+1 315-751-7604
TLI27@SYR.EDU
231 ROOSEVELT AVE, SYRACUSE, NY, 13210
TAIHUI LI
COMPREHENSIVE STUDIO
COLLABORATION WITH KAMILA BURACZYNSKI
65’0”
ROOF 57’0”
LEVEL 5 47’0”
LEVEL 4 37’0”
LEVEL 3 25’0”
D-D Section
LEVEL 2
N
14’0”
W Fayette St.
0
1
Walton St.
LEVEL 2 9’6”
Cars
Cars
5
10
15
Walking
Cars
GROUND LEVEL 0’0”
BASEMENT -9’0”
A-A SECTION A
A
1
2
3
A
1
2
3
1
2
3
1 27’ 0”
2
1
9’ 8”
27’ 0”
9’ 8”
27’ 0”
9’ 8”
.7” COR-TEN PANEL
A
A
A
STEEL FLAT
GREEN ROOF PARAPET
UP
STEEL CLIP
ROOF 57’0”
2” RIGID INSULATION
18’ 6”
18’ 6”
18’ 6”
INSULATION
STEEL W-16 BEAM
CANT STRIP B
CONCRETE SLAB WITH METAL DECKING
B 6’ 1”
B 6’ 1”
FIRE STAIR
C
COR-TEN PANEL
6’ 1”
C
C
FIRE STAIR
STEEL W-16 BEAM
FIRE STAIR
DOUBLE GLAZING 14’ 2”
14’ 2”
14’ 2”
UP
CEILING
UP UP
ALUMINUM WINDOW FRAME SYSTEM
Down
Down
D
AWNING WINDOW
D
10’ 9”
Detail in Section
D
10’ 9”
E
10’ 9”
E
E
LOBBY
BAR
1 +14”
INSULATION
25’ 0”
25’ 0”
25’ 0”
.07” COR-TEN PANEL
FAN COIL
PULLEY FIXED HINGE POINT ROILING HINGE POINT
LEVEL 5 47’0”
F
UP
F
Down
F
FAN COIL
DOUBLE GLAZING(WINDOW) INSULATION
33’ 0”
33’ 0”
33’ 0”
3 Panel Operation in Plan
G
G
G
2
25’ 0”
25’ 0”
H 5’ 4”
FILTER FABRIC
H 5’ 4”
I
RESERVOIR LAYER
37’0”
25’ 0”
H
8” SOIL WITH PLANTINGS
2” FLOOR FINISH
LEVEL 4
5’ 4”
9.5ft
I
DRAINAGE
I
MOISTURE-RETENTION LAYER AERATION LAYER CEILING
UP
Down
THERMAL INSULATION ROOT BARRIER
19’ 8”
19’ 8”
19’ 8”
WATERPROOFING MEMBRANE STRUCTURAL DECK FIRE STAIR
J
FIRE STAIR
J
FIRE STAIR
J
GALLERY
17’ 10”
GALLERY
17’ 10”
17’ 10”
UP
K
Down
UP
K
Green Roof Detail
6’ 9”
K 6’ 9”
L
6’ 9”
L
L
Down
N
3
25’ 0”
25’ 0”
25’ 0”
ALUMINUM WINDOW FRAME SYSTEM
M LEVEL 3
M
M
DOUBLE GLAZING SYSTEM
25’0”
CONCRETE FIRE PROOFING 0 1
5
10
15
BASEMENT
2ND FLOOR
3RD FLOOR
OPERATION CISSUS ANTARCTICA (GREEN WALL)
A 1
A
2
3
1
A 2
3
1
2
3
4 27’ 0”
9’ 8”
27’ 0”
9’ 8”
OPERATING HANDLE RAMP
LEVEL 2
14’0”
A
Window Detail in Section
A
18’ 6”
A
18’ 6”
4 B
B 6’ 1”
B 6’ 1”
C
C
C
FIRE STAIR
1” METAL ROD
FIRE STAIR
FIRE STAIR 20’ 6”
14’ 2”
14’ 2”
UP
Down
D
STEEL FLAT
UP
Down
D
10’ 9”
Down
D
10’ 9”
PRECAST CONCRETE SLAB REINFORCING BAR
E
E
E
INSULATION
25’ 0”
25’ 0”
Down
UP
F
5
F
F
Suspended Ramp Structure Detail in Section
GROUND LEVEL
0’0” 33’ 0”
5
33’ 0”
CONCRETE FIRE PROOFING
STEEL W-16 BEAM
G
G
G
1”THICK GROUT
GRAVEL STEEL W-16 BEAM
4” x 4” ANCHOR PLATE
25’ 0”
25’ 0”
H REINFORCE CONCRETE
H 5’ 4”
REINFORCED CONCRETE
H 5’ 4”
I
I
I
UP
19’ 8”
Down
19’ 8”
CONCRETE SLAB 3” INSULATION 3” SAND GRAVEL
FIRE STAIR
J
FIRE STAIR
J
37’ 6”
FIRE STAIR
J
DRAINAGE PIPE CONCRETE FOOTING
CONCRETE FOOTING 17’ 10”
17’ 10”
Down Down
K 3” CLEARANCE
K 6’ 9”
1
5
10
Footing Detail in Section
L
L
N 25’ 0”
25’ 0”
M
0 1
5
10
M
M
15
4TH FLOOR
WALL SECTION
K 6’ 9”
L
0
UP
PLANS
5TH FLOOR
A
ROOF
A
A
Vernon, CA Precipitation
Vernon, CA Pollution (carbon dioxide)
Vernon, CA Wind Sped
Vernon, CA People Come to Work soya
3 people /h
2 people /h 2 people /h 2 people /h 2 people /h
12 people /h
18 people /h 11 people /h 11 people /h 23 people /h 20 people /h
18 people /h 11 people /h 11 people /h 23 people /h 20 people /h
O.P. P.B.R. Diesel Diesel
P.B.R. TAG
5 6 7 8 9 10 1112 1314 15 16
330%
capital
O.P. TAG
3 people /h
75%
267.16 ton
Vernon, CA Advantage of Algae
1 2 3 4 5 6 7 8 9 10 11 12
Vernon, CA People Come to Work
5 6 7 8 9 10 1112 1314 15 16
2 people /h 2 people /h 2 people /h 2 people /h
12 people /h
23%
<4%
100%
3.27 ton 574.96 ton
Vernon, CA Humidity
algae jatropha palm
18.75 ton
1.Aluminum Co of America 2. Baker Commodities Inc 3. Contemposal Inc, West Coat RE 4.D&D Disposal Inc, West Coat RE 5.Dunn-Edwards Corp 6. Fil Trol Corp 7. Ivy Hill 8. Kal Kan Food Inc 9. Owens-Brockway Glass Container 10. Pacific 11.Sunlan 12.Vernon City Light & Power DEP
10
78.24%
flood strong thunder wind storm
10
$ 12.5
$ 19.89
$ 17.52
$ 13.85 $ 10.66
$ 9.28
operating
$ 7.12
$ 6.23
82% 83.9% 82.6% 86.6% 76.2% 79.5% 67.7% 71.5% 84.7% 85.6%
57.7%
170
170
82
82
488 Total
10
high surf
49.04 ton 2.46 ton 4.66 ton 4.66 ton 29.39 ton 16.12 ton
Vernon, CA Wether Extremes Events 1950-2010
Vernon, CA Percentage of land area
1 2 3 4 5 6 7 8 9 10 11 12
8.99 ton 1.58 ton
12.2 mph
flood strong thunder wind storm
10
488 Total
high surf
14.3 mph 5 mph 7.3 mph 7.9 mph 11 mph 9.2 mph 13.6 mph
7.5 mph
Vernon, CA Wether Extremes Events 1950-2010
81.75 ton
1 2 3 4 5 6 7 8 9 10 11 12
7.4 mph 6.9 mph 4.5 mph
8.92 mph
2.3 inches 1.2 inches 0.7 inches 0.2 inches
0.3 inches 0.9 inches 2.6 inches 3.9 inches 3.4 inches
15.61 inches
1 2 3 4 5 6 7 8 9 10 11 12
SECTION PERSPECTIVE & ENVIRONMENT ANALYSIS
UNDERGROUND RENDERING
VERNON . LANDSCAPE PARKING LOT
TAIHUI LI
+1 315-751-7604
COLLABORATION WITH SEAN MORGAN TLI27@SYR.EDU
231 ROOSEVELT AVE, SYRACUSE, NY, 13210