BIM Coordination for Clash free BIM Models
An Introduction – Planning through BIM Coordination
Founding Father of the United States Benjamin Fran klin once said: "By failing to prepare, you are prepari ng to fail."
So, if you want to reduce stress in construction workfl ow, planning is a necessity.
The appropriate planning using BIM coordination for clash free BIM models enable dispute resolution, seamless fabrication, and execution of installation process with fewer errors and uncompromising quality.
A growing number of contractors are using BIM clash c oordination to reduce project time and expenses.
How BIM Coordination Helps AEC Professionals? 1. Reducing Rework 2. Enhancing Visualization 3. Resolving Clashes 4. Mitigating Project Delays 5. Saving Man-hours
1. Reducing Rework
The apt time for roof repairs is when the sun is actually shining, according to former U.S. President John F. Kennedy. Depending on the building design standard, the cost of rework from a single onsite disagreement may range from $2000 to $9000.
Disputes and conflicts are detected and s ettled by 3D BIM model at the preconstruction stage.
2. Enhancing Visualization The statement "Visualization is more importa nt than knowledge" by Albert Einstein is true. MEP models are merged with architecture an d structural into a single cohesive model using early design-build 3D BIM visualization.
3. Resolving Clashes Former British Prime Minister Margaret Thatcher advised wor king on your plan if you plan your task for today and every day. Similar to this, if you are using BIM to plan your work, you shoul d use coordinated BIM models at various Level of Detailing to resolve conflicts, re duce delays and RFIs, and speed up the fabrication process and delivery.
Mitigating Project Delays
to former American President Abraham Lincoln, if you let yourself six hours to cut down a tree, you'll spend the first four honing your axe. In regards to BIM Coordination, the same is true.You can check the actual space availability by visualizing the intricate 3D views of corridors, firewalls, sheer walls, etc. by coordinating MEP services during the pre-construction phase.
4.
According
5. Saving Man-Hours
According to Charles Darwin, a person h as not found their true worth if they dare to waste an hour of their life.
The same is true of BIM Models , which is how every AEC professional sh ould begin the construction work proces s to ultimately save time.
Boost Coordination with BIM Coordination We should constantly make plans because it wasn't pouring whe n Noah constructed the ark, according to Richard Cushing, an A merican priest of the Roman Catholic Church. By using BIM for planning, you may reduce construction costs a nd time while overcoming project obstacles.
Overcome Construction Challenges
BIM
Discuss
with BIM Coordination fromTop BIM
coordination is more than just a clash check for the contractors!
BIM coordination for architectural, structural and MEP services from Top BIM Company in USA.