M2X3 Construction Documents

Page 1

M2X3 INSTALLATION DRAWING LIST: 000 - TITLE SHEET 100 - INSTALLATION PLAN 200 - INSTALLATION ELEVATIONS 201- INSTALLATION ELEVATIONS 400 - SCREEN MODULE 401A - SPINE MODULE UNIT A 401B - SPINE MODULE UNIT B 401C/D - SPINE MODULE UNIT C & D 402 - ARM MODULE 403 - LEG MODULE 404 - LONG LEG FORMWORK 405A - LONG LEG DIMENSIONS (UNIT A) 405C/D - LONG LEG DIMENSIONS (UNITS C/D) 406 - SPANNING MODULE 500 - SCREEN DETAILS 501A - SPINE DETAILS (UNIT A) 501B - SPINE DETAILS (UNIT B) 501C/D - SPINE DETAILS (UNITS C & D) 502A - ARM DETAILS (UNIT A) 502B - ARM DETAILS (UNIT B) 503 - LEG DETAILS 504A - LONG LEG DETAILS (UNIT A) 504C/D - LONG LEG DETAILS (UNITS C & D) 505 - SPANNING MODULE DETAILS 506 - FASTENER DETAILS & SPECS 507 - FASTENER DETAILS & SPECS 508 - FASTENER DETAILS & SPECS 509 - FASTENER DETAILS & SPECS 510 - FASTENER DETAILS & SPECS 511 - FASTENER DETAILS & SPECS 512 - FASTENER DETAILS & SPECS 600 - UNIT / MODULE SCHEDULE 601 - FASTENER SCHEDULE 700 - UNIT A EXPLODED AXON. 701 - UNIT B EXPLODED AXON. 702 - UNIT C/D EXPLODED AXON. 703 - SPANNING MODULE AXON.

SYMBOLS: A

- UNIT TAGS

1 L

- MODULE TAGS

A

- FASTENER TAGS

NOTES: 1. MODULES ARE DRAWEN IN "L" ORIENTATION. IN CASES WHERE AN "R"ORIENTATION IS REQ'D IT IS UNDERSTOOD THAT THE MODULE IS MIRRORED AND SHOULD BE FABRICATED WITH SAME DIMENSIONS. SEE CALLOUTS REGARDING SPECIFIC FASTENER DETAILS. 2. EACH BOARD IS COMPOSED OF SOUTHERN YELLOW PINE (SYP) LAYERS OF VARYING THICKNESS TOTALLING 1.5" 3. FINAL BOARD WIDTH SHOULD BE 5.25" W/ THE EXCEPTION OF THE SPINE AT 10.5" 4. CONFIRM FINISH PRIOR TO STAINING

M2X3 INSTALLATION

REVISIONS:

DATE: 14.04.24 TITLE: TITLE SHEET

SCALE: N/A DRAWING NO.

000 SHEET 1 OF 37


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.