Certainty in Solutions.
The region’s leading design and build off-site volumetric concrete construction company.
The region’s leading design and build off-site volumetric concrete construction company.
In today's fast-paced environment, time and consistency are paramount. Our streamlined solutions offer four certainties:
Consistent quality Speed Scalability Sustainability
By standardizing our offerings, we ensure unparalleled speed, delivering consistent quality that exceeds expectations.
Moreover, our scalable products adapt effortlessly to diverse needs, providing tailored solutions without compromising on quality. And with accelerated delivery times, we empower our clients to meet tight deadlines and seize opportunities. This revolutionizes modular construction through Productization.
We’ve evolved from building bespoke clients’ projects to designing and offering our own – that’s Productization in action!
ESTABLISHED MANUFACTURING IN UAE
FIRST BOX MANUFACTURED IN UAE FOR SEHA
EXPANDED MANUFACTURING IN SAUDI ARABIA
SCAN CODE FOR DUBOX CREDENTIALS
FIRST BOX MANUFACTURED IN SAUDI ARABIA FOR RED SEA GLOBAL
With Productization we aim to transform modular construction into standardized products that can be easily replicated and delivered to customers based on their requirements.
Longer & Uncertain Project Duration
Higher labour and material costs
Variations in workmanship, material, and quality
Significant Environmental Impact VS
SOLUTION
Reduced Construction Timelines
Increased Cost Efficiencies
Consistent Quality
Minimal Environmental Impact
Our modular solutions are designed to cater to your specific requirements & can be efficiently delivered to diverse regions, in any location.
218,460 Sqm
Projects delivered in KSA since 2012
403,460 Sqm
Projects delivered across GCC since 2012
The evolution of construction methods has transformed significantly over time, progressing from traditional onsite building practices to modular and now productized approaches. Traditional construction, relying on on-site labor and materials, offers flexibility but often faces challenges in cost and timeline predictability.
Modular construction, whether 2D or 3D, introduces prefabricated components that streamline assembly, enhancing quality control and minimizing on-
site work. Productization marks the latest phase of Modern Methods of Construction (MMC), treating buildings as customizable products with Standardized Components, Kit of Parts and digital integration, fostering Integrated Project Delivery (IPD) approach, optimizing efficiency, sustainability, and scalability.
This evolution reflects a shift towards more efficient, controlled, and innovative building practices to meet modern demands.
Traditional Construction has been the cornerstone of building projects, relying on on-site labor and materials. It offers flexibility but often encounters challenges in cost control and timeline predictability.
3D Modular Construction advances further with fully integrated, prefabricated units that arrive at the site ready to stack and assemble. This approach minimizes onsite work and maximizes precision.
2D Modular Construction represents a leap in efficiency with pre-built components (Kit of Parts) manufactured offsite, then assembled on location. This method streamlines timelines and enhances quality control.
Productization marks the pinnacle of construction evolution, where buildings are treated as custo-mizable products. Standardized components and digital integration optimize efficiency, sustainability, and scalability.
Traditional construction can be fraught with uncertainties in timely delivery and consistent quality. Through Productization and introduction of WorkBox, a groundbreaking solution that, in collaboration with our efficient supply chain, slashes construction time dramatically compared to conventional methods.
Our process eliminates the need for an extensive design phase and offers a fully pre-finished
modular delivery approach, setting us apart from other modular construction techniques.
The result? A streamlined, cost-effective project timeline that shifts from traditional on-site construction to an off-site manufacturing methodology.
Experience the future of construction with WorkBox, where efficiency meets innovation to deliver with Certainty.
Delivers high-end offices anywhere in 7 months*
*Disclaimer: The timeline is applicable for Essential and Premium tiers only.
Workstations
Office Units [SINGLE]
Meeting Room [20 PAX]
Meeting Room [10 PAX]
Meeting Room [6 PAX]
Printing Areas
Pantry
Male Toilet
Femail Toilet
ADA
Prayer Room
Ablution
Janitor Room
Storage
MEP Rooms
Reception Room
Circulation | Corridors
Courtyard
Meets office safety and quality standards.
Upgrades tailored to your preferences. COMING SOON
Provides a specification upgrade within the standard delivery time.
3324 sqm
TOTAL AREA
300 PAX
7 months DURATION
Meets office safety and quality standards.
Workstations
Office Units [SINGLE]
Meeting Room [20 PAX]
Meeting Room [10 PAX]
Meeting Room [6 PAX]
Printing Areas
Pantry
Male Toilet
Femail Toilet
ADA
Prayer Room
Ablution
Janitor Room
Storage
MEP Rooms
Reception Room
Circulation | Corridors
Courtyard
Provides a specification upgrade within the standard delivery time.
Upgrades tailored to your preferences.
Workstations
Office Units [SINGLE]
Meeting Room [20 PAX]
Meeting Room [10 PAX]
Meeting Room [6 PAX]
Printing Areas
Pantry
Male Toilet
Femail Toilet
ADA
Prayer Room - 2
Ablution - 2
Janitor Room
Storage
MEP Rooms
AVAILABLE IN 3 MODELS:
SQM 1550 COMING SOON COMING SOON
Meets office safety and quality standards.
Provides a specification upgrade within the standard delivery time.
Upgrades tailored to your preferences.
VINYL FLOORING
MATTE PAINT WHITE GLAZED CERAMIC CLOUD WHITE
PORCELAIN TILE CLOUD CHARCOAL
EPOXY FLOOR COAT
EXTERIOR WALLS
CARPET ROLL FOR PRAYER HALL
MATTE PAINT WHITE
CIELING
MATT PAINT WHITE SUSPENDED GYPSUM SUSPENDED GYPSUM
PERFORATED ACOUSTIC COAT
BUILT UP AREA (M
DURATION
COMPLETION YEAR
SCAN CODE TO WATCH THE VIDEO
Qiddiya Investment Co. engaged with DuBox to design and develop their latest office complex for up to 150 of their employees.
Qiddiya engaged with DuBox to build our office complex in Riyadh, KSA for 300 employees. Ahead of schedule and with 30% reduced manpower, DuBox delivered exceptional efficiency, accelerating our time to market. Their support throughout the project was invaluable. We commend DuBox for their commitment to excellence and look forward to future collaborations.
Qiddiya Investment Company
BUILT UP AREA (M
DURATION
COMPLETION YEAR
SCAN CODE TO WATCH THE VIDEO
DuBox efficiently delivered NEOM Regional Project Offices to meet the urgent need for employee housing amidst NEOM Bay Region’s rapid growth. Using Modern Methods of Construction (MMC) and DuBox’s modular technology, the project emphasized sustainability and safety.
As part of the NEOM team, we’re thrilled to express our heartfelt appreciation to Group AMANA for their exceptional work on our Regional Offices project. Their dedication to innovative Modern Methods of Construction (MMC) and use of DuBox’s technology resulted in a swift delivery timeline, leaving us incredibly satisfied. Their commitment to sustainability perfectly aligns with our vision, and their seamless integration of digitization tools enhanced coordination and efficiency.
NEOM Co
Disclaimer: The above timelines are subject to client confirming their selection without any changes by day 45. Once confirmed, the chosen selection will be considered final.
We’ve mastered delivering modular products efficiently, precisely, and to your satisfaction. Our dedication to smart solutions ensures quick turnaround. Once the product and specifications are selected by day 45, expect delivery within 7 months .
With cutting-edge technology and premium materials to bring your vision to life. 04 INSTALL
Careful attention to detail ensures the delivery of both functionality and aesthetics.
Smooth and efficient setup, guaranteeing a hassle-free transition into your space.
We’re committed to ongoing support to ensure your product operates at its best after installation.
03 DAY 1-45
Confirm suitability of layout
04 DAY 45
Confirm finishing choices
01
15 DAYS PRIOR TO DAY 0
Product chosen
02 DAY 0 Agreement signing
05 DAY 45-52
Design & BIM Integration
06 DAY 45-52 Engineering documentation
30 DAYS Material procurement 09 DAY 112 Assembly 13 WITHIN 7 MONTHS Handover
12 DAY 170 Testing & Commissioning 08 DAY 82 Production
11 DAY 142 Furniture fitout & Installation
At Group AMANA, our Engineering and BIM capabilities are at the forefront of innovation, enabling us to deliver fast-track designs for modular systems with unmatched efficiency. Our team of experts
Total No. of Boxes: 10,771
Total Sqm.: 403,460 Sqm
Total. No. Projects: 24
Total No. of Locations: 10
utilizes cutting-edge BIM technology to streamline the design process, ensuring precision and seamless integration from concept to completion. This allows us to rapidly deploy high-quality, modular solutions tailored to our clients’ needs, reducing project timelines while maintaining the highest standards of excellence and sustainability.
CAPABILITIES 100,000 m2 FACILITY 8 PRODUCTION UNITS 140,000 m2 PRODUCED PER YEAR
14 Modules finished daily
15 Days production cycle 364 Modules completed monthly KSA & UAE
6 BUILDINGS WITH 312 APARTMENTS MANUFACTURED EVERY MONTH
8 Modules finished daily
62,000 m2 FACILITY
15 Days production cycle 200 Modules completed monthly
8 PRODUCTION UNITS
2 BUILDINGS WITH 60 APARTMENTS MANUFACTURED EVERY MONTH
60,000 m2 PRODUCED PER YEAR
Low-Rise Offices
Office or Business Complexes
Remote & Relocatable Offices
Community Hubs
Box Parks
Retail Stand-Alones
Mixed-Use Retail
* Up to Ground + 6 Floors
Remote and Unique
Boutique Hotel Concepts
3-Star Hotels & Resorts*
Standardized Hotel Models
Hotel Staff Accommodation
Scalable and Relocatable Assets
On-Demand Development
MEDBOX TO BE IDENTIFIED
COMING SOON COMING SOON
Hospitals
Clinics
Remote Medical Facilities
Staff Dormitories
Master-Planned Residential Communities
Villas, Semi-Detached, and Townhouses
Low to Mid-Rise Apartment Buildings
Staff Accommodation and Dormitories
Since 2010, DuBox has been a leader in off-site volumetric concrete construction. We design, manufacture, and deliver concrete buildings using modular methods, reducing time to market by streamlining construction.
As part of the MANUFACTURE Vertical, DuBox, an AMANA Company, provides advanced modular building solutions.
SCAN TO VIEW
SCAN TO VIEW MANIFESTO
SCAN TO DOWNLOAD CORPORATE BROCHURE