Selected Laboratories

Page 1

DP THE DESIGN PARTNERSHIP Selected Laboratories



T H E D E S I G N PA R T N E R S H I P

S E L E C T E D L A B O R ATO R I E S

Contact: The Design Partnership 415.777.3737 info@dpsf.com Office: 1412 Van Ness Avenue San Francisco, CA 94109 www.dpsf.com



THE DESIGN PARTNERSHIP LLP, Architects + Planners is an architectural firm whose work is of exceptional relevance to our times and is characterized by its sensitive and resonant responses to local traditions, landscape and context as well as by its innovative aesthetic and leading edge technology. SELECTED LABORATORIES depicts our investigation and interest in creating laboratory environments while pushing technology to its limits. We strive to create architecture that participates in all aspects of local context and culture, as well as in the unfolding future that recognizes architecture in its unparalleled and timely significance. Since its birth, now more than thirty years ago, The Design Partnership success is due to the efforts of our inspirational clients, distinguished consultants and our dedicated staff who have contributed to our innovated legacy over the years.



SELECTED LABORATORIES VA Puget Sound Mental Health & Research

8

VA Palo Alto Ambulatory Care Center

16

VA Palo Alto Research Laboratory

20

UCSF Bioengineering & Tissue Research Center

24

UCSF Department of Pathology

30

UCSF Human Genetics Dry Laboratory

38

Lawrence Berkeley National Laboratory

42

UC Merced Castle Facilities Laboratory

44

Genentech Bio Laboratory Facility

48

UCSF Connie Frank Transplant Center

52

Additional Laboratory Projects

65


The VA Puget Sound Mental Health & Research project is composed of four distinct projects that are linked to Mental Health treatment and research. The projects includes a $27.7M Seismic upgrade with careful phasing of interior renovation work to existing departments. A new $105M Mental Health Services and Research Building (200,000gsf) and a new $36.8M Parking Structure (1,000 stalls). The projects require extensive coordination with VA personnel and considerable understanding of the constraints of the existing campus facilities, utilities and operations. The Design Partnership is Associate Architect on this project.

8

Cost: $105M

Size: 200,000 sf


9


Mental Health Services & Research

10


11


Mental Health Services & Research

12


Mental Health Services & Research

13


Mental Health Services & Research

14


Mental Health Services & Research

15


The VA Palo Alto Ambulatory Care Center will provide a broad range of outpatient services to veterans including primary care, specialty care, The Regional Amputee Center, Dentistry, Eye Care, Audiology, Women’s Clinic, Education and Conference. The building works together with Building 7 to create a front door to campus services on the south side of the hospital. The Design Partnership is Associate Architect on this project.

16

Cost: $212M

Size: 315,500 sf


17


18


19


The VA Palo Alto Research Laboratory The new research animal care vivarium occupies approximately 35,000 gross square feet, provides expanded research animal resources, and replaces the Building 54 Vivarium- an outmoded, noncompliant, temporary facility. The biomedical research laboratory component accommodates current underserved research staff and provides additional resources for projected new research staff. This new facility is co-located with the vivarium to support researchers who use animal models, reducing and possibly eliminating animal transport across the campus. This component occupies approximately 50,000 gross square feet and replaces substandard labs in a building slated for demolition, and resources to support new research programs. The Design Partnership as Associate Architect on this project.

20

Cost: $100M

Size: 85,000 sf


21


22


23


The UCSF Bioengineering & Tissue Research Center houses a cross-disciplinary laboratory that examines the engineering, growth and transplant of new tissues. The laboratory also includes within it an atomic force microscope, a tissue culture room, and a stateof-the-art microsurgery. Because of the rapidly evolving nature of this field of research, the laboratory is designed to be exceptionally flexible and adaptable to future changes.

24

Cost: $1.8M

Size: 4,800 sf


25


26


27


28


29


The UCSF Department of Pathology’s design utilized Integrated Project Delivery (IPD) to complete this remodel on the 4th floor of UCSF’s Health Sciences West Building. The new state-of-the-art laboratory accommodates five Principal Researchers and their 55-person cancer research team in a streamlined light-filled space, designed with contemporary colors and sleek detailing. The use of building information modeling (BIM) and IPD allowed for the project to be bid under budget, and be completed ahead of schedule.

30

Cost: $4.3M

Size: 11,000 sf


31


32


33


34


35


36

INTERIORS


37


The UCSF Human Genetics Dry Laboratory’s remodel project on the ninth floor of the UCSF Medical Sciences Building involved the modification of existing wet laboratory space into dry labs, offices for research faculty, associates, and open office cubicles for residents, students and administrative staff. The project also included upgrades to the building systems, and the rating of an adjacent corridor.

38

Cost: $1M

Size: 2,972 sf


39


40


41


The Lawrence Berkeley National Laboratory projects update laboratory and office spaces to meet contemporary standards of service, comfort, accessibility, energy conservation and safety. The Design Partnership has worked on several projects with the Lawrence Berkeley Laboratory Projects including: 1. Building 62 Helios Laser Labs, 2. Building 62 Fire Life Safety Analysis, 3. Building 70 Laboratory Feasibility, 4. Building 50 Space Survey, 5. Building 46 Engineering Laboratory Remodel, 6. Building 62 Metallurgy Laboratory Remodel, 7. Building 62 Third Floor Laboratory Remodel, 8. Building 66 Second Floor Laboratory Remodel, 9. Building 25A Modular Building Addition, 10. Building 74 Life Sciences and 11. Multiple Site Scoping Study.

42

Cost: $6.8M

Size: Varies


43


The UC Merced Castle Facilities Laboratory improvement project involved consists of full interior demolition and upgrade to contemporary wet lab bench and support space, and adaptation of additional space for day to day lab use. Built in 1989, these structures were originally used as a warehouse, office and workshop space. The labs accommodate initial faculty in all science disciplines while the campus is under construction, and will continue to be used by incoming faculty as specialty lab space as needed on a long-term basis.

44

Cost: $4.5M

Size: 17,000 sf


Existing 1989 Warehouse Building

45


46


47


The Genentech Bio Laboratory Facility remodel turned an existing two-story warehouse into their new corporate headquarters facility and a biotech laboratory with support services. The design included an interior two-story “mainstreet� which created a separation zone between the new laboratory and the existing administration department. A new entry lobby and conference center were also added to the existing facility, while maintaining the ongoing operations of administration during the construction process. The use of glass creates a feeling of transparency on the new addition, and is a wonderful contrast to the existing warehouse context. Dennis Sullivan designed this project prior to joining The Design Partnership.

48

Cost: $30M

Size: Varies


49


50


51


The UCSF Connie Frank Transplant Center’s design recognizes the ‘gift of life” and the incredible act of generosity when one donates their sacred organ to a loved one. The Center is located on the 7th Floor of a 1960’s Building that incorporates extraordinary views of the Golden Gate Bridge and Downtown San Francisco. The Center was conceived to provide comprehensive patient services for kidney transplant in a calm and graceful environment.

52

Cost: $10M

Size: 8,300 sf


53


54


55


56


57


58


A Corridor Canopy B Consultation Desk C Concrete Arch

C

D Shoji Screen E Curtain Wall A

B

D E

Remodel

N

59


60


61


62


63



Additional Laboratory Projects UCSF Mt. Zion Laboratory UCSF Koret Ophthalmology Laboratory Renovation UCSF Invitro Fertilization Laboratory UC Davis Robbins Hall Laboratory Renovations UCSF BSL-2 Laboratory UCSF Genentech Hall Cagewash UCSF MPOE is a data center in a labs building UCSF MSB Improvements Phase 2 UCSF Moffitt/MSB Seismic Separation

65


THE DESIGN PARTNERSHIP ARCHITECTS + PLANNERS

66

Contact: The Design Partnership 415.777.3737 info@dpsf.com Office: 1412 Van Ness Avenue San Francisco, CA 94109 www.dpsf.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.