g GESTURES
gestures
g
2011-2018 / /
TANMAY RAJIV SABHARWAL
COMPLETE ARCHITECTURAL WORKS
organizeddistortion
g GESTURES
GESTURES
05 /
Series of projects displaying most of my architectural capabilities have been displayed in this small work of art named - ’Gestures’.
My interpretation of one of the gravest problems of Mumbai, India - ‘The local Rail transit System’. On a proposed site owned by CIDCO [municipal authority] Bamandongri station, part of a new railway corridor ‘Seawoods - Uran’, set to release the pressure off the existing ‘trans harbour line’
The design of a new skyline to the existing fabric of navi mumbai with two towers that are gonna shine through the seascpe of karave, Navi mumbai
This competition involved designing a mini resort that could incorporate the styles of 2 architectural styles and create a unique blend of its own to surmount the hills of nagpur with a picturesque resort setup. The site faced a valley on one side and the backwaters on the other
Neo-classicism and the step-wells of gujarat have been merged together in the resort
g
Selection of some architectural works from Undergraduate & graduate levels of education..........
03 /
/
/
04 05 /
INDEX
05
/
GESTURES
01 /
02 /
/
GESTURES A RCH ITE CTURA L WORKS
/
Emphasis is on the need to explore ways that could help mimick the essence of the emotions & gestures underlying the dance form.The site is well placed in puerto madero, an upcoming neghborhood in Buenos Aires.
The project involves designing a performing arts theatre that would be responsible to hold events that relate to Tango, the native dance form of Buenos Aires.exerci tation ullamcorper suscipit lobortis nisl ut aliquip ex ea commodo consequat. Duis autem vel
Emphasis is on the need to explore what gives meaning to life beyond a singular spiritual framework. The institute of all seasons Faciity will allow scholar’s, artists, scientists, and otheers from around the world to come together in pursuit of the next revolutionary step in civilization.
/
[ 01]
SCHOL AR’S INCUBATOR
A retreat for scholars aimed at collaborations
[ 02]
PERFORMING ARTS TH EAT RE
Inspired by Dance form -Tango in Buenos Aires
[ 03]
RAIL TRANSIT - IMPETUS
A solution to the congestion of Mumbai rail system
[ 04]
M IX ED - FA M IL Y H O US ING
A small niche living towers in Navi Mumbai
[ 05]
M INI RES O RT
Designing a resort inspired by 2 styles of architecture
organizeddistortion
PROJECT ONE / RETREAT CENTRE FOR COLLABORATION
01 / /
gestures
O
S
L 01 UNIVERSITY OF BOULDER / /
C
SCHOLAR’S
INCUBATOR
A
/ /
02 SERENE FLATIRONS / /
R
BO UL D ER | CO ;
H
INTERACTION
The idea involves bridging the values and expertise of the scholar’s with the infrastructure and brilliance of the university next to the serene location for the Incubator ‘the Flatirons’ ...........
/ /
R RESEARCH
INFRASTRUCTURE
ECONOMICS
SUSTAINABILITY
The Institute would act as a research hubwith the brightest minds shaping the future of humanity
Scholars would discuss futuristic implications of production & services keeping the spirit intact
Project would deal with not mere ideation but also its pragmatic implications
Sustainable measures to induce homogeneity and mitigate damges caused are prioritized
instinctivecollaboration
gestures 02 / / GESTURES
/
project type RETREAT CENTRE FOR SCHOLARS
site BOULDER
|
COLORADO
studio COMPREHENSIVE STUDIO
year FALL
‘17
ARCHED ROOF
01 STRUCTURAL COMPONENT
/ /
TIMBER ROOF
STEEL SECTION
OPEN WEB JOISTS
/
CUSTOM STEEL SECTION
PROJECT BRIEF
I -STEEL SECTION
Architecture has long been concerned with creating structures and spaces for the expression of faith and spirituality. In our diverse ethnic and multi-cultural society, this study aims at designing a facility to celebrate and house a centre of gathering, education and research of humanity’s ongoing quest for religious, artistic, scientific and spiritual interpretrations.
Emphasis is on the need to explore what gives meaning to life beyond a singular spiritual framework. The institute of all seasons Faciity will allow scholar’s, artists, scientists, and otheers from around the world to come together in pursuit of the next revolutionary step in civilization.
LOWER STEEL SECTION
02
MUSEUM GALLERY
SPATIAL COMPONENT
/ /
SCHOLAR HOMES
AUDITORIUM
ENTRANCE PORTICO
CORRIDORS OF INTERACTION
My intent of the program is to develop instinctive saptial organizations that dwell homogenously with the site and encourage interactions & the need for collaboration amongst the scholar’s one, and also with the students........
AXONOMETRIC SPATIAL / STRUCTURAL / /
SCAD /
COMPREHENSIVE STUDIO
FALL ‘17 / /
PROJECT ONE / RETREAT CENTRE FOR COLLABORATION
03 / /
gestures
SCHOLAR ’ S WORKPLACE
SCHOLAR HOUSING
DINING / INTERACTION
RESEARCH CENTRE
INTERACTION WITH SITE
AMPHITHEATRE
SCHOLAR HOUSING
SPATIAL
DISPLAY
ZONAL
DISPLAY
AMPHITHEATRE
ZONE
1
CORRIDOR OF INTERACTION
ZONE
CONCEPTS
2
04 / / GESTURES
A’
SECTION AREA
A’ N
SITE LAYOUT 01
T H I RD F L O O R L AYO U T
/
[ 07]
07
RES EA RCH CENT RE
The symbolic arena used as a gallery.
[ 08]
03_
S ERV ICE/ S TO RAGE
The service station of the entire retreat
[ 09]
09
GYM / RECREAT IO NA L
10
10
Recreatonal arena ahead of the congregation area
08
[ 10]
S CH O L A R H O US ING
Line of housing for scholars aligned down the slope
0
10
20
SCA L E - 1/32”=1’0”
FLOOR LAYOUTS 01 /
legend
PROJECT ONE / RETREAT CENTRE FOR COLLABORATION
SE CO ND F L O O R L AYO UT
05 / /
02_
04
[ 01]
ENT RA NCE L O BBY
02
03
The wide sntrance sloping from the site
[ 02]
AUD ITO RIUM
01
Centrally located gathering arena 0
10
20
FI R S T FL OOR L AYOU T
SCA L E - 1/32”=1’0”
[ 03]
WAY TO CL AS S ROO M S
Flanges that lead to the classrooms for discussions
[ 04]
EX T END ED G A LLE R I E S
Extensions to the corridors of access
[ 05]
AT RIUM
Double-heighted atrium to the space of gathering
01_
[ 06]
INT ERACT ION S TA I RWAY
Seated wide stairway encouraging interaction 05
06
05
06
FLOOR LAYOUTS 02 /
0
10
20
SCA L E - 1/32”=1’0”
legend
instinctivecollaboration
02 / // / GESTURES GESTURES 06
01 /
RES EA RCH CENT RE
A symbolic centre used as research hub & exhibition Galleries
01
SYMBOLISM scholar’s incubator /
instinctivecollaboration
SCAD /
COMPREHENSIVE STUDIO
gestures gestures
FALL ‘17 / /
PROJECT ONE /
RETREAT CENTRE FOR COLLABORATION
gestures
07 / /
SECTIONAL ANALYSIS
/ / The area detailed below is the symbolic gallery that adds a spiritual twist to this incubator that wold help it be witnessed from the city underneath and hence be known for the work it performs worldwide....
EXHIBITION GALLERY
VIEWING GALLERY
LEVEL 2
LEVEL 1
COLLECTING CHAMBER
instinctivecollaboration
gestures
08 / / GESTURES
VENTURI EFFECT
CORRIDORS
CLASSROOMS
SUSTAINABLITY ANALYSIS
/ / The agenda is to guage the sun in the area to generate a flow of air that can be channelized within the rooms for better ventilation.....
01
02
03
BERNOUILLI’S PRINCIPLE
STACK EF F ECT
TROM B E WALLS
Channelizing vertical directions of wind-flow by variations in hot n cold air
A wall on the western sun side to capture the required heat to contol winds
/
Gugaing in the opportunity to variate presurres to direct winds
SCAD /
COMPREHENSIVE STUDIO
/
/
FALL ‘17 / /
PROJECT ONE / RETREAT CENTRE FOR COLLABORATION
09 / /
instinctivecollaboration
A
02
INTERACTION scholar’s incubator /
atrium_ AERIAL VIEW OF THE ATRIUM
02 /
ATRIUM
This double-heighted space acts as the vortex of congregation between scholars & students
A discussion room section
gestures
10 / / GESTURES
01 ACCESS CORRIDORS
02 SYMBOLIC GALLERY
03 ATRIUM ENTRANCE
03 04
SHADES
DISCUSSION ROOMS
scholar’s incubator /
05 HOUSING CORRIDORS
SCAD /
COMPREHENSIVE STUDIO
FALL ‘17 / /
PROJECT ONE / RETREAT CENTRE FOR COLLABORATION
11 / /
instinctivecollaboration
SUNSPACE
STEEL LOUVERS
ANGLED STEEL SECTION
SUPPORT I-SECTION
TROMBE WALLS
BRACED FRAME
CROSS MULLIONS
ANGLED GALZING
RCC FLOOR WEB JOIST BEAM AIR VENTS
ANGLED TRANSOMS
SLITS FOR VENTILATION
LOUVERED INLET
FALSE CEILING
SECTIONAL STUDY 01 /
SYSTEMS ANALYSIS
SYSTEMS + INTEGRATION
The structural family consists of inclined custom sections supported by a cross-bracing system . Floors supported by open web joist beams and have mechanical vents running underneath. Inlets have been placed in a way to channelize the stack effect along the lines of Bernoulli’s principle.....
/ / The main reason of placing a sunspace as an entry point to the classroom was to create the effect of trombe walls resulting in stack effect along the lines of the Bernoulli’s principle................
Incubator, 2017
gestures
12 / / GESTURES SUMMER SUN
SOLAR CHIMNEY
WINTER SUN TROMBE WALL
BERNOULLI’S PRINCIPLE
INLET/ OUTLET
DISCUSSION ROOMS
STACK EFFECT
The main reason of placing a sunspace as an entry point to the classroom was to create the effect of trombe walls resulting in stack effect along the lines of the Bernoulli’s principle................
PASSIVE DESIGN
Sunspaces are used as entrance points to rooms to have access to a longitudinal trombe wall that has access to heat promoting Bernoulli’s principle. The difference in air pressure due to change in temperature induces air circulation and ventilation in the discussion rooms through stack effect.....
Auditorium
Interactive stairway
Atrium
Discussion rooms Scholar Housing
SUSTAINABILITY ANALYSIS
01 /
SCAD /
COMPREHENSIVE STUDIO
FALL ‘17 / /
PROJECT TWO / PERFORMING ARTS THEATRE - [ UNIDAD ]
13 / /
R
organicsimulation
S
Capturing the essence of the gesture has transpired through various realms of nature & man. In the project the stiff elegance of tango is being attempted to mimick in designing a theatre
S
M N
03
R
ARTIFICIAL INTERFACE Forces involved in the burning of an incense giving the effect of organized distortion is analysed
N 01
NATURAL INTERFACE The stiffness in the drop of an ink in water is tried to be micked here in the form of the theatre
R
UNI DAD M
S
@ MADERO
02
HUMAN INTERFACE The seamless gestures captured by man in its sculpting realm have created parallels to the gestures in nature
PERFORMING ARTS THEATRE |
BUENOS
AIRES
|
PUERTO MADERO
INK IN WATER
INCENSE
WET DRAPERY
14 / / GESTURES
/
project type PERFORMING ARTS THEATRE
site PUERTO MADERO
|
BUENOS AIRES
studio DIVERSIFIED STUDIO
year FALL
‘17
01 /
PROJECT BRIEF
mimicking the gestures of tango . . . The project involves designing a performing arts theatre that would be responsible to hold events that relate to Tango, the native dance form of Buenos Aires.
Emphasis is on the need to explore ways that could help mimick the essence of the emotions & gestures underlying the dance form. The site is well placed in puerto madero, an upcoming neghborhood in Buenos Aires.
unidad @ madero
Unidad, 2017
PERFORMING
ARTS
Involves designing a theatre for congregation
THEATRE
GESTURES OF TANGO
Must underline the feelings of the dance form itself FALL ‘17 / /
PROJECT TWO / PERFORMING ARTS THEATRE - [ UNIDAD ]
15 / /
The attempt has been to create a seamless form that twirls n twists in a way that uprises from the land and returns to the same stealthily............
The access to the beautiful form have been revised in a way to take advantage of curves that climb on the structure itself.......
Entrances and exits have been carefully fabricated to have transitions from narrow to wode spaces to create the feeling of awe within spaces....
Curves climb onto the top of the structure and seamlessly have a component merging with the site and creating repercussions on the site too..............
01
02
03
04
INVITING CURVES
ENCIRCLING SPACES
GUIDING ROUTES
AMPHITHEATRE/ PORTICO
SEAMLESS
TRANSITIONS
STRUCTURE
AS
JOURNEY
EXPERIENTIAL ACCESSWAYS
ENTIRE FORM
01
DESIGN PRINCIPLES UNIDAD /
02
ENERGY SIMULATION UNIDAD /
organicsimulation 01
02
/ Rotation
45’
03
/ Rotation
90’
04
/ Rotation
135’
/ Rotation
180’
F IRST F L O O R L AYO UT
16 / / GESTURES
0
10
20
S CA L E - 1/64”=1’0”
01_ 04
06
[ 01]
03
AUD ITO RIUM
Central elliptical arena with a capacity of 1000 people
[ 02]
S ECOND FL OOR L AYOU T
GRA ND P L A Z A
0
10
20
S CA L E - 1/64”=1’0”
Inviting corridor for congregation before any event
[ 03]
[ 04]
EX P ERIENT IA L ACCES S
P RACT I C E T H E AT R E
Encircling corridors taking you over the structure
02_
Hall for prep. for any event at the auditorium
[ 05]
O F F ICE S PAC E S
01
05
Service backing needed to run any amphitheatre of this size
[ 06]
RES TAU R A N T S
02
Giving purpose to the structure when not in use
legend
05
06 /
/ Rotation
225’
SCAD /
DIVERSIFIED STUDIO
Rotation
270’
07
08
/ Rotation
315’
/ Rotation
360’
FALL ‘17 / /
PROJECT TWO / PERFORMING ARTS THEATRE - [ UNIDAD ]
17
01 /
RES TAURA NT S
The encircling corridors house places for ямБne dining restaurants
01 PERIPHERAL CORRIDOR
02 VIEW FROM ENTRANCE
03 /
A ERIA L V IEW
This view descibes the view of the Theatre from the street...........
03 AERIAL VIEW
01
SHADES UNIDAD /
organicsimulation
/ /
18 / / GESTURES
01
01
The curves crop from the site and ends into the site and create respercussions in terms of an amphitheatre..........
The energy in the curves are tried to be continued in the site and can be seen in the pathways encircling the theatre.............
/ /
01
Entrance to the theatre has been designed in a wayy that creates an experience of passing through narrow & wide spaces.....
/ /
/ /
02
04
/
/
ENC I R C LI N G COR R I DOR S
MAIN AUD ITO RIUM
Opposing curves create beautiful gestures and galleries..........
These are the ripples of the energy of the theatre..........
03 /
GRA ND P L A Z A
01
This external plaza acts as a space for congregation.........
/
P RACTICE THE ATRE
This acts as the 2nd theatre to UNIDAD..........
subtleglimpses
organicsimulation SCAD /
DIVERSIFIED STUDIO
FALL ‘17 / /
PROJECT THREE / TRANSPORTATIONAL - [ IMPETUS ]
19 / /
gestures
informednavigation
traffic mitigation
directed navigation
heedto expansion
01
IMPETUS RAIL TRANSIT SYSTEM /
PROBLEM
AVG. DAILY FOOTFALL ABOUT
10 MILLION TRAVELLERS USE
THE SYSTEM DAILY
SCENARIO
PROPOSAL
M UM BA I L OCA L T RA NS IT
P L AT F O RM AS CO NCO URS E
LIFELINE TO THE CITY OF MUMBAI AND
CREATING A BREATHING LEVEL TO
SISTER CITY NAVI MUMBAI
DIVERT PRESSURE
gestures 20 / / GESTURES
/
project type TRANSPORTATIONAL
-
RAIL TRANSIT
site BAMANDONGRI
|
NAVI MUMBAI
studio
/ /
UNDERGRADUATE THESIS
The purpose of creating a concourse was to create a shift of passenger pressure onto a body that acted at a different level yet aided to the functioning of the platform.......
year FALL
‘15
01
BAMANDONGRI CONCOURSE /
concourse_ AERIAL VIEW OF THE CONCOURSE
PROJECT BRIEF
My interpretation of one of the gravest problems of Mumbai, India - ‘The local Rail transit System’. On a proposed site owned by CIDCO [municipal authority] Bamandongri station, part of a new railway corridor ‘Seawoods - Uran’, set to release the pressure off the existing ‘trans harbour line’
CONCOURSE 01 /
UNDERGRAD / THESIS
Impetus, 2015
FALL ‘15 / /
03A
01
PARAPLEGIC ACCESS / /
CIRCULATION CONCOURSE /
All the possible passenger flows on the access concourse bridging the plaform with an escalator....... / /
paraplegic elevator
BRIDGING THE PLATFORM
03 /
All the possible passenger flows on the service concourse....... / /
BRIDGING
PROJECT THREE / TRANSPORTATIONAL - [ IMPETUS ]
All the possible passenger flows on the main concourse including ramp access & access chamber...... / /
BOARDING
SERVICE CONCOURSE
THE CONCOURSE
01 /
02 /
21 / /
UNDERGRAD / THESIS
FALL ‘15 / /
0
10
20
S CA L E - 1:500
[ 01]
RESTING CONCOURSE
Central core of the pavilion used for as waiting area
01 02
[ 02]
CO L O NNA D ED COR R I DOR S
Access corridors for navigating cross-flows
03
[ 03]
A D M INIS T RATI V E OFFI C E
M AI N CONCOU R S E
Centrally situated office spaces for governance
05
[ 04]
RA M P ACCES S
04
Ramps at the portico provide first option of circulation
01_
0
10
20
S CA LE - 1:500
[ 05]
TICKETING ISLAND
Projected islands right at the entrance for ticketing
[ 06]
06
VIE W ING G A LLERIES
Wooden extensions on either sides of the pavilion 07
SIG NA L / TE LECOM. DEPT
Overlooking offices in the level above waiting level
LEVEL PLANS 01
SE RV IC E CON CO U RSE
[ 07]
08
02_
/
22 / / GESTURES
PROJECT THREE / TRANSPORTATIONAL - [ IMPETUS ]
23 / /
SIGNALS
The level housing the signal & controlling dept. due to its overlooking position on the platform........ 01
/ /
CAFETERIA
GALLERIES
/
SERVICE CONCOURSE
CORRIDOR
ADMIN OFFICE
PAVILION
The core of the concourse that acts as a resting platform before boarding the train........... 02
TICKETING
PORTICO
/ /
/
ISLANDS
RESTING CONCOURSE
ACCESS RAMPS
The bridge between the platform & the concourse to guide the passenger traffic along the platform.... 03
AISLES
ACCESS ZONES
/ /
/
ACCESS CONCOURSE
3-TIER CONCOURSE
spaces zones
STRUCTURAL ANALYSIS
01 /
24 / / GESTURES
LEVEL PLANS 02 /
0
10
20
S CA L E - 1:500
[ 01]
INSPECTION GALLERIES
The overlooking galleries that direct passenger traffic 01
03
[ 02]
ENCL O S ED GALLE R I E S
The galleries that act as viewing diaplays
[ 03] ACCES S CONCOU R S E
H A ND ICA P P E D LI FT
04
The 2nd point of circulation right at the entrance
[ 04]
ACCES S ES CAL ATOR S
02
The escalators that bridge the concourse with the platform
03_
UNDERGRAD / THESIS
01
03
02
04
FALL ‘15 / /
PROJECT THREE / TRANSPORTATIONAL - [ IMPETUS ]
25 / /
informednavigation
/
project type TRANSPORTATIONAL
-
RAIL TRANSIT
site BAMANDONGRI
|
NAVI MUMBAI
studio UNDERGRADUATE THESIS
year FALL
‘15
The essence of a station body so flexible that any future advancements wouldn’t hamper the current functioning of the rail network. A platform crafted from function, aiming at easy paseenger flow, no cross-flows & minimalistic options for passenger travel.....
gestures 26 / / GESTURES
/ /
Ideal purpose aimed at was to mitigate issues of cross-flows and to maximise ease of passenger navigation keeping in mind the huge travel distances.....
01
BAMANDONGRI PLATFORM /
platform_
informednavigation
AERIAL VIEW OF THE PLATFORM
PROJECT BRIEF
My interpretation of one of the gravest problems of Mumbai, India - ‘The local Rail transit System’. On a proposed site owned by CIDCO [municipal authority] Bamandongri station, part of a new railway corridor ‘Seawoods - Uran’, set to release the pressure off the existing ‘trans harbour line’
PLATFORM 02 /
UNDERGRAD / THESIS
Impetus, 2015
FALL ‘15 / /
PROJECT THREE / TRANSPORTATIONAL - [ IMPETUS ]
PL ATF O RM L AYO UT
27 / /
5A
[ 01]
E ND STATION
01
02
4A
01_
Either side of the island responsible for aligthing
03 06
04
[ 02]
ISL A ND STATION
The central part of the unit that is responsible for boarding
02
2A 1A
01
[ 03]
CE NTRA L OF F I CE
05
The office space at the junction of 2 ends
G A LLE RY SPACES
These spaces align across the basement of the office space
FLOW THROUGH S U BWAY L AYOU T
[ 07]
MECHANISM /
[ 08]
5A 4A
RA MP F ROM OFFICE
Encircling spaces on either ends of the offcie
02_
2A 1A
All the possible passenger flows on the island and end stations......
Describes the journey of a typical passenger who alights at the end station and moves towards subway....
/ /
informednavigation
/ /
BOARDING
SUBWAY
ALIGHTING
EGRESS
01 /
02 /
gestures 28 / / GESTURES
0
10
20
S CAL E - 1:500
5B 4B
2B 1B
[ 04] 0
10
20
S CA L E - 1:500
S TA IRS TO S UBWAY
The bridge between the platform n site
[ 05]
IM M ED IAT E EGR E S S
5B
Stairs leading you outside the station from end stations
4B
09
[ 06]
07
CO NT RO L ROO M
08
stations at either ends to control trains 09
2B
[ 09]
1B
10
S UBWAY ACCES S
Corridors of acess of the subway beneath the platform
10
[ 10]
IM M ED IAT E EGR E S S
The illustration diplays the provision of immediate egress routs on end stations that are facilitated by ramps...
DIRECTED / INFORMED
Bridge between the subway and the site
CIRCULATION /
/ /
IMMEDIATE EGRESS
01
03 /
CIRCULATION PLATFORM /
UNDERGRAD / THESIS
FALL ‘15 / /
PROJECT THREE / TRANSPORTATIONAL - [ IMPETUS ]
29 / /
informednavigation
GLAZING
Aluminium pre-cast keel arches topped with pvc panels and glazing are te main components..... 01
/ /
SHEETING
STEEL ARCHES
/
ARCHED ROOFING
OFFICE
Platform body of 5 curvilinear stations made to avoid accidents.....
EGRESS RAMPS
ISLANDS
END STATION
02
/ /
/
PLATFORM BODY
GALLERIES
Core beneath the office space adjoined with 2 flanges of cooridors of access that help you exit........... 03
CORE
FLANGES
/ /
/
SUBWAY BODY
3-TIER CONCOURSE BODY spaces zones
STRUCTURAL ANALYSIS
01 /
gestures 30 / / GESTURES
END B Future expansion
ISLAND COMBINED END A present station body
ISLAND END
The mechanism opted here is that of curvilinear stations patched today in linear combinations.....
01
02
03
03
02
01
[ 01]
ACCE SS CORRIDORS / GALLERY
0
OFF I CE SPACE L AYOU T
The overlooking galleries from the office space
10
20
S CA LE - 1:00
[ 02]
ACCE SS RA MPS / SUBWAY
DETAILS
Ramps encircling an ellipse bridging the subway
03
[ 03]
ACCE SS RA MP / OFFICE
Ramps encircling a ellipse bridging the office...
/
/
The image shows the core of the subway housing the galleries and tagged on either ends by 2 corridors of egress that connect to the site........
The image displays the core of the corridor that has flights of stairs from the platforms above connecting the platform to the site.........
SUBWAY AXON VIEW
CORRIDOR OF EGRESS
/
01
02
/
/
legend UNDERGRAD / THESIS
FALL ‘15 / /
PROJECT THREE / TRANSPORTATIONAL - [ IMPETUS ]
31 / /
01 AERIAL VIEW
LONGITUDINAL VIEW
01 02
/
P L AT F OR M
The images on the left depect various shades of the platform at Bamandongri ........
HORIZONTAL VIEW
03
01
PLATFORM VIEWS impetus rail transit /
informednavigation
gestures 32 / / GESTURES
02
Passengers are seen boarding at the island station...... / /
SHADES impetus rail transit /
01 ISLAND STATION
Passengers are seen alighting at the end station...... / /
02 END STATION
Central office space at the junction of 2 end stations..... / /
03 OFFICE SPACE
All the egress points from the end station including egress from the subway...... / / impetus_ AERIAL VIEW OF THE PROJECT
04 END STATION EGRESS
05 EGRESS RAMPS
shades
UNDERGRAD / THESIS
FALL ‘15 / /
PROJECT FOUR / MULTI-FAMILY REISDENTIAL - [ INERTIA ]
33 / /
gestures / /
The planning mainly involved catering to the F.S.I and making sure that we maximise the permissable areas provided and don’t lose out on the super Built up much.........
I N E R T I A //
housing
mass housing_ AERIAL VEW OF PROJECTED SKYLINE
PROJECT BRIEF
The project delves into a farsighted approach of shaping the vibrant cityscape of the twin sister city of Mumbai ‘Navi Mumbai’. Possesing a nominal FSI of 2.5, the task was not only to furbish the skyline, but also to rehabilitate the Gaothan population native to the area
Inertia, 2013
MASS HOUSING 01 /
34 / / GESTURES
TY PIC AL F L O O R L AYO UT
[ 01]
L IV ING ROO M
0
10
20
Accessed through an entrance corridor
S CA L E - 1:200
[ 02]
M AS T ER BED ROOM
01_
05
peripheral views with ana attched bathroom
04
03
[ 03]
K ITCH EN
01 02
u-shaped islands aligned with the dining
06
[ 04]
S ERVA NT ’S QUA R T E R
Separate access area adjacent to the entrance porch
IXORA APTS. 4 BHK
[ 05]
/
BUIL D ING L O BB Y
Central lobby area with 4 elevators
/
IXORA APTS.
[ 06]
4 BHK
Views displaying structural and aesthetic aspects of the first 4 BHK Building component- Ixora....
/
INT ERM ED IAT E G A LLE RY
Central refuge area used as an observation gallery
GROUND/ AERIAL VIEWS
02 /
01
/ /
/
REFUGE GALLERIES
COLUMNS AS FACADE
CORNER GALLERY
Structural columns used as aesthetic members to enhance the one-dimentional facade...
/
project type MULTI - FAMILY HOUSING
site KARAVE
|
NAVI MUMBAI
studio IXORA APTS. 4 BHK /
TECHNICAL DESIGN STUDIO
year FALL
UNDERGRAD / DESIGN STUDIO
‘13
FALL ‘13 / /
PROJECT FOUR / MULTI-FAMILY REISDENTIAL - [ INERTIA ]
TY PIC AL F L O O R L AYO UT
35 / /
[ 01]
L IV ING ROO M
Accessed through an entrance corridor
[ 02]
M AS T ER BED ROOM
02_
peripheral views with ana attched bathroom
06
[ 03]
04
05
K ITCH EN
u-shaped islands aligned with the dining
01 02
[ 04]
03
GUES T BED ROO M
Additional room accesed right in the entrance for privacy
0
10
[ 05]
20
UT IL IT Y GA L L ERY
SCA LE - 1:200
An extension used for utility purpose in the duct area FIONA APTS.
[ 06]
3 BHK
/
/
BUIL D ING L O BB Y
Views displaying structural and aesthetic aspects of the 3 BHK Building component- Fiona....
GROUND/ AERIAL VIEWS
Central lobby accessed through stairs n 3 elevators
02 /
01 /
REFUGE GALLERIES
COLUMNS AS FACADE
/ / CORNER GALLERY
Structural columns used as aesthetic members to enhance the one-dimentional facade...
FIONA APTS. 3 BHK /
FIONA APTS. 3 BHK /
36 / / GESTURES
The juxtoposition of the servant’s quarter across the lobby sharing access with the outside lobby and entrance of the house adds purpose....
01
The corridors have been designed in a way that use minimal space and give most of the area in the spaces of the house to save on the permissible FSI..... 02
The Guest room has been placed cleverly at the start of the house in a niche that is seperate from the house to maintain privacy............
03
The utility space is cleverly designed in the negative niche of the houses that does not conflict with any of the visible facade of the building...........
04
SERVANT’S ACCESS
01
MINIMAL COORIDORS
02
FURNITURE LAYOUT IXORA /
GUEST ROOM
03
UTILITY GALLERIES
04
FURNITURE LAYOUT FIONA /
UNDERGRAD / THESIS
FALL ‘13 / /
PROJECT FIVE / HOSPITALITY - [ TOPAZ ]
37 / /
/ /
The purpose of the charrette was to design a resort inspired by 2 Architectural styles, to generate a new langugage that induces harmony and balance between the two...
NEO-CLASSICAL DOME
T O P A Z/
COLONNADED GALLERIES
STEPPED WELL - ‘WAW’
/
resort
resort_ AERIAL VIEW OF THE CONCOURSE
PROJECT BRIEF
Sitting quietly upon a flat plateau overlooking the valley brimming with Vaitarna Dam backwaters, the site provided an excellent setting for a picturesque resort with about 100 rooms, restaurants, convention centres, galleries etc..........
RESORT 01 /
Topaz, 2014
38 / / GESTURES
/
project type
01
HOSPITALITY
/
site
NEO-CLASSICISM
VAITARNA
|
MUMBAI
studio
2
WEEK LONG COMPETITION
year FALL
‘14
STEPPED WELLSWAWS
02 /
The merger of styles brings about a unique blend of architecture that takes advantage of the virtues of both realms and creates an identity of its own that is surely one of its kind...........
UNDERGRAD / COMPETITION
FALL ‘14 / /
PROJECT FIVE / HOSPITALITY - [ TOPAZ ]
39 / /
[ 01]
3
6
DOMED PORTICO
Neo-classical part of the resort acting as entrance lobby
4
[ 02]
2
S T EP -W EL L COR R I DOR
Descending levels of steps act as access to rooms
4
[ 03]
3 1
RES O RT ROOM S
1
Situated at an angle to take advantage of the view
5
[ 04]
5
CO L O NNA D E D G A LLE R I E S
Stepped galleries aligned with columns like in the Waws
[ 05]
A RT GA L L ERI E S
Rooms for exhibitions & displays
FIRST FLOOR
0
LAYOUT
10
[ 06]
20
CO NF ERENC E H A LLS
Areas used to hold conference meetings
S CA L E - 1:200
/
/
/
The Neo-classical part of the project acts as the entrance portico or the lobby for the resort having encircling galleries & double-heighted corridors.....
This path of descending levels that take you to a journey of experiencing nature around an enclosure, makes the space one of its kind......
DOMED PORTICO
STEPPED WELL
01
02
/
/
40 / / GESTURES
[ 01]
STEPPED WELL PATH
6
2
4
Stairway bridge between levels that enhance experience
3
1
[ 02]
ACCES S CO R E S
2
Access chmabers that take to to different levels
6 4
[ 03]
5
S T EP P ED W E LL COU R T
Central courtyard to enhance public gatherings
2 4
[ 04]
CO L O NNA D E D COR R I DOR S
1
3
Corridors mimicking the Waws of the step wells
[ 05]
2 4
RES O RT ROOM S
Rooms taking advantage of the views
SUB-FLOOR
0
LAYOUT
20
/
/
The rooms are placed at an angle to guage the views of the valley and the stream underneath. To the ones that are perpendicular have angled fenestrations....
These galleries are important aspects of the resort design where a person enjoys the view being amidst a masonary structure yet essence of being in touch with nature..........
ANGLED FENESTRATIONS
COLONNADED GALLERY
[ 06]
CO L O NNA D E D G A LLE R I E S
Ending galleries that act as great points for obsevation
S CA L E - 1:200
/
UNDERGRAD / COMPETITION
10
03
04
/
/
FALL ‘14 / /
PROJECT SIX / NATIONAL OLYMPICS STADIUM - [ PROTOTYPE ]
41 / /
reactivemodularity
‘thesis honor award’ SAVANNAH CHAPTER
THE AMERICAN INSTITUTE OF ARCHITECTS - AIA
spring 2018
06 /
GRADUATE THESIS
Reimagining Sustenance | Olympic Stadia comparitive A N A LY S I S
RIO DE JANERO 2016
$QDO\VLQJ WKH HƪHFWV
olympic causes assesment
MANAGEMENT
of deterrents on one another micro A N A LY S I S
7KH UHVXOW RI D PDPRWK GLVWULEXWLRQ RI SRZHU DPRQJVW WKH ,2& RƯFLDOV LQ WKH YHU\ JDPHV DW $WKHQV
ER
W
O FP
O
IN VE ST M EN T
N
SIO VI DI
E
TIME
REVENU
CAUSES
FIN
AN
CIN
G
80%
HIS
STA
DIA
Y TOR
TR
AN
SE
SP
RV
OR
IC
T
ES
CY GA LE
50%
45%
75%
EFFECTS
RIO DE JANERO 2016
ENVIRONMENT
Lore m i p sum dolor si t ame t , con secte tue r adi p i sci n g e l i t , se d di am n on ummy n i b h e ui smod ti n ci dun t ut laore e t dolore magn a al i quam e rat vol utp at .n i sl
SOCIOLOGY
Lorem ips um dolor s it amet , cons ect et uer adipis cing elit , s ed diam nonummy nibh euis mod t incidunt ut laoreet dolore mag na aliquam erat volut pat .nis l
INFRASTRUCTURE
ECONOMY
Lorem ipsu m dolor sit a met , consectetu er a dipiscing elit , sed dia m nonu mmy nibh eu ismod tincidu nt u t la oreet dolore ma gna a liqu a m era t volu tpa t .nisl
Lorem ipsu m dolor sit a met , consectetu er a dipiscing elit , sed dia m nonu mmy nibh eu ismod tincidu nt u t la oreet dolore ma gna a liqu a m era t volu tpa t .nisl
42 / / GESTURES
reactivemodularity 02
01 01
THE RETRACTION / VERSIONS
02
05
03
COMPLETE OLYMPIC / BOWL
PARTIALLY RETRACTED / BOWL
COMPLETELY RETRACTED / BOWL
The natural version of the Bowl when it takes its full shape during the ocassion of the Games..........
7KH ERZO VKHGV LWV ƬUVW OD\HU RI WLHU WR FRQWUDFW into a much smaller bowl with 2 Tiers..........
The bowl then sheds its second layer of tier to contract into a its smallest retracted form with just a permanent level left...
DISMANTLABLE TIERS / PROGRESSION
05
The progression displayed here depicts the process of dismantling each tier of the upper extension ..........
FLEXIBILITY
ALL 3 TIERS INTACT
UPPER EXTENSION /
The ability of the individual stadia sector to deconstruct and construct within limited period of time makes it a viable option.........
TIER 3 TIER 2
VERSIONS OF RETRACTION
TIER 1
Can Architecture be by any means, a response to the ubiquitous ambiguity or underlying discrepancies that are known to crumble developing economies, uproot flourishing neighborhoods and hinder any possibilities of future growth for cities that host the big event - ........
CAPACITY - 60,000
CAPACITY - 35,000
CAPACITY - 15,000
01 01 COMPLETE BOWL
TIMBER
JOIN
DOVETAIL JOINT
7.5 M_
01
01
BOWL IN PLACE
02
REDUCING HEIGHT
7.5 M_
03
02
03
03
01
02
SLIDING BOWL
CONTRACTED SKIN
15 M_
PARTIAL RETRACTION
TIER 3 DISMANTLED
COMPLETE RETRACTION
TIER 2
BOWL SLIDES IN HEIGHT
PROCESS OF RETRACTION
TIER 3
TIER 1 01
01
SECTOR STATS
02
PREPARING SLIDE
INITIATING PUSH
SLIDING SKIN
INITIATING PUSH
TIER 2
PUSH
FURTHERING PUSH
CAPACITY The locks along the Web joists are released to let the skim skim down.........
TIER 3 - 800 TIER 2 - 700 TIER 1 - 500
The shutters are unlocked from the guides and force along the direction inwards..........
The thin envelope skims along the channels provided by the steel Web joists..........
/ /
The shutters are unlocked from the guides and force along the direction inwards..........
/ /
/ /
SOLAR SENSITIVE MEMBRANE
The need for complete retraction is gained by pushng the shutters to its farthest extreme - 15 m ..........
/ /
/ /
MANOUVERING SHUTTER
FLEXIBLE CIRCUMFERENCE
100 %
04
02 PARTIAL RETRACTION 01
&KQDJLQJ FDSDFLW\ IRU GLƪHUHQW VL]HG stadiums has been an ever-lasting need for any national stadium..........
SUSTENANCE
01
03
02
STADIUM ENTRANCE
DECONSTRUCTION AXON.
AQUACULTURE
ENTRANCE TO AQUA.
UPPER BOWL EXTENSION
PURPOSE OF RETRACTION
statistics
MULTIPLE EVENTS
/ /
$IWHU HQWHULQJ WKH VWDGLD ƮLJKW RI stars take you beneath to a level that houses the viewing gallery for aqua centre..........
Obscure entrance to the level lower tier that takes you up into the top levels with ease..........
Taking adavantage of the +UDYHVWHG ZDWHU WR FKDQQQHOL]H aquatic life for culturing..........
TIER 2 DISMANTLED BOWL SHRINKS
TIER 1
SOCCER TRACK N FIELD
/ /
SECTIONAL / SIGNIFICANCE
RUGBY TENNIS
/ /
The juxtaposition of the stadium to a subtle slope in a way that helps you access the lower bowl of the stadium seamlessly due to its inclined access proves to be a innovative solution to the accessibility for such huge infrastructure ..........
01
REDUCING HEIGHT
The purpose of juxtaposition stems from the urgent need to create seamless accessible experience for the paraplaegic in such massive architectural boulders........
OLYMPICS
03
PUSH
PUSH
Rainwater Harvesting in Circumscribing Trench
01 PREPARING SLIDE
03
Juxtaposition to a slope
COMPLETE RETRACTION
reactivemodularity
01
INSTALLATION SCHEMES
ADAPTIVE
LEGACY PROPOSAL
STANDING GALLERIES
01
01
02
/
The purpose of creating a central installation body that changes with time is so that the stadium has the ability to react to the need of the hour and respond adequately.......
Reviving a new way to encounter experience through standing Galleries.........
Solar powered membrane to guage in solar energy for power generation.........
02
These perforated membrane like skin acts DV VHDPOHVV FURVVƮRZV IRU ZLQG ZKLOH harnessingsolar power through built in panels..........
100 %
SUSTENANCE
LEVITATING STAGE
LEGACY PROPOSAL SCHEME
Unshrunk bowl
SOLAR SENSITIVE MEMBRANE
/ /
01
The venue can hold a number of sporting HYHQWV IURP VRFFHU WUDFN Q ƬHOG DPHULFDQ football..........
$
REVENUE GENERATOR
PART BOWL
The bowl houses the standard dimensions for amjority of the / / VSRUWLQJ ƬHOG HYHQWV
/ /
The 4 processes highlights the stages involved in th etransformation of the Bowl into its smaller version..........
RETRACTABLE
MULTI-EVENT VENUE
The locks along the Web joists are released to let the skim skim down.........
THE RETRACTION / PROCESS
/ /
/ / 02
04
Flexibility with various sports
Alternating Installations
INSET GALLERY
AQUACULTURE/ AQUARIUM
The events in the central bowl change and give rise to a memoir museum, aquaculture, & concert hall.........
Creating a safe niche for aquatic life to breed and culture and then use it for public access can genrate revenue..........
PERENNIAL USAGE
BRACED ROOFING
/ /
20 EVENT OVER
S
GENERATING ENERGY SUPPLY BACK TO GRID
VENUE
02
Using available energy source to feed the immediate neighborhood with with portable water.........
The bowl houses the standard dimensions for amjority of the VSRUWLQJ ƬHOG HYHQWV
SOLAR MEMBRANE
/ /
SOCCER
01
TRACK N FIELD RUGBY
BRIDGE NETWORK ON TRENCH
TENNIS
01
PROMENADE
PRESENT BOWL OF THE GAMES ENTIRE BOWL
An array of bridges are aligned atop the trench on the circumference of the Bowl..........
/ / SHUTTER
/ /
02 CONTINUING CANOPY
The landings from each sectors continue to the outer rim regions acting as canopy for thep promenade ...........
LEGACY INSTALLMENTS
LEGACY INSTALLMENTS
/ /
TIMBER COVERING
SLIDING COVERS
BRACED ROOFING GRID
VIEWING GALLERY
01
REVISITING
MEMOIR
02
SUPPLY CHANNELS
BIOME The extensive rims are used as pedestrian jogging tracks & walkways..........
TEMPORARY
01
AQUA POND
PEDESTRIAN PROMENADE
HARNESSING
TEMPORARY
RETAINING WALLS
03
03
02
SUB - STRUCTURE
03
SUPER - STRUCTURE
REPLACEMENT - STRUCTURE
AQUACULTURE/ AQUARIUM
REVISITING MEMOIR
HARNESSING A - BIOME
Taking advantage of the natural resource of rainwater and channelizing future revenue streams..........
Relive the magic of the history of the Games in this memoir installation that could be the most popular revenue stream after the games..........
The last use of the area that the bowl captures into a energy producing Biome..........
AQUACULTURE
HARVE RAINWA
PERMANENT
Demand for fish growing
Reducing footfalls into stadiums
02
$50 mil.
01
PROFITABLE VENTURE
The purpose of creating a central installation body that changes with time is so that the stadium has the ability to react to the need of the hour and respond adequately.......
Using existing resource
An added source of revenue generation that takes advantage of the cllected water through aquacul-
/
78 % VENUES DESERTED
/ /
Using the catchment area to house and produce portable water
FREE
REVENUE SOURCE
TICKETS/ BUSINESS
02
Adequate Surface Area
Central Museum
Green-house enclosure
2080
Museum of memories from the games of this season and from history..........
Vegetative enclosure
GREEN-HOUSE ENCLOSURE
RELIVE GAMES RELIVE PLAYERS
/ /
The memoir acts as a tribute to the players and the sporting nations to have an occasion to relive the games..........
CONSISTENT REVENUE STREAM SPIRIT OF GAMES
/ /
The area houses vegetation nad uses solar power to cultivate green-house gases.........
01
DEPLETING RESOURCES
/ /
Opportunity to synthesis wn biome using dolar casings and creating a green-house dome
General inun of the slopin of the natur direct.........
/ /
The area is deserted an responds well to the created installation by creating an energy Biome..........
/ /
2030 dem supply
/
/
NATURAL RESOURCE
Lack of Land-mass for building Biomes
01
Reaching the neighborhood
Distributing water channels to neighborhoods in the form of pure portable water
TICKETS
INTACT
CONSISTENT REVENUE STREAM SPIRIT OF GAMES
TICKETS
INTACT
03
40-5
SAVE ON WATER BIL
The conserve FDQ DPRXQW LQ D VPDOO WR by 50 %........
LEGACY SCHEMES
/ /
ADAPTIVE REUSE OF THE INNER BOWL / /
present
immediate future
far in the future
04
TIMBER SHUTTER
/
BRACED CURVED BOWL
GUIDE RUNNERS
project type TIMBER OVER STEEL
RAPID ASSEMBLY/ DECONST.
The contrast between two counterparts emerging in the Building industry has been addressed well and analysed..........
The ability of the mechanism to dismantle individual sections of the tier makes it a vital aspect for multi-valency.........
80 %
THE SLIDING / MECHANISM
100 %
studio
SUSTENANCE
FASTER TO CONST.
MECHANICS OF SLIDING
LIGHTER, STABLER
4 TIMES
TIMBER USAGE
CROSS LAMINATED TIMBER
superior insulation
CHEAPER.
SUSTAINABLE
6 TIMES
OLYMPIC NATIONAL STADIUM
The natural sliding mechanism involves a joint between curved bracing and shutter along a timber guide..........
low CO2 emissions
GUIDE RUNNERS
GRADUATE THESIS
year
NERY
SPRING
PERFORATED MEMBRANE
‘18
CURVED WEB JOISTS
CENTRAL AISLE
FLIGHT OF SEATS
LANDING
TIMBER NETWORK / STRUCTURE
TIMBER SHUTTER TIMBER RAFTER BEAMS
2ND FLIGHT OF SEATS
The timber structure network involving the a series of joinery to aid to the gentle slide -in of the stadium bowl..........
BRACED COLUMN SUPPORT
SUPPORTING ANGLE
05
BOWL TIMBER MEMBER
PERFRATED MEMBRANE
EXTENDED BEAMS
FLIGHT OF ACCESS STAIRS
NAVIGATING RAILS
04
03
CONTRACTED SKIN
COMPLETE RETRACTION
SLIDING BOWL
04
03
02
FURTHERING PUSH
INITIATING PUSH
SLIDING SKIN
The thin envelope skims along the channels provided by the steel Web joists.......... / /
MECHANICS OF STRUCTURE
02
The shutters are unlocked from the guides and forcedalong the direction inwards..........
The need for complete retraction is gained by pushing the shutters to its farthest extreme - 15 m .......... / /
/ /
PUSH
VENTILATING LOUVERS
01 AERIAL VIEW
Bowl as an Energy Generator
The aerial display of the olympic stadium with all its tiers intact...stadia in its complete form.... /
synthesizing solar power
SOLAR SENSITIVE MEMBRANE
NAVIGATING SHUTTER
01 GRAND STADIA CENTRE OUTER SKIN OF THE BOWL / /
The entire bowl has been divided into 2 basic systems - one lower permanent bowl and the other a retractable upper 2- tiered bowl..........
03
harbouring aquaculture
STRUCTURE STRUCTURAL ANALYSIS
G
01
/
S
STRUCTURAL
The axonometric display describes the layers of structure and individual members that make uo the entire stadia..........
ANALYSIS
TEMPORARY / PERMANENT
D
ALTERNATING INSTALLATIONS
Y
The central curves crop installation from theis site bound and ends to change into thewith site and respect create to the arising respercussions need of the in terms hour of an amphitheatre.......... ..........
S
D
S
06
01 ENCIRCLING BOWL
underground supply channels
The outer aesthetic component givingit the shape of a bowl with arched round members..........
/ /
02
/ /
ESTING WATER
CHEAP INSTALLATION LOW MAINTENANCE
ndation around the periphery ng lands to take advantage ral gradient of the slope to
$500 1000 L.
TIER 3 TIER 2
03
The upper extension of the bowl that is temporary and can be removed once the event is done.......... / /
TIER 1
The permanent strata of the stadium that stays intact in the sloping land to organize events of smaller scale......... / /
ENCIRCLING PROMENADE
ILLS
ed water harvested WR D PDMRU GLƪHUHQFH RZQ ZLWK GƪHUHQW ELOOV ...
Encircling promenade acts as the outer rim here giving ample room for pedestrian usage..........
05 UNDERLYING TIMBER STRUCTURE
TAKING ADVANTAGE OF NATURAL GRADIENT
Sustenance | Olympic Stadia
LOWER PERMANENT BOWL
LOWER TIER BOWL
TRENCH
Reimagining
UPPER TIERED BOWL
04
STADIA
mand outstrips
50 %
UPPER TEMPORARY EXTENSION BOWL
HOLDING SHUTTER
The timber shutter mechanism that brought the bowl near the ƬHOG DIWHU WKH PDLQ HYHQW RU during small events..........
100 %
The dismantlable timber structure that supports the upper extension of the bowl..........
SUSTENANCE
/ /
01 MEMBER ANALYSIS AXON. TEMPORARY/ PERMANENT / /
REGULAR USAGE Framer’s market and jogging tracks ensure usage
comparitive A N A LY S I S
the issue
Reimagining Sustenance by Reinventing Purpose
ENVIRONMENT
Amount of Waste (Tonne.)
28,500 No.
Air Travel
36,00,000
&2 2ƪVHW 2
impacts
Returns Impact on GDP
7,20,000 2,500 30,000
6000
0
23,500
Athens
2700
29,500 GW
Beijing
15,00,000
ECONOMY
Gross Investment
Seoul Barcelona Atlanta
Food
Beijing
displaced
Sydney
Fuel Electricity
No. of people
17,000
Waste
‘In 2016, rio the FDUERQ RƪVHW IURP WKH VWDƪ DQG DWKOHWHV from the events alone is known to be about 36,00,000 not even counting the millions of visitors
SOCIOLOGY
‘In 2014, a decade from the Games, Athens sees itself caught in an unprecedented debt of a whopping US $465 Billion.
RETURN TO INVESTMENT
Athens
US $ 42.3 Billion
US $ 11 Billion
US $ 146 Million
US $ -14.5 Billion
nearly nothing
US $ -14.5 Billion
Olympics A Hindrance or an Impetus ?
g GESTURES
g GESTURES
gestures
g
THANK YOU
COMPLETE ARCHITECTURAL WORKS
organizeddistortion