1 minute read

01 SILURSKA RESIDENCE | BIM MODELING

Residential project developed at MS Architekti

Study & DUR Phases | MS Architekti | worked with: Katerina Fiserova, Linda Svobodova, Pavel Shaban |

Advertisement

Spring 2022 till now

My main responsibility in this project is to build, maintain and update Revit model, create drawings and exports for presentations.

Project phases: new, vs existing constructions

02 Kolben Tower

Multifunctional addition on top of the Kolbenova metro station vestibule

Concept development phase | Schindler Seko Architects | worked with: Jan Schindler and Ondrej Dusek | Archicad | Summer 2021

The project was being developed by Schindler Seko Architects aiming to propose a suitable addition to the Kolbenova metro station vestibule. I was engaged with following responsibilities:

Modelled the existing situation, including the underground metro tunnels, developed options of volumes for the client presentation in collaboration with other two architects, designed a Kavarna space and volunteered to do renderings for it as well.

Tower options

Chosen option

Visualizations for the concept

Program on plans and sections

03 Schiffswerft Dresden

Redevelopment of Schiffswerft dresden

Closed competition| Schindler Seko Architects | worked with: Jan Schindler | Skill: Archicad Summer 2021

Schindler Seko Architects studio was invited to participate in this competition among other 10 famous studios from all over the world. The organizators wanted to explore the possibilities of redevelopment of the former Schiffswerft Dresden territory.

I was engaged in this competition with Jan Schindler. We worked together to develop options initially, and later on, develop further the chosen option, which was an Arches steel construction supporting the offices and open collaboration spaces.

I totally loved this experience, not only because of the exciting task, but also because of a pleasant collaborator Janek Schindler who gave me creative freedom I have never experienced anywhere before.

At the initial stage I developed several volume proposals, however, the version which finally we went for belonged to the senior architect.

This article is from: