TRI-COUNTY TECHNICAL COLLEGE
Student Success Center
More than Construction.
TRANSFORMATION.
Student Success Center Project
At a Glance Project Scope: The Student Success Center is a key component of Tri-County Technical College’s strategy to increase student success, reduce long-term maintenance costs, and address decades of enrollment growth. The project scope includes a new building, the complete refurbishment of Ruby Hicks Hall, and the installation of a central chiller plant and chilled water loop. The new building will be the first built on the Pendleton Campus in twenty years. At that time, enrollment was just over 3,000 students, compared with close to 5,000 students on the Pendleton Campus today. Cost: $42 Million New Construction: A 75,000 square-foot building will include a Learning Commons that houses library collections, flexible meeting spaces for students, computer labs, study areas, computer laboratories, supplemental instruction, and tutoring spaces; Student Development Office; Information Technology Services; College Store; CafÊ, Printing Services, meeting spaces, shipping and receiving. Construction of this facility required the removal of the amphitheater and Clarke and McKissick halls. Ruby Hicks Hall Renovation: A complete renovation and refurbishment of Ruby Hicks Hall to house TC Central, a one-stop enrollment center that will include Admissions, Student Records,
Cashier, Financial Aid, Student Data Center, Assessment, Advising, and Student Success Coaches; Curriculum and Academic Support Services; Administration; and conference/training spaces. Central chiller plant and chilled water loop: The installation of a central chiller and chilled water loop will cool the new building, Hicks Hall, and Fulp Hall. Eventually, all buildings will be connected to the chilled water loop. Timeline: Construction of the new building is expected to take 18 months. The entire project, including the renovation of Hicks Hall, will take two and one-half years. Architectural Firm: LS3P Associates, LTD, Greenville, SC Construction Firm: Juneau Construction Company, LLC, Atlanta, GA Gifts: Reliable Automatic Sprinkler Company is the first industry partner to designate a gift for the new Student Success Center. The new Campus Store will be named for the company in honor of its $100,000 contribution to the Tri-County Technical College Foundation.
SOUTHEAST VIEW, STUDENT SUCCESS CENTER
NORTHEAST VIEW, STUDENT SUCCESS CENTER
SOUTHWEST VIEW, STUDENT SUCCESS CENTER
More than Construction.
TRANSFORMATION. EAST DINING
MULTI-PURPOSE
WEST DINING SERVERY
STUDENT ORGANIZATIONS
CAMPUS STORE
PLAZA LEVEL
SERVERY, DINING, STUDENT ORGANIZATIONS, & CAMPUS STORE
• Campus Store • Dining • Student Organizations
More than Construction.
TRANSFORMATION.
MAKERS’ SPACE
LEARNING COMMONS STUDY AREA
CIRCULATION & INFORMATION AREA OPEN TUTORING CLASSROOM
CLASSROOM
UPPER LEVEL
LEARNING COMMONS & TUTORING
LARGE CONFERENCE
• Computer Labs • Learning Commons • Tutoring
More than Construction. TRANSFORMATION. More than Construction.
TRANSFORMATION. IT SERVICE DESK CENTRAL ENERGY PLANT
IT SERVICE DESK
SHIPPING & RECEIVING
ENGAGED LEARNING
IT STAFF AREA
D
CENTRAL ENERGY PLANT
ENGAGED LEARNING
IT STAFF AREA
INDUSTRIAL KITCHEN
SHIPPING & RECEIVING
D
PRINT STUDIO
PRINT STUDIO
GROUND LEVEL
ENGAGED LEARNING, IT AREA, CENTRAL ENERGY PLANT, & AUXILIARY
GROUND LEVEL
ENGAGED LEARNING, IT AREA, CENTRAL ENERGY PLANT, & AUXILIARY
CAMPUS STORE INVENTORY
INDUSTRIAL KITCHEN
CAMPUS STORE INVENTORY
• Help Desk/IT • Kitchen Prep • Print Shop • Shipping & Receiving • Student Support and Engagement
www.tctc.edu