Architectural Thesis by Tanay Sethi - Mount Abu Research Center for Ecologists

Page 1

Mount Abu Research Center for Ecologists Architectural Thesis by Tanay Sethi


Please note This presentation was solely made with animated switches to navigate and understand process of design. Please follow the link to get to the animated file zip folder.

The link https://drive.google.com/drive/folders/18KmHIAUoT_pAadHsMorO7OYbdnU9d0or?usp=sharing


DELWARA LAKE NAKKI LAKE

Project Name: Mount Abu Research Centre for Ecologists Stakeholder: Indian Institute of Ecology, India Governing body: Ministry of Environment, Forest & Climate Change (MoEFCC), India Site location: Mount Abu, Rajasthan, India

SITE

POLITICAL MAP OF RAJASTHAN

ROAD MAP OF MOUNT ABU

PROPOSED SITE

NH 14 MOUNT ABU

DISTRICT ROAD

BOUNDARIES OF ECO SENSITIVE ZONE OF MOUNT ABU

ABU ROAD

Project Background

Mount Abu is a samll town in Sirohi district of Rajasthan sits under canopy of natural heritage of Aravli hill ranges. People admire the natural ecosystem of this region and find this town to be hotspot for weekend gateways. To preserve extensive human encroachment on natural heritages of this oldest ecosystem Indian government has listed this region in Eco Sensitive Zones of India. That means a lot of activities regarding urbanization are banned over here. To manage the researches over this forest, Indian Institute of Ecology has collaborated with Ministry of Environment and Forest to develop a research center in Mount Abu which could focus on ecological researches and can become an International Platform to showcase latest researches and developments in field of ecology.

Need of this project

1. To advance the cause of ecology in India 2. To encourage and promote ecological studies in the country and to integrate research in different fields of ecology 3. To cooperate with organizations with related aims and interests, and provide opportunities for communication among ecologists.

NH 14


Project User & activities What is a research center? A research center is a facility or building dedicated to research, commonly with the focus on a specific area. A center is a facility and not an institute which doe not provide any degree but a space and equips one to conduct research on a specific topic for as much as time they require.

Hierarchy of research process and activities involved Step 1: The big Idea A researcher or a sponsor have some idea of research

Space requirement and area analysis

Meeting rooms Registrar

Dean office

Desk and outside campus research using labs in campus but field is in forest or some other area. Research may go to field or conduct stationary research

Step 5: completion of research and a final presentation Finally a day research will be completed and research will present the research in front of international audience which will be invited for a presentation or further over dinner

Rooms

Documentation in charge Cashier Utilities

bathing and changing dry room

Wet labs

Research offices Discussion rooms Pantry

Gardens or field

Step 4: Selection of research method.

Field in situ research using nurseries or the subject is in campus

Residential block

Admin block

Step 2: The deciding meeting They both can contact research center for space availability but first the center must step up a meeting to hear out their potential. Step 3: Approval and joining The institute has approved their idea and ready to provide a space in their facility for some charges. Now the researcher and his team can join in the facility where they can reside for the period of research.

TV room and indoor play Pantry

Dry labs Utilities

Auditorium

Nurseries

Aim of the project: The thesis aims to provide a sustainable and site responsive architecture withstanding the human comforts and aesthetics of architecture. Conclusions and objectives of project: 1. To respond the user and activities while deriving the built forms. 2. To respond the existing features of site and develop the design accordingly. 3. To incorporate nature and ecology of context.


Mount Abu Mount Abu as an Eco Sensitive Zone of India: Mount Abu has been designated as an Ecologically Sensitive Zone by the ministry of Environment, forest and climate change, government of India vide its notification dated 25th June, 2009 recognizing its Dilwara Temples

unparalleled ecological importance comprising of several endemic and rare species of flora and fauna coupled with natural, cultural, and manmade heritage.

Natural heritage Mount Abu has natural sites such as, Nakki lake,

Nakki Lake

Toad rock, formations, waterfalls, pools, springs, gorges, caves etc., MoEF&CC plans to conserve all the natural heritage sites including a wild life sanctuary.

Man-made heritage Mount Abu is famous for several temples, the most famous being Dilwara temples, Achalgarh fort, space observatory, guru shikar temple, Achaleshwar mahadev, old heritage buildings of British period and many more.

Flora and Fauna

The flora of mount Abu consist of 112 plant Todd Rock

families comprising of 449 and 820 species. Mount Abu is the only place in Rajasthan where one can find Orchids. The dominant trees are Anogeissus pendula (Dhauk), Butea onosperma, lannea coromandelica, Boswella serrata,

Gurushikhara

Achal Garh Fort

Peace Park

Anogeissus fatifolia and diospyros melanoxylon. Predominantly 22 species of Fauna exist in the area of Mount Abu. Panthers, Bears, Boars, Sambhar, Hyena, Vultures, Fox and Wolf are some of the endangered species of Fauna in ESZ.


Site Study

Sanskrit school

Accessibility Farm lands

The site is accessible from one side only that is marked with a red arrow on the shown map.

N

and following are the images of site entry.

Surrounding context

12 M wide Road connecting the sanskrit school uphill

Site is surrounded by rock mound for

W

E S

Site entry Mound 2

understanding i have marked them as

School hostel

1. Mound 1 & Mound 2, which marks the entry of site. 2. Mound 3 and 4 marking the back end of site.

Mound 1

3. Neighborhood has schools and farm lands.

Site road

Connectivity to transport The main connecting road is district road

Mound 3

coming from Abu road city and connecting the

Mound 4

gurushikhar of Mount Abu. Nearest bus stop is 3.5 KM in Mount Abu and nearest Railway station is 35 KM in Abu road city.

Natural physical feature on site The site offers natural rocky mound and a

District road

seasonal water body which flows from northwest direction to south-east direction and

Water body

connects to the main river on edge of mount abu.

School

Farm lands


Site Study Topography of site The map is a representation of site topography which shows the various features of site such

Peepal and banyan trees

Neem and Dhauk trees

Date palm Trees

Unidentified group of trees and bushes may include cactus and other desert vegetation.

N

and rocky mounds and water body

Existing vegetation The map is a representation of vegetation that exists on site. It includes date palm, neem,

W

E S

peepal, dhauk trees and some cuctus plants whit a variety of unidentified vegetation in dense areas.

Precipitation The diagram depicts the rain water path of Site on an average rainy day. Site receive rain in monsoon and a little showers in February.

Sun direction The diagram depicts the sun path of Site on an

1167 M

average sunny day. Site receive sun over 300

1166 M

days of a year.

1165 M

Wind Direction

1163 M

The wind is prevailingly flow in south-west to

1161 M

north-east direction with a little experience of winter winds from northeast to south.

Temperatures The chart shows temperatures above 25 degree Celsius which concludes the maximum time is sunny and mild hot in year while extreme hot in mount of April May and June.

1164 M 1162 M 1160 M 1159 M 1158 M 1157 M 1156 M 1155 M 1154 M from sea level


Site Study N W

E

Road S

Site offering Axial paths

Focal points 1167 M 1166 M 1165 M

Water flow

1164 M 1163 M 1162 M 1161 M 1160 M 1159 M

Placements of built environment

1158 M 1157 M 1156 M 1155 M 1154 M from sea level


N W

Site Plan

S Road

Site entry

Rocky mound 2

Desk Research Block Public parking

Auditorium

Rocky mound 1

Residential block

Field Research block

Rain Gardens

Botanical Gardens

E

Preserved area

Volleyball court

Rocky mound 3

Connecting bridge Rocky mound 4

OAT

Palm plaza

Service zone Water body


Desk Research block

N

Ground Floor Plan

W

A

S

A

Links

LEVEL MALE VISITOR TOILET

+1.75M PAntry LEVEL LEVEL FEMAL VISITOR TOILET MALE VISITOR TOILET

+1.80M Conference Room

LEVEL EATING SPACE

+1.75M PAntry

Control room +1.10M +1.80M Conference Room

LEVEL EATING SPACE

UP

LEVEL FEMAL VISITOR TOILET

+1.00M First floor staircases

DN +1.30M Foyer of botanical garden

First floor plan

+1.45M DN +1.30M Exit +1.30M Foyer of botanical garden Control room

Views

+1.15M Documentation room +1.00M Lawn

+1.50M Femal Staff toilet

E

UP

Control room +1.10M

+1.45M Exit

UP

+1.00M First floor staircases

+1.30M Control room

Contents

+1.15M Documentation room +1.50M Femal Staff toilet +1.50M Male staff toilet

+1.00M Lawn

+1.10M Admin office Foyer

+1.10M Waiting for office

+1.10M +1.20M Admin Asistant cabinoffice Foyer

+1.15M Addmision manager +1.10M Waiting for office

UP +1.05M Lift Foyer

UP

+1.50M +1.35M Malearea staff toilet Waiting

+1.35M Waiting area

+1.15M +1.15 Dean office Registrar office

+1.05M Entrance foyer +1.00M Shrub bed

+1.20M Asistant cabin

0.00M Entrance ramp foyer -0.05M Shrub bed

0.00M Entrance ramp foyer

+1.15 Registrar office

+0.05M Parking

+1.15M Cloak room +1.15M Video room

+1.10M Reception and visitors waiting area +1.05M Visitors entry

+0.05M Parking

0.00M VISITOR'S ENTRY

UP +0.05M Parking

+0.05M Parking

UP

+0.05M Parking

0.00M VISITOR'S ENTRY

+0.05M Parking

A A

Wind

+1.15M Cloak room

UP

UP

0.00 M Admin block entry

LEVEL SHRUB BED

LEVEL SHRUB BED

+1.05M Entrance foyer UP

0.00 M Admin block entry

UP

+1.15M Cash counter

UP +0.05M Parking

UP

+1.15M Addmision manager

Circulation

+1.10M Reception and visitors waiting area +1.05M Visitors entry

+1.05M Lift Foyer

UP

-0.05M Shrub bed

+1.15M Video room

+1.15M Cash counter

+1.00M Shrub bed

UP UP

Elevation

Parameters

+1.15M Dean office

+0.05M Parking

Open & Shaded


Desk Research block

N

First Floor Plan

W

A

+5.25M Discussion room

+5.20M

S +4.55M Cold store

+4.50M Desk Research Wing

+1.05M Store and washing area

+4.55M Pantry

Ground floor plan

+4.50M Toilet foyer

+4.55M Equipment room

+4.60M Wet lab

+5.25M Desk labs +4.45M Lab foyer

Links

E

+4.50M Lab foyer

+4.50M Store

UP

+4.45M wooden deck

+4.55M Desk

+4.60M Qurantine lab

+4.50M Desk Research Wing

Views DN +4.50M Waiting area

+4.50M Lift Foyer fisrt floor

Contents

+4.55M Desk lab +4.60M Dark lab

+4.45M Wooden deck

+4.50M Cloak room

Parameters Circulation

Wind

A

Open & Shaded

+8.70M Roof top +7.60M Space frame girder

Section +8.70M Roof top +7.60M Space frame girder +6.60M Lintel +5.65M Desk center planter +5.15M Planter box +4.50M First floor +4.05M Ground floor ceiling +3.20M Lintel +1.05M Ground Floor 0.00M Site Road

+6.60M Lintel +5.65M Desk center planter +5.15M Planter box +4.50M First floor +4.05M Ground floor ceiling +3.20M Lintel +1.05M Ground Floor 0.00M Site Road


The idea was to create a nature loving environment in offices and to make it more vibrant in sense of freshness and colors. The typical office layout doesn’t seem to form an interactive environment so I tried to incorporate arcs instead to linear design and plants a partition element.

The typical linear format

Back

The designed curvilinear format


Back


Desk Research block

N W

First Floor Plan

E S

Links First floor plan Section

Lift

Ramp to nursury

0.00M ENTRANCE

Site plan

+0.45M Research offices

A

A

+0.45M Entrance foyer and Waiting +0.50M Lab 1

Parameters Circulation

+0.45M staircases to first floor 0.00 M Central court

Wind

+0.50M Women Toilet

2.30

18 sqm

1

1.2

Open & Shaded +0.50M Men Toilet

+0.50M Lab 2

18 sqm

+0.50M Dark lab

1m

00m

3m

2m

5m

4m

15m

7.5m

35m

25m


Desk Research block

N W

First Floor Plan

E S

Links Ground floor plan Section Site plan

+3.30M Confrence room +3.30M Lift lobby

A

Parameters

+3.30M Discussion / Reading room

Circulation

LEVEL ENTRANCE RAMP FOYER LEVEL ENTRANCE RAMP FOYER

+3.35M Women Toilet

+3.30M Corridor

Electrical shaft

18 sqm

+3.15M +3.35M Men Toilet

+6.80M Parapet +6.15M Roof slab

18 sqm

+3.30M Corridor

Plumbing shaft

+3.30M First floor FFL

+0.45M Groundfloor FF

0.00M (1160.5 Confrence room

1m

00m

3m

2m

5m

4m

15m

7.5m

35m

25m


Desk Research block Section

Links Ground floor plan

First floor plan Site plan

Parameters Wind

Open & Shaded

+6.80M Parapet +6.15M Roof slab

+3.30M First floor FFL

+0.45M Groundfloor FFL 0.00M (1160.5 M on site) Confrence room


Residential block

N W

Ground floor plan

E S

Links

+0.80M Indivisual room type 25 sqm

First floor plan +0.75M Common seating area

+0.65M Lawn of block 1

+0.75M Common pantry

Section

16 sqm

+0.75M Entry to block 1

A

+0.75M Entrance to block 1

+0.70M Corridor of block 1

A

View

+0.75M Entry to block 1 +0.70M corridor of block 3 +0.75M Entry to block 2

+0.65M Lawn of block 3

+0.75M Indoor play zone

+0.75M Common Hall Foyer

+0.80 M Store room

+0.75M Waiting zone and T.V. area 60 sqm

+0.85M Amenities foyer

+0.80M Toilet facilites +0.80M washing area

+0.80M Dual sharing room type

+0.85M Dry area

UP

+0.80M washing area

25 sqm

+0.80M Bathing cubicals

+0.80M Bathing cubicals

+0.85M Amenities foyer

+0.75M Entrance foyer

0.00M (1159.5M on site) Entrance

Parameters Circulation

UP

+0.80M Toilet facilites

Site plan

+0.65M Lawn of block 2

+0.85M Dry area

+0.70M Corridor of block 2

+0.80M Dual sharing room type 25 sqm

+0.75M Entrance to block 2


Residential block

N W

First floor plan

E S

Links

+4.15M Indivisual room type 25 sqm

Ground floor plan +0.75M Common seating area

+0.65M Lawn of block 1

+4.10M Common seating area

Section +0.75M Entrance to block 1

A

A

+4.10 M FIrst floor corridor

Views

+0.75M Entry to block 1 +4.10 M FIrst floor foyer

+0.75M Indoor play zone

DN

+0.75M Common Hall Foyer

+0.65M Lawn of block 3 +4.10 M FIrst floor balcony

+0.80M Toilet facilites

+0.75M Waiting zone and T.V. area

+4.10 M FIrst floor corridor

60 sqm

+0.85M Amenities foyer

+0.80M Toilet facilites +0.80M washing area

+4.15M Indivisual room type

+0.85M Dry area

+0.75M Entrance to block 2

DN

+0.80M washing area

25 sqm

+0.80M Bathing cubicals

+0.80M Bathing cubicals

+0.85M Amenities foyer

+0.65M Lawn of block 2

+0.85M Dry area

+4.15M Indivisual room type 25 sqm

Site plan

+0.75M Entrance foyer

0.00M (1159.5M on site) Entrance


Residential block Section

+9.00M Height of tree(assumed) +8.10M Roof parapet +7.45M Roof slab FFL +6.50MM Arch opening

+4.95M First floor parapet +4.10M First floor FFL

+1.40M Ground floor parapet +0.75M Plinth 0.00M (1159.5M on site) Entrance

Parameters

Links

Wind Ground floor plan Open & Shaded

First floor plan

Views

Site plan


Links Ground floor plan First floor plan

Next view


Links Ground floor plan First floor plan

Previous view


A

Auditorium

N W

Plan

-1.50M Stage

UP

E

-1.80M Stage back entry foyer

S

-1.85M Control room and store -0.60M Male common room

-1.80M Stage foyer

DN DN

DN

+4.15 M Female toilets

-0.60 M Female common room -0.30M FFL Top seating floor +0.45M Regestration desk

DN +4.15 M Girls common room

Parameters

DN

+0.30M FFL Entrance foyer

Project User About Mount Abu

Circulation

Site Study

Links

Built placement Site Plan

Section Views

Site Plan

Architectural Design UP 0.00M (1159.5M on site) Entry Ramp

A

Landscape Design

Contents


Auditorium Section and elevations

N +5.20M Parapet +4.30M Roof Top

W

+3.85M Foyer ceiling +2.55M Stage ceiling +1.50M (1161.2M on site) SIte Road level +0.30M FFL Entrance foyer 0.00M Entrance ramp -1.50M FFL Stage floor -1.80M FFL Stage foyer

Links Ground floor plan Views Site plan

E S


Project User About Mount Abu Site Study

Built placement Site Plan

Architectural Design Landscape Design

Water management

Contents


Project User About Mount Abu Site Study

Built placement Site Plan

Architectural Design Landscape Design

Water management

Contents


Landscape site plan

N W

E S

UP/DN

UP/DN

UP/DN

UP/DN UP/DN

PHDA

CESP

UP/DN

UP/DN

PHDA

UP/DN UP/DN

CESP

PHDA

PHDA PHDA

UP/DN

UP/DN

PHDA UP/DN

UP/DN

CAFI

PHDA

UP/DN

PHDA PLOB

UP/DN

ACAU

SYCU PLOB

DERE

PIDU PHDA

PHDA

PHDA

PIDU

PIDU PHDA

CAVI

PHDA

PHDA

CAVI

PUGR PUGR PUGR PUGR

PIDU

CAVI

PIDU

CAVI

PHDA

PHDA

PUGR PUGR PUGR PUGR

PHDA

PHDA PHDA PHDA

CAVI PHDA

Views Sections Links

PHDA PHDA PHDA

00m

20m 10m

40m 30m

Graphical scale

60m 50m

80m 70m

100m 90m




Landscape

N W

E S

UP/

DN UP/

DN

PHDA

CESP PHDA

UP/

DN UP/

DN

CESP

PHDA

PHDA PHDA

PHDA

CAFI

PHDA PHDA

PLOB ACAU

PLOB


Project User About Mount Abu

Site Study

Built placement Site Plan Architectural Design Landscape Design

Water management

Contents


Landscape

N W

CAFI

E S

PLOB

SYCU PLOB

DERE


Landscape

N W

CAVI

E S

CAVI

PUGR PUGR PUGR PUGR

PIDU CAVI

PHDA

PHDA

PHDA

PUGR PUGR PUGR PUGR

PHDA

PHDA PHDA PHDA

PHDA PHDA PHDA


Landscape

N W

E S

PIDU PHDA

CAVI

PHDA

PHDA

CAVI PIDU CAVI

PIDU

CAVI

PHDA

PHDA

PHDA

PHDA PHDA

CAVI PHDA

PHDA PHDA


Landscape sections

N W

E S


Services

N W

E S

Road

Site entry

Rocky mound 2

Public parking Rocky mound 1 Preserved area

Volleyball court

Rocky mound 3

Treated water supply

Incoming sewage

Potable water supply

Connecting bridge Rocky mound 4

OAT Water from RWT

Palm plaza

Hydro pneumatic pumps connected to OHWT Water from water body

Water cisterns for storage

Effluent treatment plant

Compost pit

Raw Water treatment plant

Treated water overflow

Water body


HOSTEL

BLOCK 1

BLOCK 2

MESS OVERFLOW

RAIN GARDENS

POTABLE WATER

OVERFLOW

IRRIGATION

BORE WELL PUMP

Project User

OVERFLOW

UNDERGROUND CISTERNS TREATED WATER

RAINWATER TANK

About Mount Abu

STORAGE Site Study

Built placement

WTP

DAILY PUMPING

WATER BODY Architectural Design Contents

SLUDGE

COMPOST PIT

OVERFLOW

WATER BODY

Site Plan

Landscape Design

ETP

STORAGE

INTERMEDIATE CHECK DAM

ADJACENT SITE CHECK

TREATED WATER

NURSERIES


Architecture must have enough chaos to merge with nature and enough order to cherish human comfort.

Thank you! END