Vilai profile fixsmall

Page 1

COMPANY PROFILE

VILAI VIET CONTSTRUCTION JOINSTOCK COMPANY

Address: 1st & 5th Floor, CT02, Nang Huong Tower, 583 Nguyen Trai street, Thanh Xuan Dist, Hanoi Tel: 0243.535.3027 | Fax: 0243.535.3027 | Hotline: 0982.610.675 | Web: www.vilaiviet.com.v n


TALBE OF CONTENT

2

VILAI VIET CONSTRUCTION .JSC

1. Introduction

3

2. Legal Information

4

3. Share Holder

5

4. Our Policy/Vision/Mission/Core Value

6

5. Business Area

7

6. Company Organization

8

7. Site Organization

9

8. Certificate

10

9. Human Resource

11

10. Equipment resource

14

11. List Of Experience

18

12. Our Customer

22

13. Project Reference

23


INTRODUCTION Vilai Viet Constructions JSC was founded in 2012, specializing in the construction of civil works, industrial works, factory and landscape infrastructure. After more than 6 years of development, VLV has been asserting its position in the Vietnam construction industry. With strong financial capacity, high quality human resources and modern equipment, we have completed high quality projects, safety and on schedule. In the development process, we always update the new construction methods, the advanced equipment and improve the capacity of technical staff to make impression on constructions - affirm Vilai Viet brand. We try our best to improve this capacity profile to provide you with the most accurate information. So, if you have any questions, please contact us. We are happy to cooperate with you.

VILAI VIET CONSTRUCTION .JSC

3


LEGAL INFORMATION

Company Name:

VILAI VIET Construction Joint Stock Company

Type of Company: Sole Proprietorship

Public Company

Partnership

Joint-Venture

Private Company

Other (Please specify)

Joint Stock

Country of Incorporation:

Vietnam

Registration No:

0105957614

Date of Registration:

31th July 2012

Registered Address:

No.12, N4, Allay90, Nguyen Tuan Street, Thanh Xuan Dist, Hanoi

Office Location:

1st & 5th Floor, CT02, Nang Huong Tower, 583 Nguyen Trai Street, Thanh Xuan Dist, Hanoi

Telephone Number:

0243.200.3760

Facsimile Number:

0243.200.3760

Website:

https://www.vilaiviet.com.vn

Email:

vilaiconst@gmail.com

4

VILAI VIET CONSTRUCTION .JSC


SHARE HOLDER PRINCIPALS, PARTNERS OR DIRECTORS Name

NRIC/ Passport No.

Tran Tien Dung

Chairman

Viet Nam

026076000044

Kieu Ngoc Thanh

Director

Viet Nam

026085004398

MAJOR SHAREHOLDERS AND PERCENTAGE OWNED Name of Shareholder

% Shareholder

Tran Tien Dung

Other

Viet Nam

42%

Viet Nam

42%

Viet Nam

16%

FINANCIAL CAPACITY 3.1 AUTHORISED CAPITAL: VND 30,000,000,000 3.2 PRESENT PAID-UP CAPITAL: VND 30,000,000,000 3.3 ANNUAL TURNOVER OVER LAST THREE FINANCIAL YEARS:

Year

2015

2016

2017

Vietnam(VND) Vietnam (USD)

139.978.000.000 7.350.000

210.434.000.000 10.750.000

308.698.000.000 14.580.000

Overseas

0

0

0

Total

139.978.000.000

210.434.000.000

14.580.000

7.350.000

10.750.000

308.698.000.000

VILAI VIET CONSTRUCTION .JSC

5


OUR POLICY VILAI VIET JSC is committed to providing quality products/ services and timely delivery of these products/services to our customers, shareholders and general public. We are also committed to providing a safe and healthy working environment to our employees and those under our care. We support an environmentally responsible approach to our business. A comprehensive Quality, Safety & Health and Environmental (QSHE) Management System has been established and implemented to ensure that we systematically plan to achieve our objectives, deal with challenges and develop our people in the realization of the Company’s goals. With this QSHE Management System, we can manage and improve our operations to consistently provide high quality, cost effective, reliable, safe and environmental friendly products and services to our customers. The QSHE Management concept is universal, and applies to all areas of the Company’s operations. We will continuously improve our products and the processes that deliver these products That requires that we: Understand and consistently respond to the needs and expectations of our customers Manage systematically our products/services to enhance the value to our shareholders Develop and inculcate a self regulating mindset to all staff that will ensure the success of the company goals and QSHE Management System Continually improve our quality, safety & health and environmental processes that facilitate the effective management and control of these areas Minimize safety & health risks through adoption of best practices Prevent environmental impacts and manage resources through proper and effectively implementation of our obligations. Identify and comply to the relevant safety & health and environmental legislations and regulations Provide appropriate training to our employees and other related parties to improve awareness and knowledge of these requirements Each employee is expected to be aware of and implement the requirements of this policy. The employees are also required to actively promote the acceptance of this policy to our customers, subcontractors, suppliers and the TRAN TIEN DUNG Chair Man - Vilai Viet Construction JSC

6

VILAI VIET CONSTRUCTION .JSC


OUR VISSION The Company continues to move forward in become the leading Engineering and Constructuion ďŹ rm in Vietnam and eventually the region, by consistently delivering projects that meet international standards

OUR MISSION With a weel-defined direction in place, the path ot realizing our Vision in bases on fundamental drivers, instrumental in achieving our goals. Our mission To undertake the engineering and construction business with a focus on becoming the cost leadership while excellence in every aspect to meet customers’ stringent requirements regarding quality, on-time delivery, safety and environmental concerns. To develop an effective management that stresses productivity, perpetual development of the organization, and instilling work ethics in all personnel. To build value for the organization in order to become a unique and distinct firm. To remain focused on controlled organizational growth and recognizing those who contribute to this growth.

VILAI VIET CONSTRUCTION .JSC

7


BUSINESS AREA Is an Young Enterprise of Bussiness in general and the construction in particular. With leadership team have more experience in construction and corporate governance, project management team are also successful people in large companies and hundreds of high quality input engineers from universities such as the civil engineering, urban, industry, industrial electricity and communication. VILAI VIET also continuous update, application new technology, material, equipment system for support construct building, infrastructure and basement work such as bored pile, centrifugal piles by robots, Al-form‌. Through its efforts, VILAI VIET has affirmed its capacity to many custumers, with a variety of construction types: - Building work: Residential complexes, apartment‌. - Industrial factory work - Infrastructure work and urban landscape, water and waste water treatment system

8

VILAI VIET CONSTRUCTION .JSC


COMPANY ORGANIZATION

Safety Safety

Traffic

HSE Department

Health & Safety Manager*

Environment Environment

First AID First AID

Design DesignC

Planning Department Planning Manager

Program ProgramC

PROJECT DIRECTOR

PROJECT MANAGEMENT

ontract Contract

Cost ost

Admin. Department

Administation

Accounting

Package 11P Package

Package ackage22

Const. Department *

QA/QC Department

Package NNS Package

Survey urvey

Quality Assurance Department

Environment Environment

Laboratory Laboratory

VILAI VIET CONSTRUCTION .JSC

9


SITE ORGANIZATION

PROJECT DIRECTOR

Safety Safety

Traffic

HSE Department

Health & Safety Manager*

Environment EnvironmentF

First irst AID AID

Design DesignC

Contract ontract

Planning Department Planning Manager

Program ProgramC

10

VILAI VIET CONSTRUCTION .JSC

Cost ost

Environment Environment

PROJECT MANAGEMENT

QA/QC Department

Quality Assurance Department

Laboratory Laboratory

Administation

Admin. Department

Accounting

Package 11 Package

Package 2 Package

Const. Department

Package N N Package

Survey Survey


CERTIFICATE

CERTIFICATE Management system as per ISO 9001 : 2015 In accordance with TÜV NORD CERT procedures, it is hereby certified that

VILAI VIET CONSTRUCTION JOINT STOCK COMPANY

1st & 5th Floor, CT02, Nang Huong Tower, 583 Nguyen Trai Street, Thanh Xuan District, Hanoi, Vietnam

applies a management system in line with the above standard for the following scope

Construction of Industrial, Civil Engineering and Infrastructural Projects Design, Construction and Installation of Sewage Treatment Projects Certificate Registration No. 44 100 160322

Valid from 2018-03-21

Audit Report No. 2.3-8471/2018

Valid until 2021-03-20 Initial Certification 2012-12-13

TUV ASIA PACIFIC LIMITED Unit 01-03 26/F Tower 1, Millennium City 1, 388 Kwun Tong Road, Kwun Tong, Kowloon, Hong Kong 2012-12-13

Certification Body at TÜV NORD CERT GmbH

This certification was conducted in accordance with the TÜV NORD CERT auditing and certification procedures and is subject to regular surveillance audits. TÜV NORD CERT GmbH

Langemarckstrasse 20

45141 Essen

www.tuev-nord-cert.com

VNA, FE8471, CA 0280-D

VILAI VIET CONSTRUCTION .JSC

11


HUMAN RESOURCE In VILAI VIET Construction .JSC, we believe Human Resource is the key to success. That is why we invest into our People to creat a experienced administrator team. And about 80 staffs include Civil, Electrical, Mechanical Engineers, Officer… are the young peoples so enthusiastic and modern. They are the future of company.

Management, technical specialists, worker

Remark

Top Manager

05

Permanent employee

Department Head

05

Permanent employee

Engineers Electrical engineer, Mechanical engineer, Environmental

15

Permanent employee

05

Permanent employee

03

Permanent employee

Bachelor of science in economics

03

Permanent employee

Technician

05

Permanent employee

Project Manager

05

Permanent employee

Site Manager for building projects, infrastructure projects, Environmental projects, …

15

Permanent employee

13

Permanent employee

13

Permanent employee

Planning and cost control

10

Permanent employee

Site Supervisor

25

Permanent employee

Technicians

15

Permanent employee

Foreman

35

Permanent employee

Surveyor

08

Permanent employee

25

Permanent employee

Economic Engineers, IT Engineer..) Accountant

For Projects

security…)

12

VILAI VIET CONSTRUCTION .JSC


“Run for the heart” is a social activity of VILAI VIET for “A Happy Environment”.

CT1 APARTMENT SITE TEAM with fighting spirit “Union is Strength”. VILAI VIET CONSTRUCTION .JSC

13


EQUIPMENT RESOURCE

No.

Type of Machine

Unit

Original

Status

1

Bore pile machine HITACHI KH180 Long boom 60m

Nos

02

Japan

Good

2

Crane IHICH500

Nos

01

Japan

Good

3

Vibro hammer 60 - 90KW

Nos

02

Japan

Good

4

Pump high pressure

Nos

02

China-2010

Good

5

Crane QUY50A

Nos

01

Japan - 2011 Good

6

Sheet pile pressing machine

Nos

01

Japan - 2009 Good

7

Sheet pile pressing vibro hammer

Nos

01

Japan - 2010 Good

8

Excavator PC 300, 2.5m3

Nos

01

Japan - 2009 Good

9

Breaker hammer 2.5KW

Nos

02

Japan

Good

10

Bore pile machine HITACHI KH150

Nos

01

Japan

Good

11

Pilling machine D408-90m sè 3

Nos

01

Japan

Good

12

Hammer piling Kobelco K35

Nos

01

Japan

Good

13

Bore pile machine KH100

Nos

01

Japan

Good

14

Excavator Komatsu

Nos

01

Japan

Good

15

Kobelco 7065/ R6G

Nos

01

Japan

Good

16

Excavator HITACHI PC200

Nos

01

Japan

Good

17

Bore pile machine SANY SR150C

Nos

03

China

Good

18

Crane Sumitomo – LS 120RH

Nos0

apan

Good

14

VILAI VIET CONSTRUCTION .JSC

1J


Equipment for infrastructure works No.

Type of Machine

Unit

1

Roller LIUGONG CL614

Nos

2

Grader machine MITSUBISHI MG3

3

Original

Status

02

China -2008

Good

Nos

01

Japan

Good

Excavator Komatsu PC150-3

Nos

01

Japan

Good

4

Roller Machine Dynapac CG16C

Nos

01

Japan

Good

5

Roller machine Ammann AC110

Nos

01

Swistlen

Good

6

Asphalt spreader machine Mitsubishi MF44WD

Nos

01

Japan

Good

7

Roller machine Sakai TW25

Nos

01

Japan

Good

8

Excavator Kobelco SK100W

Nos

01

Japan

Good

9

Welding machine

Nos

02

Vietnam

Good

10

Welding machine (boiler)

Nos

02

Japan

Good

Nos

02

China

Good

Nos

03

China

Good

11 12

Steel mill machine

Equipment for concrete works 1

Concrete mixing 250l

Nos

03

Vietnam

Good

2

Motar mixing 100l

Nos

02

Vietnam

Good

3

Palang

Nos

03

Russia

Good

4

Compactor mini

Nos

02

Japan

Good

5

Compactor

Nos

03

Japan

Good

6

Generator Hon Da 75KVA

Nos

02

Japan

Good

7

Formworks

Nos

2000

Vietnam

Good

8

Nos

1000

Vietnam

Good

9

Nos

200

VietnamG

ood

Nos

7000

VietnamG

ood

10

Aluminum formwork

VILAI VIET CONSTRUCTION .JSC

15


16

VILAI VIET CONSTRUCTION .JSC


VILAI VIET CONSTRUCTION .JSC

17


18

VILAI VIET CONSTRUCTION .JSC


VILAI VIET CONSTRUCTION .JSC

19


20

VILAI VIET CONSTRUCTION .JSC


LIST OF EXPERIENCE

VILAI VIET CONSTRUCTION .JSC

21


1. STP (Sewage Treatment Plant) 220,000 m3/day Construction and completion of Reinforced Concrete Retaining Wall and Rubble Pitching Wall at Set River Radial Gate Client: EPC: Type of contract: Location: Starting and Completion Date:

GAMUDA LAND VIETNAM Gamuda Engineering Subcontractor Yen So, Hoang Mai, Ha Noi July 2012 - Dec 2012

2. STP (Sewage Treatment Plant) 220,000 m3/day. Construction and completion of cover walk way SBR tank Client: EPC: Type of contract: Location: Starting and Completion Date:

GAMUDA LAND VIETNAM Gamuda Engineering Subcontractor Yen So, Hoang Mai, Ha Noi July 2012 - Dec 2012

3. STP (Sewage Treatment Plant) 220,000 m3/day. Construction and completion of asphalt mainroad in the internal Plant Client: EPC: Type of contract: Location: Starting and Completion Date:

GAMUDA LAND VIETNAM Gamuda Engineering Subcontractor Yen So, Hoang Mai, Ha Noi July 2012 - Dec 2012

4. STP (Sewage Treatment Plant) 220,000 m3/day. Construction and completion of infrastructure works of Set River Client: EPC: Type of contract: Location: Starting and Completion Date:

GAMUDA LAND VIETNAM Gamuda Engineering Subcontractor Yen So, Hoang Mai, Ha Noi July 2012 - Dec 2012

5. STP (Sewage Treatment Plant) 220,000 m3/day. Construction and Completion of Reinforced Concrete Plinth for Odour Control Unit and Intake Screening Skip at Set River Client: EPC: Type of contract: Location: Starting and Completion Date:

GAMUDA LAND VIETNAM Gamuda Engineering Subcontractor Yen So, Hoang Mai, Ha Noi April 2012 - June 2012

6. Thanh Liet Gate and infrastructure works Client: EPC: Type of contract: Location: Starting and Completion Date:

GAMUDA LAND VIETNAM Gamuda Engineering Subcontractor Yen So, Hoang Mai, Ha Noi July 2012 - Dec 2012

7. GAMUDA GARDEN Construction and completion of sewage system of infrastructure in Gamuda Garden at C2, Yen So, Hoang Mai Client: Type of contract: Location: Starting and Completion Date:

GAMUDA LAND VIETNAM Main Contractor C2, Yen So, Hoang Mai, Ha Noi August 2012 - April 2013

8. GAMUDA GARDEN Construction and completion of Main Asphalt road works of infrastructure in Gamuda Garden at C2, Yen So, Hoang Mai Client: Main Contractor: Type of contract: Location: Starting and Completion Date:

22

VILAI VIET CONSTRUCTION .JSC

GAMUDA LAND VIETNAM THIEN AN Subcontractor C2, Yen So, Hoang Mai, Ha Noi August 2012 - April 2013


9. Hanoi Police project Construction and completion of main asphalt road works Client: Type of contract: Location: Starting and Completion Date:

Hanoi Police Main Contractor Ha Dong, Hanoi Sep-12

10. Bank of Social policies Construction and completion of admistration building of Bank of Social policies Client: Type of contract: Location: Starting and Completion Date:

Bank of Social policies Main Contractor Hoang Mai, Hanoi Jan 2013 - Dec 2013

11. Bank of Social policies Construction and completion of Branch Office Building of Bank of Social policies Client: Type of contract: Location: Starting and Completion Date:

Bank of Social policies Main Contractor Hung Yen Province May 2013 - June 2014

12. HAPULICO project Wet finishing works including brickwork, tiling work, plastering works, water proofing works Client: Type of contract: Location: Starting and Completion Date:

HAPULICO Subcontractor Cau Giay, Hanoi Jan 2013 - Sep 2013

13. Luong Son, Hoa Binh Industrial Construction and completion of asphalt road works Client: Type of contract: Location: Starting and Completion Date:

Luong Son, Hoa Binh Industrial Main Contractor Luong Son, Hoa Binh Aug 2014 - Sep 2014

14. Danang administration new center building project Supply, fabrication and installation Glazing curtain wall Client: Type of contract: Location: Starting and Completion Date:

Da Nang PC Subcontractor Da Nang City Mar 2013 - Otc 2013

15. Expand feed mills USA Construction of new lines of office projects Client: Type of contract: Location: Starting and Completion Date:

Limited liability companies feed USA Main Contractor Hai Duong City Feb 2014 - May 2014

16. Bac Ha Bored pilling & Diaphram wall works for 219 Trung Kinh tower. Scope: 3700m D-Wall, 256 nos bore pile D1200 Client: Type of contract: Location: Starting and Completion Date:

Bac Ha Subcontractor Cau Giay, Hanoi April 2015 – July 2015

17. Thu Do Investment & trading JSC Bore pilling works for Green Capital project. Scope: 132 nos D800, 198 nos D1200, 99 nos D1500 with 44 - 45 m length Client: Type of contract: Location: Starting and Completion Date:

Thu Do Investment & trading JSC Subcontractor Nam Tu Liem Dist, Hanoi August 2015 –September 2015

VILAI VIET CONSTRUCTION .JSC

23


18. GAMUDA GARDEN Construction and completion of 23 unit small villa including related infrastructure work and landscape works for C2 township development in Hoang Mai Dist., Hanoi City Vietnam Client: Type of contract: Location: Starting and Completion Date:

GAMUDA LAND VIETNAM Main Contractor C2, Yen So, Hoang Mai, Ha Noi Dec 2015 - Mar 2016

19. Military Vietnam - Main contractor: Delta Co.,Ltd 115 Tran Duy Hung Tower Construction and completion infrastructure and hard landscape works Client: Type of contract: Location: Starting and Completion Date:

Military Vietnam Subcontractor Cau Giay, Hanoi Dec 2015 - Mar 2016

20. Tan A Dai Thanh Tan A Dai Thanh Factory project Construction and completion infrastructure Client: Type of contract: Location: Starting and Completion Date:

Tan A Dai Thanh Subcontractor Hung Yen Province Jan 2016 - Mar 2016

21. FIVE STAR My Dinh Construction and completion 15 Units Villas Client: Type of contract: Location: Starting and Completion Date:

FIVE STAR Subcontractor My Dinh, Nam Tu Liem, Ha Noi June 2016 - Dec 2016

22. BOOYOUNG International project Civil works for foundation of CT04 including excavation, cut pile head, backfilling Client: Type of contract: Location: Starting and Completion Date:

BOOYOUNG VINA Main Contractor Ha Dong, Hanoi Dec 2015 - Apr 2016

23. BOOYOUNG International project Bored piling works for CT02 including 208 nos D1500, D1200 and D100 Client: Type of contract: Location: Starting and Completion Date:

BOOYOUNG VINA Main Contractor Ha Dong, Hanoi Apr 2016 - June 2016

24. HOA LAC HIGHTECH Project Construction and completion asphalt road works Client: Type of contract: Location: Starting and Completion Date:

Hoa Lac PMU Subcontractor Hoa Lac, Hanoi June 2016 - July 2016

25. GAMUDA GARDEN Construction and completion of water tank for CT03 The One tower Client: Type of contract: Location: Starting and Completion Date:

GAMUDA LAND VIETNAM Main Contractor C2, Yen So, Hoang Mai, Ha Noi Oct 2016 - Dec 2016

26. GAMUDA GARDEN Construction and completion of Infrastructure and building works for 78 ST Units Client: Type of contract: Location: Starting and Completion Date:

24

VILAI VIET CONSTRUCTION .JSC

GAMUDA LAND VIETNAM Subcontractor C2, Yen So, Hoang Mai, Ha Noi July 2016 - Mar 2017


27. GAMUDA GARDEN Construction and completion of show village of CT01 Zen Tower Client: Type of contract: Location: Starting and Completion Date:

GAMUDA LAND VIETNAM Main Contractor C2, Yen So, Hoang Mai, Ha Noi Nov 2016 - Feb 2017

28. GAMUDA GARDEN Construction and completion of Bore Piling works of CT01 Zen Tower Client: Type of contract: Location: Starting and Completion Date:

FIVE STAR Subcontractor C2, Yen So, Hoang Mai, Ha Noi Nov 2016 - Feb 2017

29. GAMUDA GARDEN Construction and completion of structure works of pile cap, foundation, podium and supper structure of CT01 Zen Tower (3 block, 34 stories) Client: Type of contract: Location: Starting and Completion Date:

GAMUDA LAND VIETNAM Subcontractor C2, Yen So, Hoang Mai, Ha Noi Nov 2016 - Feb 2017

30. IMPERIA SKY GARDEN Project Construction and completion of show village and infrastructure Client: Type of contract: Location: Starting and Completion Date:

TERRA GOLD, MIK Main Contractor 423 Minh Khai, Ha Noi Dec 2016 - Mar 2017

31. HUMAN CITY Project Construction and completion of low-rise apartment building phase A & B Client: Type of contract: Location: Starting and Completion Date:

HUMAN City Co.,Ltd Main Contractor Ky Anh, Ha Tinh province Feb 2017 - Dec 2017

32. BOOYOUNG International project Construction and completion infrastructure, hard and landscaping works of CT07 tower Client: Type of contract: Location: Starting and Completion Date:

BOOYOUNG VINA Main Contractor Ha Dong, Hanoi May 2017 - Nov 2017

33. YOUNYI Electrolic factory Construction works for factory (12,000 m2) including infrastructre and hard landscaping work Client: Type of contract: Location: Starting and Completion Date:

SEJUNG (Korea) Subcontractor Cau Yen Industrial park, Ninh Binh province July 2017 - Jan 2018

34. SEJUNG Factory Phase 1 Construction works for factory (8,000 m2) including infrastructre and hard landscaping work Client: Type of contract: Location: Starting and Completion Date:

YOUNYI (Korea) Subcontractor FUJI industrial park, Bac Giang province May 2017 - Nov 2017

35. FIVE STAR KIM GIANG Construction and completion external works including waste water treatment, road works, drainage system and swimming pool and landscaping works Client: Type of contract: Location: Starting and Completion Date:

FIVE STAR Subcontractor Kim Giang, Thanh Xuan, Hanoi Aug 2017 - Dec 2017

VILAI VIET CONSTRUCTION .JSC

25


36. GAMUDA GARDEN Construction and completion of Infrastructure and building works for 77 ST Units of Semi-detached house SD3 in Gamuda Garden Client: Type of contract: Location: Starting and Completion Date:

GAMUDA LAND VIETNAM Main Contractor C2, Yen So, Hoang Mai, Ha Noi Sep 2017 - Dec 2017

37. BOOYOUNG International project Construction and completion infrastructure, hard and landscaping works of CT04 tower Client: Type of contract: Location: Starting and Completion Date:

BOOYOUNG VINA Main Contractor Ha Dong, Hanoi Nov 2017 - Mar 2018

38. GAMUDA GARDEN Construction and completion of landscaping works for Tropical precinct in Gamuda Garden Client: Type of contract: Location: Starting and Completion Date:

26

VILAI VIET CONSTRUCTION .JSC

GAMUDA LAND VIETNAM Main Contractor C2, Yen So, Hoang Mai, Ha Noi Nov 2017 - Mar 2018


OUR CUSTOMER

VILAI VIET CONSTRUCTION .JSC

27


PROJECT REFERENCE 28

VILAI VIET CONSTRUCTION .JSC


Building

VILAI VIET CONSTRUCTION .JSC

29


1. Booyoung international project Project/Custumer name: Scope of work: Site location:

30

VILAI VIET CONSTRUCTION .JSC

BOOYOUNG VINA Bored piling work for CT02 including 208 nos D1500, D1200 and D1000 Mo Lao new urban area, Ha Dong, Ha Noi


VILAI VIET CONSTRUCTION .JSC

31


32

VILAI VIET CONSTRUCTION .JSC


2. The Zen Residence Project Project/Custumer name: Scope of work:

Site location:

GAMUDA LAND VIET NAM Bored piling works including 149 nos D1500, D1200 and D800 Construction of building work for 3000m2 of Basement and 4 levels Podium, 1200m2 of 30 levels tower Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi.

VILAI VIET CONSTRUCTION .JSC

33


34

VILAI VIET CONSTRUCTION .JSC


VILAI VIET CONSTRUCTION .JSC

35


36

VILAI VIET CONSTRUCTION .JSC


VILAI VIET CONSTRUCTION .JSC

37


38

VILAI VIET CONSTRUCTION .JSC


VILAI VIET CONSTRUCTION .JSC

39


3. 78 units of small terrace (ST3) Project/Custumer name: Scope of work: Site location:

40

VILAI VIET CONSTRUCTION .JSC

GAMUDA LAND VIET NAM Construction and completion of building work for block TT35 & TT43 Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi.


VILAI VIET CONSTRUCTION .JSC

41


42

VILAI VIET CONSTRUCTION .JSC


4. 77 Units of Semi-detached (SD3) house Project/Custumer name: Scope of work: Site location:

GAMUDA LAND VIET NAM Construction and completion of building and M&E work for 77 units Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi

VILAI VIET CONSTRUCTION .JSC

43


44

VILAI VIET CONSTRUCTION .JSC


VILAI VIET CONSTRUCTION .JSC

45


46

VILAI VIET CONSTRUCTION .JSC


5. CT1 Show village Project/Custumer name: Scope of work: Site location:

GAMUDA LAND VIET NAM Construction and completion of CT1 Show village Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi

VILAI VIET CONSTRUCTION .JSC

47


6. Human City Project Project/Custumer name: Scope of work: Site location:

48

VILAI VIET CONSTRUCTION .JSC

HUMAN CITY CO.,LTD Construction and completion of 2 Block A,B (8 floors,1300m2/1 Block) Central urban zone, Vung Ang economic zone, Ky Anh District, Ha Tinh Province


VILAI VIET CONSTRUCTION .JSC

49


Industrial

50

VILAI VIET CONSTRUCTION .JSC


1. YOUNYI Electrolic Factory Project/Custumer name: Scope of work: Site location:

YOUNYI (KOREA) Civil, Architecture, and landscaping works FUJI industrial park, Bac Giang Province

VILAI VIET CONSTRUCTION .JSC

51


52

VILAI VIET CONSTRUCTION .JSC


VILAI VIET CONSTRUCTION .JSC

53


2. SEJUNG Factory phase 1 Project/Custumer name: Scope of work: Site location:

54

VILAI VIET CONSTRUCTION .JSC

YOUNYI (KOREA) Civil, Architecture, and landscaping works Cau Yen industrial park, Ninh Binh Province


VILAI VIET CONSTRUCTION .JSC

55


56

VILAI VIET CONSTRUCTION .JSC


VILAI VIET CONSTRUCTION .JSC

57


58

VILAI VIET CONSTRUCTION .JSC


VILAI VIET CONSTRUCTION .JSC

59


Infrastructure

60

VILAI VIET CONSTRUCTION .JSC


1. Sewerage treatment plan (222.000m3/day) Project/Custumer name: Scope of work: Site location:

GAMUDA LAND VIETNAM Infrastructure, asphalt mainroad, retaining wall and rubble pitching wall Yen So, Hoang Mai, Ha Noi

VILAI VIET CONSTRUCTION .JSC

61


Sewage Treatment Plant, Yen So, Hoang Mai, Hanoi - Investor: GAMUDA LAND VIETNAM - Investment fund: 350 million USD - Total build up are: 8.9 hectare - Capable of treating 200,000 m3 or half of Hanoi’s population of water per day. - Sewerage flushing system. - Meets international standards of environmental health and hygiene. - Scope of work: Infrastructure, asphalt mainroad, retaining wall and rubble pitching wall. - Site location: Yen So, Hoang Mai, Ha Noi

62

VILAI VIET CONSTRUCTION .JSC

We provided construction and completion of - Access road and drainage system for sewage treatment plant. - Construct the temporary work (sheet piling, excavation, dewatering) for sewage pipe line. - As one of the largest sewage treatment plant in Vietnam, we capture technology, investment in new method and search for better ways in the construction field, we are always looking for the ability to incorporate new technology and modern equipment offers greater efficiency in works. We mobilize plant and equipment with multiple functions driving machine, long arm excavator where are ideal for projects where poor conditions are encountered and especially site conditions Sewage Pipe.


VILAI VIET CONSTRUCTION .JSC

63


2. CT3 water tank Project/Custumer name: Scope of work: Site location:

64

VILAI VIET CONSTRUCTION .JSC

GAMUDA LAND VIETNAM Construction and completion of water tank for CT03 ( The one residence tower) Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi


3. 78 ST3 infrastructure and additional hardscape Project/Custumer name: Scope of work: Site location:

GAMUDA LAND VIETNAM Infrastructure, Sewerage, Drainage, Water supple, Road work, Hard and landscaping work Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi

VILAI VIET CONSTRUCTION .JSC

65


66

VILAI VIET CONSTRUCTION .JSC


VILAI VIET CONSTRUCTION .JSC

67


4. Tropical precinct at parcel C2 Project/Custumer name: Scope of work: Site location:

68

VILAI VIET CONSTRUCTION .JSC

GAMUDA LAND VIETNAM Landscaping work Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi


VILAI VIET CONSTRUCTION .JSC

69


5. Water Filtration system for landed house Project/Custumer name: Scope of work: Site location:

70

VILAI VIET CONSTRUCTION .JSC

GAMUDA LAND VIETNAM Design, Construction, Installation, Commissioning for water filtration and water tank. Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi


6. BOOYOUNG INTERNATIONAL PROJECT Project/Custumer name: Scope of work: Site location:

BOOYOUNG VINA Infrastructure, hard and landscaping (CT04 and CT07 tower) Mo Lao new urban area, Ha Dong, Ha Noi

VILAI VIET CONSTRUCTION .JSC

71


72

VILAI VIET CONSTRUCTION .JSC


VILAI VIET CONSTRUCTION .JSC

73


7. Fivestar Kim giang Project/Custumer name: Scope of work: Site location:

74

VILAI VIET CONSTRUCTION .JSC

Five Star Infrastructure, hard and landscaping, Swimming pool Kim Giang, Thanh Xuan, Ha Noi


VILAI VIET CONSTRUCTION .JSC

75


Addr ess: 1st & 5th Floor, CT02, Nang Huong Tower, 583 Nguyen Trai street, Thanh Xuan Dist, Hanoi Tel: 0243.535.3027 |

Fax: 0243.535.3027 |

Hotline: 0982.610.675 |

Web: www.vilaiviet.com.vn