TRAI NI NGREPORT ( JUNE-NOVEMBER)
Submi t t edi npar t i al f ul f i l mentoft he Requi r ementf ort heawar dofdegr eeof BACHELOROFARCHI TECTURE
Submi t t edby : SWASTI K B. Ar ch.Semest er9th
GANGAI NSTI TUTEOFARCHI TECTUREANDTOWNPLANNI NG 2019
TRAI NI NGREPORT ( JUNE-NOVEMBER)
Submi t t edi npar t i al f ul f i l mentoft he Requi r ementf ort heawar dofdegr eeof BACHELOROFARCHI TECTURE
Submi t t edby : SWASTI K B. Ar ch.Semest er9th
GANGAI NSTI TUTEOFARCHI TECTUREANDTOWNPLANNI NG 2019