tesmecnews-2013-01-tr-1475

Page 1

TesmecNews

01#2013

PRODUCTS & TECHNOLOGIES LATEST INFORMATION

Mr Flavio Villa, Chief Engineer - Trencher Division, talks about the latest improvements to the new version of the 1475 Trencher Series

1475 SERIES UPGRADE The first 1475 was built in Tesmec USA requirement to increase more and more in 2001 and put in service on June 24th, the productivity of the 1475 and its 2002. reliability have been the drivers for the Since then, over 80 units have been last upgrade of the model 1475. manufactured in both Tesmec SpA and Tesmec USA facilities, with 3 different digging attachments: Chainsaw, Rock Hawg and Bucket wheel.

Starting from the model serial #212 released at the end of 2012, a major upgrade of the 1475 has took place in order to make this unit able to fulfill the Several upgrades took place during requirements of the more and more these 11 years, including an engine challenging tasks it is used for. power increase from 600 up to 630 hp in 2007. The basic machine structure have however always been the same. In the last 3 years, bulk excavation works have shown a huge potential in Tesmec’s actual markets and a relevant part of total sales volume has been Rock Hawg. The higher stress and vibration lever induced on the machine by the drum attachment, together with the


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
tesmecnews-2013-01-tr-1475 by Tesmec S.p.A. - Issuu