STINSON AIRPORT TRAFFIC CONTROL TOWER
STINSON AIRPORT [PX] Pat Garrett [PM] Robert Varner [S] Wes Chapman & John Chapman [PC] Tricia Parker Shout out to the Stinson Airport Traffic Control Tower team!!! On February 8th, the team working with Garden & Ornamental Designs, Inc. lifted the control tower cab safely and successfully. The entire team with Corporate Safety Director, Ziggy Garcia, built the lift plan with the erector and pre-test lifts prior to the final lift on Thursday. This is the first control tower that Teal has constructed and our third project with TxDot Aviation Division.
SAFETY MOMENT
NEAR-MISS REPORTING OSHA defines a near miss as an unplanned event that did not result in injury, illness, or damage -but had the potential to do so. Only a fortunate break in the chain of events prevented an injury, fatality, or damage; in other works, a miss that was nonetheless very near. NEAR MISSES DON’T EXIST IN A VACUUM. Conoco Phillips Marine conducted a study in 2003 that examined at-risk behaviors, near misses, injuries, and fatalities. The study found that, for every fatality, there are at least 300,000 at-risk behaviors (such as skipping a safety step to save time.)
WAYS TO STAY AHEAD OF THE GAME
1. FIND SAFETY CONCERNS BEFORE OSHA INSPECTORS 2. TAKE A PROACTIVE APPROACH TO SAFETY 3. FIND THE ROOT CAUSES OF NEAR-MISSES 4. CATCH HAZARDS BEFORE THEY LEAD TO IMPACTFUL ACCIDENTS *Information came from https://www.graphicproducts.com/infographics/near-miss-reportinginfographic/ Near Miss Reporting Infographic Designed by Malcolm Bungcayao for Graphic Products
EXAMPLES
ü ü ü ü
SLIPPING & FALLING ON LIQUID BUT NOT SUSTAINING AN INJURY NEARLY RUNNING INTO A WORKER WHILE OPERATING A MACHINE SUCCESSFULLY PREFORMING MACHINE MAINTENANCE WITHOUT TAKING LOCKOUT/ TAGOUT PRECAUTIONS
WORKING ON SCAFFOLDING WITHOUT FALL PROTECTION, BUT NOT ACTUALLY FALLING
KLEIN FIRE STATION - OPEN FOR SERVICE Klein Fire Station is a 10,907 square foot facility to support the growing community in the Harris County ESD 16 precinct. The new fire station has three apparatus bays with electronic four-fold sectional doors that add additional innovative and aesthetic value to the project. The one-story building contains eight sleeping quarters, kitchen and day room, training room, office areas, and auxiliary spaces to support the station. The double height apparatus bay contains storage and an equipment platform. The Grand Opening was January 27, 2018.
WEATHER STATS JANUARY 2018
[PX] JASON HOGUE [PM] CHRIS HORNER [S] TAYLOR MACON [PC] CONNIE ENMON
Houston Rain Index
+3.1”
Particularly cold January, January 2018 ranked 12th for the number of consecutive days with maximum temperatures below 70 degrees in the City of Houston history - Total of 28 days. Number 1 is February 1926.
Corpus Christi Rain Index
+4.5”
January 27, 2018 was the wettest day with 4.2” of rain
San Antonio Rain Index
+0.3”
PROJECT STARTS | MOVING DIRT
FORT BEND COUNT Y SHERIFF ADMIN BUILDING [S] DEREK NEY [FE] HARRISON CARDIFF
AEP LON HILL [S] BLUE VASQUEZ
MONTGOMERY COUNT Y FIRE STATION [S] ROBERT SUBINSKY
DO YOU KNOW THE TEAL FAMILY? Here’s a little tidbit about our Tealians. s. Employee Name
Tealian Career
Les Chipman
Executive Vice President
Year
Month
24
January
Mike McGlynn
Superintendent - HOU
24
January
Bill Schultz
Superintendent - HOU
23
January
Dave Ogden
Estimating
12
February
Mike Tancill
Project Manager - CC
10
February
Michael Miller
Project Executive - CC
7
January
Jason DeVries
Project Manager - CC
5
January
Mike Harp
Project Manager - HOU
2
February
HAPPY 10 YRS MIKE TANCILL!!!
HAPPY 5 YRS JASON DEVRIES!!! JASON DEVRIES is a Project Manager in the CC Office and celebrated his 5th year with Teal this quarter. He is a TAMU graduate and enjoys golfing and outdoor sports. Jason has completed multiple projects such as Doggett, Sames Honda, SSCI, and Sames Bastrop Ford. He is currently working on Honda of Corpus Christi. When Jason isn’t working, he enjoys playing with his two kids and wife. Teal greatly appreciates all of your hardwork and dedication to our company!
MEET OUR TEALIANS
MIKE TANCILL. Mike is celebrating his 1 as a Project Manager in our Houston offic multiple projects including the Oakforest Center, Evelyn Meador Library, BARC Ado Field to name a few. Mike is currently fini Projects and starting up Bayou City Fellow Station. When not working Mike enjoys pl kids and grandkids in Tyler. Teal greatly a dedication to our company!
Christy Perez Barry Peel
John C Chapman
Megan Smith
Assistant Superintendent
Project Coordinator Superintendent
at Teal Construction
at Teal Construction
at Teal Construction
Houston, TexasTexas Area || Construction San Antonio, Construction
Houston, Texas|exas Construction Area | Construction
Houston, Texas | Construction Houston, TexasArea | Construction
Endorse John for Site Safety
x Cleveland, TX
Hunting & Fishing
Endorse Christy for Endorse Barry for Organization Quality Control
Endorse Megan for Teamwork
+
Hobbies
AP Manager/Assist. Controller Superintendent
x Sugar Land, TX
x
+
Hobbies
Time with My Children
Houston, Texas
+
Hobbies
Outdoor RacingActivities Super Karts
Teal Construction
Teal Construction
Teal Construction
Assistant Superintendent July 2017 - Present (8 months)
Project Coordinator July 2016 - Present (1 year 8 months)
Superintendent AP Manager/Assistant Controller June 2012 - Present (3 years August 2007 - Present (10 year 3 months) 7 months)
Message Favorite Quote Winners hate losing more than they enjoy winning What’s your best achievement? Becoming a Dad!
Message Do you you have hidden talents? Do have any kids? Scooby Doo Laugh Double Jointed Elbows Favorite Quote Tell me and I’ll forget, show me and I may remember, but involve me and I’ll understand
Message What’s your favorite Building? Most Interesting or Unusual Project The Picnic Palisade Palms in Galveston, TX. This The Basket is one of OH the coolest designs for a pool. The Newark, pool goes from inside the condo to the
Iexterior. am happiest when I’m surrounded by my family
KENDALL LIBRARY
OAKFOREST LIBRARY
EVELYN MEADOR LIBRARY
LITTLE YORK FIRE STATION
BARC ADOPTION CENTER
MIKE TANCILL 10 YEARS OF SERVICE PROJECT GALLERY
10 year anniversary with Teal. He works ce. Mike has successfully completed Library, Kendall Library & Community option Center, and Little York Fire Training ishing the Fort ISD Classroom Addition wship and our new Harris County Fire laying drums in his band and visiting his appreciates all of your hardwork and
“
It is literally true that you can succeed best and quickest by helping others to succeed.
THROWBACK PROJECT
”
- Napoleon Hill TEALWOOD SUBDIVISION
In the 1964, Murray Building Company and Cranbrook Corporation developed the subdivision Tealwood in the now ‘Memorial Area’. The subdivision was 107-acre tract that fronts 1750 feet along Memorial Drive. Murray Building Company was the predecessor of Teal Construction Company. John Murray Sr. was the President of Murray Building Company that started in 1947 building homes for the GI’s returning from the war in Pasadena, TX. Up until the 1959, it was primarily residential construction as the commercial construction division increased, Teal Construction was opened running as a sister company to Murray Building Company. The lots in Tealwood ranged from $8,000 $16,000 which once completed offered 200 homes. The Mortgagee magazine stated “Teal Wood”, a heavily wooded tract, offers fresh, new perspective in subdivision platting design. Enhanced by the native stately trees and winding lanes, this new are offers close proximity to excellent community shopping centers, schools, and churches. It is a “just right” distance from downtown Houston,”
AEP CORPUS CHRISTI
CONCRETE STATS 2018 TOTAL POURS APPROX. 4,350 YDS
WALLS 9” - 14” THICK
ROOF 6” CONCRETE WITH BUILT-UP
MAGNOLIA ISD CONFERENCE CENTER
[PX] JASON HOGUE [PM] JORDAN STENNIS [S] MIKE PETTUS [PC] MEGAN SMITH
THROWBACK PROJECT
CLEAR CREEK ISD ADMINISTRATION BUILDING In the 1980’s, Teal Construction completed the Clear Creek ISD Education Center which now serves as their Administration Building. The two story, 34,000 square foot facility contained the District’s Board Room and offices. It was Class A Structural Steel and Masonry exterior envelope. Since this project, Teal completed the Renovations and Additions to Victory Lakes Intermediate with Mike Harp as the Project Manager and DeWayne Lucas as the Estimator/Project Executive. Teal has recently broke ground on another contract with Clear Creek ISD which consists of additions and renovations to three intermediate schools; Brookside, Space Center, and League City. The Project Team is [E] DeWayne Lucas [PX] Jason Hogue [PM] Mike Harp [S] Vincent Salmeron & Jason Garcia [PC] Connie Enmon
FEBRUARY & MARCH EVENTS
FEB 22 MARCH 1
7 14 21 26
HOU: ABC Member Mixer King’s Bierhaus Teal Training Teal Offices
HOU: AIA TAC Trivia Night Heights Bingo Hall HOU: ABC YPC Bowling Tournament University of Houston Teal Corporate
HOU: ABC Golf Tournament Kingwood Country Club
Teal Offices
KIDS MEALS HOUSTON DONATION DELIVERY
HONDA OF CORPUS CHRISTI
[PX] Michael Miller [PM] Jason DeVries [S] Red Wood [PC] Morelva Gonzalez