sample 1

Page 1

1

Alma Ct Residence

Alma Ct Pleasanton, CA 94588 | Residential | Professional | Panafolr Studio

Project scope consists of re-designing the house’s entry. The main entrance will have a new design to include a ramp and make the overall entrance more prominent.

The ramp will comply with ADA standards for disability. Scope of work extends to adding an ADA full bathroom with a deck and accessibility ramp.

FOR REVIEWFOR

2 2325 THIRD STREET, Suite 425, San Francisco, California 94107 | design@panafold.com | www.panafold.com
vs. New Site Plan
Existing

REVIEWFOR REVIEW

FOR REVIEWFOR

Existing Floor Plan

4

REVIEWFOR REVIEW

5 New Floor Plan

South Elevation (Demo)

FOR REVIEW FOR REVIEWFOR

East Elevation (Demo)

Existing Elevations

6

REVIEWFOR REVIEW

South Elevation

7
Elevation New Elevations REVIEW
East
8 GENERAL NOTES: 1. ALL DIMENSIONS TO BE VERIFIED IN FIELD. 2 PAINT WALLS WITH ZERO V.O.C. PAINT. MAIN LEVEL 0' - 0" T.O. ROOF 13' - 10 3/8" CEILING 7' - 11" GROUND -1' - 10" (E) BATH (E) WALKING CLOSET (E) PRIMARY BEDROOM (E) LAUNDRY (N) ENTRY (N) PERGOLA (N) SKYLIGHT BY VELUX A A600 9 A500 14 A500 2 A500 1 D&W HEAD 7' - 0" A600 8 REMOVE TO EXTENTS WEATHERTIGHT PATCH INTERIOR PARTIALY STRUCTURE ROOF MAIN LEVEL 0' - 0" T.O. ROOF 13' - 10 3/8" (E) BATH (E) WALKING CLOSET (E) PRIMARY BEDROOM CEILING 7' - 11" GROUND -1' - 10" (E) LAUNDRY (E) ENTRY PARTIALY REMOVE ROOF STRUCTURE TO CONNECT NEW PERGOLA REMOVE EXISTING WALL, INCLUDING DOOR AND ACCESSORIES IN MARKED AREA REMOVE (E) RAMP AND PREPARE THE GROUND FOR NEW ACCESS PARTIALY REMOVE ROOF STRUCTURE TO INSTALL NEW SKYLIGHT REMOVE (E) CEILING TO GET THE LIGHT FROM THE SKYLIGHTS (E) CRAWLSPACE 2' - 10" 0' - 8 1/2" 2' - 4 5/8" 1' - 11 1/2" D&W HEAD 7' - 0" 3/16" = 1'-0" A300 3 (N) BUILDING SECTION 3/16" A300 4 (N) 3/16" A300 2 (E) 3/16" = 1'-0" A300 1 (E) BUILDING SECTION GENERAL NOTES: 1. ALL DIMENSIONS TO BE VERIFIED IN FIELD. 2 PAINT WALLS WITH ZERO V.O.C. PAINT. MAIN LEVEL 0' - 0" T.O. ROOF 13' - 10 3/8" CEILING 7' - 11" GROUND -1' - 10" (E) BATH (E) WALKING CLOSET (E) PRIMARY BEDROOM (E) LAUNDRY (N) ENTRY (N) PERGOLA (N) SKYLIGHT BY VELUX A A600 9 A500 14 A500 2 A500 1 D&W HEAD 7' - 0" A600 8 REMOVE TO EXTENTS WEATHERTIGHT PATCH INTERIOR PARTIALY STRUCTURE ROOF MAIN LEVEL 0' - 0" T.O. ROOF 13' - 10 3/8" (E) BATH (E) WALKING CLOSET (E) PRIMARY BEDROOM CEILING 7' - 11" GROUND -1' - 10" (E) LAUNDRY (E) ENTRY PARTIALY REMOVE ROOF STRUCTURE TO CONNECT NEW PERGOLA REMOVE EXISTING WALL, INCLUDING DOOR AND ACCESSORIES IN MARKED AREA REMOVE (E) RAMP AND PREPARE THE GROUND FOR NEW ACCESS PARTIALY REMOVE ROOF STRUCTURE TO INSTALL NEW SKYLIGHT REMOVE (E) CEILING TO GET THE LIGHT FROM THE SKYLIGHTS (E) CRAWLSPACE 2' - 10" 0' - 8 1/2" 2' - 4 5/8" 1' - 11 1/2" D&W HEAD 7' - 0" 3/16" = 1'-0" A300 3 (N) BUILDING SECTION 3/16" A300 4 (N) 3/16" A300 2 (E) 3/16" = 1'-0" A300 1 (E) BUILDING SECTION
FOR REVIEWFOR FOR REVIEWFOR
Existing Section A New Section A
9 MAIN LEVEL 0' - 0" T.O. ROOF 13' - 10 3/8" CEILING 7' - 11" GROUND -1' - 10" D&W HEAD 7' - 0" MAIN LEVEL 0' - 0" T.O. ROOF 13' - 10 3/8" GROUND -1' - 10" (N) BEDROOM (N) BATHROOM (N) ENTRY (E) GARAGE ALL EXISTING BEAMS TO REMAIN. PROTECT DURING CONSTRUCTION (E) NO WORK IN THIS AREA C B B A600 8 A MAIN LEVEL. CElLlNG 7' - 11" D&W HEAD 7' - 0" MAIN LEVEL 0' - 0" T.O. ROOF 13' - 10 3/8" (E) BEDROOM (E) GARAGE (E) ENTRY CEILING 7' - 11" GROUND -1' - 10" ALL EXISTING BEAMS TO REMAIN. PROTECT DURING CONSTRUCTION REMOVE EXISTING WALL, INCLUDING WINDOWS, DOORS, AND ACCESSORIES IN MARKED AREA (E) NO WORK IN THIS AREA REMOVE (E) EXTERIOR FINISH TO EXTENTS SHOWN. REMAIN WEATHERTIGHT BARRIER. PATCH AND REPAIR TO RECEIVE INTERIOR FINISH TO MATCH PARTIALY REMOVE ROOF STRUCTURE TO CONNECT NEW ROOF (E) CEILING REMOVE (E) CEILING. WALL REFINISH TO CONTINOUS LOWER (E) WALL FINISH (E) FENCE TO BE REMOVED (E) CRAWLSPACE MAIN LEVEL. D&W HEAD 7' - 0" MAIN LEVEL 0' - 0" T.O. ROOF 13' - 10 3/8" CEILING 7' - 11" GROUND -1' - 10" D&W HEAD 7' - 0" 3/16" = 1'-0" A300 4 (N) BUILDING SECTION 3/16" = 1'-0" A300 2 (E) BUILDING SECTION MAIN LEVEL 0' - 0" T.O. ROOF 13' - 10 3/8" CEILING 7' - 11" GROUND -1' - 10" D&W HEAD 7' - 0" MAIN LEVEL 0' - 0" T.O. ROOF 13' - 10 3/8" GROUND -1' - 10" (N) BEDROOM (N) BATHROOM (N) ENTRY (E) GARAGE ALL EXISTING BEAMS TO REMAIN. PROTECT DURING CONSTRUCTION (E) NO WORK IN THIS AREA C B B A600 8 A MAINMAlNLEVEL. CElLlNG 7' - 11" D&W HEAD 7' - 0" MAIN LEVEL 0' - 0" T.O. ROOF 13' - 10 3/8" (E) BEDROOM (E) GARAGE (E) ENTRY CEILING 7' - 11" GROUND -1' - 10" ALL EXISTING BEAMS TO REMAIN. PROTECT DURING CONSTRUCTION REMOVE EXISTING WALL, INCLUDING WINDOWS, DOORS, AND ACCESSORIES IN MARKED AREA (E) NO WORK IN THIS AREA REMOVE (E) EXTERIOR FINISH TO EXTENTS SHOWN. REMAIN WEATHERTIGHT BARRIER. PATCH AND REPAIR TO RECEIVE INTERIOR FINISH TO MATCH PARTIALY REMOVE ROOF STRUCTURE TO CONNECT NEW ROOF (E) CEILING REMOVE (E) CEILING. WALL REFINISH TO CONTINOUS LOWER (E) WALL FINISH (E) FENCE TO BE REMOVED (E) CRAWLSPACE MAIN LEVEL. D&W HEAD 7' - 0" MAIN LEVEL 0' - 0" T.O. ROOF 13' - 10 3/8" CEILING 7' - 11" GROUND -1' - 10" D&W HEAD 7' - 0" 3/16" = 1'-0" A300 4 (N) BUILDING SECTION 3/16" = 1'-0" A300 2 (E) BUILDING SECTION Existing Section B New Section B REVIEWFOR REVIEW REVIEWFOR REVIEW
GENERAL NOTES: 1. ALL DIMENSIONS TO BE VERIFIED IN FIELD. 2 PAINT WALLS WITH ZERO V.O.C. PAINT. GENERAL NOTES: 1. ALL DIMENSIONS TO BE VERIFIED IN FIELD. 2 PAINT WALLS WITH ZERO V.O.C. PAINT. GENERAL NOTES: DIMENSIONS TO BE VERIFIED IN FIELD. WALLS WITH ZERO V.O.C. PAINT. A500 6 SECTION N.T.S A500 11 DETAIL @ N.T.S 2325 THIRD STREET, Suite 425 San Francisco, California 94107 Email: design@panafold.com www.panafold.com A500 11 DETAIL @ DECK N.T.S @ PLANTERS & RAMP
FOR REVIEWFOR
Details: Pergola Connection

REVIEWFOR REVIEW

11 Perspective Sketches

FOR REVIEW FOR REVIEW FOR FOR

Visualizations

FOR REVIEW FOR REVIEW

13
REVIEW REVIEW
14

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.