BBRE

Page 1

www.bbre.com.tr



About Us Rüzgar türbini kule parçaları alanında faaliyet gösteren BARGA BAYRAMOĞLU RÜZGAR ENERJİSİ ÜRÜNLERİ ÜRETİM SANAYİ VE TİCARET ANONİM ŞİRKETİ (B&B Renewable Energy) İspanyol Industrias Barga SL ile BAYRAMOĞLU A.Ş ortaklığında 28.05.2018 tarihinde kurulmuştur. B&B Renewable Energy Barakfakih (Bursa / Turkey) Organize Sanayi Bölgesinde 5.000 m² açık alan ve 10.000 m² kapalı alandaki üretim tesisinde Temmuz 2018’de üretime başlamıştır. B&B Renewable Energy; tecrübeli ortakları ve tecrübeli personeli sayesinde enerji sektöründe müşterileri, çalışanları ve hissedarlarının beklentilerini en üst seviyede karşılamayı hedeflemektedir.

www.bbre.com.tr


Our Values Ob Security To Be Fair Humanistic Approach Trust Quality Security Instant Development and Innovation Solution Oriæented Customer Satisfaction Just In Time Sustainable Growth Team Work Agility

Our Mission In the sectors in which we operate, B&B Renewable Energy customers, employees and shareholders with respect to the individual and society, law, economic and moral principles, heaælth, safety and enviroment are sensitive to the expectations of the highest level.

Our Vision Ensuring continuity as a sector leader with service and æ quality.



Quality Policy

Enviroment Polic

B&B Renewable Energy is commited to provide good quality products and services to it’s customers. We continuously review the quality management system for the following reasons and continuously make efforts.

Enviroment is seen as a much valuable treasure by B&B Renewable Energy and we believe that we should protect our environment to provide life of good quality which is our valuable inheritance for future life. For this reason; B&B Renewable Energy has adopted the innovative and sustainable environmental approach in its operations.

To supply our best quality products stably to our customers. To adapt to the ever changing customers’ needs by enhancing our skills. To set systems and procedures for continuous improvement and comply to them. To maximize customers satisfaction.

In order to fulfill its responsibilities towards the environment, B&B Renewable Energy is commited to; All enviroment -related laws should be complied with, at the same time customers’ requirements should be met All our stakeholders particularly our staff and suppliers, should be trained accordingly. Productive usage of our resources should be conducted. The environmental risks should be identfied and managed.

To build the trust from our customers. To ensure safe and healthy workplace enviroment for our employees. It is an exemplary organization that fulfills its legal obligations.

The environmental awarenessand information sharing for purposes of social development should be supported. Continuous improvement should be provided.



Our Management Policy We estipulate; To give importance to human being and development of human being, To do the right job “in the first time, each time and on time” by creating a positive communication inside the company, To enable continuity in product and serving quality by understanding the expections of the customers right and answer them, To protect the security of life and property of not only our staff, but also our suppliers, customers and all partners in our activities and for this reason to create and continue an active JHS system, To control all the waste which can treat environment and nature negatively, to educate our staff for this aim, to create an image of “a company which is beneficial for environment and public” and strengthen it, To develop the management system all the time by adapting technological developments in our field to our process.



Field Of Activities STEEL CONSTRUCTİON BAYRAMOĞLU AŞ has the capacity of processing 400 tones per month in 3000 m2 covered area with expertise staff who has skills to solve the problems, with management staff who answer the problems rapidly, with references which lead the sector and with a half-century experience. Some of our basic activities in the field of steel construction; Designed and Production of Steel Construction Designed, Building and Installation of Industrial Plants Designed and Productions of Steel Pipe Bridges Steel Construction Works of Industrial Purification Plants



Energy The raising costs of fossil fuel in the world and in our country clear the way for fast developing wind energy sector. Our company has been succesfully making the production of steel, stainless steel and aluminum products for all the welded and weldless external and internal parts of wind tribunes of big companies such as Gesbey-Gestamp, General Electric, Vestas, Alstom, Nordex which have many activities worldwide and lead energy sector. Our company produces and welds internal and external parts of the wind towers in the scope of *EN1090-1 EXC3 - *EN 1090-2 EXC3 Quality certificates. Besides, our company succesfully delivered steel construction production and installation works in natural gas cycle plants of some national companies such as Zorlu Enerji A.Ş, Bosen Enerji A.Ş, PETKİM A.Ş. Our activities in the field of energy; Production of Wind Towers Platform Steel Construction Works of Natural Gas Cycle Plants Tribune Buildings Pipe Bridges Liquid LPG Tanks Waste Gas Chimneys Production and Installation of Steel Construction for Other Energy Plants As BAYRAMOĞLU AŞ. our aim is to raise the market share and competitive capacity of the company by producing high quality products to answer all the needs of our customers which are leaders in energy sector and by steel production systems with innovative activities.



Welder Production BayramoÄ&#x;lu AĹž has a worldwide success in welded production which is the basic activity of the company. There are 20 gas metal arc welding machines. 20 rectifier welding machines, 2 automatic submerged arc welding machine and many helping hand-held devices in the company. Our company has taken part in many different projects in the country and abroad and completed successfully the projects such as; Crusher Chassises Production of Bunkers Bridges of Gantry Cranes Productions of Cement Silo The Chassis of the Machines Bitumen Tanks for Asphalt Plants Pressured Containers



Flow Chart With the idea of high traceability and satisfaction for both sides, the demands taken from our customers analyzed by our experienced engineers with their projects and transformed into MPP (Manufacturing Process Plan) version. With the aim of reaching high quality and customers satisfaction, in accordance with demand of the clients fixed period quantity (FPQ) and %100 control are done. The processes of production and weld are done in the light of WPQR and WPS with the accredited companies and certificated welders appropriate to the project. Our company has EN1090-2 EXC3 and ISO 3834-2 to reach the international welding quality standards. Our company has EN1090-1 EXC3 accreditation which enables creating CE trademark. Our staff creates the needed circumstances for the company to run basic production steps safely by applying the 5S and job security trainings which they take periodically in their work life. Our company takes support from Istanbul Technical University and BoÄ&#x;aziçi University to give its customers high quality service in innovation activities, basic production and management areas.



Quality Certificates

ISO 9001 : 2015

GSI SLV

GSI SLV

GSI SLV

EN 1090-2 EXC3

EN 1090-1 EXC3

DIN EN ISO 3834-2

Bilgi Merkezi

* ISO 9001 :2008 * EN 1090-1 EXC3 * ISO 3834-2

Bilgi Merkezi

* OHSAS 18001 :2015 * EN 1090-2 EXC3

Bilgi Merkezi



STEEL CONSTRUCTION COMPLETED PROJECTS OYAK RENAULT OTOMOBİL FABRİKALARI A.Ş. I-3 Building Construction (Turnkey )- 600 tonnes Seperation of Paintshop with Aluminium panels Seismic retrofitting of D Assembly Building - 380 tonnes Assembly Building additional Construction Manufacturing of Tristock Area Platforms Construction of the area between D and G Buildings (Turnkey) – 650 tonnes Air Preparation Group Platforms outside the 22,5 V/h paintshop plants and 30 mt extension of this platform with its erection POE Storehouse Apromodule Platform Manufacturing and Erection of Steel Platforms over H20 Paint Hole – 400 tonnes Manufacturing and Erection of Tunnel between Assemby area and paintshop TOFAŞ TÜRK OTOMOBİL FABRİKALARI A.Ş. Main Atelier Section 1, 2 and 3 Construction- 1265 tonnes Dining Hall and Paintshop Construction – 197 tonnes Manufacturing Building, Pipe- Track Construction- 509 tonnes Mechanical Atelier Construction – 1568 tonnes BORUSAN MANNESSMANN A.Ş. Gemlik Spiral Pipe Plant Various Steel Works – 1000 tonnes BORÇELİK A.Ş. Gemlik Provincial Treasurer Building Steel

Construction Works – 100 tonnes Soaking Pit and Exhaust Shaft Steel Construction Works – 500 tonnes RCM 3 Reversible Cold Rolling Hall Construction CGL 3- RCM 3 and SPM Pipe Conveyer Systems – 200 tonnes CGL 3 Furnace Entrance and Exit Platform Manufacturing and Erection – 550 tonnes BTSO International Fair Area additional Buildings Steel Construction – 700 tonnes ROBERT BOSCH Bursa Industrial Zone, Plant Construction Steel Works BİLİM MAKİNA Turkmenistan Jebel and Lebap Cement Factory Steel Construction 400 tonnes Gaziantep Limak Cement Factory Steel Construction – 250 tonnes BOZÜYÜK ECZACIBAŞI SERAMİK FABRİKALARI Ceramic Factory Building, additional Buildings and Lodging Building Steel Construction 3000 tonnes Ceramic Factory Various Steel Construction Works BOLVADİN AFYON ALKOLOİDLERİ Factory Building Steel Construction Works ASİL ÇELİK FABRİKASI 2000 tonnes


BANDIRMA BAĞFAŞ İŞKUR KİMYA TESİSLERİ 2000 tonnes

KARAKOÇ KALIP A.Ş. Additional Factory Building Construction – 300 tonnes

BORUSAN MÜHENDİSLİK A.Ş. Various Steel Construction Works (2005) – 1000 tonnes Various Steel Construction Works (2006)- 200 tonnes Borusan Logistics S2 Building Crane Walking Ways – 200 tonnes Birlik Galvaniz Cooling Towers

MAKO ELEKTRİK SANAYİ VE TİCARET A.Ş. Additional Factory Building Steel Construction

BURSA BETON A.Ş. Steel Construction Works Around Concrete Plant

BANDIRMA ETİBANK BORAKS TESİSLERİ Etibank-Bandırma Borax and Acid Factories Steel Constructions Works

COŞKUNÖZ A.Ş. 800 Tonnes ÇANAKKALE ÇİMENTO SANAYİ A.Ş. Steel Construction Works of Factory Building ERDEMİR T.A.Ş The extension of Cooling Hall Construction (Turnkey) – 650 tonnes EREĞLİ DEMİR ÇELİK FABRİKASI T.A.Ş The extension of 1. Cold Rolling Mill Hall JK additional Roof Truss Above steelworks sinter discharge plant Steelworks Maintenance Atelier and Office Building Construction Manufacturing of dumber palet GISTASMONT D.O.O. Mall of Montenegro Green Bazaar Steel Construction Works – 330 tonnes

SOĞANLI BAZAAR PROJECT 330 tonnes

ENERGY COMPLETED PROJECTS GESBEY- GENERAL ELECTRİC GE 13 Wind Steel Projects Mechanical Internals GESBEY- ALSTOM Wind Steel Projects Platform BOSEN ENERJİ A.Ş. Steel Construction Works of Natural Gas Combined Cycle Capacity Increase – 350 tonnes ZORLU ENERJİ Pipe Racks Turbine Building – 1500 tonnes GESBEY-GENERAL ELECRİC GE Wind Steel Projects Damaged Sections


GESBEY-NORDEX Wind Steel Projects Platforms GESBEY- VESTAS Wind Steel Projects Welded Parts

WELDED PRODUCTİON COMPLETED PROJECTS BURÇELİK A.Ş. Rock Crushing Plant Steel Construction (Bunker, silo, screens and channels) BURSA ÇİMENTO FABRİKASI A.Ş. 1000 tonnes cement silo BURÇELİK A.Ş. Stone Chips Crushing Plant Machine Frames Various Machine Crusher Frames, Channel and Main Body Products – 400 tonnes Various Crusher, Frame and Bunker Manufacturing – 1000 tonnes KARAKOÇ KALIP A.Ş. 1000 tonnes capacity press fabrication BURSA ÇİMENTO FABRİKASI A.Ş. Structual Steel Construction Works – 3000 tonnes Gİrder Overhead Crane Manufacturing – 2 pieces, 100 tonnes Kütahya Gevrek Seydi mixing and Packing Plant and fly ash stock silos – 1000 tonnes capacity stock

silo, faccade cladding and bunker feding conveyors production and erection Semi finished goods dispatch, stocking and pulverization plant steel construction and erection the new cement mill and Cement Transport Platforms steel construction. Erection, disassemblyi painting and cladding Works Cement Mill Seperator Building, Elevator Towers and Transport Systems Steel Construction Packing silo transport systems Rock crushing and drying plant steel construction, erection and caldding works MAVİTEC GIDA MAK. SAN. ve TİC. A.Ş. Manufacturing of bunkers and platforms SİMGE GROUP E-MAK Manufacturing of Bitumen Tanks and Challengers for Asphalt Plants PETKİM PETROKİMYA A.Ş. Water Flow Control Valve, Exhaust Gas Chimney and Channels, Steel Construction, Elbows, Cooling Room Door, Pressurized Vessels SİSTEM YAPI A.Ş. The metropolitan municipality of Bursa West waste water purification Plant Steel works – 350 tonnes TUNÇ KÜL ÇİMENTO A.Ş. Kütahya Seyitömer Silo – 1000 tonnes BORUSAN MÜHENDİSLİK A.Ş Steel platform manufacturing – 100 tonnes



BARGA BAYRAMOĞLU RÜZGAR ENERJİ ÜRÜNLERİ ÜRETİM SANAYİ VE TİCARET A.Ş. Barakfakih Sanayi Bölgesi 14. Cad. No:6 Kestel / BURSA Tel: +90 224 532 0 957 - Fax: +90 224 532 0 958 www.bbre.com.tr


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.