Varna public library Year4

Page 1

Portfolio Year 4 MArch Architecture (ARB/ RIBA Part2)

Takuma Kiyama


Extension

- Varna Publ

MArch Architecture (ARB/ RIBA Pa


of Nature

lic Library

art2) 2015 -2016 Distinction

Takuma Kiyama U1424042 Unit 6 2015 - 2016 Tutors: Gilles Retsin & Isaie Bloch



Contents

Form Finding

Site Analysis & Context

Design Proposal

Project Development


Discrete Spatia


al Assemblage


Form finding The building is conceived with a form finding using folded paper. Through the surfaces in torsion, the space works similarly to landscapes and can produce unexpected spaces. Simultaneously, this logic informs us of the landscape, and creates places for activity.



Phasing

Phase 1

Phase 2

Phase 3


Phase 4

Phase 5

Phase 6


Junction Activities will be developed in the various patterns of junctions created by stacking pieces on top of each other. The pathways connected to each zone generated by the junctions will, in turn, generate activities and scenes in the building.




0

1

2

3

4

5m

Plan


20000


Section 1:50

Section

2880

2880

2880

20000

2880

2880

2880

2880






Site Ana


alysis


Site Analysis and Context

New Library in Varna, Bulgaria The site is located in Varna, Bulgaria. The new building of Varna Regional Library will be the first library to be built in Bulgaria for the last 30 years. This project aims that the future building should demonstrate contemporary attitude to books and have one major message. A solution is yet to be found for a long-standing problem of the city of Varna which has been without proper building of its library for years. The Library of Varna is a 130 year old institution, but presently its collection of over 860 000 library items is spread in 6 different buildings throughout the city. The new building aims to collect the library under one roof, to ensure its comfortable and smooth working process and at the same time to create a new and active public space in the centre of Varna.

Context Municipality Hall Archaeological Park

"P.r ofessor Marin Drinov” Street

Site "Osmi Primorski Polk “ Boulevard

“Bratya Miladinovi” Street

The competition area is locked between „Osmi Primorski Polk “ Boulevard, “Bratya Miladinovi” , “Professor Marin Drinov” streets, and the Municipality Hall of Varna (the former city headquarters of the Bulgarian Communist Party). The main spatial landmark in the area is the Municipality Hall of Varna, which was completed in 1984. With its 17 floors, well developed surrounding space, commanding silhouette and singular materials (visible structural concrete, stone tiling, anodized aluminum windows) it dominates perception in the surrounding vicinity. Presently, the competition area is covered with lush greenery, and combines the functions of a park with those of an open-air parking lot for the needs of the Municipality Hall.


The Site


Climate Average Temperature (℃) Graph for Varna

Rainfall Amount (mm)

30

80

Temperature (℃)

24 18

20 10 0

6 -1

7 -1

10

13

15

27

27

18

18

11

23

70

18 14 10

6

60

5

2

50

12 7 1

40 30 20 10

-10

0 JAN

FEB

MAR

APR

MAY

JUN

Average High Temp (℃)

JUL

AUG

SEP

OCT

NOV

DEC

JAN

FEB

MAR

APR

MAY

JUN

JUL

AUG

SEP

OCT

Average Low Temp (℃)

• Average January temperature: 1.7 C • Average for July: 22.8 • Yearly average: 12.2 • Lowest temperature on record; -24.3 C on February 10th 1929 • Highest temperature on record: 41.4 C in July Usually, the temperature from May to October is between 18 to 31 C, and an average of 22.8 C in July and August. In the summer, the water temperature is around 20 C, while on some of the hottest days, the beach sand heats up to 60 C.

Average yearly rains are 498 mm, with a maximum in November, and a minimum


Wind

Sun Position 345-

N

15-

330-

N

3045-

315-

N

N

N

50km/h

50km/h

50km/h

50km/h

40km/h 30km/h 20km/h

40km/h 30km/h 20km/h

40km/h 30km/h 20km/h

40km/h 30km/h 20km/h

10km/h

10km/h

10km/h

10km/h

hrs 407+ 366 325 284 244 203

3001st Jun

162

1st Jul 60-

122

1st Aug 1st May 75-

285-

1st Spt 1st Apr VARNA

270-

901st Oct

S

JAN N

S

FEB N

S

MAR N

S

APR

81 <40

N

50km/h

50km/h

50km/h

50km/h

40km/h 30km/h 20km/h

40km/h 30km/h 20km/h

40km/h 30km/h 20km/h

40km/h 30km/h 20km/h

10km/h

10km/h

10km/h

10km/h

1st May 255-

1051st Nov

1st Feb 240-1st Jan

NOV

DEC 225-

135-

N

S

JUN N

S

JUL N

S

AUG N

50km/h

50km/h

50km/h

50km/h

40km/h 30km/h 20km/h

40km/h 30km/h 20km/h

40km/h 30km/h 20km/h

40km/h 30km/h 20km/h

10km/h

10km/h

10km/h

10km/h

150-

210-

m in August

S

MAY 1st Dec 120-

195-

180-

165S

SEP

The longest sun-hours in Varna occur in July and August, with 331 and 313 hours respectively. The climate in the city’ s surroundings is suitable for the cultivation of Mediterranean vegetation. Varna is very appropriate for balneotherapy.

S

OCT

S

NOV

S

DEC

The predominant winds during the winter are from the northwest and north, and during the summer, from the northwest, east and northeast. The city’ s proximity to the sea creates a convergence zone, also called a sea breeze front. During the day, cooler air from the sea blows to up to 30-40 km inland, whereas during the night, a reversal of the same process is observed.

VARNA


Green Spaces Connecting with the green spaces, the development is equal to creating a network of green spaces, offering an affable asset to the city and people. The places and its experience sets a tempo for the growth and life of a city which in turn affects the city, Varna.

Municipalit Hall

Park


Site

ty

Park

The sea garden


Accessibility The library is considered as a hub for the city. It is surrounded by the parks, the sea gardens, the museums, the schools, and the municipality hall. It serves as the central part for the aforementioned places as it connects a place to another. Activities will be

High School

developed in the relationship between the library and other facilities.

Archaeological Museum

Residential Area

Municipalit Hall


University

ty

Gallery

The sea garden


Library Courtyard

Library Open Space

Library of Celsus (2 Century A.D.) Chetham's Library (1651) The Załuski Library (1747)

Linen Hall Library (1785) Boston Public Library (1852) National Library of France (1989)


Garden

Library

Vancouver library

Contemporary Library

Various paterns of garden in the library

Library

Park Dallas Public Library Cedar Rapids Public Library

Library Garden

Library of Birmingham


Library Open Space

Library Courtyard

Library

Park

Garden

Library Garden

Library



Existing Park

Existing Park

Existing Park Muni Municipality Hall

Proposal Site (Car Parking)

Proposal Site (Car Parking)

Urban Co


ondition

Future Future public building Existing Park Existing Park

Park

Park

Park


SQUARE

New square

1:20 (5

%)


View from the site

View from new square


Design Pr


roposal



Library

Main Entrance

Square

Municipality Hall

Master Plan 1:1000


Curvature Analysis and Adaptation The continuous structure divides private spaces and open spaces. This generates the new relationship between private and public use. The deflection creates the scene and people’ s activities in the library.

Deflection

Optimization of Curvature


Vertical

Optimized for program distribution

0

25%

50%

75%

100% Horizontal



Enclosed space for ptivate program

Open space for public program




Offices Accounting office Tecnical service Rental office spaces

Break room for staff Cafe Locker room for staff Individual work area

Reference and bibliographic section & Expert consultancy Administration area

Comme


LIbrary, Book area Art & Media centre

Public Area

Study room(Quiet Area)

Private Area

Auditriu Lecture room Book area Reading area

Garden Public Area Garden Meeting Areas

Private Area

ercial Area

Library Entrance Book area Copy service Reading Area

Nursery

Public Area Square

Main Entrance Cafe Restaurant Exibition space 24 Book retern




7F

Public Area

6F

Private Area

5F

Private Area

4F

Public Area

3F

Public Area

R

A

2F

Private Area

1F

Public Area

Ground Floor

Commercial Area & Car Parking


Teenager Book Area

Hobby Zone Teenager Book Area Teenager Book Area

Rental office spaces

Accounting Office Study Room(Quiet Area) Tecnical Service

Auditrium Individual Work Area Storage for Auditrium Locker Room for Staff Lecture Room

Break room for staff Cafe

Adult Book Area

Adult Book Area

Outside Reading Area Adult Book Area

Reading Area

Adult Book Area Print service

Children Book Area

Lounge

Library Garden

Nursery Storage

Reference and Bibliographic Section

Administration Area Conference Rooms A,B,C Expert Consultancy

Art & Media Area

Office Suvenir Shop Cafe Restaurant

Exibition Space Computer Area Multipurpose Hall Main Entrance 24 Self borrow and retern Information Center

Car Parking

Library Main storage

Waste Containers

Shop

Shop


Shop

Shop


5500 33400

5000

Audito

m

2700 2700

Stud Garden

5500 Nursery r

4000

afe

Storage

3500

Storage

Mulitpurpse hall

Storage St Sto e

Car Parking

Main Storage

Car Parking

4500

Administrati Ad Adm d inistrati

Outside Library Garden

4300

Reading Area

Section A-A’ 1:300


Public Circulation Flow

Private Circulation Flow


EV 1~8F EV 1~8F EV 1~8F

EV 1~8F

30m

Vertical Circulation

Fire Escape




Shop

Storage

Storage

Shop


EV

CAR PARKING

Library Main Storage

+0.0

EV

Technical Entrance with Loading Desk and Service Area Incl. Security Control

Waste Containers Shop

Storage

Storage

Shop

Shop

Storage

PLAN 1 [+ 0.00] 1:300


GL +0.00

Side e private


GL +4.00

Office Theater Area

Exibition Area

Gallery

EV

Staff Entrance

Lounge

Suvenir Shop

GL +4.50

Conputer Area

Multipurpose Hall

Main EV

Restaurant EV

Self Collection

Storage

Self Borrow & Self Returen

Coustmer Service

Cafe

Entrance Hall

Information GL +4.50

Caffe Entarance

entrance for e program

Main Entrance

Event Space

GL +0.00

PLAN 2 [+ 6.00] 1:300




Entra privat


ance for te area

Lounge EV

Nursery Reference and bibliographic section & Expert consultancy

Open space for children

+5.00

Staff room

Local Storage

EV

EV

Administration Office

Coferences room A Coferences room B

Meeting Space Coferences room C +4.30

PLAN 3 [+ 5.00] 1:300




A


WC

Living Room EV

Adult Children

A' Copy center

LIBRARY GARDEN

EV

Meeting Area EV

PLAN 4 [+ 13,500] 1:300


Phasing

Site

PHASE 1

PHASE 3

PHASE 4

First floor will be constructed.

Second floor will be constru

PHASE 6

PHASE 7

Fourth floor will be constructed.

Fifth floor will be constructed

Primary Structure will be con


nstructed.

ucted.

d.

PHASE 2

Comercial Space and new park will be constructed.

PHASE 5 Third floor will be constructed.

PHASE 8 Sixth floor and roof will be constructed.


Structure

Roof

7th Floor

6th Floor

5th Floor

4th Floor

3nd Floor

Column 2nd Floor

Caustic concrete

Caustic concrete (Primary Structure) Elevator / Toilet / Staircase

Caustic concrete (Primary Elevator / Toilet / Staircase 1st Floor

Column (Secondary Struct

Ground Floor

Solid Concrete Walls

Column (Secondary Structure)


Steel Column

The Steel column, which radius is 75mm and each span is 8m, allows to support the building as part of the structure, creating big open spaces.

Structure)

ture)


Acoustic Qualities Teenager Book Area

Noise Level

Hobby Zone Teenager Book Area

High

Teenager Book Area

Midle Low

Rental office spaces

Accounting Office Study Room(Quiet Area) Tecnical Service

Auditrium Individual Work Area Storage for Auditrium Locker Room for Staff Lecture Room

Break room for staff Cafe

Adult Book Area

Adult Book Area

Outside Reading Area Adult Book Area

Reading Area

Adult Book Area Print service

Children Book Area

Library Garden

Nursery Lounge Storage Reference and Bibliographic Section Administration Area Conference Rooms A,B,C Expert Consultancy

Art & Media Area

Office Suvenir Shop Cafe Restaurant

Exibition Space Computer Area Multipurpose Hall Main Entrance 24 Self borrow and retern Information Center

Car Parking

Library Main storage

Waste Containers

Shop

Shop


Detail 01 Hobby Zone Floor finish Acoustic floor tile

Floating Screed Levelling Screed Concrete

Study Room

Detail 02

Soundproof glass

Sun Light

Sound is asorbed

View

Glass

Glass

Sound Absorbing Spacer

Sound Absorbing Spacer

Detail 03 Library

Tile finish (Interior) Concrete

Glass wool board

Nursery


Solor Analysis

1st April AM 9:00

1st April PM 4:00

1st A

1st


April PM 00:00

t April PM 6:00

1st April PM 2:00


Daylight Analysis and Lighting Plan

Lighting Analysis w

Without Artificial L

Teenager Book Area

Hobby Zone Teenager Book Area Teenager Book Area

Rental office spaces

Accounting Office Study Room(Quiet Area) Tecnical Service

Auditrium Individual Work Area Storage for Auditrium Locker Room for Staff Lecture Room

Break room for staff Cafe

Adult Book Area

Adult Book Area

Outside Reading Area Adult Book Area

Reading Area

Adult Book Area Print service

Children Book Area

Lounge

Library Garden

Nursery Storage

Reference and Bibliographic Section Administration Area Conference Rooms A,B,C Expert Consultancy

Art & Media Area

Office Suvenir Shop Cafe Restaurant

Exibition Space Computer Area Multipurpose Hall Main Entrance 24 Self borrow and retern Information Center

0

1500

3000

4500


with Sun

Lighting Plan < Study Room>

Light

0

Small Window for the view to the library garden

Lamp

Op Area Open

Lighting Plan

<Office Area 01>

Corridor Indirect Light

Enclosed Area En Enc

Suspended Ceiling Indirect Light

Enclosed Area En

Lighting Plan < Library> Reading Area

Book Area Pendant ceiling light

Stand Lamp

Op Area Open

Open Area O

Lighting Plan < Office Area02> Office and Conference Room Pendant ceiling light

Corridor Stand Lamp

Enclosed Area E

Entrance Main Entrance Down Light

Open Area (Entrance) O

6000 (LX)

Cafe and Restaurant Pendant ceiling


Natural Ventilation

Fresh Air Exhaust Air Mechanical ventilation

p



Key Junction 01

Tile finish (Ex

S

Ins

Co

Study room

Office

Exterior


Tile finish (Interior) Screed Gutter Concrete

xterior)

Screed

Rod Suspension Hanger with Adustment Spring

sulation

Joist Channel

oncrete

Dropdown Ceiling

Interior Tile finish (Interior) Screed Concrete

Indirect Light

Interior

Tile finish (Interior) Screed

Interior

1:40 Sectional Detail 01


Key Junction 02

Exterior Steel Beam

Terrace

Wooden Sheet Waterproofing Membrane Batten Wood Deck

Gutter

GFRC Panels Joist Channel

Garden

Reading Area

Treaded Rod

Drain Inspection Chamber

Exterior


Tile finish (Interior) Screed Concrete Insulation

Interior

Rod Suspension Hanger with Adustment Spring Joist Channel Dropdown Ceiling

Interior

Exterior

Reading Area

Raised Floor

Drain

Interior

Sectional Detail 1:40


Key Junction 03

Drain Inspection Chamber

Garden

Reading Area

Grass Soil Stone Filter Fablic Filter Drainage Layer Waterproofing Membrane Structual Concrete

Exterio

Sectional Detail 1:20


Exterior

Interior

Gutter Garden

or Interior

Sectional Detail 1:30


Key Junction 04

Garden

Office

Through conduits junction boxes, and thermostats

Through floor and carpet joints Through electrical/data floor boxes

Cable Management for Office and Study Room

Raised floor edges Wall bases and penetrations

Gutter


Interior

Rod Suspension Hanger with Adustment Spring Joist Channel

Dropdown Ceiling

Exterior

Interior

Office

Interior

Raised Floor

Sectional Detail 1:30




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.