The master plan process included a robust public outreach process involving multiple types of outreach. The process centered around public meetings but also utilized a mailer and online surveys. Below is a diagram showing the components of the process and where they occurred from Site Analysis to Concept Design to Master Plan Development.
September 2019 Public Meeting No. 1: Vision and Programming February 2020 Public Meeting No. 2: Schematic Design AlternativesAugust 2021 Public Meeting No. 4: Preferred Master Plan August 2022 Public Meeting No. 5: Colocation Master PlanOnline Public Survey No. 4 Online Public Survey No. 5November 2020 Public Meeting No. 3: School Colocation Discussion/FeedbackOnline Public Survey No. 1Online Public Survey No. 2Online Public Survey No. 3 L L L L L L L L L L