS 340 SF
SHOWERS 347 SF
CORRIDOR 67 SF
AD3.22
2
COACH OFFICE 404 SF
TOWELS 89 SF
WASH/DRY 89 SF
AD3.22
H 21 G 2. D 21 / A D2. /A
0"
FACULTY SHOWER 280 SF
LINE OF OVERHANG ABV RESTROOMS 349 SF
FACULTY RR 66 SF
D27
0"
1
'-
OUTDOOR EQUIP STORAGE 212 SF
21' - 0"
LINE OF OVERHANG ABV
21' - 0"
D20
"
1
30
D9
29' - 0" 18' - 11"
1
SEISMIC JT
DP
D8
20' - 6"
23' - 0"
'-
D7
20' - 6"
1 / AD2.21B 1 / AD2.21C
AD3.11
DQ
30
D6
33' - 0"
21' - 4"
37
D5
33' - 0"
1 / AD2.21A 1 / AD2.21B
° .7 13
3 '-
D4
20' - 6"
DR
1 / AD2.21F
8
DF
MENS 369 SF
AD3.21 AD3.22
2 21' - 4"
WEIGHTLIFTING CLASSROOM 1438 SF
LINE OF OVERHANG ABV
WOMENS 420 SF
11
DG
'6"
D20
RESTROOM 57 SF
'6"
STORE SALES 270 SF
DH
2
15 '0"
1
AD3.11
1
STORE COUNTING/SECURITY 107 SF
27
AD3.22
'-
IDF 118 SF
0"
3
DJ
GYM LOBBY 1058 SF
AD3.22
GYMNASIUM
TRUSS ABV
D25
1. Lobby 2. Main Gym 3. Practice Gym 4. Locker 5. P.E Classroom
1
26 .0°
DK
1 / AD2.21D 1 / AD2.21E SOLAR CANOPY ABV
D26
28' - 9"
1 / AD2.21E
25' - 0"
D10
D1
25' - 0"
25' - 0"
D11
1 / AD2.21F
25' - 0"
D12
25' - 0"
D13
25' - 0"
D14
25' - 0"
D15
D16
D9
1 AD3.21
OVERALL FLOOR PLAN
D1
D10
D11
D12
D13
D14
D15
D16
D9
1/16" = 1'-0"
EXTERIOR ELEVATION GENERAL NOTES 28' - 9"
25' - 0"
25' - 0"
25' - 0"
25' - 0"
25' - 0"
25' - 0"
25' - 0"
1. 3
1
3
AD8.05
AD8.05
AD8.04
12'-6"
12'-6"
TYP
11' - 7 7/8"
HIGH ROOF 33' - 0"
PT-30
TYP
PT-30
PT-30
S 21
G4e
11' - 7 7/8"
LOW ROOF 12' - 0" S 01
8'-4"
TYP
8'-4"
S 03
TYP
8'-4"
TYP
S 04
TYP
PT-34
PT-34
PT-34
12' - 0"
8'-4"
S 02
4 AD3.24
1
D9
1/8" = 1'-0"
08 5113 GLAZED WDW FIXED/ PROJECTING 2"
G4e
08 4513 POLYCARBONATE PANEL
W2c
CIP CONCRETE WALL
5055
W4a
INSUL PLAS WALL
Los A
DA
W4a
DB
G2a
DC
12' - 4"
DD
21' - 0"
DE
21' - 0"
PLAS JT
DF
23' - 0"
DG
21' - 4"
DRIFT JT
DH
21' - 4"
W4a G2a
S4a
PLASTER SOFFIT, INSUL
S4b
PLASTER SOFFIT, NON - INSUL
DK
21' - 4"
08 8000 V2, V2.T, TINTED FLOAT/TEMPERED GL
08 8000 L2, LOW-E TINTED LAMINATED GL
REF TO SHT AD3.20B FOR TYP EXT ENVELOPE ASSEMBLIES.
W4a 33' - 6 1/2" T.O.PARAPET 1
EXTERIOR ENVELOPE ASSEMBLIES
08 5113 GLAZED WDW FIXED/ PROJECTING 2"
G4e
08 4513 POLYCARBONATE PANEL
W2c
CIP CONCRETE WALL
5055 Wilshire Boulevard, 9th Floor
W4a
INSUL PLAS WALL
Los Angeles, California 90036
LOW ROOF 12' - 0" 12' - 0"
S 04 PT-34
W4c
INSUL TILE WALL
W4d
NON - INSUL PLASTER SCREEN WALL
W4e
NON - INSUL PLASTER WALL
S4a
PLASTER SOFFIT, INSUL
S4b
PLASTER SOFFIT, NON - INSUL
R1b
PVC ROOF ON MTL DECK
3'-9"
3'-9"
PT-30
2
DRINKING FOUNTAIN PER PLUMBING
3'-9"
08 5656 SECURITY SCREEN
HIGH ROOF 33' - 0"
1' - 3"
14' - 0"
7' - 1"
7' - 0"
EGRESS WDW (PROJECTING)
2' - 3"
5' - 4"
14' - 0"
LOW ROOF 12' - 0"
DRIFT JT
13' - 7 1/8"
PT-30 03 3000 CIP CONC BENCH
ELEVATION - WEST 1/8" = 1'-0"
BOARD FORM CONC BASE
G2a
W4a
W4a
G2a
TICKETS WDW
DRIFT JT
D7
D6
D5
D4
D3
D2
D1 COLOR LEGEND
20' - 6"
N 21
PT-30
G4e
20' - 6"
33' - 0"
7'-0"
TYP
TYP
N 22
PT-34
20' - 6"
G4e W4a W4a
4 AD8.03
7'-0"
33' - 0"
20' - 6"
DRIFT JT
3
26' - 9"
2 AD8.03
AD8.03
33' - 6 1/2" T.O.PARAPET
09 9000 PAINTING & COATING, TBD
PT-34
09 9000 PAINTING & COATING, TBD
DRIFT JT
G3b PT-30
R1b W4d
N 03
N 04
PT-30
08 5656 SECURITY SCREEN 6'-5 5/16"
6'-5 3/16"
6'-5 3/16"
PT-34
7'-0"
7'-0"
TYP
TYP
N 01
08 8000 S1, SPANDREL
3
DOWNSPOUT PER PLUMBING
W4a
1/8" = 1'-0"
DK
DJ
21' - 4"
DH
21' - 4"
DG
21' - 4"
W4a
W4a
DF
21' - 4"
09 2423 CEMENT PLASTER, FINE SAND
6'-5 3/16"
LOW ROOF 12' - 0"
6'-5 5/16"
N 02
PT-30
ELEVATION - NORTH
EGRESS WDW (PROJECTING)
6'-5 3/16"
PT-34
12' - 0"
HIGH ROOF 33' - 0"
21' - 0"
PT-30
HIGH ROOF 33' - 0"
W4a
N 23
PT-34
W4a
2
DRIFT JT
OPNG TAG -REF TO SHT AD10.24, 10.25, 10.26 FOR GLAZING ELEVATIONS
DRIFT JOINT SEE DETAIL 18/A8.41
D8
W4a
08 8000 L2, LOW-E TINTED LAMINATED GL
LOW ROOF 12' - 0"
09 2423 CEMENT PLASTER, LIGHT DASH
LEVEL 1 0' - 0"
1 AD3.24
09 2900 DECORATIVE WALL TILE #1
818.898.1521 phone, 818.361.9208 fax
08 8000 V2, V2.T, TINTED FLOAT/TEMPERED GL
08 4113 S2, ANODIZED ALUMINUM SPANDREL
09 2423 CEMENT PLASTER, FINE SAND
555 1st Street
21' - 4"
1' - 3"
08 4113 S2, ANODIZED ALUMINUM SPANDREL
11' - 5"
PT-30
W 02
PT-30
BASKETBALL COURTS
AD8.05
PT-30
14' - 0"
W 03
323.525.0500 phone, 323.525.0955 fax
LEGEND
AD8.05
3'-9"
PT-30
29' - 0"
DK
5'-0"
AD8.06
TYP
R1b
G3b W4a
W4a G2a
5'-0"
R1b
D9California 91340 San Fernando,
ROOFS
LEVEL 1 0' - 0"
5'-0"
5' - 0"
W4a W4a
W4a
W4a.1 INSUL PLAS WALL, FURRED
1'-0"
AD8.06
21' - 0"
08 4113 GLAZED STOREFRONT 4.5"
G3b
5'-0"
1'-0"
2
12' - 0"
G4e
G2a
3'-9 1/2"
1
08 8000 S1, SPANDREL
OPENINGS
WALLS
21' - 0"
PT-30
AD8.03
2
21' - 0"
HIGH ROOF 33' - 0"
7'-2"
DRIFT JT
7'-2"
1.
8.06
818.8
21' - 4"
25' - 0"
1
555 1 San
PVC ROOF ON MTL DECK
LEGEND
DJ
21' - 4"
NON - INSUL PLASTER SCREEN WALL NON - INSUL PLASTER WALL
R1b
323.5
INSUL TILE WALL
W4d W4e
ROOFS
LEVEL 1 0' - 0"
03 3000 CIP CONC BENCH
EXTERIOR ELEVATION GENERAL NOTES
08 4113 GLAZED STOREFRONT 4.5"
G3b
W4c
PT-30
ELEVATION - SOUTH
G2a
W4a.1 INSUL PLAS WALL, FURRED
PT-30
G2a
OPENINGS
WALLS
21' - 0"
W4a
W4d
REF TO SHT AD3.20B FOR TYP EXT ENVELOPE ASSEMBLIES.
EXTERIOR ENVELOPE ASSEMBLIES
DRIFT JT
D16
AD3.21
4
PRACTICE GYM 7807 SF
TICKETS 128 SF CONCESSION 171 SF
STORE OFFICE 216 SF
D24
3
MAIN GYM 10913 SF
21' - 4"
33
9 CORRIDOR 147 SF
STORAGE 192 SF
D23
2
AD3.22
21' - 4"
4
WEIGHTLIFTING EQUIP STORAGE 242 SF
21' - 4"
3 AD3.11
D21
DE
DD
21' - 4"
DC
23' - 0"
2
1
AD8.04
AD8.04
08 3313 COILING DOOR TYP.
W4a
G3b
DB
21' - 0"
21' - 0"
21 1313 SPRINKLER BELL
LEVEL 1 0' - 0"
05 5000 PICKET FENCE
FR COMP
DA
12' - 4"
33' - 6 1/2"
HIGH ROOF 33' - 0"
T.O.PARAPET
12' - 0"
LEVEL 1 0' - 0"
W4a
OPNG TAG -REF TO SHT AD10.24, 10.25, 10.26 FOR GLAZING ELEVATIONS
W4d
PT-30
19' - 0" T.O.PARAPET
PT-30
DRIFT JOINTS
COLOR LEGEND 26' - 9"
33' - 6 1/2" T.O.PARAPET
THIS PAGE TOP Floor Plan
W4a
09 9000 PAINTING & COATING, TBD
PT-34
09 9000 PAINTING & COATING, TBD
E 01
GYMNASIUM - EAST 1/8" = 1'-0"
21' - 0"
THIS PAGE BOTTOM Elevation
LOW ROOF 12' - 0"
6'-5 5/16" 12' - 0"
6'-5 3/16"
E 02
PT-34
LOS ANGELES UNIFIED SCHOOL DISTRICT
W4a
DOWNSPOUT NOZZLE PER PLUMBING, TYP.
03 3000 CIP CONC BASE ,TYP.
E 03 PT-30
PT-30
G2a
4
OVE ELE LOW ROOF 12' - 0"
DRIFT JT
G3b
6'-5 3/16"
HIGH ROOF 33' - 0"
PT-30
R1b
E 04
DRIFT JOINT SEE DETAIL 18/A8.41
D1
G3b
21'-0"
09 2423 CEMENT PLASTER, LIGHT DASH
LIGHT FIXTURE AS SCHEDULED
BOARD FORM CONC BASE
G2a
DOWNSPOUT PER PLUMBING
W4a
W4a
SCALE: DATE O BUILDIN PHASE
12'-0"
03 3000 CIP CONC BENCH
LEVEL 1 0' - 0"
100% CO LAUSD PR
Copyrigh
4
01 // FRANCIS POLYTECHNIC HIGH SCHOOL
5055 Wilshire 5055 Boulevard, Wilshire 5055 9th Boulevard, Wilshire Floor 9th Boulevard, Floor 9th5055 Floor 5055 Wilshire Boulevard, Wilshire 9thBoulevard, Floor 9th
Los Angeles, Los California Angeles, Los 90036 California Angeles,90036 California 90036California Los Angeles, Los Angeles, 90036 California 9003
323.525.0500 323.525.0500 phone, 323.525.0955 323.525.0500 phone, 323.525.0955 fax phone, 323.525.0955 fax 323.525.0500 323.525.0500 phone,fax 323.525.0955 phone, 323.52 fax
555 1st Street 555 1st Street 555 1st Street 555 1st Street555 1st Street San Fernando, SanCalifornia Fernando, San 91340 California Fernando,91340 California 91340 San Fernando, San California Fernando, 91340 California 91
818.898.1521 818.898.1521 phone, 818.361.9208 818.898.1521 phone, 818.361.9208 fax phone, 818.361.9208 fax 818.898.1521 818.898.1521 phone,fax 818.361.9208 phone, 818.36 fax
W4a
W4a
W4a
W4a
W4a
5
5
5
5
5
4
4
4
4
4
A8.24-1
A8.24-1
A8.24-1
A8.24-1
A8.24-1
A8.24-1
A8.24-1
A8.24-1
A8.24-1
A8.24-1
2"
2"
2"
2"
2"
6"
6"
6"
6"
6"
6"
6"
2"
2"
2"
6"
2"
1/2"
1/2" 6" 1/4" 3"1/2"
G1a
G1a
6"
3" = 1'-0" 3" = 1'-0" 3" = 1'-0"
3" = 1'-0"
1' - 0" 6"
3" = 1'-0"
1' - 0" 6"
1' - 6" 0"
1' - 0"6"
6"
SLAB
3" /4"
1.
FRAMING FRAMING SEE AD3.20BFRAMING FOR TYP EXT ENVELOPE ASSEMBLIES. FRAMING
2.
GENERAL NOTES 07 95 TO 13 EXT 07 95 STUD, 13 07 95 13 EXT WALL DIMS F.O. UON. INSUL WP BARRIERWP BARRIERWP BARRIER
FRAMING
GENERAL NOTESLOS ANGELESLOS UNIFIED ANGELES SCHOOL LOS UNIFIED ANGELES DISTRICT SCHOOL UNIFIED DISTRICT SCHOOL UNIFIED DISTRICT LOS ANGELES LOS ANGELES SCHOOL UNIFIED DISTRIC S 07 95 13 07 95 13 WP BARRIER WP BARRIER
8" MIN
INSUL
8" MIN
1 1/2" 8" MIN
1 1/2"
FRAMING FRAMING INSUL INSUL SAF
SAF
8" MIN
1 1/2"
1 1/2"
1 1/2"
T.O. DECKING
BD
T.O. DECKING
1' - 6" MIN
BD
1' - 6" MIN
BD
T.O. DECKING
1' - 6" MIN
1' - 6" MIN
BD
1. SEE AD3.20B FOR TYP EXT ENVELOPE ASSEMBLIES. EXTERIOR ENVELOPE ASSEMBLIES
T.O. DECKING
FRANCIS FRANCIS POLYTECHNIC FRANCIS POLYTECHNIC SENIOR POLYTECHNIC HIGH SENIORPOLYTECHNIC HIGH SENIOR HIGH FRANCIS FRANCIS POLYTECHN SENIOR COMPREHENSIVE COMPREHENSIVE MODERNIZATION COMPREHENSIVE PROJECT MODERNIZATION PROJECT PROJECT 6" FRAMING MODERNIZATION 6" COMPREHENSIVE FRAMING COMPREHENSIVE MODERNIZATION MODER 5055 Wilshire Boulevard, 9th Floor
3.
REFER TO STRUCTURAL, MEP AND LIGHTING DRAWINGS FOR INFORMATION SPECIFIC TO THAT DISCIPLINE.
FOR INFORMATION SPECIFIC TO THAT DISCIPLINE. EXTERIOR ENVELOPE 1. SEE AD3.20B FOR TYP EXTASSEMBLIES ENVELOPE ASSEMBLIES.
6" FRAMING 6" FRAMING 6" FRAMING OPENINGS 2. EXT WALL DIMS TO EXT F.O. STUD, UON.
T.O. DECKING
12431 ROSCOE 12431 BLVD, ROSCOE SUN12431 VALLEY, BLVD, ROSCOE SUN CA 91352 VALLEY, BLVD, SUN CA 91352 VALLEY, CA 91352 12431 ROSCOE 12431 BLVD, ROSCOE SUN VALLEY, BLVD,CASUN 91 EXTERIOR ENVELOPE ASSEMBLIES Los Angeles, California 90036
08 4113 GLAZED STOREFRONT 3. TO STRUCTURAL, MEP AND 4.5" LIGHTING DRAWINGS G2aREFER EXTERIOR ENVELOPE ASSEMBLIES 5055 Wilshire Boulevard, 9th Floor FOR INFORMATION SPECIFIC TO THAT DISCIPLINE. 323.525.0500 phone, fax 5055323.525.0955 Wilshire Boulevar OPENINGS 08 5113 GLAZED WDW FIXED/ PROJECTING 2" G3b Los Angeles, California 90036 5055 Wilshire Boulevard, 9th Flo OPENINGS Los Angeles, California R1b R1b R1b R1b 08 4513 POLYCARBONATE G4e 08 4113PANEL GLAZED STOREFRONT 4.5" G2a 323.525.0500 phone, 323.525.0955 fax Los Angeles, California 90036 08 4113 GLAZED STOREFRONT 4.5" G2a 323.525.0500 phone, 3 08 5113 GLAZED WDW FIXED/ PROJECTING 2" G3b 323.525.0500 phone, 323.525.0 WALLS 08 4513 POLYCARBONATE PANEL G4e 08 5113 GLAZED WDW FIXED/ PROJECTING 2" G3bENVELOPE EXTERIOR ASSEMBLIES 08 4513 POLYCARBONATE PANEL G4e 08 4513 POLYCARBONATE PANEL CIPG4e CONCRETE WALL W2c 5055 Wilshire Boulevard, 9th Floor EXTERIOR ENVELOPE 1WALLS 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2"ASSEMBLIES = 1'-0" 1 1/2" = 1'-0"1 1/2"DE 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2"OPENINGS = 1'-0" = 1'-0"1 1/2" = 1'-0" INSUL PLAS WALLS WALL W4a Los Angeles, 555 1st StreetCalifornia 90036 WALLS 5055 Wilshire Boulevard, 9th Floor CIP CONCRETE WALL 08 4113 GLAZED STOREFRONT 4.5" W2c G2a OPENINGS T.O.INSUL STEEL T.O.W2c STEELFURRED T.O. STEEL PLAS WALL, T.O. STEEL T.O. STEEL CIP CONCRETE WALL W4a.1 323.525.0500 323.525.0955 fax San Fernando,phone, California 91340 T.O. STEEL T.O. STEEL T.O. T.O. STEEL90036 T.O. STEEL 21 21 21 GLAZED LosSTEEL Angeles, California INSUL PLAS WALL 08 5113 WDW PROJECTING 2" W4a 21 FIXED/ 21 G3b CIP CONCRETE WALL W2c 555 1st Street 08 4113 GLAZED STOREFRONT 4.5" G2a INSUL PLAS WALL INSUL TILE WALL W4a A8.24-1 W4c A8.24-1 A8.24-1 A8.24-1 A8.24-1 818.898.1521 phone, 818.361.9208 fax 555 1st Street 323.525.0500 phone, 323.525.0955 fax INSUL PLAS WALL, FURRED W4a.1 08 4513 PANEL INSUL PLAS WALL G4e W4a POLYCARBONATE San Fernando, California 91340 4' - 10" 2 3/4" 555 1st Street 08 5113 GLAZED WDW FIXED/ PROJECTING 2" G3b INSUL PLAS WALL, FURRED NON INSULW4a.1 PLASTER SCREEN WALL 07 42 13 07 42W4d 13 07 42-13 San Fernando, Californ 07 42 13 07 42 13 INSUL TILE WALL W4c INSUL PLAS WALL, FURRED W4a.1 PANEL 818.898.1521 phone, 818.361.9208 fax San Fernando, California 91340 08 4513 POLYCARBONATE PANEL SCREEN PANEL SCREEN PANEL SCREEN G4e SCREEN PANEL PANEL INSUL TILE SCREEN WALL PLASTER WALL W4e WALLS NON - INSULW4c 818.898.1521 phone, 8 RUBBER/ RUBBER/ EPDM RUBBER/ EPDM RUBBER/ EPDM RUBBER/ EPDM NON - INSUL PLASTER SCREEN WALL EPDM W4d INSUL TILE WALL W4c 818.898.1521 phone, 818.361.9 ISOLATION ISOLATION ISOLATION NON PLASTER SCREEN WALL W4dSTL INSUL S4a ISOLATION ISOLATION INTERMEDIATE INTERMEDIATE STL INTERMEDIATE STL TSSOFFIT, TS - INSUL WALLSNON - INSUL PLASTER WALL CIP CONCRETE WALL INTERMEDIATE INTERMEDIATE STL TS STL TS DE W2cTS PLASTER NON INSUL PLASTER SCREEN WALL W4e W4d 1 INTERIOR 4 x 2 x 1/8" SPACED 4 x 2 x 1/8" SPACED 4 x 2 x 1/8"SOFFIT, SPACED 2NON x 1/8" SPACED 4 PLASTER x 2 x 1/8" SPACED - INSUL WALL W4e 4 xNON PLASTER -INTERIOR INSUL S4b A8.24-1 INSUL PLAS(2) WALL W4a EQUALLY, (2)EQUALLY, PER BAY (2) EQUALLY, PER PER BAY PLASTER SOFFIT,WALL INSUL NON -EQUALLY, INSUL WALL S4a W4eBAY CIP CONCRETE (2) PER EQUALLY, BAY (2) PER BAY W2c PLASTER 555 1st Street 07R1b 42 13 07 42 13 07 42 13 07 42 13 07 42 13 HSS PER STRUCT PLASTER SOFFIT, INSUL S4a SCREEN PANEL SCREEN PANEL SCREEN PANEL WALL, FURRED SCREEN PANEL W4a.1 INSUL SOFFIT, INSUL SOFFIT, NON - INSULSCREEN PANEL S4aPLASPLASTER S4b INSUL PLAS WALL W4a PLASTER San Fernando, California 91340 ROOFS 555 1st Street NON - INSUL S4b S1PLASTER SOFFIT, S1 S1W4c INSUL S1 TILE WALL 1/2" / 1'-0" S1- INSUL HIGH ROOF PLASTER SOFFIT, NON S4b 818.898.1521 phone, 818.361.9208 fax W4a.1 INSUL PLAS WALL, FURRED 144° San Fernando, California 91340 PVC ROOF ON MTL DECK R1b ROOFS 4' - 10" 2 3/4" 33' - 0" NON INSUL PLASTER SCREEN WALL W4d ROOFS INSUL TILE WALL W4c W4a 818.898.1521 phone, 818.361.9208 fax ROOFS PVC ROOF ON MTL DECK W4a R1b NON - INSUL PLASTER WALL W4e NON - INSUL PLASTER SCREEN WALL W4d PVC ROOF ON MTL DECK R1b INTERMEDIATE INTERMEDIATE STL INTERMEDIATE STL STL INTERMEDIATEINTERMEDIATE STL STL PVC ROOF ON MTL DECK R1b SOFFIT, PLASTER INSUL S4a POSTS AS SPACED POSTS AS SPACED POSTS AS NON - INSUL PLASTER WALLPOSTS SPACED W4e SPACED POSTS AS SPACED AS 5 5/8" PRIMARY STL PRIMARY SUPPORT STL PRIMARY SUPPORT STL SUPPORT PRIMARY STL SUPPORT PRIMARY STL SUPPORT 1 REQ'D BY PANEL REQ'D BY PANEL REQ'D BY PANELREQ'D BY PANEL REQ'D BY PANEL PER STRUC PERS4b STRUC PLASTER PER STRUC 5 5/8" PER STRUC SOFFIT, NON - INSUL PER STRUC PLASTER SOFFIT, INSUL S4a A8.24-1 DEFLECTIONDEFLECTION CRITERIA DEFLECTION CRITERIA CRITERIA DEFLECTION CRITERIA DEFLECTION CRITERIA 09 2423 SPECIALLY SCALE: As indicated SCALE: As indicated SCALE: As indicated SCALE: As indicatedSCALE: As indicated R1b SHAPED DEEP CASING PLASTER SOFFIT, NON - INSUL 09 SPECIALLY S4b DATE OF ISSUE:DATE 10 JULY OF ISSUE: 2019 DATE 10 JULY OF ISSUE: 2019 10 JULY DATE2019 OF ISSUE: 2423 10DATE JULY OF 2019 ISSUE: 10 JULY 2019 21 21 W4a SCREWS ROOFSB.O. STL BEAD21 SHAPED DEEP CASING B.O. STL 21 B.O. STL 21 B.O. STL #12 x 1 1/4" x 1 1/4"G4e SCREWS #12 x 1 1/4" SCREWS B.O. STL #12 x 1 1/4" SCREWS #12 x 1 1/4" SCREWS A8.24-1 A8.24-1 A8.24-1 1/2"#12 / 1'-0" A8.24-1 A8.24-1 BEAD HIGH @ 2'-0" OC, TYP @ 2'-0" OC, TYP @ 2'-0" OC, TYP @ 2'-0" OC, TYP G4e @ 2'-0" OC, TYP ROOF ROOFS 07 6000 PVC ALUM ROOF ON MTL DECK R1bSHAPED 07 9200 SEALANT, 33' 0" ANGLE07 4"9200 x 2" SEALANT, 07 6000 SHAPED ALUM RECESSED 1/2" 16 PVC ROOF ON MTL DECK R1b ANGLE 4" x 2" RECESSED 1/2" 07 42 13A8.54-1 07 42 13 L PAINT 07 42 13 07 42 13 07 42 13 07 6000 ALUM 09 2216 2.5" FINISHED TO TRIM FINISHED FINISHED TRIM FINISHED TRIMFINISHED TRIM MATCH ALTRIM WDW 07 6000 ALUM L PAINT FRAMING @ 2'-0" OC FRAME TO MATCH AL WDW FRAME 07 2719 SAF WRAPPED GYP BD CEILING G4e INTO OPNG 07 2719 SAF WRAPPED G4e W4a INTO OPNG 092423 DEEP CASING BEAD, VENTED W4a 092423 DEEP CASING 100% CONSTRUCTION 100% CONSTRUCTION DOCUMENTS 100% CONSTRUCTION DOCUMENTS100% DOCUMENTS CONSTRUCTION 100%DOCUMENTS CONSTRUCTION DOCUMENTS 1/2" = 1'-0"1/2" = 1'-0"1/2" = 1'-0" 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" = 1'-0" 1 1/2" = 1'-0"1 1/2" = 1'-0" BEAD, 1/2" VENTED G4e W4a NO.: LAUSD PROJECT LAUSD NO.: 10366804 PROJECT LAUSD NO.: 10366804 PROJECT 10366804 LAUSD PROJECT NO.: LAUSD 10366804 PROJECT NO.: 10366804 16 A8.54-1 DK Copyright © 2019 Copyright CO Architects. © 2019 If drawing Copyright CO Architects. is not © 2019 30"If x42", drawing CO Architects. it isCopyright isanot reduced 30"If©x42", drawing print.it isCO isaCopyright not reduced 30" x42", print. itdrawing is a CO reduced 2019 Architects. ©If2019 isArchitects. not print. 30" x42", If drawing it is a red is 2. EXT WALL DIMS TO EXT F.O. STUD, UON. OPENINGS PLASTER 3. REFER TOPLASTER STRUCTURAL, MEP AND LIGHTING DRAWINGS 08 4113 GLAZED STOREFRONT 4.5" G2a SOFFIT SOFFIT R1b FOR INFORMATION SPECIFIC TO THAT DISCIPLINE. 08 5113 GLAZED WDW FIXED/ PROJECTING 2" G3b
PLASTER SOFFIT
11 11 11 11 11
3 3
FRAMING INSUL
SAF
1. SEE AD3.20B FOR TYP EXTDRAWINGS ENVELOPE ASSEMBLIES. 3. REFER TO STRUCTURAL, MEP AND LIGHTING ROOF ROOF ROOF ROOF WALL WALL WALL 1. ROOF SEE AD3.20B FOR TYP EXT ENVELOPE ASSEMBLIES. ASSEMBLY WALL ASSEMBLY WALL ASSEMBLY WALL WALL WALL ASSEMBLY WALL ASSEMBLY FOR INFORMATION SPECIFIC TO THAT DISCIPLINE. ASSEMBLY ASSEMBLY ASSEMBLY ASSEMBLYASSEMBLY 2. EXTASSEMBLY WALL DIMSASSEMBLY TO EXT F.O. STUD, UON. ASSEMBLY ASSEMBLY ASSEMBLY 2. EXT WALL DIMS TO EXT F.O. STUD, UON. COVER COVER COVER COVER GENERAL NOTES 3. REFER TO STRUCTURAL, MEP AND LIGHTING DRAWINGS
GENERAL NOTES PLASTER PLASTER FINISH FINISH
PLASTER FINISH
1 1/2" 3"PLASTER 1 1/2" PLASTER 3" SOFFIT SOFFIT
FRAMING
SAF
8" MIN
SLAB
SLAB
FRAMING
CURB
1' - 6" MIN
PLASTER FINISH
11
/4" 11
1 1/2" 3"
3 3 3
2 2
3"
3"
3"
3"
1 1/2" 3"
CURB
SHT MTL AND SHT MTL AND SHT MTL AND SHT MTL AND SHT MTL AND WALL EXT WALL DIMS TO EXT F.O. STUD, UON. J MOLDS TOJ MOLDS TOJ MOLDS TO 2.J MOLDS TO J MOLDS TO WEEP WEEP WEEP WEEP 3.WEEP REFER TO STRUCTURAL, MEP AND LIGHTING DRAWINGS COVER FOR INFORMATION SPECIFIC TO THAT DISCIPLINE.BD
PLASTER FINISH
/4"
/4"
2 2 2
11
1 1/2" 3"
LOW ROOF ROOF 12' - 0" 12' - 0"
CURB
SEE AD3.20B FOR TYP EXT ENVELOPE ASSEMBLIES. SAF
1.
8" MIN
PLASTER FINISH
CURB
8" MIN
PLASTER FINISH
8" MIN
PLASTER FINISH
8" MIN
PLASTER FINISH
8" MIN
PLASTER FINISH
PLASTER FINISH
1 1
G1a
07 6000 GUTTER 07 6000 GUTTER 07 6000 GUTTER07 6000 GUTTER 07 6000 GUTTER
6"
SLAB
SLAB
31°
31°
31°
31°
31°
PLASTER FINISH
G1a
4"
4 1/2"
2"
2"
1/4" 1/2" 6"
GENERAL NOTES PLASTER FINISH
ALIGN TO ALIGN TO ALIGN TO ALIGN TO ALIGN TO 10 ADJACENT WALL ADJACENT WALL ADJACENT WALLADJACENT WALL ADJACENT WALL 10 A8.41 LOW A8.41
1 1 1
3"
05 1200 STL 05 1200 STL 05 1200 STL 05 1200 STL 05 1200 STL FRAMING FRAMING FRAMING FRAMING FRAMING 07 6200 PTD 07 SHT 6200 PTD 07 SHT 6200 PTD SHT07 6200 PTD SHT 07 6200 PTD SHT MTL TRIM MTL TRIM MTL TRIM MTL TRIM MTL TRIM 07 9200 07 9200 07 9200 07 9200 07 9200 CAULKING CAULKING CAULKING CAULKING CAULKING 1/2" 1/2" 1/2" 1/2" 3" 6"1/4" 1/2"6" 1/2" 08 4113 CURTAIN 08 4113 CURTAIN 08 4113 CURTAIN08 4113 CURTAIN 08 4113 CURTAIN WALL SPANDREL WALL SPANDREL WALL SPANDREL WALL SPANDREL WALL SPANDREL
6" 6" 07 95 13 07 95 13 07 95 13 07 95 13 07 95 13 SEISMIC JT SEISMIC JT SEISMIC JT WP BARRIER BARRIER WP BARRIER SEISMIC JT WPSEISMIC JT WP BARRIER WP BARRIER 07 95 13 JT COVER 07 95 13 JT COVER 07 95 13 JT COVER 07 95 13 JT COVER 07 95 13 JT COVER 07 95 13 07 95 13 07 95 13 07 95 13 07 95 13 SEISMIC JT COVER SEISMIC JT COVER SET IN SEALANT SET IN SEALANT SET IN SEALANTSET IN SEALANT SEISMIC JT COVER SEISMIC JT COVER SET IN SEALANT SEISMIC JT COVER 07 62 00 SHT07 MTL 62 00 SHT07 MTL 62 00 SHT MTL 07 62 00 SHT MTL 07 62 00 SHT MTL FLASHING OVER FLASHING OVER FLASHING OVERFLASHING OVER FLASHING OVER H TEMP RESIS H TEMP SAF RESIS H TEMP SAF RESIS SAF H TEMP RESISHSAF TEMP RESIS SAF GENERAL NOTES SAF SAF SAF SAF SAF
CURB PLASTER FINISH
11
W4a
6"
1/2 "
F.O.G2a
R1b
R1b
7
F.O.G2a
F.O.STUD
1'-8 7/8"
R1b
1' -
PLASTER 1' - 2" FINISH
1' - 2"
1/4" 6"
1' - 0"
CNTR FLSH SHT MTL ROOF ASSEMBLY
/4"
D1
6"
CNTR FLSH SHT MTL ROOF ASSEMBLY
11
D1
1D1 '7 1/2 "
1/2 "
36°
36°
36°
36°
1/2"
1/2"
1/2"
1/2"
1/2"
36°
F.O.STUD
7
CNTR FLSH CNTR FLSH CNTR FLSH SHT MTL SHT MTL SHT MTL ROOF ROOF ROOF ASSEMBLY ASSEMBLY ASSEMBLY
1/2"
1' -
6"
1/2"
1/2 "
3"
G1a
1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"1 1/2" = 1'-0"
1/2"
1'-8 7/8"
7
1/2"
1' -
1":12" SLOPE 1":12" SLOPE
CANOPY SKYLIGHT SHORT SKYLIGHT DETAILS SHORT DETAILS DETAILS SKYLIGHT TOSKYLIGHT CURTAIN WALL CURTAIN DETAIL WALL DETAIL WALL CANOPY CANOPY SKYLIGHT SKYLIGHT SHORTSKYLIGHT DETAILS SKYLIGHT SKYLIGHT TO CURTAIN TO DETAIL CURTAIN WALL DETAIL WALL DETAIL 5 CANOPY 5 CANOPY 5SKYLIGHT 6 6SHORT 6DETAILS 5 5 SHORT 6TO CURTAIN 6TO
CNTR FLSH CNTR FLSH CNTR FLSH 6" CNTR FLSH CNTR FLSH 6" 6" SHT MTL SHT MTL SHT MTL SHT MTL SHT MTL ROOF ROOF ASSEMBLY ROOF ASSEMBLY 6" ASSEMBLY ROOF ASSEMBLY ROOF ASSEMBLY 1/2"
1R1b '7 1/2 "
1/4"
4"
3"
1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"1 1/2" = 1'-0"
6"
1":12" SLOPE1":12" SLOPE1":12" SLOPE
4 1/2"
05 1200 STL 05 1200 STL 05 1200 STL 05 1200 STL 05 1200 STL FRAMING FRAMING FRAMING FRAMING FRAMING SEE SEE SEE SEE SEE STRUCTURAL. STRUCTURAL. STRUCTURAL. STRUCTURAL.STRUCTURAL.
2"
2"
07 6200 PTD 07 SHT 6200 PTD 07 SHT 6200 PTD SHT07 6200 PTD SHT 07 6200 PTD SHT MTL TRIM MTL TRIM MTL TRIM MTL TRIM MTL TRIM
CANOPY SKYLIGHT LONG SKYLIGHT LONG DETAILS LONGSKYLIGHT DETAILS CANOPY CANOPY SKYLIGHT LONG DETAILS LONG DETAILS 4 CANOPY 4 CANOPY 4SKYLIGHT 4 4 DETAILS
D1
C1
08 6323 MTL 08 6323 MTL 08 6323 MTL 08 6323 MTL 08 6323 MTL FRAMED FRAMED FRAMED FRAMED FRAMED SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT 07 9200 07 9200 07 9200 07 9200 07 9200 CAULKING CAULKING CAULKING CAULKING CAULKING 1/4":12" SLOPE 1/4":12" SLOPE 1/4":12" SLOPE 1/4":12" SLOPE 1/4":12" SLOPE 07 6200 SHT 07 MTL 6200 SHT 07 MTL 6200 SHT MTL07 6200 SHT MTL 07 6200 SHT MTL FLASHING FLASHING FLASHING FLASHING FLASHING
STRUCTURAL FRAMING STRUCTURAL FRAMING FRAMING BLOCKWORKSTRUCTURAL BLOCKWORK STRUCTURAL FRAMING STRUCTURAL FRAMING SEE STRUCTURAL. SEE STRUCTURAL. SEE STRUCTURAL. SEE STRUCTURAL. SEE STRUCTURAL.
26 3100 26 3100 26 3100 26 3100 26 3100 PHOTOVOLTAIC PHOTOVOLTAIC PHOTOVOLTAIC PHOTOVOLTAIC PHOTOVOLTAIC SYSTEM SYSTEM SYSTEM SYSTEM SYSTEM
6"
C1
4 1/2"
BLOCKWORK BLOCKWORK BLOCKWORK
05 3000 PTD 05 MTL 3000 PTD 05 MTL 3000 PTD MTL05 3000 PTD MTL 05 3000 PTD MTL DECKING. SEE DECKING. SEE DECKING. SEE DECKING. SEEDECKING. SEE STRUCTURAL STRUCTURAL STRUCTURAL STRUCTURAL STRUCTURAL
6"
C1
FLUSH
4"
FLUSH
4"
FLUSH
4"
FLUSH
07 6200 PTD 07 SHT 6200 PTD 07 SHT 6200 PTD SHT07 6200 PTD SHT 07 6200 PTD SHT 05 3000 PTD 05 MTL 3000 DECKING PTD 05 MTL 3000 DECKING PTD MTL05 DECKING 3000 PTD MTL 05 DECKING 3000 PTD MTL DECKING MTL TRIM MTL TRIM MTL TRIM MTL TRIM MTL TRIM SEE STRUCTURAL. SEE STRUCTURAL. SEE STRUCTURAL. SEE STRUCTURAL. SEE STRUCTURAL.
05 1200 STL 05 1200 STL 05 1200 STL 05 1200 STL 05 1200 STL FRAMING FRAMING FRAMING FRAMING FRAMING SEE SEE SEE SEE SEE STRUCTURAL. STRUCTURAL. STRUCTURAL. STRUCTURAL.STRUCTURAL.
6"
2"
2"
8"
2"
2"
8"
8"
C1 C1 07 6200 PTD 07 SHT 6200 MTL PTD 07 SHT 6200 MTL PTD SHT07 MTL 6200 PTD SHT 07 MTL 6200 PTD SHT MTL FLUSH
05 1200 STL 05 1200 STL 05 1200 STL 05 1200 STL 05 1200 STL FRAMING FRAMING FRAMING FRAMING FRAMING SEE SEE SEE SEE SEE STRUCTURAL. STRUCTURAL. STRUCTURAL. STRUCTURAL.STRUCTURAL.
6 1/4"
8"
8"
05 4100 STUD 05FRAMING 4100 STUD 05FRAMING 4100 STUD FRAMING 05 4100 STUD FRAMING 05 4100 STUD FRAMING
SEE REFLECTED SEE REFLECTED CEILINGSEE PLAN REFLECTED CEILING PLAN CEILING PLANSEE SEE REFLECTED CEILING REFLECTED PLAN CEILING PLAN
4 1/2"
6 1/2"
6 1/2"
METAL STUD METAL STUD FRAMING FRAMING
07 6200 SHT 07 MTL 6200 SHT 07 MTL 6200 SHT MTL07 6200 SHT MTL 07 6200 SHT MTL 6"FLASHING FLASHING 6" FLASHING FLASHING FLASHING TRANSITIONS TRANSITIONS TO TRANSITIONS TO TOTRANSITIONS TO TRANSITIONS TO 16 GA GUTTER 16 GA GUTTER 16 GA GUTTER 16 GA GUTTER16 GA GUTTER
05 1200 STL FRAMING 05 1200 STL 05 FRAMING 1200 STL FRAMING 05 1200 STL FRAMING 05 1200 STL FRAMING 4" 4" 4" 4"
4"
4 1/2"
2"
2"
2" 6 1/2"
METAL STUDMETAL STUDMETAL STUD FRAMING FRAMING FRAMING
08 6323 MTL FRAMED SKYLIGHT
07 6200 PTD 07 SHT 6200 PTD 07 SHT 6200 PTD SHT07 6200 PTD SHT 07 6200 PTD SHT MTL TRIM MTL TRIM MTL TRIM MTL TRIM MTL TRIM
07 6200 PTD 07 SHT 6200 PTD 07 SHT 6200 PTD SHT07 6200 PTD SHT 07 6200 PTD SHT MTL TRIM MTL TRIM MTL TRIM MTL TRIM MTL TRIM
6 1/4"
2"
6 1/4"
6 1/2"
2" 6 1/2"
6"
6 1/4"
6"
6 1/4"
6"
08 6323 MTL FRAMED SKYLIGHT
6"
PLAN PER PLAN SLOPE PER PLAN SLOPE PER SLOPE SLOPE PER PLAN SLOPE PER PLAN 08 6323 MTL 08 6323 MTL 08 6323 MTL 08 6323 MTL FRAMED FRAMED FRAMED FRAMED SKYLIGHT SKYLIGHT SKYLIGHT SKYLIGHT
PLAN PER PLAN SLOPE PER PLAN SLOPE PER SLOPE SLOPE PER PLAN SLOPE PER PLAN 08 6323 MTL 08 6323 MTL 08 6323 MTL 08 6323 MTL FRAMED FRAMED FRAMED FRAMED SKYLIGHT SKYLIGHT SKYLIGHT SLOPE PER PLAN SLOPE PER SLOPE SKYLIGHT SLOPE PER PLAN SLOPE PER PLAN PLAN PER PLAN
08 6323 MTL 08 FRAMED 6323 MTL SKYLIGHT 08 FRAMED 6323 MTL SKYLIGHT FRAMED SKYLIGHT 08 6323 MTL FRAMED 08 6323SKYLIGHT MTL FRAMED SKYLIGHT 4" 4" 4" 4" 4"
08 6323 MTL 08 6323 MTL FRAMED FRAMED SKYLIGHT 07SKYLIGHT 6200 SHT 07 MTL 6200 FLASHING SHT 07 MTL 6200 FLASHING SHT MTL07 FLASHING 6200 SHT MTL 07 FLASHING 6200 SHT MTL FLASHING
2"
08 6323 MTL 08 6323 MTL 08 6323 MTL FRAMED FRAMED FRAMED PLAN PER PLAN PLAN PER PLAN SKYLIGHT SLOPE PER PLAN SLOPE PER SLOPE SLOPE PER SLOPESKYLIGHT SKYLIGHT
2"
2"
6"
07 6200 SHT 07 MTL 6200 FLASHING SHT 07 MTL 6200 FLASHING SHT MTL07 FLASHING 6200 SHT MTL 07 FLASHING 6200 SHT MTL FLASHING
16 16 16 16 16
404 SF
5' - 0"
4 A9.54-1
1/2" = 1'-0"
30 A8.12
SIM30 A8.12
LEVEL 1 1LEVEL 1 0' - 0" LEVEL LEVEL 1 0' - 0" 0' - 0" 0' - 0"
19 19 A9.54-1 A9.54-1 4 A9.54-1
2"
2"
07 2719 SAF, 9" STRIP WRAPPED INTO OPNG
0' - 0"
(2) HILTI KB-TZ 3/8" DIA X 2" EMBED & 2 1/2" SPACING (ICC ESR-1917)
333 3
1/2" = 1'-0"
10
EXT.
ROOM SIDE
14 10
1/2" 1/2" = 1'-0" = 1'-0" 1/2" = 1'-0"
1 1/2" = 1'-0"
W4c
W2c
'W4a'
EXTERIOR WALL SECTIONS LEVEL 1 0' - 0"
SCALE: As indicated DATE OF ISSUE: 10 JULY 2019 BUILDING D PHASE 1
03 3600 CAST-INPLACE CONC CURB
EXTERIOR SIDE EXTERIOR WALL SECTIONS EXT.
BUILDING D
PHASE 1 100% CONSTRUCTION DOCUMENTS LAUSD PROJECT NO.: 10366804
WALL WALLSECTION SECTION- D9 - DANEAR NEARDGD3 1/2" = 1'-0" 1/2" = 1'-0"
33
WALL WALLSECTION SECTION- DK - DENEAR NEARD13 D4 1/2" = 1'-0" 1/2" = 1'-0"
4
WALL SECTION - DE NEAR D6 1/2" = 1'-0"
X'- X"
X'- X"
X'- X"
2' - 0"
2' - 0"
2' - 0"
2' - 0"
5 1/2"
F.O.W4a
8' - 0"
8' - 0"
1"
11"
VARIES
12431 ROSCOE BLVD 12431 ROSCOE BLVD, SUN VAL
WINDOW NOM. THICKNESS
FRANCIS POLYTECHNIC SENIO 06 4000 14 GA SST BRUSHED COMPREHENSIVESST MODERNIZATION COUNTER
COUNTERTOP 08 8000 PASS@ 2-10" THROUGH TRAY
10" MAX
COUNTERTOP @ 2'-10"
CLR. CA 9 12431 ROSCOE BLVD, SUN2'-0" VALLEY, 3"
10" MAX
3" 3 1/32"
12' - 0"
12' - 0"
2' - 7"
3 1/2" 3 1/2"
2' - 0"
3" 3"
GYP BD CEILING
SPEAK-THRU @ 4'-6"
06 4000 COUNTER BRACKET, FOR TYPICAL NOTES, SEE 1"14/A9.41 DETAIL
T.O. HSS
T.O.07 HSS 9200 SEALANT 07 9200 SEALANT 07 2719 SAF, 9" STRIP 07 2719 SAF, WRAPPED STRIP INTO9"OPNG WRAPPED INTO OPNG
06 4000 COUNTER BRACKET, 08 4113 TRIM NOTES, SEE FOR TYPICAL DETAIL 14/A9.41 06 4000 WOOD BLOCKING 08 4113 TRIM 05 5000, HSS 4X4 BEAM
WOOD BLOCKING 05 5000, HSS 4X4 POST 05 5000, HSS 4X4 BEAM 09 2900 5/8"GYPSUM BOARD 05 5000, HSS 4X4 POST ALL SIDES
W4c
LEVEL 1 LEVEL 1 0' - 0" 09 HILTI 2900 5/8"GYPSUM (2) KB-TZ 3/8" DIABOARD X 2" 0' - 0" ALL SIDES EMBED & 2 1/2" SPACING (ICC
08 4113 TRIM 06 4000 WOOD BLOCKING
W2c
05 5000, HSS 4X4 BEAM
EXTERIOR WALLWALL SECTIO EXTERIOR WA EXTERIOR SE 05 5000, HSS 4X4 POST
09 2900 5/8"GYPSUM BOARD ALL SIDES
ROOM SIDE
CONCESSIONS WINDOW - D 1 1/2" = 1'-0"WINDOW - D TICKET 1 1/2" = 1'-0"
06 4000 COUNTER BRACKET, FOR TYPICAL NOTES, SEE DETAIL 14/A9.41
(2) HILTI KB-TZ 3/8" DIA X 2" SCALE: As indicated SCALE: As indicated EMBED &indicated 2 1/2" SPACING (ICC SCALE: DATE OF ISSUE: 10 As JULY 2019 ESR-1917)DATE OF ISSUE: 10 JULY 2019 10 JULY BUILDING DDATE OF ISSUE: BUILDING D 2019 03 3600 CAST-INREFER BUILDINGTO DPHASE 1 PLACE CONC PHASE 1 MANUFACTURE FOR CURB PHASE 1INFO PLATE
ESR-1917) (2) HILTI KB-TZ 3/8" DIA X 2" REFER EMBEDTO & 2 1/2" SPACING (ICC MANUFACTURE FOR ESR-1917) PLATE INFO REFER TO MANUFACTURE FOR PLATE INFO ROOM SIDE
19 AD8.0414
LOS ANGELES UNIFIED SCHOOL DISTR LOS ANGELES UNIF LOS ANGELES UNIFIED SCHO
08 8053 SECURITY GLAZING, 1/2" NOM. THICKNESS
08 8000 SPEAK HOLE
10' - 0"
3 1/2"
3"
07 9200 SEALANT 07 9200 LEVEL 1 SEALANT SAF, 0' - 0"07 2719 9" STRIP 07 2719 SAF, WRAPPED 9" STRIP 1 1/2" INTO OPNG WRAPPED 1 1/2" INTO OPNG
EXTERIOR WALL SECTIO ROOM SIDE
EXT. EXTERIOR SIDE
19
Copyright © 2019 CO Architects. If drawing is not 30" x42", it is a reduced print.
1/4" /12" SLOPE
AD8 AD
CONCESSION
SCALE: As indicated DATE OF ISSUE: 10 JULY 2019 1 1/2" = 1'-0" EXTERIOR BUILDING D PHASE 1 100% CONSTRUCTION DOCUMEN 100% CONSTRUCTION DOCUMENTS 100% CONSTRUCTION DOCUMENTS LAUSD PROJECT LAUSD PROJECT NO.: 10366804 2' - 5NO.: 3/4"10366804 LAUSD PROJECT NO.: 10366804
G2a 2' - 0"
Copyright © 2019is CO 0 Copyright © 2019 CO Architects. If drawing not Architects. 30" x42",2'itIfis-dra a 1/4" /12"IfSLOPE Copyright © 2019 CO Architects. drawing is not 30
AD8.04View of Polygon and Gymnasium South
100% CONSTRUCTION DOCUMENTS LAUSD PROJECT NO.: 10366804
11 3/16"
11"
21' - 0" 12' - 0" 12' - 0"
W2c
T.O. HSS
T.O. HSS
7 A8.52
TICKET WINDOW - D SCALE: As indicated 1 1/2"D6 = 1'-0" WALL SECTION - DE NEAR TEXTBOOK -F CLASSROOMS -NEAR D23 NEAR DATE OF ISSUE: 10 JULY 2019 CLASSROOMS - D23 DQ DQ WINDOW
444
21' - 0"
6' - 0" 11' - 6" 11' - 6"
09 2900 5/8"GYPSUM BOARD 09 2900 5/8"GYPSUM ALL SIDES BOARD ALL SIDES (2) HILTI KB-TZ 3/8" DIA X 2" (2) HILTI KB-TZ 3/8" 2" EMBED & 2DIA 1/2"XSPACING (ICC EMBED &ESR-1917) 2 1/2" SPACING (ICC ESR-1917) REFER TO MANUFACTURE REFER TOFOR PLATE INFO MANUFACTURE FOR PLATE INFO ROOM SIDE
7 A8.52
3 1/2"
VARIES
11"
3"
4 A9.54-1
05 5000, HSS 4X4 HSS POST4X4 POST 05 5000,
1 - 0" 0' 0' - 0"
TEXTBOOK WINDOW - F 1 1/2" = 1'-0"
08 4113 TRIM 08 4113 TRIM
G2a
(2) HILTI KB-TZ 3/8" DIA X 2" EMBED & 2 1/2" SPACING (ICC ESR-1917)
FRANCIS POLYTECHNIC SENIO FRANCIS POLYTE POLYTECHNIC COMPREHENSIVE MODERNIZATION LOS FRANCIS ANGELES UNIFIED SCHOOL DISTR COMPREHENSIVE MO 08 3313 COILING 08 5113 ALUMINUM 08 8053 SECURITY 12431 COMPREHENSIVE ROSCOE BLVD, SUNMODERNI VALLEY, CA 9 COUNTER DOOR WINDOWS, SERVICE GLAZING, 1/2"
FRANCIS POLYTECHNIC SENIOR HIGH COMPREHENSIVE MODERNIZATION PROJECT
G2a
HEAD OF WINDOW VARIES
'W4a' SCREED 08 5113 ALUMINUM WINDOWS, SERVICE HEAD OF WINDOW WINDOW @ 7' - 2"
LOW ROOF LOW ROOF 12' - 0" 4" MIN 12' - 0"
06 4000 14 GA SST BRUSHED 06 4000 14 GA 2' - 7" SST COUNTER SST BRUSHED AEROBICS SST COUNTER COUNTERTOP AEROBICS CLASSROOM @ 2-10" 10" MAX 2'-0" CLR. CLASSROOM 4-164 COUNTERTOP 4-164 10" MAX @ 2'-10" 2'-0" CLR. 12431 ROSCOE BLVD, SUN VALLEY, CA 91352 1558 SF 1558 SF
3" = 1'-0"
REFER TO MANUFACTURE FOR PLATE INFO
09 2423 PLAS SOFFIT HSS PER STRUC 09 2423 VENTILATING
08 8000 PASSTHROUGH TRAY
4 A9.54-1 1" 06 4000 COUNTER BRACKET, 06FOR 4000 COUNTER BRACKET, TYPICAL FOR NOTES, SEE NOTES, SEE TYPICAL DETAIL 14/A9.41 DETAIL 14/A9.41
3" = 1'-0"
08 083313 4113COILING TRIM COUNTER DOOR
WINDOWS, SERVICE SPEAK-THRU @ 4'-6" WINDOW
06 4000 14 GA SST BRUSHED 2'-0" CLR. SST COUNTER 2'-0" CLR.
05 5000, HSS 4X4 HSS BEAM 05 5000, 4X4 BEAM
'W4a'
ROOM SIDE
WALL SECTION - DK NEAR D13 WALL SECTION - DE D4 CLASSROOMS - DR NEAR CLASSROOMS - DRNEAR NEAR D23 D23 1/2"1/2" = 1'-0" = 1'-0" 1/2" = 1'-0"
09 2423 VENTILATING SCREED
06 4000 WOOD WOODBLOCKING BLOCKING
05 5000, HSS 4X4 BEAM
4 05 5000, HSS 4X4 POST A9.54-1 LEVEL 1 09 2900 5/8"GYPSUM LEVEL 1 BOARD LEVEL 0' - 0"LEVEL 1 ALL SIDES
09 2423 PLAS SOFFIT
10 FRANCIS POLYTECHNIC SENIOR HIGH 10 A8.41
Copyright © 2019 CO Architects. If drawing is not 30" x42", it is a reduced print.
22
X'- X"
X'- X"
3' - 6 7/8"
2' - 0"
LEVEL 1 LEVEL 1 0' - 0" 0' - 0"
11 3/16"
- SECTIO 22 JAMB 17 POLYCARBO
METAL DECK 05 4100 SUSP SOFFIT FRAMING
1' - 0"
GYP BD CEILING 09 2900 GYP BD CEILING
A8.41 08 8053 SECURITY S4b LOS ANGELESMODERNIZATION UNIFIED SCHOOL DISTRICT COMPREHENSIVE PROJECT GLAZING, 1/2" S4b NOM. THICKNESS 12431 ROSCOE BLVD, CA 91352 08SUN 5113VALLEY, ALUMINUM
3 1/32"
HSS
07 9200 SEALANT
06 4000 WOOD BLOCKING
SIM
F.O.W4a
F.O.STUD
189 T.O. SF
REFER TO MANUFACTURE FOR PLATE INFO
LEVEL 1 0' - 0"
11"
11"
12' - 0" 12' - 0"
12' - 0"
12' - 0"
3 1/32"
08 4113 TRIM
1"
21' - 0"
21' - 0" 12' - 0"
4 06 4000 COUNTER A9.54-1BRACKET, FOR TYPICAL NOTES, SEE DETAIL 14/A9.41
F.O.STUD
21' - 0"
21' - 0"
14' - 0" 14' - 0"
4 A9.54-1
SIM
222 2
10' - 6"
10' - 6"
4-127A
W4a
WALL SECTION - D9 NEAR DGD3DH WALL SECTION - DA NEAR WALL SECTION - D1 NEAR WALL SECTION - D1 NEAR DH 1/2" = 1'-0" 1/2" =1/2" 1'-0" = 1'-0"
EQUIPMENT CIRCULATION
LOW ROOF LOS ANGELES UNIFIED SCHOOL DISTRICT 12' - 0"
SOFFIT @ 8'
06 4000 14 GA SST BRUSHED SST COUNTER
COUNTERTOP @ 2-10"
(2) HILTI KB-TZ 3/8" DIA X 2" EMBED & 2 1/2" SPACING (ICC ESR-1917)
SIM 09 2423 PLAS SOFFIT SIM30 HSS PER STRUC 09 30 2423 VENTILATING A8.23 SCREED A8.23 08 5113 ALUMINUM 05 4100 SUSP SERVICE WINDOWS, SOFFIT FRAMING WINDOW
R1b
4" MIN
08 4113 TRIM
10" MAX
REFER TO MANUFACTURE FOR PLATE INFO
SCHEDULED OPNG
AD8
THIS PAGE TOP LOBBY
1/4" /12
100% CONSTRUCTION DOCUMENTS LAUSD PROJECT NO.: 10366804
THIS PAGE BOTTOM Wall Sections and Details
Copyright © 2019 CO Architects. If drawing is not 30" x42", it is a
R2
4" 1"
LEVEL 1 0' - 0"
GYP BD CEILING
189 SF
G2a
204 SF
R1b
ALIGN 08 3313 COILING 08DOOR 8000 SPEAK HOLE COUNTER
4-127A
06 4000 14 GA SST BRUSHED SST COUNTER 2'-0" CLR.
17 A8.21
1' - 0"
ALIGN 08 5113 ALUMINUM WINDOWS, EQUIPMENT SERVICE CIRCULATION WINDOW
HSS PER STRUCT
1
EXTERIOR W4a
05 4100 SHAPED LIGHT GA ANGLE
POLYCARBONATE SILL - D 17 12 SILL - G3a
HEAD OF WINDOW VARIES
B.O.CEILING @ 9'-0"
MAX
4-142
30 A8.12
F.O.G4e
F.O.STUD F.O.G4e
1558 SF
4-113D
MECH DOGHOUSE MECH DOGHOUSE
09 2900 GYP BD CEILING
09 2423 PLAS SOFFIT
LOW ROOF 12' - 0"
11 3/16"
SOFFIT @ 8'
4" MIN
08 3313 COILING COUNTER DOOR
EQUIPMENT CIRCULATION
128 SF
4-113 10913 SF
17 A8.21
05 4100 WALL TRACK, 20 GA CONT
3" = 1'-0" 1 1/2" = 1'-0"
05 4100 SUSP SOFFIT FRAMING
1' - 6"
10"
MAX 09 2900 09 2900 DECORATIVE DECORATIVE WALL TILE #1 WALL TILE #1
1558 SF
12' - 0"
12' - 0"
VARIES
12' - 0"
4-102A
4-164
SIM
1/8
09 2423 SPECIALLY SHAPED DEEP CASING BEAD
09 2900 GYP BD SILL 05 4100 METAL STUD JOIST. SEE SPAN TABLE
T.O.PARAPET W4a T.O.PARAPET
1 1/2" = 1'-0" 1 1/2" = 1'-0"
11 (2) 11 HILTI KB-TZ 3/8" A8.24-1 DIA X 2" EMBED & A8.24-1
25 A8.21
1/4"/12"
1/4"/12"
1/2" / 1'-0" 1/2" / 1'-0"
BLOCKING
05 4100 SPECIALLY SHAPED WALL TRACK
FORMED ALUMINUM CAP
4-113
MAIN GYM
1/2" / 1'-0" 05/ 4100 SUSP 1/2" 1'-0" SOFFIT FRAMING
09 2423 VENTILATING SCREED AEROBICS AEROBICS CLASSROOM CLASSROOM 4-164
SIM12 A8.21
2 1/2" SPACING R1b HSS PER STRUC (ICC ESR-1917)
G2a
10"
COACH OFFICE
SIM 03 3000 CIP 30 CONC BASE A8.12
W4d
6'-7 1/2"
09 2900 GYP BD SILL
W4a 06 1643 5/8" EXT GYP SHTG
1' - 6"
SIM
8 W4a A8.52
404 SF
4 A9.54-1
TICKETS
4-113DW4a W4a204 SF
12 A8.21
09 2423 SPECIALLY SHAPED DEEP CASING BEAD
MAIN GYM
G4e
1' - 2"
5 3/8"
G3a
10913 SF
REFER TO MANUFACTURE SEISMIC JOINT PLATE SEISMICFOR JOINT INFO
LOW ROOF LOW ROOF LOW ROOF 12' LOW - 0" ROOF 12' - 0" 12' - 0" 12' - 0"
2 A8.42
12' - 0"
G3b
11 3/16" W4d LOW ROOF LOW ROOF 12' - 0" 12' - 0"
R1b
R1b
07 9200 D23 CAULKING D23
SILL - G3a 912'W4A.1' TO STRUCT STEEL
25 A8.21
R1b
10913 SF
S4a 2 A8.42
128 SF
2' - 10"
SCREEN
4-102A
INTERIOR CEILING, WHERE COACH OFFICE OCCURS, TYP 4-142
5' - 0" 2' - 2"
A8.52 6 A8.52
03 3000 CIP 08 5656 CONC SECURITY BASE
1 1/2" = 1'-0"
6'-7 1/2"
W4a
1 A8.23
'W4A.1' TO STRUCT STEEL
10913 SF
° 4.7
EQUIPMENT CIRCULATION
12' - 0"
TICKETS
SIM
VARIES
14 14 A8.54-1 A8.54-1
G3b
REFER TO MANUFACTURE MAIN GYM FOR PLATE 4-113 INFO
(2) HILTI KB-TZ 3/8" B.O.G4e DIA X 2" EMBED & MAIN GYM2 1/2" SPACING 4-113 (ICC ESR-1917)
3 A8.24-1
LOW ROOF 12' - 0"
12' - 0"
4' - 2' 10" - 1"
08 5656 SECURITY SCREEN W4a
2' -4'2"- 10"
A8.426 A8.52
4-113 10913 SF
1 A8.23
S4a
INTERIOR COL BEYOND, CEILING, WHERE COL BEYOND, PER STRUC OCCURS, TYP PER STRUC
12 W4a
11
9
MAIN GYM
GYP BD CEILING
1/2" / 1'-0"
W4a8
LOW ROOF LOW ROOF ROOF LOW ROOF 12' LOW - 0" 12' - 0" 12' - 0" 12' - 0"
2' - 10"
S4a
SIM
10913 SF
E.O.ROOF E.O.ROOF
B.O.G4e
W4a
25 A8.21
R1b
4-113
12' - 0"
8 A8.52
3
A8.24-1 25 A8.21 HSS FRAMING WHERE OCCURS, 1/2" / 1'-0" PER STRUC
W4a.1
MAIN GYM
3"
G3b
SIM SITE LIGHTING PER ELEC SIM 4 15 A8.21 A8.41
SITE LIGHTING PER SIMELEC 4 A8.21 W4a
R1b
LOW ROOF 12' - 0"
R1b
2' - 1"
5 R1b A8.411/2" / 1'-0"
6 1/8"
R1b
W4a.1
R1b
06 1643 5/8" EXT GYP SHTG
4 1/4"
1' - 4 7/8"
BLOCKING 05 4100 SPECIALLY SHAPED WALL TRACK
09 2900 GYP BD BEAM PER STRUCT SILL
1/4"/12"
B.O.CEILING @ 9'-0"
6 1/8"
SIM 8 A8.52 SIM SIM 22 SIM30 SIM A8.51 30 SIM30 A8.21 30 A8.21 A8.21 25 A8.21 R1b R1b A8.21
8'-0"
G3b
W4d
8'-0"
W4d
07 9200 ALUMINUM CAP CAULKING
W4a R1b
1' - 2"
17 A8.54-1 FORMED ALUMINUM CAP
BIRD WIRE HSS FRAMING WHERE BEAMOCCURS, PER STRUCT PER STRUC FORMED
INTERIOR 3" = 1'-0"
G4e
INTERIOR
G3a
6 A8.42
W4a PLAS SOFFIT
3 1/2"
R1b
SIM DOWNSPOUT NOZZLE SIM11 A8.21 PER PLUMBING11 A8.21 17 A8.54-1 16 1'-0" 6" 16 A8.24-1 1'-0" 6" R1b A8.24-1 SJ 25 W4a SJ R1b A8.21 ° R1b 4.7 HSS FRAMING 11 1/2" / 1'-0" WHERE OCCURS, PER STRUC DOWNSPOUT NOZZLE PER PLUMBING 17 A8.54-1
7' - 2"
SIM
1'-1 3/8"
1' - 6"
22 A8.51
2" / 1'-0 "
5 A8.21
09 2423
FORMED ALUMINUM CAP
3' - 6"
DB
DR
1' - 4 7/8"
INTERIOR EXTERIOR
3' - 6" 11"
T.O.PARAPET T.O.PARAPET
6 A8.42
1' - 6"
12' - 4"
SIM
2" / 1'-0 "
09 2423 PLAS SOFFIT
7' - 2"
R1b
A8.23
DA
5 A8.41
1'-1 3/8"
F.O.STUD
15 A8.21 A8.23
21' - 0"
F.O.STUD
1/2" = 1'-0"
DR
W4a DB
EXTERIOR
HSS FRAMING WHERE OCCURS, PER STRUC G4e T.O.STEEL 12'-0"
BIRD WIRE
G4e
1' - 3"
WALL SECTION - D1 NEAR DB 1
12 A8.42
36.2 °
13'-6"
LEVEL 1 0' - 0"
F.O.STUD
1' - 3"
12' - 4"
T.O.STEEL 12'-0"
W4a
D1
D1
1/2" = 1'-0"
S4a
3" = 1'-0" 3" = 1'-0"
D20
17 A8.54-1
G4e
21' - 0"
SIM
DA
15 A8.41
3" = 1'-0"
D20
LEVEL 1 0' - 0"
WALL SECTION - D1 NEAR DB
1
A8.24-1 MECH MECH EQUIPMECH EQUIP SCREEN SCREEN STRUCTURE SCREEN STRUCTURE STRUCTURE -F -SCREEN FSTRUCTURE MECH - F STRUCTURE MECH EQUIPMENT EQUIPMENT EQUIPMENT -MECH F SCREEN -EQUIPMENT F SCREEN -F A8.24 A8 MECH EQUIP MECH SCREEN EQUIP - F MECH - FSCREEN MECH EQUIPMENT SCREEN - F A8.24-1 - F A8.24-1 21 21 21 26 26 26 21EQUIP 21 26 26SCREEN POLYCARBONATE JAMB - D POLYCARBONATE HEAD - D POLYCARBONATE JAMB D POLYCARBO 11 16 11 16
2' - 0"
SIM
1/2" = 1'-0"
1
DK
T.O.G4e 16 A8.54-1
SECTION - D1 NEAR WALLWALL SECTION - D1 NEAR DJ DJ 1/2" = 1'-0" 30 A8.12
F.O.G4e
W4a
FRAMING, PER STRUC
3"
11
HIGH ROOF 33' - 0" HIGH ROOF 33' - 0"
T.O.G4e
16 A8.54-1
LEVEL 1 LEVEL 1 0' - 0" 0' - 0"
12' - 0"
PLUMBING
1/2" / 1'-0"
10' - 0"
1' - 7"
1' - 7"
DRINKING
FOUNTAIN PER W4a
6° 128.
W4a PER FRAMING, STRUC
EXTERIOR EXTERIOR DETAILS EXTERIOR DETAILS - ROOF DETAILS - ROOF - ROOF DETAI EXTERIOR EXTERIOR DETAILS - ROO
3' - 6 7/8"
HIGH ROOF 33' - 0"
HIGH ROOF 33' - 0" HIGH ROOF 33' - 0"
R1b
1'-4 1/2" OUTDOOR EQUIP STORAGE 4-143
30 A8.12
R1b
SIM
R1b
6' - 0"
30 A8.21
DE
3'-10 1'-11 1/2"1/4"
F.O.STUD
12' - 0"
12' - 0"
2 A8.24-1
212 SF
DRINKING FOUNTAIN PER PLUMBING
1 A8.24-1
DK
1/2" / 1'-0"
13'-6"
W4a
1'-4 1/2"
36.2 °
2 A8.23
12' - 0"
F.O. STUD
4-143 212 SF
R1b
6° 128.
LOW ROOF HIGH 12' ROOF - 0" 33' - 0"
STORAGE
1'-3 3/8"
1 A8.24-1
2 A8.24-1
9' - 10"
COL BEYOND, COL BEYOND, PER STRUC PER STRUC OUTDOOR EQUIP
9' - 10"
SIM
1058 SF
0' - 6 1/2"
30 A8.21
3'-10 1/4" 1'-11 1/2"
4-101
4-101 1058 SF
0' - 6 1/2"
F.O. STUD
D9
2 A8.23
GYM LOBBY
GYM LOBBY
2"
LOW ROOF 12' - 0"
1'-3 3/8"
5 A8.21
DE DK 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"1 1/2" = 1'-0"
1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"1 1/2" = 1'-0"
2"
W4a
F.O.STUD
D9
F.O.G4e
1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2"S4a = 1'-0" 1 1/2" = 1'-0"1 1/2" = 1'-0"
5 A8.21
2"
METALMETAL TRIM METAL NORTH TRIM NORTH TRIM -S4a D NORTH - DTRIM -NORTH DTRIM NORTH TRIM METAL SOUTH1 TRIM SOUTH1 TRIM - D SOUTH1 -TRIM D SOUTH1 - DTRIM SOUTH1 TRIM METAL SOUTH2 TRIM SOUTH2 TRIM - D SOUTH2 -TRIM D SOUTH2 - DTRIM SOUTH2 SEISMIC ROOF SEISMIC JOINT SEISMIC -JOINT D SEISMIC JOINT -ROOF D -SEISMIC DJOINT - JOINT SEISMIC ROOF SEISMIC JOINT SEISMIC -JOINT D SEISMIC JOINT -ROOF D -SEISMIC DJOINT - JOINT METAL METAL - D METAL - D METAL METAL METAL - D METAL - D METAL METAL METAL - D ROOF - D ROOF ROOF D ROOF - D ROOF ROOF D -D
1' - 0" M
5
01 // FRANCIS POLYTECHNIC HIGH SCHOOL C10 C10
C1
C3
13'-4"
C3.7
13'-6" C1
C6
34'-0" C3
13'-4"
AC3.11
9'-6"
C3.7
13'-6"
C6.5
34'-0"
C8
24'-6" C6
1
9'-6"
1
1
CA
CA
1 C6.9
AC3.21
8'-0"
25'-0"
C2.3
C2
C4
25'-0"
32'-0" C5
25'-0"
C2
C8.3
8'-0" AC3.21
UP
26'-0"
9'-0" 27'-0"
27'-0"
36'-0"
26'-0" C6.9
7'-0"
C8.3 C9
8'-0" C7
OPEN
2
6
C10
DN
DN
CJ
TECH GALLERY 1155 SF DN
UPPER AUDITORIUM 2916 SF
VESTIBULE 46 SF
18'-0"
KEY CK
CIRCULATION 349 SF
UP
CM
VESTIBULE 46 SF
1
LIFT
LOBBY L2 636 SF OPEN
DN
CIRCULATION 349 SF
UP
CM
VESTIBULE 46 SF
LOBBY L2 636 SF
CK
2'-6"
25'-0"
C2.3
C2
C4
32'-0" C5
25'-0"
BLOCKING
CM
CN
7'-0"
C8.3
8'-0" AC3.21
5"
C8.6 2'-6" 26'-0" C6.9
C7 32'-0" C8
25'-0"
C4
C2
6'-6"
1 C6.9
AC3.21
8'-0"
25'-0" C10
CK.7
CM
ELEV 71 SF
OPEN
DN
8'-0"
26'-0"
CK.7
ELEV 71 SF
VESTIBULE 46 SF
C5
26'-0" C8.6
C8.3
C7
°
09 2900 5/8" FINISHED GYP BD PAINTED BLACK
C10
26'-0"
06 4000 SOLID WOOD TOP
C8
CN
05 4100 4" MTL. STUD
09 2900 5/8" FINISHED GYP BD PAINTED BLACK
C9
76
09 2900 5/8" FINISHED GYP BD PAINTED BLACK BEYOND
7"
6'-6"BLOCKING 7'-0"
8'-0"
CO
CH.7 CJ
UPPER AUDITORIUM 2916 SF
LIFT
12'-0"
CH.7
TECH GALLERY 1155 SF
TECH GALLERY 909 SF
DN CH.7
CJ
CH CH.2
18'-0"
6
27'-0"
OPEN
4'-6"
27'-0"
AC3.11
TECH GALLERY 909 SF
CG CH
CH.2
24'-6"
27'-0"
16'-6"
CH.2
C2.3
C9
33'-0"
OPEN
12'-0"
12'-0"
CH
CN
CF
AC3.22
2 CG
3
PV CANOPY ABV
26'-0"
AC3.22
2
2
CG 3
CK
9'-0"
16'-6" AC2.22B
26'-0" C8.6
C8
9'-0"
9'-0"
16'-6"
16'-6"
33'-0" 18'-0"
12'-0"
AC2.22A
/
1 6'-6"
26'-0"
26'-0" 33'-0"
33'-0" 12'-0"
/
1
17'-6"
17'-6"
1
AC3.21
CF
PARAPET
AC3.11
CJ
CM
MECH
C8.6 2'-6"
C5
2
CH.7
PV CANOPY ABV
C7 32'-0" C8
25'-0"
C4
CF
CE.5
PARAPET
CK
CN
DN
7'-0"
OPEN TO BELOW AND ABV
CE.5
7'-0"
STAIR 2
6'-6"
2'-6"
/
AC2.22B
CK.7
CM
CE
CE.5
O &
SEATING FLOOR, PER STRUCT
26'-0"
C9
17 1/2"
7'-0"
LINE OF FLOOR ABOVE
MECH
REF
AC2.22A
3
OPEN TO BELOW AND ABV
24'-6"
STAIR 2
1 8'-0"
CK.7
MACH RM 87 SF
/
1
AC3.21
CH.2
CK
7'-0"
REF CM
CH
CH.2
CK
MACH RM 87 SF ELEV 71 SF
CH
1
18'-0"
18'-0"
24'-6"
24'-6"
ELEV 71 SF
CG
CJ
PUBLIC RR (M) 262 SF
LOBBY 2484 SF
DN UP CONCESSION 266 SF
CG
CH.7
PUBLIC RR (W) 290 SF
FAC. WC 66 SF
RESTROOM LOBBY 257 SF
CONCESSION 266 SF
CH CH.2
CJ
LOBBY 2484 SF
C2.3
CG
CH.7
PUBLIC RR (M) 262 SF PLUMB FAC. WC 59 SF 37 SF
RESTROOM LOBBY 257 SF
CE.5
CF
27'-0"
CHORAL 1619 SF
PUBLIC RR (W) 290 SF
FAC. WC 66 SF
PLUMB FAC. WC 59 SF 37 SF
CN LINE OF FLOOR ABOVE
CF
CD
CE
OPEN
CE
24'-6"
MIXING STATION
1
AC2.21D
18'-0"
DN
CM
AC2.21C
/
4'-6"
5 VESTIBULE 51 SF
MIXING STATION
CH.7
/
1
24'-6"
LOWER AUDITORIUM SEATING 2964 SF
16'-6"
UNIFORM STORAGE 198 SF
1
7'-0"
DN
VESTIBULE 51 SF
PV CANOPY
CD
OPEN
CD
18'-0"
GENERAL STORAGE 398 SF
WORKROOM 191 SF
CB
CC
PV CANOPY
CF
16'-6"
VESTIBULE DNSF 57
CK
33'-0"
AC2.21D
17'-6"
27'-0"
AC2.21C
/
CHORAL 1619 SF
LOWER AUDITORIUM SEATING 2964 SF
VESTIBULE 57 SF
16'-6"
4'-6"
3 AC3.11
CJ
18'-0"
/
1
LIFT
12'-0"
DN
DN
7'-0"
CE
18'-0"
CORRIDOR 421 SF
-3' - 0" UP
CH.2
CJ
CN
CD
CE
16'-6"
2
-3' - 0"
1
UNIFORM STORAGE 198 SF
12'-0"
VESTIBULE 57 SF
2
GENERAL STORAGE 398 SF
WORKROOM 191 SF
CUSTODIAN 63 SF
12'-0"
4'-6"
SPEAKER ABV
CORRIDOR 421 SF
AC3.11
16'-6"
27'-0"
FIRE CURTAIN
18'-0"
SPEAKER ABV
CE.5
BAND ROOM 2142 SF
4'-6"
AC3.21
SPEAKER ABV
16'-6"
UP
CH
CK
CD
18'-0"
AC2.21B-1
5
STAGE 2871 SF
FIRE CURTAIN
CUSTODIAN 63 SF
AC2.21A
/
CE.5
27'-0"
LADDER
/
CG 3
CH.7
CE
L. PRACTICE 91 SF
LIFT
1
18'-0"
2
1
VESTIBULE 57 SF
CORRIDOR 123 SF
CF
DN
CH.2
S. PRACTICE 81 SF
24'-6"
16'-6" AC2.21B-1
3
SPEAKER ABV
CORRIDOR 123 SF
AC2.21A
/
AC3.21
PV CANOPY ABV
CD
BAND ROOM 2142 SF
CE.5
CB
CC
7
OFFICE 167 SF
L. PRACTICE 91 SF
S. PRACTICE 66 SF
OPEN BELOW
CB
18'-0"
9'-0" 16'-6"
33'-0"
/
1 18'-0"
CORRIDOR 174 SF
STAGE 2871 SF
LADDER
1
CH
S. PRACTICE 81 SF
CA
CB
CC
CIRCULATION
S. PRACTICE 66 SF
VESTIBULE 152 SF
INSTRUMENT STORAGE 372 SF
GIRLS RR 77 SF
COSTUME RM 125 SF
PV CANOPY ABV
CE
CE.5
CG
CORRIDOR 533 SF
GIRLS RR 77 SF DRESSING RM 301 SF
OFFICE 167 SF
ELEC 214 SF CIRCULATION
CB
CC AC3.23
12
AC3.11
36'-0"
36'-0" 9'-0"
CD
COSTUME RM 125 SF
CORRIDOR 174 SF
2
7 INSTRUMENT STORAGE 372 SF BOYS RR 67 SF
ELEC 214 SF
CORRIDOR 533 SF
DRESSING RM 301 SF
STAGE ELEC 142 SF
VESTIBULE 152 SF
DRESSING RM 311 SF
SCENE PREP 1574 SF
IDF 95 SF
STAGE ELEC 142 SF
COSTUME RM BOYS RR 135 SF 67 SF
9'-0"
36'-0"
IDF 95 SF
CD
C10
SC DA BU PH
06 4000 CLEAT LOW PROFILE ROLLTOP SECURE CABINET
06 4000 WOOD VENEER, V1
07 7100-3 ACOUSTIC ? SMOKE
1/16" = 1'-0"
2. Chamber 3. Stage 4. Scene Prep 5. P.A Classroom 6. Tech Gallery
60' - 3"
2
T.O.PARAPET
HATCH
CJ
CK
CM
OVERALL FLOOR PLAN - LEVEL 2 1/16" = 1'-0" OVERALL FLOOR PLAN - LEVEL 2 27' - 0"
18' - 0"
CN
24' - 6"
7' - 0" 5 1/4"
1/16" = 1'-0"
BLOCKING
76
09 2900 5/8" FINISHED GYP BD PAINTED BLACK SEATING FLOOR, 6 1/2" PER STRUCT
8"
ACOUSTIC CURTAIN
TRUSS
06 4000 CLEAT
2
1 1/2" = 1'-0"
06 4000 SOLID WOOD TOP
T.O.PARAPET
LOW PROFILE ROLLTOP SECURE CABINET
7"
1' - 0"
06 4000 SOLID WOOD TOP
17 1/2"
2
06 4000 CLEAT LOW PROFILE ROLLTOP SECURE CABINET
06 4000 WOOD VENEER, V1
09 2900 5/8" GYP BD
LOBBY 3-101
3' - 0" CLEAR
1/4"
5055 Wilshire Boulevard, 9
Los Angeles, California 90
TICKETS 3-102B
323.525.0500 phone, 323.
12
LEVEL 1 GUARD RAIL SECTION DETAIL 06 4000 MAGNETIC CATCH- C 0'1 -1/2" 0"= 1'-0"
3-110A 3-110B 09 2900 5/8" FINISHED MIXING STATION SECTION DETAIL -C GYP BD
2 A9.73
06 4000 WOOD VENEER, V1
UPPER 3' - 0" SEATING CAVITY
6 1/2"
MIXING STATION
1 1/2"
8"
06 4000 SOLID WOOD TOP
1 1/2" = 1'-0"
SEATING, PER THEATER
555 1st Street
09 2900 5/8" GYP BD
San Fernando, California 9
LINE OF TOP818.898.1521 ABOVE phone, 818.
2'-4"
CH.2
CH.7
CH
CG
CE
FLOOR TO MATCH PT-1.7
CD
LOW AUDITORIUM SEATING
4
1' - 2"
SEATING FLOOR, PER STRUCT
3'-6"
CE.5
CF
30"
CJ
CK
3' - 6"
3'-11 1/2"
3' - 6"
1/8" = 1'-0"
CK.7
LEVEL 2 16' - 4"
06 4000 SOLID WOOD BASE
LEVEL 1
16' - 4"
LOWER AUDITORIUM SEATING 3-110
SEATING FLOOR, PER STRUCT
NORTH / SOUTH THRU AUDITORIUM CN
4"
2' - 4"
09 2900 5/8" FINISHED GYP BD PAINTED BLACK
06 4000 CLEAT
1
FLOOR TO MATCH PT-1.7
06 4000 CLEAT
2' - 8"
28 A9.73
06 4000 SOLID WOOD BASE
LOW AU
SEATING FLOOR, PER STRUCT
05 4100 4" MTL. STUD
1 1/2"
3-100B
2
A9.73
06 4000 CLEAT
09 2900 5/8" FINISHED GYP BD PAINTED BLACK BEYOND
3 3/4"
BLOCKING CORRIDOR 09 2900 5/8" FINISHED GYP BD PAINTED BLACK
DRESSING RM 3-114
STAGE 3-111
08 3323 ELEC
OPERATED ? FIRE COILING DOOR
5"
27 A9.54-2
LOBBY L2 3-200
UPPER AUDITORIUM 3-210
°
R 144' - 9"
ENTRY GARDEN 3-D2
76
SEATING, PER THEATER
CONTROL ROOM 25' - 6" 9' - 2"
BLOCKING
PROJECTOR
DRESSING RM 3-116
30"
RAIL 05515 STEEL ? LADDER
09 2900 5/8" FINISHED GYP BD
06 4000 WOOD VENEER, V1
09 2900 5/8" GYP BD 2'-4"
3'-11 1/2"
41 61/64"
CONTROL ROOM 3-302
5 1/4"
MECH WELL
3' - 0" CLEAR
1' - 0"
06 4000 CLEAT
OPEN WOOD SLAT CEILING
3' - 6"
REFLECTOR
GRIDIRON 45' - 2"
3' - 0"
MIXING STATION38' SECTION DETAIL - C - 7 1/2"
06 4000 WOOD VENEER, V1
09 2900 5/8" GYP BD
Co
3'-6"
CATWALK 2
2 AC9.07
19' - 8"
CATWALK 1
106 4000 SOLID AC9.07WOOD TOP
17 1/2"
FIRE CURTAIN
2' - 4"
05 4100 4" MTL. STUD
BLOCKING 09 2900 5/8" FINISHED GYP BD PAINTED BLACK
3' - 6"
GRIDIRON 3-100G
09 2900 5/8" FINISHED GYP BD PAINTED BLACK BEYOND
7"
12' - 10"
5"
°
4"
06 4000 SOLID WOOD BASE
100% LAU
TOP OF BUILDING 58' - 0"
06 4000 CLEAT
1 1/2"
CH
2
30' - 0"
1'-2"
CF
16' - 6"
3'-11 1/2"
CE.5
16' - 6"
3 3/4"
1
CE
9' - 0"
30"
CD
36' - 0"
1 1/2"
CB
26' - 0"
4"
CA
OVERALL FLOOR PLAN - LEVEL 1 1/16" = 1'-0" 1. Lobby OVERALL FLOOR PLAN - LEVEL 1
3' - 6"
AUDITORIUM
CC
MIX
C5
0' - 0"
MIXING STATION WALL PLAN DETAIL - C 3" = 1'-0"
CB
CA
5 1/4"
06 4000 CLEAT9'
- 0"
2
27' - 0"
A9.73
2'-4"
3'-6"
3' - 6"
4
C5
12 A9.73
C6
C6.9
C8.3
C8
C9
3/8"
4
C6.5
"
1'-2"
1/4" 1/4"
C10
10
20
1/4"
"
4 1/4
3/4" WOOD SLAT
1/4
"
4"
10 2°
3/8"
4
05 4100 MTL STUD FRAMING 09 2900 5/8" GYP BD Z-CLIP 3/4" MDF BACKING BD
4"
8" R
4 1/4"
" 3/8
16 A9.55-2
12"
23' - 0"
4 1/4" 3/8"
"
20' - 2" 4"
LOS ANGELES UNIFIED SCHOOL DISTRICT 3/8"
25
4"
3/8"
3/4" CURVED WD
4"
4"
FRANCIS POLYTECHNIC SENIOR HIGH CORNER PLAN DETAIL FRONTWALL1&2 3" = 1'-0" COMPREHENSIVE MODERNIZATION PROJECT 12431 ROSCOE BLVD, SUN VALLEY, CA 91352
"
4 1/4"
4 1/4
05 4100 MTL STUD FRAMING
CATWALK 25' - 0"
8' - 8"
3/8" 4" 4"
3" = 1'-0"
3/8" "
GUARD RAIL PLYWOOD ARMATURE
4"
R
4 1/4"
PANEL JOINT DETAIL - BASESIDEWALL 1 CORNER PLAN DETAIL 2
2'-1 1/8" 4 1/4
09 2900 5/8" GYP BD
4"
CHORAL 3-121
3" = 1'-0"
05 4100 MTL STUD FRAMING
LEVEL 2 16' - 4"
1'-8 4" 3/ 8"
4"
24
16 A9.55-2
06 4000 SOLID WOOD BASE
1/4"
CORRIDOR 3-100C
3" = 1'-0"
3/4" WOOD SLAT
3/4" CURVED WD
09 2900 5/8" FINISHED GYP BD PAINTED BLK
1' - 2"
SIDEWALL 1 CORNER PLAN LIFT DETAIL
3" = 1'-0"
INTERIOR DETA SCALE: As indicated DATE OF ISSUE: 12 JULY 2019 BUILDING C PHASE 2
16' - 4"
SEATING ROW J
"L" MOLD TRIM TO MATCH GYP BD FINISH
05 4100 MTL STUD FRAMING
1/4" 4"
4"
4"
12431 ROSCOE BLVD, S
SIDEWALL 1 CORNER PL
Z-CLIP 3/4" MDF BACKING BD
8"
16 A9.55-2
3/8"
" 3/8
06 40 23 CLEAT
1/4
3/8 "
12"
3" = 1'-0"
1"
4"
"
3/8
12"
3/8"
R 9"
3/8 "
4"
4"
09 2900 5/8" GYP BD
1'-8"
3" = 1'-0"
3/4" MDF BACKING BD PLYWOOD ARMATURE
8"
3" = 1'-0"
" 1/4
4
" 5/8 4
PANEL JOINT DETAIL- VERTICAL
4
"
05 4100 4" MTL. STUD
LOS ANGELES UNIFIED
FRANCIS POLYTECH COMPREHENSIVE MODE
20
SIDEWALL 1 CORNER PLAN DETAIL
"
- 3"
0' - 0"
SIDEWALL 2 CORNER PLAN DETAIL
RAIL
16 A9.55-2
09 2900 5/8" FINISHED GYP BD PAINTED BLK 05 4100 MTL STUD FRAMING
3" = 1'-0"
1'
MIXING STATION
5
" 1/2
5/8
28
06 4000 WOOD VENEER, V1
4"
LOWER PER STRUCT AUDITORIUM SEATING 3-110
3/4" CURVED WD
R
4 1/4
"L" MOLD TRIM TO MATCH GYP BD FINISH
GRIDIRON 45' - 2"
3/8"
3/4" MDF BACKING BD
4"
3"
06 4000 INVISIBLE HINGE
1/2" 4 1/2 "
4
5/8" 3/4" CURVED WD
"
16 A9.55-2
4"
1'-8"
R
"
24 10
2'-1 1/8"
3" = 1'-0"
LIGHT WELL
3/8"
VESTIBULE 3-110A
"
4"
PANEL JOINT DETAIL - BASE
4 1/4"
"L" MOLD TRIM TO MATCH GYP BD FINISH
EAST / WEST THRU AUDITORIUM 4 1/2
1/4"
16 A9.55-2
3" = 1'-0"
PANEL JOINT DETAIL PLYWOOD - TOPARMATURE
VARIABLE ACOUS DRAPE
09 2900 5/8" FINISHED GYP BD PAINTED BLK
1' - 10
3/8"
4"
06 4000 WOOD VENEER, V1
"
09 2900 5/8" GYP BD
3/4" CURVED WOOD 06 4000 MAGNETIC CATCH
LINE OF TOP ABOVE
1/8" = 1'-0"
3/8"
1/4
4 1/4"
3/4" CURVED WOOD
SEATING FLOOR
3" = 1'-0"
1/4"
CONTINUOUS, BLACK REVEAL
4"
4
" 1/2
05 4100 MTL STUD FRAMING
3/4" MDF BACKING BD
4
THIS PAGE BOTTOM Mixing Station Detail 3
GUARD RAIL PLYWOOD ARMATURE
OPEN TO BEYOND
MIXING STATION WALL PLAN DETAIL - C
3/4" MDF BACKING BD PLYWOOD ARMATURE
TOP OF BUILDING 58' - 0"
06 4000 SOLID WOOD BASE
1' - 2"
SIDEWALL 2 CORNER PLAN DETAIL 4 1/4
3/4"
23
12 A9.73
3/4" MDF BACKING BD
4
3/4" CURVED WOOD
05 4100 4" MTL. STUD
8"
TECH GALLERY 3-200C
4 1/4 3/8"
3/4" CURVED WD
09 2900 5/8" GYP BD
3/4" MDF BACKING BD
05 4100 4" MTL. STUD SEATING FLOOR 09 2900PER 5/8" STRUCT GYP BD
5
09 2900 5/8" GYP BD
4
R 144' - 9"
THIS PAGE MIDDLE Bldg Section
3" = 1'-0"
06 40 23 CLEAT 09 2900 5/8" FINISHED 06 4000 GYP BD PAINTED BLKWOOD VENEER, V1
4"
06 4000 SOLID WOOD TOP
1/4"
09 2900 5/8" GYP BD
"L" MOLD TRIM TO MATCH GYP BD FINISH
SEATING ROW J
C5
1/2" 4 1/2 "
R
3" = 1'-0"
PANEL JOINT DETAIL- VERTICAL
05 4100 4" MTL. STUD
05 4100 MTL STUD FRAMING
3/4" CURVED WOOD 3/4" MDF BACKING BD
0' - 0"
1/4"
STAIR C1 3-B1
28
10 2°
MIXING STATION
06 4000 CLEAT
THIS PAGE TOP Floor Plan
3" = 1'-0"
PLYWOOD ARMATURE
3"
3" = 1'-0"
2' - 8" TYP
SIDEWALL 1 CORNER
2'-1
PANEL JOINT DETAIL - TOP
3/8
GUARD RAIL
26' - 0"
3/8"
0' - 0" MIXING STATION WALL PLAN DETAIL - C
3/8"
10
4"
8"
MIXING STATION - 3D AXON
06 4000 WOOD VENEER, V1
2' - 8"
3/8"
5/8"
"
3/8 "
R
19' - 6"
4"
22
1' - 10
2
1/4"
3/8
6' - 6"
06 4000 INVISIBLE HINGE
1 1/2" = 1'-0"
LOW AUDITORIUM SEATING
"
3" = 1'-0"
4"
10' - 6"
06 4000 MAGNETIC CATCH
GUARD RAIL SECTION DETAIL - C
LINE OF TOP ABOVE
4 1/2
LEVEL 1 0' - 0"
SIDEWALL 2 CORNER PLAN DETAIL
1/4"
14' - 0"
1/4" 1 1/4"
12 4
CONTINUOUS, 16BLACK REVEAL A9.55-2
SEATING ROW J
06 4000 WOOD VENEER, V1
SEATING FLOOR PER STRUCT 1/4"
06 4000 CLEAT
23
4"
05 4100 4" MTL. STUD
0' - 0"
1"
9' - 6"
4"
4"
4
1/2" 4 1/2 "
1/2"
3' - 0" CLEAR
1 1/2" = 1'-0"
3/4" CURVED WOOD
09 2900 5/8" GYP BD
3/4"
34' - 0"
MIXING STATION SECTION DETAIL - C
3/4" MDF BACKING BD
09 2900 5/8" GYP BD
4 1/4"
3' - 0"
09 2900 5/8" FINISHED GYP BD PAINTED BLK
05 4100 4" MTL. STUD
60' - 1"
A9.73
5
" 1/2
06 4000 SOLID WOOD BASE
09 2900 5/8" GYP BD
"L" MOLD TRIM TO MATCH GYP BD FINISH
MIXING STATION
06 4000 WOOD VENEER, V1
4
LEVEL 1
28 A9.73
San Fernando, ROOM California 91340
3-123818.361.9208 fax 818.898.1521 phone,
3" = 1'-0"
2' - 8" TYP
06 4000 CLEAT
C3.7
05 4100 MTL STUD FRAMING
3/4" CURVED WOOD
06 4000 INVISIBLE HINGE
555 1st Street DRAMALINE OF TOP ABOVE
INSTRUMENT STORAGE 3-122A
1' - 10
2' - 8"
28 A9.73
26' - 10"
2
"
06 4000 SOLID WOOD TOP
MIXING STATION WALL PLAN DETAIL - C
5/8
2
C1
6 1/2"
5/8 4"
S. PRACTICE 3-122B
PLYWOOD ARMATURE
4"
06 4000 CLEAT
06 4000 MAGNETIC CATCH
12' - 10"
3'-11 1/2"
3' - 6"
SEATING FLOOR, PER STRUCT
A9.73
1/8" = 1'-0"
06 4000 SOLID WOOD BASE
1 1/2" = 1'-0"
LOW AUDITORIUM SEATING
R 144' - 9"
2
22
MIXING STATION - 3D AXON
Los Angeles, California 90036
323.525.0500 phone, 323.525.0955 fax
FLOOR TO MATCH PT-1.7
NORTH / SOUTH THRU CLASSROOMS
GUARD RAIL
3/4" MDF BACKING BD
GUARD RAIL SECTION DETAIL - C
BAND 0' - 0" ROOM 3-122
GENERAL STORAGE 3-121B
CHORAL 09 2900 5/8" GYP BD 3-121
T.O.STEEL
8"
3"
SEATING, PER THEATER
06 4000 WOOD VENEER, V1
RESTROOM LOBBY 3-103
09 2900 5/8" GYP BD
R
5055 Wilshire Boulevard, 9th Floor
09 2900 5/8" FINISHED GYP BD
06 4000 CLEAT LOW PROFILE ROLLTOP SECURE CABINET
12
1' - 0"
06 4000 SOLID WOOD TOP
A9.73 1/4"
24' - 0 7/8"
3/8"
1 1/2" = 1'-0"
2' - 8" TYP
3/8"
MECH WELL
3' - 0" CLEAR
MIXING STATION SECTION DETAIL - C
06 4000 CLEAT 06 4000 WOOD VENEER, V1
4"
4"
2' - 4"
2
3' - 0"
1' - 2"
17 1/2"
06 4000 SOLID WOOD TOP
6 1/2"
1 1/2"
8"
SEATING FLOOR, PER STRUCT
1 1/2"
3 3/4"
09 2900 5/8" FINISHED GYP BD PAINTED BLACK
1/4"
RAILING LADDER
05 4100 4" MTL. STUD
BLOCKING 09 2900 5/8" FINISHED GYP BD PAINTED BLACK
12
2' - 8"
28 A9.73
1/2" 4 1/2 "
"
4 1/4"
09 2900 5/8" FINISHED GYP BD PAINTED BLACK BEYOND
7"
06 4000 SOLID WOOD BASE
LEVEL 1
4 1/2
" 1/2
T.O.PARAPET 5"
06 4000 SOLID WOOD BASE
°
26' - 0"
4
76
24' - 10"
1' - 10
9' - 0"
"
16' - 6"
1/4
16' - 6"
4
18' - 0"
3/8"
12' - 0"
4"
4' - 6"
R 9"
16' - 6"
06 4000 CLEAT
1/4" 1 1/4"
0"
4
BLOCKING 6' -
3/8 "
18' - 0"
1'-2"
17' - 6"
R 144' - 9"
14' - 0"
4"
1
09 2900 5/8" GYP BD
30"
33'-0"
4
SET/STAGE STORAGE 316 SF
CB
1' - 0" AC3.23
12
DRESSING RM 311 SF
SCENE PREP 1574 SF
AC3.11
OPEN BELOW
4'-6"
SET/STAGE STORAGE 316 SF
CE
DRAMA ROOM 2 1651 SF
16'-6"
16
1' - 0"
COSTUME RM 135 SF
CB
CF
5
9'-0"
CB
11
27'-0"
AC3.23
C10
26'-0"
2
AC3.22
CA 26'-0"
DRAMA ROOM 1651 SF
OPEN ABV 21
16
1
1
CA
26'-0"
11
C9
26'-0"
AC3.11
CA
9'-0"
26'-0"
AC3.23
21
9'-0"
26'-0"
OPEN
YARD ABV 995 SF
BIKE RACK (14 TOTAL)
CA ENTRY GARDEN 834 SF
C10
26'-0"
C8 2
24'-6"
1
1
27'-0"
YARD 995 SF
BIKE RACK (14 TOTAL)
9'-0"
ENTRY GARDEN 834 SF
CA
C9
26'-0"
C6.5
AC3.22
AC3.11
16'-6"
AC3.11
26'-0"
26'-0"
2 AC3.22
33'-0"
1
1
9'-0"
C9
26'-0"
AC3.11
18'-0"
26'-0"
C8 2
24'-6"
4'-6"
C9
26'-0"
C6.5
AC3.22
27'-0"
9'-6"
16'-6"
C6
18'-0"
C8
24'-6" 1
AC3.11
24'-6"
C6.5
34'-0"
17'-6"
9'-6"
C3.7
13'-6"
7'-0"
C6
34'-0" C3
13'-4"
4'-6"
C3.7
16'-6"
C1
3 3/4"
13'-6"
OPEN
C3
13'-4"
8"
C1
LEVEL 1 0' - 0"
100% CONSTRUCTION DOCUMENTS LAUSD PROJECT NO.: 10366804
Copyright © 2019 CO Architects. If drawing
6
01 // FRANCIS POLYTECHNIC HIGH SCHOOL LEGEND
4' - 0"
4' - 0"
4' - 0"
12 MODULES
11 MODULES
11 MODULES
0
1A
1B
ACOUSTIC FABRIC
VARIES
PAINTED PDF
PLYWOOD VENEER
SIDEWALL 3 3 / AC9.03
ELEVATION
5055 Wilshire Boulevard, 9th Floor Los Angeles, California 90036 4' - 0"
SECTION 10 MODULES
9 MODULES
2B
3A
2A
4' - 0"
323.525.0500 phone, 323.525.0955
4' - 0"
SIDEWALL 2 4 / AC9.03
6A
5A
6' - 4" MAX
10 MODULES
5' - 9" OR 6' - 4"
4' - 0"
TRANSPARENT
4' - 0"
VARIES
4' - 0"
6B
4' - 0" 7 MODULES
4A
4A
3B
5A
3B
2B
3A
3A
2A
2B
1B
2A
5A 16' - 4"
3B
VARIES
4' - 0" 8 MODULES
SECTION 4' - 0"
4' - 0" 6 MODULES
SOLID
20' - 0"
ELEVATION
6 MODULES
LEVEL 2
8"
SECTION 4' - 0"
San Fernando, California 91340
818.898.1521 phone, 818.361.9208
ELEVATION
9 MODULES
555 1st Street
SIDEWALL 1 5 / AC9.03
1A
LEGEND
6B
0
BELEVATION
C
PLYWOOD VENEER
6A
5A
6B
8"
3B
ELEVATION
07 6000 METAL PANEL
9'-4"
4'-0"
A
WALL PANEL TYPES
2
3/4" WOOD SLAT 1' - 0"
1/2" = 1'-0"
ACOUSTIC FABRIC
28" CLEAR
4'-0"
05 4100 6" MTL. STUD FRAMING 16" O.C. TYP
Z-CLIP 3/4" MDF BACKING BD PAINTED BLACK
4'-0"
5'-9"
B
A
B 9"
1/4" STEEL BRACKET PLATE ABOVE
5
A
C
B
C HOOD
SIDEWALL 1
MOTOR
3 1/2"X 3 1/2"X 1/4"
3'-8"
16
08 3323 ELEC OPERATED COILING FIRE DOOR
AC
100% CONSTRUCTION DOCUMENTS FRANCIS POLYTECHNIC SEN LAUSD PROJECT NO.: 10366804
COMPREHENSIVE MODERNIZATI
Copyright © 2019 CO Architects. If drawing is not 30" x42 12431 ROSCOE BLVD, SUN VALLEY, C
SMOKE SEAL
1' - 0"
A9.55-2
LOS ANGELES UNIFIED SCHOOL DIS
1' - 5 1/2"
3/8" = 1'-0"
4'-0"
3/8" = 1'-0"
LEVEL 2 16' - 4" 4'-0"
6'-4"
SIDEWALL 2
C
SCALE: As indicated DATE OF ISSUE: 12 JULY 2019 BUILDING C PHASE 2
1' - 4"
3" X 2"X 3/16" LEVEL 2
16'-4"
4
INTERIOR WALL PANE CE
LOW SEAT -3' - 0"
A
1 1/4"
3 A9.55-2
FOLLOW SPOT
B
1' - 2"
4 1/4"
2 A9.55-2
3/8" = 1'-0"
C
SIDEWALL PLAN DETAIL- TRANSPARENT 3" = 1'-0"
3/4" WOOD SLAT
LEVEL 1 0' - 0"
4'-0"
B 6 MODULES
17
1' - 0"
3" = 1'-0"
A
4' - 0"
4'-0"
SIDEWALL 3 CONTROL ROOM
7
B
LINE OF FLOOR
3'-0"
3' - 0"
C
ACOUSTIC FABRIC 4"
4" TYP
2"
A
2"
2"
3/8"
8"
3
6
3/8" = 1'-0"
4'-0"
3" = 1'-0"
B
FOLLOW SPOT WINDOW HEAD & SILL
1/2"
CONTROL RM WINDOW HEAD & SILL
TRANSPARENT
6" MTL STUD FRAMING
12431 ROSCOE BLVD, SUN VALLEY
2" LONG METAL ANGLE WITH 2" ESCUTCHEON, 32" O.C. TYP
SIDEWALL - 3D AXON DIAGRAM
Z-CLIP
25' - 6"
2
FOR PANEL LAYOUT SEE AC9.03
PTD STL HANDRAIL
C
2"
3/4" MDF BACKING BD PAINTED BLACK
555 1st Street
FRANCISSan POLYTECHNIC SE Fernando, Californ 818.898.1521 phone, 8 COMPREHENSIVE MODERNIZA
3" = 1'-0"
LEVEL 1
B
WALL PATTERN
SIDEWALL PLAN DETAIL- SOLID
5'-0"
1
6" MTL STUD FRAMING
1B
ANGLE WITH 2" ESCUTCHEON, 4'-0" O.C. TYP BACKING PLATE
0
SECTION 4"
1A
AUDITORIUM
6B
28' - 6"
TABLE TOP @ 2'-8"
2A
323.525.0500 phone, 3
LOS ANGELES UNIFIED SCHOOL
3/4" WOOD SLAT
2"
6A
16
1B2" LONG METAL
4'-0"
FOLLOW SPOT
1A
6'- 4" MAX TRANSPARENT
AUDITORIUM
2B
PTD STL HANDRAIL
3'-8"
CONTROL ROOM
2A
4' - 0"
Los Angeles, California
3/4" MDF BACKING BD PAINTED BLACK 4"
4" TYP
4'-0"
SOLID
3A 1 1/2" 1 1/2"
2 3/4"
4' - 0" 6 MODULES
5055 Wilshire Bouleva
Z-CLIP
4'-0"
4'-0" 4' - 0"
09 2900 5/8" FINISHED GYP BD PAINTED BLACK
3A
17
6 MODULES
05 4100 6" MTL. STUD FRAMING 16" O.C. TYP 2"
2"
LEVEL 2 16' - 3/8" 4"
SECTION 8
2B
ELEVATION A9.55-2
A9.55-2
San Fernando, California 91340
818.898.1521 phone, 818.361.9208 fa
5 / AC9.03 09 2900 5/8" FINISHED GYP BD PAINTED BLACK
5A
8 A9.55-2
5A
7 MODULES
16' - 4"
4A
3B
5'-9"
4A
4' - 0"
LEVEL 2
3' - 0"
3B
08 8000 GLAZING TYPE: GA2
555 1st Street
FOR PANEL LAYOUT SEE AC9.03 SIDEWALL 1
SECTION 4' - 0" 8 MODULES
20' - 0"
4' - 0"
9 MODULES
VARIES
08 5113 ACOUSTICAL WINDOW (DeVAC MODEL 430 or EQUAL )
6'-4"
07 9200 SEALANT
08 8000 GLAZING TYPE: GA2
TRANSPARENT
07 9200 SEALANT
323.525.0500 phone, 323.525.0955 fa
5'-9"
3A
6" MTL STUD FRAMING
ELEVATION
08 5113 ACOUSTICAL SLIDING WINDOW (DeVAC MODEL 450 OR EQUAL)
5055 Wilshire Boulevard, 9th Floor Los Angeles, California 90036
SIDEWALL 2 4 / AC9.03
9 MODULES
16'-4"
2B
6
4' - 0"
SIDEWALL 3 3 / AC9.03
SIDEWALL - 3D AXON DIAGRAM
4'-0"
2A
6" MTL STUD FRAMING
3/8" = 1'-0"
4' - 0"
4'-0"
VARIES
4' - 0"
10 MODULES
4' - 0"
5'-9"
2
4' - 0" 10 MODULES
4' - 0"
SECTION
R 66' - 0" OR R 90' - 0"
1/2" = 1'-0"
WALL PATTERN
5' - 9" OR 6' - 4"
1
PAINTED PDF
1B A
WALL PANEL TYPES
ACOUSTIC FABRIC
TRANSPARENT
1A
1B
R 66' - 0" OR R 90' - 0"
SECTION 0
1A
6' - 4" MAX
VARIES
ELEVATION
LEVEL 1
1' - 5"
4' - 0" 11 MODULES
TRANSPARENT
4' - 0" 11 MODULES
3' - 0"
4' - 0" 12 MODULES
TRANSPARENT
6A
4'-0"
4'-0"
2 1/4"
SCHEDULED OPENING
5 3/4"
B
HM FRAME FINISH
B 6 MODULES
1"
4
4' - 3"
1"
FINISHED WD BLOCK
C
SIDEWALL 2 3/8" = 1'-0"
A
C
B
A
B
A
C
3" = 1'-0"
LOS ANGELES UN
1' - 8"
1/2" FINISHED PLYWOOD
T.O.OPENING @ 2'-10"
4' - 0"
SUBWOOFER PER PLAN
13 A9.54-2
06 40 00 COUNTER BRACKET, FOR TYPICAL NOTES, SEE DETAIL 14/A9.41 5/8"GYPSUM BOARD ALL SIDES
09 2900 DECORATIVE WALL TILE #1 CEMENT BOARD 2"
5"
1 1/4"
14
STAGE FLOOR FINISH PANEL SCREW PATTERN 1" = 1'-0"
20
STAGE APRON 3" = 1'-0"
1 1/2"
INTERIOR DET SCALE: As indicated DATE OF ISSUE: 12 JULY 2019
5/8"GYPSUM BOARD
4"
8' - 0"
COUNTERTOP @ 2'-10"
7"
2X6 BLOCKING
LINE OF OPEN SHELEVES BEYOND
HARDWOOD BASE
3 3/4"
4' - 0" .
CAULK SEALANT
07 4213 PERF METAL
3/4"
9"
2' - 0"
09 6453, PLYRON PANEL
FINISH FRAMING DOOR THRESHOLD, WHERE OCCURS
1' - 10 3/4"
1 1/2".
1 1/2"
4 1/2"
3'.
FINISHED WD BLOCK
1 1/2"
12431 ROSCOE BLV
06 4000 SST COVER
06 4000 SST BRUSHED SST COUNTER
1 1/2"
HAT CHANNELS
FRANCIS POLYTE COMPREHENSIVE M
PARTITION AS SCHEDULED
08 33 13 COILING COUNTER DOOR
10' - 6".
1"
8"
5
FLATHEAD SCREWS COUNTERSUNK ALONG PERIMETER AND ALONG LONG-AXIS CENTERLINE OF SHEET ON 16" CENTERS.
HM FRAME
3/4" 1 1/4"
STAGE FLOORING
100% CONSTRUCTION DOCUMENTS LAUSD PROJECT NO.: 10366804
2' - 10"
4 1/8"
5 1/2"
-3' - 0"
1" = 1'-0"
TYP
1 1/2" 3/4"
EXPANSION VOID
09 2900 DECORATIVE WALL TILE #1
5 1/2"
2"
STAGE APRON ELEVATION
16" O.C.
NEOPRENE PAD @ 16" O.C.
4'-0"
09 2900 GYP BD CEILING
STAGE FLOOR ASSEMBLY, SEE DETAIL 5/A9.54-2
6" 1 7/8"
1/2" PLYWOOD SUBSTRATE
3/32" GAP BETWEEN PANEL
LAP JOINT @ 16" O.C.
AC9
B.O.CEILING @ 8'-6" 1' - 2 7/8"
3/8" = 1'-0"
27"
12
09 6457, PLYWOOD SUBFLOOR
SCALE: As indicated DATE OF ISSUE: 12 JULY 2019 BUILDING C PHASE 2
C
SIDEWALL 1
FINISHED WD BLOCK
3" = 1'-0"
09 6457, VENTED RUBBER BASE
T.O.WALL REFER TO 3/AC3.24 FOR TILE LAYOUT PATTERN
Copyright © 2019 CO Architects. If drawing is not 30" x42", it
SUBWOOFER BEHIND
CHORAL FLOORING
WALL AS SCHEDULED
B
INTERIOR WALL PANEL
0' - 0"
LOW SEAT -3' - 0"
5
1/2"
09 6453, PLYRON PANEL WITH COUNTER-SUNK SCREWS AT 16" O.C. ALONG PARIMETER ONLY
1 1/2" = 1'-0"
07 4213 PERF METAL
HARDWOOD BASE
4
B
T.O.STAGE LEVEL 1
5 1/2"
1/2"
A
1/2" FINISHED PLYWOOD
SIDEWALL 3
FRAMING
3/8" = 1'-0" DOOR THRESHOLD, WHERE OCCURS
EXPANSION VOID
B
HEAD - STAGE COILING DOOR - C LEVEL 1
5 1/2"
3
VAPOR BARRIER
C
FINISHED WD BLOCK
1 1/2"
EXPANSION VOID
1/2"
09 6459, VENTED RUBBER BASE
A
LINE OF FLOOR
3" = 1'-0"
3 3/4"
09 6459, PLYWOOD SUBFLOOR
28
JAMB - STAGE COILING DOOR - C
4' - 5" TYP
1' - 0 1/4"
09 6459, MAPLE TONGUE AND GROOVE FLOORING
4'-0"
5'-0"
3" = 1'-0"
1' - 9 1/2"
WALL AS SCHEDULED
18
SIDEWALL SECTION DETAIL - C 4' - 5"
3'-0"
3" = 1'-0"
1 1/2"
13
FOLLOW SPOT WINDOW JAMB
SCHEDULED OPENING
SMOKE BRUSH SEAL 08 3323 ELEC OPERATED COILING FIRE DOOR
09 2900 5/8" FINISHED GYP BD PAINTED BLACK
LINE OF WINDOW FRAME BELOW
1 1/2" 9 1/2"
8
3" = 1'-0"
Z-CLIP
08 5113 ACOUSTICAL WINDOW (DeVAC MODEL 430 or EQUAL )
LINE OF WALL BELOW
CONTROL RM WINDOW JAMB
07 9200 SEALANT
AUDITORIUM
2"
08 5113 ACOUSTICAL WINDOW (DeVAC MODEL 430 or EQUAL )
3
PARTITION AS SCHEDULED
07 9200 SEALANT
AUDITORIUM
9'-4"
PARTITION AS SCHEDULED
3/4" MDF BACKING BD PAINTED BLACK
2"
5"
3/4" WOOD SLAT
30
CONCESSION WINDOW SECTION - C 1 1/2" = 1'-0"
A
100% CONSTRUCTION DOCUME LAUSD PROJECT NO.: 10366804
Copyright © 2019 CO Architects. If d
THIS PAGE TOP Wood Panel Layout Pattern
THIS PAGE MIDDLE Wood Panel / Control RM Detail
THIS PAGE BOTTOM View of Chamber looking towards Stage
02
68-74 TRINITY PLACE COMMUNITY FACILITY AND OFFICE TOWER JULY 2016 - JUNE 2017 *PROFESSIONAL WORK - UNDER CONSTRUCTION
LOCATION: New York, NY CLIENT: Trinity Church, In the City of New York PROJECT SIZE: Podium- 109,346 sqft, Tower- 141,470 sqft SERVICES: Programming, Public Charrette, Architecture, Interior Design BUILDING USE/TYPE: Community Facilities, Commercial Offices The 68-74 Trinity Place is a 28 story building designed to serve as both ministry and community center for Trinity Church Wall Street. Located directly behind the Church, the building includes open public spaces, multipurpose rooms, Parish hall, library, gym, and trinity offices. Although the base podium will be reserved for the Trinity Church, the rest of the 141,000 square foot office tower is devoted to commercial space. The project will have two lobbies: Trinity Place Lobby, a large space for congregating and art exhibits, and Greenwich Street Lobby, an amphitheater type space where smaller performances could be held. Pelli Clarke Pelli Architects: Design Architect; Stephen B. Jacobs Group: Executive Architect.
THIS PAGE View of East Podium from Trinity Church
OPPOSITE PAGE View of East Facade from Broadway
01 // 68-74 TRINITY PLACE
A A
C
B
C
B D
16' - 0"
8.5°
15' - 10"
D E
27' - 0"
15' - 10"
E F 27' - 0"
27' - 0"
16' - 0"
G
G
F H
23' - 6"
I
27' 12' - 0"- 6"
H J
15' - 6"
I
23' - 6"
J
12' - 6"
15' - 6"
8.5°
8.5°
1
CAFE EQUIPMENT PER SAMTELL
2.9°
2.9°
TOILET ROOMS L.101
1
KITCHEN PREP L.002B
SP/1
TRASH
2
2 RETAIL L.002A
L. STAIR B M. STAIR B DN
NICHE M.504
13
CHECK-IN M.500A
9
CAFE L.002
3
DN
12
CORRIDOR M.500
3
0.6°
STORAGE M.503
32' - 6"
CORRIDOR L.100
STORAGE M.501
0.6°
RISER
32' - 6"
UP
UP
4
AHU MECH. M.502
5
20' - 0"
20' - 0" WC M.402A
WC M.405A
10
KIDS CLUB M.402
DN
6
14 8
UP
AV 3500LB
3500LB
3500LB
3500LB
3500LB
PE A3
PE A2
20' - 0"
8'
UP
9' - 0"
DN
9' - 0"
ELEVATOR LOBBY M.000
PE A2
PE B2 3500LB
6' - 8 1/4"
6' - 8 1/4"
PE B4
3500LB
ELEVATOR LOBBY L.000
3500LB
PE A3
UP
L. STAIR 9' D
9'
DN
9
STAFF OFFICES AND PANTRY M.401
12
CORRIDOR M.100
LAUNDRY M.401A
NICHE M.100A JANITORIAL M.101
M. SEC PANEL
STROLLERS M.100B
6°
6°
3500LB
3500LB
8.5
8
8' ELEVATOR LOBBY M.200
13
10
FUEL
PE A1
PE A4
PE B1
PE B3
9
PE A1
7
8
UP PE A4
M. STAIR A
11. Check-In 12. Office 13. Childrens Class 14. Kids Club 15. Nursery
3500LB
CORRIDOR M.400B
7
STROLLER STORAGE L.001C
3500LB
CHILDRENS CLASS 1 M.406
4' - 8 1/4"
DN
4.8°
CORRIDOR M.300
4.8°
11
VESTIBULE L.001A
4' - 8 1/4"
CHECK-IN M.400A
8.5
TRINITY LOBBY L.001
20' - 0"
CHILDRENS CLASS 2 M.403
1st FLOOR
1st FLOOR-MEZZANINE
6
DN
WC M.403A
13
5
MOTHER'S ROOM M.506A
CORRIDOR M.400
13
7' - 6"
STROLLER STORAGE L.001D
15
NURSERY M.506
WC M.506B
CHILDRENS CLASS 3 M.405
8. Trinity Lobby 9. Cafe 10. Seating
4
7' - 6"
CHILDRENS CLASS 4 M.407
10
A
C
B
D
E
16' - 0"
G
F
27' - 0"
H
27' - 0"
I
23' - 6"
J
12' - 6"
15' - 6"
8.5°
15' - 10"
DIST.
DIST.
DIST.
DIST.
DIST.
MAIN METER
1
6
ELECTRICAL B.121
2.9°
250V 200A 3P
DGP
FIRE SERVICE RM B.119
6
TX/1
JANITORIAL B.120 EN
CLO
SE
OP
EN
CLO
SP/2
OP
VESTIBULE B.121A
SE
2
B. STAIR B UP
DN
B1
32' - 6"
LEVEL BASEMENT
MEDIA LAB B.109 STORAGE G.100D
3
OA/1
5
TOILET ROOMS G.104
4
1
RA
AHU B.114
6
7' - 6"
COMMUNITY ENGAGEMENT G.100
0.6°
VESTIBULE G.100B
ACS-B-1 DX COIL
5
STORAGE B.108
SA
BREAK OUT B.107
? ?
4 20' - 0"
STORAGE G.101
WC B.112 DN
DN
UP
WC B.113
G.STAIR F
3
FIRE SHUTTER
LOBBY G.200
VESTIBULE G.200A
6
STORAGE B.103C
2
QUIET ROOM B.103
G. RAMP H
STORAGE B.103B
G. STAIR G
CORRIDOR B.100
4' - 8 1/4"
DN
STORAGE G.203
7
Q.R VESTIBULE B.103A
8 FUEL
3500LB
XFMR DISC.
ELEVATOR LOBBY B.000
ELEVATOR LOBBY G.300
3500LB
RETAIL G.201
3500LB
3500LB
3500LB
6' - 8 1/4"
TRINITY MAIL ROOM G.407
6°
SX/GX
TX/2
SERVICE CORRIDOR G.500
WC G.401 UP
JAN G.403
G. SEC PANEL
SS-B SS-B DISC. METERING
ELECTRICAL B.102
250V 100A 3P
9 SERVICE CORRIDOR G.400
1250 KVA XFMR
LEVEL B1
STORAGE G.405
LEVEL BASEMENT
6
4.8°
7
T
COMMUNITY STAFF OFFICE B.101
250V 100A 3P
8'
9' - 0"
3500LB
3500LB
3500LB
P-RISER
8.5
10
BREAK OUT B.105
G.STAIR E
COMMUNITY STAIR G.102
1. Community Lobby 2. Office Lobby 3. Quiet Room 4. Break Out 5. Media Lab 6. Building Support 7. Office
CORRIDOR B.100A
UP
G. STAIR C
20' - 0"
BASEMENT FLOOR
9'
10
02 // 68-74 TRINITY PLACE
A
C
B
D
E
16' - 0"
15' - 10"
G
F
27' - 0"
27' - 0"
H 23' - 6"
I
J
12' - 6"
15' - 6"
8.5째
JAN 2.401A
2.9째
1
TOILET ROOMS 2.401
2 STOR 2.311A
32' - 6"
CORRIDOR 2.400
UP
17 PARLOR LIBRARY 2.311
DN 2. STAIR B
RISER
STORAGE 2.305
STORAGE 2.303
NICHE 2.300A
STORAGE 2.304
LARGE SEMINAR 2.207
3 VESTIBULE 2.300B
CHECK-IN 2.310
CORRIDOR 2.300
CORRIDOR 2.301
21
ELEC. ROOM 2.308
STORAGE 2.306
BRIDGE
16
4
STORAGE 2.307
7' - 6"
STORAGE 2.207A
SKYFOLD 20'H
5
20' - 0"
AHU MECH. 2.206
2nd FLOOR
1836
1830
1860
1842
1842
PARISH HALL 2.001
OPERABLE PARTITION
BRIDGE 2.500
18
6
16
SEMINAR 2 2.205
20' - 0"
CART CLEAR.
16. Bridge 17. Parlor Library 18. Parish Hall 19. Kitchen 20. Sacristy 21. Seminar
OPEN KITCHEN 2.001A
19
2424
4' - 8 1/4"
CORRIDOR 2.200
21
7
8 3500LB
3500LB
FUEL
DN UP
PE B4
PE B2
PE A2
COAT CLOSET 2.601 2.STAIR D
3500LB
3500LB
2. STAIR A
8'
OPEN
3500LB
6' - 8 1/4"
DN
CORRIDOR 2.600 3500LB
ELEVATOR LOBBY 2.000
9' - 0"
3500LB
ELEVATOR LOBBY 2.102
PE A3
8.5
PE A1
PE B1
PE B3 SEMINAR 1 2.203
4.8째
3500LB
PE A4
9'
9
6째
20
CORRIDOR 2.100 SACRISTY 2.201
NICHE 2.100A WC 2.201A
JANITORIAL 2.101
2. SEC PANEL
10
OPPOSITE PAGE Basement & Level 1 Floor Plan
THIS PAGE TOP View of Trinity Lobby from Entry
THIS PAGE BOTTOM Level 2 Floor Plan
11
02 // 68-74 TRINITY PLACE
KIDS CLUB
8'-0"
NURSERY
16'-10"
7"
3'-4 1/4"
2'-1"
1'-2"
WD-9 1'-6"
ROLLING STAIR UP
NURSERY M.506
WD-9 4"
1'-3"
3'-4 1/2"
2'-0"
SS-1
SS-1 12 ID-714
2'-1 1/2"
1'-0"
3/4" QS BIRCH CABINET TOP W/ 3/4" x 1 1/2" SOLID QS. BIRCH EDGES- TYP.
SS-1
7'-0"
3/4" SOLID QS BIRCH BASE
4
CHANGING STATION
5'-5"
4'-0 1/4"
3
90째
7'-0" 7"
4'-6"
10
ID-714
1'-11"
1 1/4" SS-1 TOP ON 3/4" QS BIRCH PLYWD
R 3' - 7"
9
ID-714
WD-9 SS-1
R 3' 10" R2 '-8 "
WD-9. 2'-11"
NURSERY M.506 MILLWORK - ELEVATION 2 1/2" = 1'-0"
ID-714
ID-714
5"
SS-1
0"
2'-0"
5 2'
5'
- 10"
ID-714
R
7"
WD-9.
8
R 3'
1'-11"
9 1/4"
0" R 5' -
85째
4"
45째
2 ID-714
3'-0"
1'-6"
1'-11" ROLLING STAIR
15'-2"
NURSERY M.506 MILLWORK - PLAN
7'-7 1/4"
4
1/2" = 1'-0" 2'-8"
2'-1 1/4"
NURSERY M.5 1/2" = 1'-0"
1'-0"
1'-0 3/4"
PL-3
3/4" PL-3 PLYWD CLOSURE PANEL
1'-4"
2'-2"
5 ID-714
2'-10"
1'-6"
1/2" = 1'-0"
ID-714
1'-4"
ID-714
3/4" SOLID QS BIRCH BASE
NURSERY M.506 MILLWORK - ELEV3
2'-10"
1
3/4" QS BIRCH PLYWD W/ 3/4" X 1 1/2" SOLID QS BIRCH EDGES
9"
SS-1
1'-2"
6'-0"
FABRIC COVERED SEAT CUSHION TYP.
R
SS-1
1'-6"
3
WD-9.
ID-714
4"
11 ID-714
4 1/2"
7
5 1/2"
ID-714
16 4.8 째
2'-4"
6
1'-9"
4'-2"
1'-4"
PL-3
3/4" ADJ. PL-5 PLYWD SHELVES BEYOND M.W
1'-1"
PL-3
M.W
1 1/2" HDWD ROD BEYOND
SS
SS-1 CTR TOP & BACK SPLASH, SIDE SPLASH 3"
FABRIC COVERED SEAT CUSHION TYP.
FABRIC COVERED SEAT CUSHION TYP.
2'-4"
4"
4"
OPEN
2'-10"
4"
WD-9
WD-9
4"
2'-3"
WD-9
1'-6"
2'-10"
REF.
PL-3
REF.
BS-6
BS-6
BS-6
2'-0"
2'-7
(3) 3/8" BENT QS BIRCH PLYWD 3/4" SOLID QS BIRCH BASE
2
2'-6"
4'-4"
3"
(2) 3/8" QS BIRCH PLYWD CLAD GATE W/ SOLID BIRCH EDGES
4'-6"
SS-1
1'-9"
1 1/2" X 3/4" SOLID QS BIRCH EDGES
PL-3
2'-0"
3/4" FIXED PL-5 PLYWD SHELF BEYOND
2'-0"
9'-0"
M.W
6
NURSERY M.506 MILLWORK - ELEVATION 1
ID-714
NURSERY MILLWORK - ELEV 5 1/2" = 1'-0"
7 ID-714
NURSERY MILLW 1/2" = 1'-0"
1/2" = 1'-0"
ID-714
1" SS-2 COUNTERTOP ON 3/4" QS BIRCH PLYWD 1" SS-2 COUNTERTOP ON 3/4" QS BIRCH PLYWD
3/4" X 1 1/2" SOLID QS BIRCH EDGES TYP.
1 1/2"
3/4" X 1 1/2" SOLID QS BIRCH EDGES TYP.
3/4" QS BIRCH PLYWD FIXED SHELF W/ 3/4" X 1 1/2" SOLID QS BIRCH EDGE
9" 9 1/4" 1 1/2"
(3) 3/8" BENT QS BIRCH PLYWD
FABRIC COVERED SEAT CUSHION
2'-3"
3/4" X 1 1/2" SOLID QS BIRCH EDGES TYP. 1" QS BIRCH PLYWD BENCH TOP (3) 3/8" BENT QS BIRCH PLYWD
10 3/4"
(2) 3/4" QS BIRCH PLYWD CABINET SIDES
(2) 1" PLYWOOD ARMATURE 1'-3"
4" 1 5/8"
FABRIC COVERED SEAT CUSHION
1" QS BIRCH PLYWD BENCH TOP
3"
3/4" QS BIRCH PLYWD FIXED SHELF W/ 3/4" X 1 1/2" SOLID QS BIRCH EDGE
3/4" SOLID QS BIRCH BASE
3/4" QS BIRCH PLYWD 3/4" SOLID QS BIRCH BASE
FLOOR
2x WD BLOCK AS REQ'D
FLOOR
1 5/8"
1 5/8"
FLOOR
1 5/8" 2x WD BLOCK AS REQ'D
NURSERY LOW SHELVING CROSS SECTION 1 1/2" = 1'-0"
9 ID-714
2'-0 3/4"
NURSERY CURVED BENCH CROSS SECTION
10
1 1/2" = 1'-0"
ID-714
NURSERY CURVED BENCH @ SHELVING - SECTION 1 1/2" = 1'-0"
7"
2'-0"
7"
FABRIC WRAPPED CHAINGING CUSHION 1'-6"
1'-6"
FABRIC WRAPPED CHAINGING CUSHION
1" SS-1
1" SS-1
1 1/2" 1" SS-1 OR SS-2 COUNTER TOP
1 1/2"
13
1'-9 1/2"
NURSERY MILLW
ID-714 3/4" QS BIRCH PLYWD APRON
5 1/2"
5 1/2"
1 1/2"
6"
2"
4 1/2"
3/4" QS BIRCH PLYWD APRON
1" SS-1 OR SS-2 COUNTER TOP
4 1/2"
8 ID-714
3/4" PL-3 APRON EQ
EQ
EQ
SS DOOR PULL TYP 3/4" PL-3
3/4" PL-3 CABINET DOOR EQ
3/4" QS BIRCH PLYWD CABINET DOOR ROLLING STAIRS BEYOND
1 1/2" SOLID QS BIRCH TREAD 2'-0"
2'-10"
FREEZER
3"
11 ID-714
3/4" BS-6
NURSERY CHANGING STATION SECTION 1 1/2" = 1'-0"
EQ 4"
3/4" BS-6 4"
4"
4"
EQ
2'-3"
2'-3"
1" SOLID QS BIRCH RISER
TRASH
3"
3/4" PL-5 ADJ PLYWD SHELVES W/ 3/4" x 1'-2" SOLID BIRCH EDGES 3/4" SOLID QS BIRCH BASE (2) 6" SS FLUSH FLOOR BOLTS- W/ FLUSH SS MORTISE FLOOR RECEIVERS
(4) 6" X 2" RIGID MOLD ON RUBBER WHEEL KINGPINLESS CASTER
12 ID-714
NURSERY SECTION @ ROLLING STAIRS 1 1/2" = 1'-0"
(2) EA SIDE PBC LINEAR HARDENED CRWON ROLLERS W/ WHEEL BEARING IN STEEL RAIL & END STOP (2) 6" SS FLUSH FLOOR BOLTS- W/ FLUSH SS MORTISE FLOOR RECEIVERS
(4) 6" X 2" RIGID MOLD ON RUBBER WHEEL KINGPINLESS CASTER
14 ID-714
NURSERY MILLW
02 // 68-74 TRINITY PLACE
OPPOSITE PAGE Nursery Millwork Drawings
12
THIS PAGE Stacking Diagram
03
SHRINERS
FOR CHILDREN MEDICAL CENTER, AMBULATORY SURGICAL CENTER & CLINICS JULY 2013 - APRIL 2015 *PROFESSIONAL WORK
LOCATION: 909 S. Fair Oaks Ave, Pasadena, CA 91105 CLIENT: Shriners Hospitals for Children PROJECT SIZE: Building- 73,495 sqft, Parking Garage- 96,360 sqft SERVICES: Programming, Design BUILDING USE/TYPE: Healthcare - Outpatient Care Facility The Shriners for Children Medical Center outpatient surgery / clinic complex will stand as the Shriners organization’s new flagship facility in Southern California. The specialized facility will house pediatric orthopedic care services; its design creates a compelling healing environment that engages with the outdoors. The three-story facility includes a surgical suite, diagnostic clinic and radiology department, rehabilitation clinic, orthotics and prosthetics manufacturing, patient and family support services, administrative offices, and underground parking garage. Outdoor spaces include a rehabilitation therapy garden and a gathering/ event space. The energy-efficient design meets CalGreen sustainability requirements. CO Architects: Design Architect; SRG Partnership: Executive Architect. (http://coarchitects.com/project/shriners-for-children-medical-center/?term_id=11)
THIS PAGE Key Wall Sections
03 // SHRINERS FOR CHILDREN MEDICAL CENTER
THIS PAGE TOP South-East Aerial View
14
THIS PAGE BOTTOM South and North Elevation
11
10 12 9
2nd FLOOR (+15’) (Department) 8. Rehabilitation 9. Ortho & Prosthetics 10. Administration 11. Pharmacy 12. Surgery
8
2
3
5
GROUND FLOOR (0’) (Department) 1. Lobby 2. Building Support 3. Plant Services 4. EVS 5. Clinic 6. Imaging 7. Ortho & Prosthetics
7
6 4
1
16
17
18
15 16
3rd FLOOR (+33’) (Department) 13. Building Support 14. Lobby 15. MIS 16. Administration 17. Fiscal 18. HR
OPPOSITE PAGE Level 1 & Level 2 Floor Plan
16
13
14
THIS PAGE TOP Level 3 Floor Plan
THIS PAGE BOTTOM View of Level 3 Garden
17
03 // SHRINERS FOR CHILDREN MEDICAL CENTER
03 // SHRINERS FOR CHILDREN MEDICAL CENTER
0
OPPOSITE PAGE TOP Section
OPPOSITE PAGE BOTTOM Details
THIS PAGE TOP Site Plan (Left) and Landscape Render (Right)
10
20
18
40
THIS PAGE BOTTOM View of Rose Garden
04
38TH PARALLEL NORTH SPRING 2013- SENIOR PROJECT SENIOR PROJECT HONOR AWARD- 1ST PLACE DWELL ON DESIGN 2013 EXHIBITION
* *
LOCATION: Joint Security Area, DMZ, Korea PROJECT SIZE (GSF): 67,930 sqft PROGRAM REQUIREMENTS: South Korea, North Korea, United Nation & Redcross BUILDING USE/TYPE: Government Among many countries with borders, North and South Korea has the most fortified condition. Both parties have been in a neutral state since 1953, which signifies that another war can arise at any moment. The Demilitarized Zone (DMZ) embodies the tensions and contrasts in politics and ideologies in the form of a 4km buffer zone. Within the DMZ lies the Joint Security Area (JSA): the only place where the North and South are allowed to meet face to face. Facilitated and maintained by the United Nations, JSA is the only designated area for engagement and dialogue. Ironically, the current JSA is merely a miniaturized DMZ, where North and South stand across and apart, with UN a tenuous presence keeping delicate balance. Since the buffer between the two maximizes the tension, the goal of this project is to remove the in-between spaces by rearranging the JSA into a single entity rather than three. The complexity lies in the politically restrictive programs, and the United Nations is a component that can accommodate these programs, therefore, blending becomes a possibility. In order to solve the problems of disconnection and rising tension, the project aims to create an ambiguous space that will house the three sides through intersecting, cropping, alternating solids and voids, and blending object into landscape.
04 // 38TH PARALLEL NORTH
SOUTH KOREA
20
4
1. Freedom House
3
UNITED NATION (Neutral) 2. U.N Conference (7)
2
NORTH KOREA 3. Panmungak 4. Watch Tower
OPPOSITE PAGE View of project from North Korea
1
4
THIS PAGE TOP Korean National Border Diagram
THIS PAGE BOTTOM Existing Site - JSA (Joint Security Area) Diagram
04 // 38TH PARALLEL NORTH
plan view
22
COLLECTION
INTERSECTION
BOOLEAN AND CROP
SUBTRACT AND ADD
CARVE CIRCULTION AND DELETE SELECTED FACES
LANDFORM- OBJECT EXTENDS TO FIELD AND BLENDS
OPPOSITE PAGE Process Model
THIS PAGE Process Diagram
23
04 // 38TH PARALLEL NORTH
5 6 3
4
1
5
1
2
NORTH
5 4
2
3
1 1
9
SOUTH
9
9 9
8 7
8
1
UNITED NATIONS
1. Office 2. Entry 3. Sculpture Exhibition 4. Photo Exhibition 5. Art Exhibition 6. Outdoor Lounge 7. Museum Office 8. Storage 9. U.N Conference Room
MERGED
SOUTH KOREA UNITED NATION (Neutral) NORTH KOREA
CIRCULATION
04 // 38TH PARALLEL NORTH
OPPOSITE PAGE TOP Programs and Circulation OPPOSITE PAGE BOTTOM Section Render
24
THIS PAGE TOP Building Interior THIS PAGE BOTTOM Aerial View
05
HOLLYWOOD COURTHOUSE WINTER 2013- 5TH YEAR DESIGN STUDIO INTERIM EXHIBITION- WINTER 2013
*
LOCATION: Hollywood, Los Angeles, CA (6106 Sunset Blvd, Los Angeles, CA 90028) PROJECT SIZE (GSF): 62,894 sqft PROGRAM REQUIREMENTS: Courthouse, Retail, Public Parking BUILDING USE/TYPE: Government
As the place where the citizen interacts with his democratic system of justice, the courthouse is loaded with historic and cultural significance: It is a symbol of justice and state power. Located in Hollywood, this project was designed with the assumption of State of California determining that with the overcrowding at the central Stanely Mosk Courthouse in Downtown-Los Angeles, a smaller, standalone courthouse will be located in Hollywood to serve the needs of that community. Since, Hollywood generally lacks any public buildings of civic importance, the new courthouse will be fitted into the commercial fabric of the area while establishing its importance as a civic and institutional landmark. In order for this courthouse to be part of the Sunset Blvd fabric, design took a concept of bringing the public programs towards the street (Sunset Blvd) and pushing the private functions to the back (North), creating contrast in programs and building design.
05 // HOLLYWOOD COURTHOUSE
26
Courtroom Jury Deliberation
Skylight Garden
Courtroom
PUBLIC CIRCULATION PRIVATE/ SECURE CIRCULATION PUBLIC ELEVATOR
Court Support Atrium Public Counter
Judicial Chamber
PRIVATE ELEVATOR IN-CUSTODY ELEVATOR
Staff Break Room Bioswale Parking
Family Meditation
Assembly Room Entry Retail
27
05 // HOLLYWOOD COURTHOUSE
SUNSET BLVD
ENT
RY
N. GOWER ST
EL CENTRO AVE
RETAIL
PUBLIC PARKING
JUDGES PARKING
0
5
10
20
40
A
4
15 2
1
GROUND FLOOR 1. Entry 2. Security Screening 3. Public Lobby 4. Clerk’s Office 5. Public Counter 6. Work Station 7. Court Support 8. Judicial Chamber 9. Jury Deliberation Room 10. Courtroom 11. Waiting 12. Holding 13. Attorney/Client Conference Room 14. Court Administration 15. Outdoor Seating
11
5
3
11
6 13
13
14
13
12
B
7
12
10 8
13
B
10 8
9
A
THIS PAGE TOP Site Plan
THIS PAGE BOTTOM Ground Level Floor Plan
OPPOSITE PAGE Floor Plan (Basement, L2, L3)
0
5
10
20
40
05 // HOLLYWOOD COURTHOUSE
25
24
25
26
BASEMENT 30
23
29
23. Control Room 24. Interview Room 25. Storage 26. Sheriff’s Office 27. Weapon Storage 28. Vehicular Sally Port 29. Pedestrian Sally Port 30. Holding
27
28
JUDGES PARKING
11
11
18
18
18
18
18 19
17
2ND FLOOR 6. Work Station 7. Court Support 8. Judicial Chamber 9. Jury Deliberation Room 10. Courtroom 11. Waiting 12. Holding 13. Attorney/Client Conference Room 14. Court Administration 15. Outdoor Seating 16. Jury Assembly 17. Child Play 18. Office 19. Staff Break Room 20. Staff Training Room 21. Copy 22. Workshop
20
21 21
22
22
16
15
11
11
11
6 13
13
14
13
12
13
7
12
10
10
8
8
9
15
3RD FLOOR 6. Work Station 7. Court Support 8. Judicial Chamber 9. Jury Deliberation Room 10. Courtroom 11. Waiting 12. Holding 13. Attorney/Client Conference Room 14. Court Administration 15. Outdoor Seating
11
11
11
6 13
13
14
13
12
7
12
10 8
13
10 9
8
0
5
10
20
40
28
06
URBAN RIVER SANTA MONICA FALL 2012- 4TH YEAR DESIGN STUDIO INTERIM EXHIBITION- FALL 2012 AIAPF CITATION AWARD
* *
LOCATION: Santa Monica, CA (1615 Ocean Ave, Santa Monica, CA 90401) PROJECT SIZE(GSF): 219,829 sqft PROGRAM REQUIREMENTS: Water Museum, Desalination Plant, Public Parking BUILDING USE/TYPE: Industrial
75% of California’s available water is imported from North of Sacramento, while about 80% of the demand is in the Southern two-thirds of the State. As one of the solutions for the water crisis, California passed Proposition 50 that funds $50 million for brackish water and ocean water desalination projects. Urban River Santa Monica project (URS) brings in desalination plant with Reverse Osmosis System into an urban and coastal city, Santa Monica, CA and attempts to localize water by utilizing ocean water for both potable and non potable water. The main issue with the desalination plant and its RO system is the enormous amount of energy, which in the case of URS is solved through Archimedes Wave Swing that converts ocean wave energy to electricity. By utilizing renewable energies including; photovoltaic panels, vertical axis, in-house gasification of waste to energy, and wave swing, URS meets Zero Energy. URS is not only the city’s water supply in whole, but also a park, an entertainment, and learning facility where families can spend their time. By taking the challenge of creating an inviting, family-friendly water desalination plant into an urban setting, URS standardizes the future perspective of any type of plant.
THIS PAGE Water Facts Diagrams
OPPOSITE PAGE TOP Concept Diagram
OPPOSITE PAGE BOTTOM Site Context Diagram
30
30
06 // URBAN RIVER SANTA MONICA SANTA MONICA MUNICIPAL COURT
CITY OF SANTA MONICA
MAIN ST ENTRY
EN TR Y
OCEAN AVE
0 5
10
20
40
B
4 2
5
1
6 3
3
7
3 14 8
10 A
12
11
9
A
13
14
B
MUSEUM 1. Lobby 2. Media Room 3. Exhibition 4. Office 5. Classroom 6. Cafe
PLANT 7. Office/Shop 8. Pre-Treatment & R.O. 9. Post-Treatment 10. Clearwater Storage 11. In-House Gasification (Waste to Energy) 0 5
10
PLAZA 12. Food Court 13. Gift Shop 14. Outdoor Seating PARKING STRUCTURE 15. Parking 20
40
31
06 // URBAN RIVER SANTA MONICA
Sustainability Elements
URS Program Ocean Viewing Deck
Green Roof
Pedestrian Bridge
Sky Light & Automated Vent Wind Turbine
Rooftop Seating Area
Solar Panel
Rooftop Amphitheater Parking Structure
Reclaimed Water River Desalination Plant
Food Court
Retention Pond Water Museum
Desalination Viewing Deck
Extended Park
Smoke Stack
4. Reverse Osmosis
8.22 kWh x 36 turbines 296 kWh/day
OFFSHORE WIND ENERGY (Vertical Axis Turbine)
5. Post -Treatment
0.08 kWh x 24,255 sf 1,940 kWh/day
3. Pre-Treatment
7. Freshwater Distribution
2. Power Collector
SOLAR ENERGY
9.76 MGD
*ERI
6. Freshwater Storage
1. Seawater Intake
4.4 lb/person x 150 people 3979 kWh/day
IN-HOUSE WASTE TO ENERGY
1,200 kWh x 66 units 79,097 kWh/day
OCEAN CURRENT ENERGY (Archimedes Wave Swing)
6. Water Turbine
7. Brine Water Outlet
06 // URBAN RIVER SANTA MONICA
32
OPPOSITE PAGE TOP Exploded A xon OPPOSITE PAGE BOTTOM LEFT Desalination Process OPPOSITE PAGE BOTTOM RIGHT Renewable Energy Strategies For Net Zero Energy
THIS PAGE TOP View of Entry from Main St THIS PAGE BOTTOM Water Museum Interior View
07
FRAME HOUSE FALL 2011- 3RD YEAR DESIGN STUDIO INTERIM EXHIBITION- FALL 2011
*
LOCATION: Mt. Baldy, CA PROJECT SIZE(GSF): 543 sqft PROGRAM REQUIREMENTS: Living Rm, Kitchen, Bedrm, Bathrm, Storage, Outdoor Deck BUILDING USE/TYPE: Residential (Vacation House for Japanese Flim Maker)
Located in Mt. Baldy, California, Frame House is a vacation home for a Japanese Film maker. She comes to this house once in a year to enjoy the Mountain. The design concept of this house is to frame the landscape that surrounds the building. Four volumes intersects and create one continuous space, allowing light to penetrate in to all four volumes. Building masses are pushed away from each other to create negative spaces that provide telescoping views. This design has 6 views (or frames) that are organized in a sequence following the circulation. As a result, one can experience 360 view of the mountain and be surrounded by pure nature.
07 // FRAME HOUSE
34
THIS PAGE TOP View Sequence Diagram THIS PAGE Project View from East of Site
35
07 // FRAME HOUSE
BEDROOM
KITCHEN
LIVING ROOM
07 // FRAME HOUSE
36
THIS PAGE EXPLODED AXON
08
AQUA CENTER FALL 2010- 2ND YEAR DESIGN STUDIO INTERIM EXHIBITION- FALL 2010
*
LOCATION: Dana Point Harbor, CA PROJECT SIZE(GSF): 24,250 sqft PROGRAM REQUIREMENTS: Swimming Pool (3), Physical Training Rooms, Therapy Room, Community Meeting Rooms, Office, Outdoor Deck BUILDING USE/TYPE: Industrial The Aqua Center design started from the idea of rock and shells. Converting the shapes of organic Dana Point to a building, it naturally creates a landmark of the city. Through an environment that supports both active and leisurely water activities, the Aqua center fosters the concepts of safety, self-reliance and personal responsibility. Swimmers and bathers of all ages will learn the ethics of respect, trust, honesty and sportsmanship. Aqua Center intends to be a hub of social interaction, and a place for the community. The site for the project sits on an island, bordered by the harbor inlet channel on one side, and boat slips on the other. The site is part of a large manmade harbor complex bordered by rock cliffs that includes restaurants, parks, a marine science center and various boating infrastructural buildings.
EAST BASIN
DANA WEST YACHT CLUB
ISLAND WAY
WEST BASIN
AVENTURA SAILING ASSOCIATION
DANA DRIVE
EN
TR
Y
Line of Highest High Tide Line of Mean Lower Low Tide
0
THIS PAGE Site Plan
OPPOSITE PAGE Floor Plans
5
10
20
40
08 // AQUA CENTER
38
27 29
28
3RD FLOOR (+29’) 27. Community Room 28. Viewing Deck 29. Outdoor Dining Area
OPEN
OPEN
26 15
22
25 24
23
16 OPEN
17
21 20
18 19
2ND FLOOR (+13’) 15. Lounge 16. Staff/ Lifeguard Office 17. Staff/ Lifeguard Locker 18. Staff/ Lifeguard Ready 19. Laundary/ Storage 20. Therapy Room
10 2
21. Training/ Weight Room 22. Yoga Room 23. Reception 24. Multipurpose Room 25. Cafe Kitchen 26. Club Room
14
3 9
6
11
7 6
8 7
4 5
8
12
13
1
1ST FLOOR (-6’) 8. Sauna 9. Women’s Locker 10. Ticket Window 11. Lobby 12. Men’s Locker 13. Storage 14. Main Entry
1. Recreation Pool 2. Diving Pool 3. Lap Pool 4. Toddler Pool 5. Vending 6. Steam Room 7. Hot Tub 0
5
10
20
40
VIEW A
VIEW B
08 // AQUA CENTER
A
KEY C
D E
B
VIEW C
VIEW D
1/32” MODEL MADE WITH BASSWOOD, PLEXIGLASS, MUSEUM BOARD, AND RESIN OPPOSITE TOP View A: North Aerial OPPOSITE BOTTOM View B: South Aerial THIS PAGE TOP View C: North East Elevation THIS PAGE MIDDLE View D: South West Recreation Pool
VIEW E
THIS PAGE BOTTOM View E: South West Elevation