COMPANY PROFILE VILAI VIET CONTSTRUCTION JOINSTOCK COMPANY 1
TALBE OF CONTENT
2
VILAI VIET CONSTRUCTION .JSC
1. Introduction
3
2. Legal Information
4
3. Share Holder
5
4. Our Policy/Vision/Mission/Core Value
6
5. Business Area
7
6. Company Organization
8
7. Site Organization
9
8. Certificate
10
9. Human Resource
11
10. Equipment resource
14
11. List Of Experience
18
12. Our Customer
22
13. Project Reference
23
INTRODUCTION Vilai Viet Constructions JSC was founded in 2012, specializing in the construction of civil works, industrial works, factory and landscape infrastructure. After more than 6 years of development, VLV has been asserting its position in the Vietnam construction industry. With strong financial capacity, high quality human resources and modern equipment, we have completed high quality projects, safety and on schedule. In the development process, we always update the new construction methods, the advanced equipment and improve the capacity of technical staff to make impression on constructions - affirm Vilai Viet brand. We try our best to improve this capacity profile to provide you with the most accurate information. So, if you have any questions, please contact us. We are happy to cooperate with you.
VILAI VIET CONSTRUCTION .JSC
3
LEGAL INFORMATION Company Name:
VILAI VIET Construction Joint Stock Company
Type of Company:
Sole Proprietorship
Public Company
Partnership
Joint-Venture
Private Company
Other (Please specify)
Joint Stock
4
VILAI VIET CONSTRUCTION .JSC
Country of Incorporation:
Vietnam
Registration No:
0105957614
Date of Registration:
31th July 2012
Registered Address:
No.12, N4, Allay90, Nguyen Tuan Street, Thanh Xuan Dist, Hanoi
Office Location:
1st & 5th Floor, CT02, Nang Huong Tower, 583 Nguyen Trai Street, Thanh Xuan Dist, Hanoi
Telephone Number:
0243.200.3760
Facsimile Number:
0243.200.3760
Website:
https://www.vilaiviet.com.vn
Email:
vilaiconst@gmail.com
SHARE HOLDER PRINCIPALS, PARTNERS OR DIRECTORS Name
NRIC/ Passport No.
Tran Tien Dung
Chairman
Viet Nam
026076000044
Kieu Ngoc Thanh
Director
Viet Nam
026085004398
MAJOR SHAREHOLDERS AND PERCENTAGE OWNED Name of Shareholder
% Shareholder
Tran Tien Dung
Other
Viet Nam
42%
Viet Nam
42%
Viet Nam
16%
FINANCIAL CAPACITY 3.1 AUTHORISED CAPITAL: VND 30,000,000,000 3.2 PRESENT PAID-UP CAPITAL: VND 30,000,000,000 3.3 ANNUAL TURNOVER OVER LAST THREE FINANCIAL YEARS: Year
2015
2016
2017
Vietnam(VND) Vietnam (USD)
139.978.000.000 7.350.000
210.434.000.000 10.750.000
308.698.000.000 14.580.000
Overseas
0
0
0
Total
139.978.000.000 7.350.000
210.434.000.000 10.750.000
308.698.000.000 14.580.000
VILAI VIET CONSTRUCTION .JSC
5
OUR POLICY
OUR VISSION
VILAI VIET JSC is committed to providing quality products/ services and timely delivery of these products/services to our customers, shareholders and general public. We are also committed to providing a safe and healthy working environment to our employees and those under our care. We support an environmentally responsible approach to our business. A comprehensive Quality, Safety & Health and Environmental (QSHE) Management System has been established and implemented to ensure that we systematically plan to achieve our objectives, deal with challenges and develop our people in the realization of the Company’s goals.
The Company continues to move forward in become the leading Engineering and Constructuion firm in Vietnam and eventually the region, by consistently delivering projects that meet international standards
With this QSHE Management System, we can manage and improve our operations to consistently provide high quality, cost effective, reliable, safe and environmental friendly products and services to our customers. The QSHE Management concept is universal, and applies to all areas of the Company’s operations.
OUR MISSION With a weel-defined direction in place, the path ot realizing our Vision in bases on fundamental drivers, instrumental in achieving our goals. Our mission To undertake the engineering and construction business with a focus on becoming the cost leadership while excellence in every aspect to meet customers’ stringent requirements regarding quality, on-time delivery, safety and environmental concerns.
We will continuously improve our products and the processes that deliver these products
To develop an effective management that stresses productivity, perpetual development of the organization, and instilling work ethics in all personnel.
That requires that we:
To build value for the organization in order to become a unique and distinct firm.
Understand and consistently respond to the needs and expectations of our customers Manage systematically our products/services to enhance the value to our shareholders Develop and inculcate a self regulating mindset to all staff that will ensure the success of the company goals and QSHE Management System Continually improve our quality, safety & health and environmental processes that facilitate the effective management and control of these areas Minimize safety & health risks through adoption of best practices Prevent environmental impacts and manage resources through proper and effectively implementation of our obligations. Identify and comply to the relevant safety & health and environmental legislations and regulations Provide appropriate training to our employees and other related parties to improve awareness and knowledge of these requirements
Each employee is expected to be aware of and implement the requirements of this policy. The employees are also required to actively promote the acceptance of this policy to our customers, subcontractors, suppliers and the other related parties. TRAN TIEN DUNG
Chair Man - Vilai Viet Construction JSC
6
VILAI VIET CONSTRUCTION .JSC
To remain focused on controlled organizational growth and recognizing those who contribute to this growth.
BUSINESS AREA Is an Young Enterprise of Bussiness in general and the construction in particular. With leadership team have more experience in construction and corporate governance, project management team are also successful people in large companies and hundreds of high quality input engineers from universities such as the civil engineering, urban, industry, industrial electricity and communication. VILAI VIET also continuous update, application new technology, material, equipment system for support construct building, infrastructure and basement work such as bored pile, centrifugal piles by robots, Alform‌. Through its efforts, VILAI VIET has affirmed its capacity to many custumers, with a variety of construction types: - Building work: Residential complexes, apartment‌. - Industrial factory work - Infrastructure work and urban landscape, water and waste water treatment system
VILAI VIET CONSTRUCTION .JSC
7
COMPANY ORGANIZATION
HR & GA Department DEPUTY GENERAL DIRECTOR
SHARHOLDERS SHAREHOLDERS
BOARD OF BOARD OF MANAGEMENT MANAGEMENT
Business Development Dept
GENERAL BOARD OFDIRECTOR DIRECTOR
Project Management Dept DEPUTY GENERAL DIRECTOR
Material and Equipment Dept
8
VILAI VIET CONSTRUCTION .JSC
SITE ORGANIZATION PROJECT DIRECTOR
Safety Safety
Traffic
HSE Department
Health & Safety Manager*
Environment EnvironmentF
First irst AID AID
Design DesignC
Contract ontract
Planning Department Planning Manager
Program ProgramC
Cost ost
Environment Environment
PROJECT MANAGEMENT
QA/QC Department
Quality Assurance Department
Laboratory Laboratory
Administation
Admin. Department
Accounting
Package 11 Package
Package 2 Package
Const. Department
Package N N Package
Survey Survey
VILAI VIET CONSTRUCTION .JSC
9
CERTIFICATE CERTIFICATE Management system as per ISO 9001 : 2015 In accordance with TÜV NORD CERT procedures, it is hereby certified that
VILAI VIET CONSTRUCTION JOINT STOCK COMPANY
1st & 5th Floor, CT02, Nang Huong Tower, 583 Nguyen Trai Street, Thanh Xuan District, Hanoi, Vietnam
applies a management system in line with the above standard for the following scope
Construction of Industrial, Civil Engineering and Infrastructural Projects Design, Construction and Installation of Sewage Treatment Projects Certificate Registration No. 44 100 160322 Audit Report No. 2.3-8471/2018
Valid from 2018-03-21 Valid until 2021-03-20 Initial Certification 2012-12-13
TUV ASIA PACIFIC LIMITED Unit 01-03 26/F Tower 1, Millennium City 1, 388 Kwun Tong Road, Kwun Tong, Kowloon, Hong Kong 2012-12-13
Certification Body at TÜV NORD CERT GmbH
This certification was conducted in accordance with the TÜV NORD CERT auditing and certification procedures and is subject to regular surveillance audits. TÜV NORD CERT GmbH
VNA, FE8471, CA 0280-D
10
VILAI VIET CONSTRUCTION .JSC
Langemarckstrasse 20
45141 Essen
www.tuev-nord-cert.com
HUMAN RESOURCE In VILAI VIET Construction .JSC, we believe Human Resource is the key to success. That is why we invest into our People to creat a experienced administrator team. And about 80 staffs include Civil, Electrical, Mechanical Engineers, Officer… are the young peoples so enthusiastic and modern. They are the future of company.
Management, technical specialists, worker
Remark
Top Manager
05
Permanent employee
Department Head
05
Permanent employee
Engineers Electrical engineer, Mechanical engineer, Environmental
15
Permanent employee
05
Permanent employee
03
Permanent employee
Bachelor of science in economics
03
Permanent employee
Technician
05
Permanent employee
Project Manager
05
Permanent employee
Site Manager for building projects, infrastructure projects, Environmental projects, …
15
Permanent employee
13
Permanent employee
13
Permanent employee
Planning and cost control
10
Permanent employee
Site Supervisor
25
Permanent employee
Technicians
15
Permanent employee
Foreman
35
Permanent employee
Surveyor
08
Permanent employee
25
Permanent employee
Economic Engineers, IT Engineer..) Accountant
For Projects
security…)
VILAI VIET CONSTRUCTION .JSC
11
“Run for the heart” is a social activity of VILAI VIET for “A Happy Environment”.
12
VILAI VIET CONSTRUCTION .JSC
CT1 APARTMENT SITE TEAM with fighting spirit “Union is Strength”.
VILAI VIET CONSTRUCTION .JSC
13
EQUIPMENT RESOURCE Equipment for infrastructure works No.
Type of Machine
Unit
Original
Status
1
Bore pile machine HITACHI KH180 Long boom 60m
Nos
02
China -2008
Good
01
Japan
2
Crane IHICH500
Nos
01
Japan
Good
Good
3
Vibro hammer 60 - 90KW
Nos
02
Japan
Good
Nos
01
Japan
Good
4
Pump high pressure
Nos
02
China-2010
Good
Roller Machine Dynapac CG16C
Nos
01
Japan
Good
5
Crane QUY50A
Nos
01
Japan - 2011 Good
5
Roller machine Ammann AC110
Nos
01
Swistlen
Good
6
Asphalt spreader machine Mitsubishi MF44WD
Nos
01
Japan
6
Sheet pile pressing machine
Nos
01
Japan - 2009 Good
Good
7
Sheet pile pressing vibro hammer
Nos
01
Japan - 2010 Good
7
Roller machine Sakai TW25
Nos
01
Japan
Good
8
Excavator PC 300, 2.5m3
Nos
01
Japan - 2009 Good
8
Excavator Kobelco SK100W
Nos
01
Japan
Good
9
Breaker hammer 2.5KW
10
Bore pile machine HITACHI KH150
Nos
02
Japan
Good
9
Welding machine
Nos
02
Vietnam
Good
Nos
01
Japan
Good
10
Welding machine (boiler)
Nos
02
Japan
Good
11
Pilling machine D408-90m sè 3
Nos
01
Japan
Good
11
Nos
02
China
Good
12
Hammer piling Kobelco K35
Nos
01
Japan
Good
12
Nos
03
China
Good
13
Bore pile machine KH100
Nos
01
Japan
Good
14
Excavator Komatsu
Nos
01
Japan
Good
15
Kobelco 7065/ R6G
Nos
01
Japan
Good
16
Excavator HITACHI PC200
Nos
01
Japan
Good
17
Bore pile machine SANY SR150C
Nos
03
China
Good
18
Crane Sumitomo – LS 120RH
Nos
01
Japan
Good
02
Original
Status
No.
Type of Machine
Unit
Japan
Good
1
Roller LIUGONG CL614
Nos
2
Grader machine MITSUBISHI MG3
Nos
3
Excavator Komatsu PC150-3
4
Equipment for concrete works 11
Concrete Concrete mixing 250l
Nos
03
Vietnam
Good
22
Motar Motar mixing 100l
Nos
02
Vietnam
Good
33
Palang Palang
Nos
03
Russia
Good
44
Compactor Compactor mini
Nos
02
Japan
Good
55
Compactor Compactor
Nos
03
Japan
Good
66
Generator Generator Hon Da 75KVA 75KVA
Nos
02
Japan
Good
77
Formworks Formworks
Nos
2000
Vietnam
Good
88
Nos
1000
Vietnam
Good
99
Nos
200
Vietnam VietnamG
Good ood
Nos
7000
VietnamG
ood
10
14
VILAI VIET CONSTRUCTION .JSC
Steel mill machine
Aluminum formwork
Roller
Bore pile machine - SANY
Mobile crane
Crane Kobelko 50 Ton
Roller and excavator
Bulldozer
Leveling ďŹ nisher MITSUBISHI MG3
VILAI VIET CONSTRUCTION .JSC
15
truck
Injection hole drilling machine - HITACHI KH100
Mobile crane
Truck
Excavator pc200
Excavator
Injection hole drilling machine - HITACHI KH180
16
VILAI VIET CONSTRUCTION .JSC
Asphalt spreader
Steel tube
Aluminum formwork
Scraffolding
Rebar fabrication area
Aluminum formwork
VILAI VIET CONSTRUCTION .JSC
17
LIST OF EXPERIENCE 1. STP (Sewage Treatment Plant) 220,000 m3/day Construction and completion of Reinforced Concrete Retaining Wall and Rubble Pitching Wall at Set River Radial Gate Client: EPC: Type of contract: Location: Starting and Completion Date:
GAMUDA LAND VIETNAM Gamuda Engineering Subcontractor Yen So, Hoang Mai, Ha Noi July 2012 - Dec 2012
2. STP (Sewage Treatment Plant) 220,000 m3/day. Construction and completion of cover walk way SBR tank Client: EPC: Type of contract: Location: Starting and Completion Date:
GAMUDA LAND VIETNAM Gamuda Engineering Subcontractor Yen So, Hoang Mai, Ha Noi July 2012 - Dec 2012
3. STP (Sewage Treatment Plant) 220,000 m3/day. Construction and completion of asphalt mainroad in the internal Plant Client: EPC: Type of contract: Location: Starting and Completion Date:
GAMUDA LAND VIETNAM Gamuda Engineering Subcontractor Yen So, Hoang Mai, Ha Noi July 2012 - Dec 2012
4. STP (Sewage Treatment Plant) 220,000 m3/day. Construction and completion of infrastructure works of Set River Client: EPC: Type of contract: Location: Starting and Completion Date:
GAMUDA LAND VIETNAM Gamuda Engineering Subcontractor Yen So, Hoang Mai, Ha Noi July 2012 - Dec 2012
5. STP (Sewage Treatment Plant) 220,000 m3/day. Construction and Completion of Reinforced Concrete Plinth for Odour Control Unit and Intake Screening Skip at Set River Client: EPC: Type of contract: Location: Starting and Completion Date: 18
VILAI VIET CONSTRUCTION .JSC
GAMUDA LAND VIETNAM Gamuda Engineering Subcontractor Yen So, Hoang Mai, Ha Noi April 2012 - June 2012
6. Thanh Liet Gate and infrastructure works
Client: EPC: Type of contract: Location: Starting and Completion Date:
GAMUDA LAND VIETNAM Gamuda Engineering Subcontractor Yen So, Hoang Mai, Ha Noi July 2012 - Dec 2012
7. GAMUDA GARDEN Construction and completion of sewage system of infrastructure in Gamuda Garden at C2, Yen So, Hoang Mai Client: Type of contract: Location: Starting and Completion Date:
GAMUDA LAND VIETNAM Main Contractor C2, Yen So, Hoang Mai, Ha Noi August 2012 - April 2013
8. GAMUDA GARDEN Construction and completion of Main Asphalt road works of infrastructure in Gamuda Garden at C2, Yen So, Hoang Mai Client: Main Contractor: Type of contract: Location: Starting and Completion Date:
GAMUDA LAND VIETNAM THIEN AN Subcontractor C2, Yen So, Hoang Mai, Ha Noi August 2012 - April 2013
9. Hanoi Police project Construction and completion of main asphalt road works Client: Type of contract: Location: Starting and Completion Date:
Hanoi Police Main Contractor Ha Dong, Hanoi Sep-12
10. Bank of Social policies Construction and completion of admistration building of Bank of Social policies
Client: Type of contract: Location: Starting and Completion Date:
Bank of Social policies Main Contractor Hoang Mai, Hanoi Jan 2013 - Dec 2013
11. Bank of Social policies Construction and completion of Branch Office Building of Bank of Social policies
16. Bac Ha Bored pilling & Diaphram wall works for 219 Trung Kinh tower. Scope: 3700m D-Wall, 256 nos bore pile D1200
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
Bank of Social policies Main Contractor Hung Yen Province May 2013 - June 2014
Bac Ha Subcontractor Cau Giay, Hanoi April 2015 – July 2015
12. HAPULICO project Wet finishing works including brickwork, tiling work, plastering works, water proofing works
17. Thu Do Investment & trading JSC Bore pilling works for Green Capital project. Scope: 132 nos D800, 198 nos D1200, 99 nos D1500 with 44 - 45 m length
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
HAPULICO Subcontractor Cau Giay, Hanoi Jan 2013 - Sep 2013
Thu Do Investment & trading JSC Subcontractor Nam Tu Liem Dist, Hanoi August 2015 –September 2015
13. Luong Son, Hoa Binh Industrial Construction and completion of asphalt road works
18. GAMUDA GARDEN Construction and completion of 23 unit small villa including related infrastructure work and landscape works for C2 township development in Hoang Mai Dist., Hanoi City Vietnam
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
Luong Son, Hoa Binh Industrial Main Contractor Luong Son, Hoa Binh Aug 2014 - Sep 2014
GAMUDA LAND VIETNAM Main Contractor C2, Yen So, Hoang Mai, Ha Noi Dec 2015 - Mar 2016
14. Danang administration new center building project Supply, fabrication and installation Glazing curtain wall
19. Military Vietnam - Main contractor: Delta Co.,Ltd 115 Tran Duy Hung Tower Construction and completion infrastructure and hard landscape works
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
Da Nang PC Subcontractor Da Nang City Mar 2013 - Otc 2013
Military Vietnam Subcontractor Cau Giay, Hanoi Dec 2015 - Mar 2016
15. Expand feed mills USA Construction of new lines of office projects
20. Tan A Dai Thanh Tan A Dai Thanh Factory project Construction and completion infrastructure
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
Limited liability companies feed USA Main Contractor Hai Duong City Feb 2014 - May 2014
Tan A Dai Thanh Subcontractor Hung Yen Province Jan 2016 - Mar 2016
VILAI VIET CONSTRUCTION .JSC
19
21. FIVE STAR My Dinh Construction and completion 15 Units Villas
26. GAMUDA GARDEN Construction and completion of Infrastructure and building works for 78 ST Units
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
FIVE STAR Subcontractor My Dinh, Nam Tu Liem, Ha Noi June 2016 - Dec 2016
GAMUDA LAND VIETNAM Subcontractor C2, Yen So, Hoang Mai, Ha Noi July 2016 - Mar 2017
22. BOOYOUNG International project Civil works for foundation of CT04 including excavation, cut pile head, backfilling
27. GAMUDA GARDEN Construction and completion of show village of CT01 Zen Tower
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
BOOYOUNG VINA Main Contractor Ha Dong, Hanoi Dec 2015 - Apr 2016
GAMUDA LAND VIETNAM Main Contractor C2, Yen So, Hoang Mai, Ha Noi Nov 2016 - Feb 2017
23. BOOYOUNG International project Bored piling works for CT02 including 208 nos D1500, D1200 and D100
28. GAMUDA GARDEN Construction and completion of Bore Piling works of CT01 Zen Tower
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
BOOYOUNG VINA Main Contractor Ha Dong, Hanoi Apr 2016 - June 2016
FIVE STAR Subcontractor C2, Yen So, Hoang Mai, Ha Noi Nov 2016 - Feb 2017
24. HOA LAC HIGHTECH Project Construction and completion asphalt road works
29. GAMUDA GARDEN Construction and completion of structure works of pile cap, foundation, podium and supper structure of CT01 Zen Tower (3 block, 34 stories)
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
Hoa Lac PMU Subcontractor Hoa Lac, Hanoi June 2016 - July 2016
GAMUDA LAND VIETNAM Subcontractor C2, Yen So, Hoang Mai, Ha Noi Nov 2016 - Feb 2017
25. GAMUDA GARDEN Construction and completion of water tank for CT03 The One tower
30. IMPERIA SKY GARDEN Project Construction and completion of show village and infrastructure
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
20
VILAI VIET CONSTRUCTION .JSC
GAMUDA LAND VIETNAM Main Contractor C2, Yen So, Hoang Mai, Ha Noi Oct 2016 - Dec 2016
TERRA GOLD, MIK Main Contractor 423 Minh Khai, Ha Noi Dec 2016 - Mar 2017
31. HUMAN CITY Project Construction and completion of low-rise apartment building phase A & B
36. GAMUDA GARDEN Construction and completion of Infrastructure and building works for 77 ST Units of Semi-detached house SD3 in Gamuda Garden
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
HUMAN City Co.,Ltd Main Contractor Ky Anh, Ha Tinh province Feb 2017 - Dec 2017
GAMUDA LAND VIETNAM Main Contractor C2, Yen So, Hoang Mai, Ha Noi Sep 2017 - Dec 2017
32. BOOYOUNG International project Construction and completion infrastructure, hard and landscaping works of CT07 tower
37. BOOYOUNG International project Construction and completion infrastructure, hard and landscaping works of CT04 tower
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
BOOYOUNG VINA Main Contractor Ha Dong, Hanoi May 2017 - Nov 2017
BOOYOUNG VINA Main Contractor Ha Dong, Hanoi Nov 2017 - Mar 2018
33. YOUNYI Electrolic factory Construction works for factory (12,000 m2) including infrastructre and hard landscaping work
38. GAMUDA GARDEN Construction and completion of landscaping works for Tropical precinct in Gamuda Garden
Client: Type of contract: Location: Starting and Completion Date:
Client: Type of contract: Location: Starting and Completion Date:
SEJUNG (Korea) Subcontractor Cau Yen Industrial park, Ninh Binh province July 2017 - Jan 2018
GAMUDA LAND VIETNAM Main Contractor C2, Yen So, Hoang Mai, Ha Noi Nov 2017 - Mar 2018
34. SEJUNG Factory Phase 1 Construction works for factory (8,000 m2) including infrastructre and hard landscaping work
Client: Type of contract: Location: Starting and Completion Date:
YOUNYI (Korea) Subcontractor FUJI industrial park, Bac Giang province May 2017 - Nov 2017
35. FIVE STAR KIM GIANG Construction and completion external works including waste water treatment, road works, drainage system and swimming pool and landscaping works Client: Type of contract: Location: Starting and Completion Date:
FIVE STAR Subcontractor Kim Giang, Thanh Xuan, Hanoi Aug 2017 - Dec 2017
VILAI VIET CONSTRUCTION .JSC
21
OUR CUSTOMER
22
VILAI VIET CONSTRUCTION .JSC
PROJECT REFERENCE VILAI VIET CONSTRUCTION .JSC
23
Building
24
VILAI VIET CONSTRUCTION .JSC
1. Booyoung international project Project/Custumer name: Scope of work: Site location:
BOOYOUNG VINA Bored piling work for CT02 including 208 nos D1500, D1200 and D1000 Mo Lao new urban area, Ha Dong, Ha Noi
VILAI VIET CONSTRUCTION .JSC
25
Site office
Fabrication and installation for steel cage
Koden test pile
26
VILAI VIET CONSTRUCTION .JSC
Drilling work
2. The Zen Residence Project Project/Custumer name: Scope of work:
Site location:
GAMUDA LAND VIET NAM Bored piling works including 149 nos D1500, D1200 and D800 Construction of building work for 3000m2 of Basement and 4 levels Podium, 1200m2 of 30 levels tower Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi.
VILAI VIET CONSTRUCTION .JSC
27
Lean concrete for pile cap
28 VILAI VIET CONSTRUCTION .JSC Building
Construction for basement floor
Formwork for column 1,8x1,4m
VILAI VIET CONSTRUCTION .JSC
29
30
VILAI VIET CONSTRUCTION .JSC
VILAI VIET CONSTRUCTION .JSC
31
32
VILAI VIET CONSTRUCTION .JSC
3. 78 units of small terrace (ST3) house Project/Custumer name: Scope of work: Site location:
GAMUDA LAND VIET NAM Construction and completion of building work for block TT35 & TT43 Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi.
VILAI VIET CONSTRUCTION .JSC
33
34
VILAI VIET CONSTRUCTION .JSC
VILAI VIET CONSTRUCTION .JSC
35
36
VILAI VIET CONSTRUCTION .JSC
4. 77 Units of Semi-detached (SD3) house Project/Custumer name: Scope of work: Site location:
GAMUDA LAND VIET NAM Construction and completion of building and M&E work for 77 units Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi
VILAI VIET CONSTRUCTION .JSC
37
38
VILAI VIET CONSTRUCTION .JSC
VILAI VIET CONSTRUCTION .JSC
39
5. CT1 Show village Project/Custumer name: Scope of work: Site location:
40
VILAI VIET CONSTRUCTION .JSC
GAMUDA LAND VIET NAM Construction and completion of CT1 Show village Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi
6. Human City Project Project/Custumer name: Scope of work: Site location:
HUMAN CITY CO.,LTD Construction and completion of 2 Block A,B (8 floors,1300m2/1 Block) Central urban zone, Vung Ang economic zone, Ky Anh District, Ha Tinh Province
VILAI VIET CONSTRUCTION .JSC
41
42
VILAI VIET CONSTRUCTION .JSC
Industrial
VILAI VIET CONSTRUCTION .JSC
43
1. YOUNYI Electrolic Factory Project/Custumer name: Scope of work: Site location:
44
VILAI VIET CONSTRUCTION .JSC
YOUNYI (KOREA) Civil, Architecture, and landscaping works FUJI industrial park, Bac Giang Province
VILAI VIET CONSTRUCTION .JSC
45
2. SEJUNG Factory phase 1 Project/Custumer name: Scope of work: Site location:
46
VILAI VIET CONSTRUCTION .JSC
YOUNYI (KOREA) Civil, Architecture, and landscaping works Cau Yen industrial park, Ninh Binh Province
VILAI VIET CONSTRUCTION .JSC
47
48
VILAI VIET CONSTRUCTION .JSC
VILAI VIET CONSTRUCTION .JSC
49
50
VILAI VIET CONSTRUCTION .JSC
VILAI VIET CONSTRUCTION .JSC
51
Infrastructure
52
VILAI VIET CONSTRUCTION .JSC
1. Sewerage treatment plan (222.000m3/day) Project/Custumer name: Scope of work: Site location:
GAMUDA LAND VIETNAM Infrastructure, asphalt mainroad, retaining wall and rubble pitching wall Yen So, Hoang Mai, Ha Noi
VILAI VIET CONSTRUCTION .JSC
53
Sewage Treatment Plant, Yen So, Hoang Mai, Hanoi
We provided construction and completion of
- Investor: GAMUDA LAND VIETNAM - Investment fund: 350 million USD - Total build up are: 8.9 hectare - Capable of treating 200,000 m3 or half of Hanoi’s population of water per day. - Sewerage flushing system. - Meets international standards of environmental health and hygiene. - Scope of work: Infrastructure, asphalt mainroad, retaining wall and rubble pitching wall. - Site location: Yen So, Hoang Mai, Ha Noi
- Access road and drainage system for sewage treatment plant. - Construct the temporary work (sheet piling, excavation, dewatering) for sewage pipe line. - As one of the largest sewage treatment plant in Vietnam, we capture technology, investment in new method and search for better ways in the construction field, we are always looking for the ability to incorporate new technology and modern equipment offers greater efficiency in works.
54
VILAI VIET CONSTRUCTION .JSC
We mobilize plant and equipment with multiple functions driving machine, long arm excavator where are ideal for projects where poor conditions are encountered and especially site conditions Sewage Pipe.
Main Asphalt road in Sewage Treatment Plant in Hoang Mai
Sewage Pipe Line
Asphalt Road for Sewage Treatment Plant, Hoang Mai, Hanoi
Installation pipe line
Asphalt Road for Sewage Treatment Plant, Hoang Mai, Hanoi
VILAI VIET CONSTRUCTION .JSC
55
2. CT3 water tank Project/Custumer name: Scope of work: Site location:
56
VILAI VIET CONSTRUCTION .JSC
GAMUDA LAND VIETNAM Construction and completion of water tank for CT03 ( The one residence tower) Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi
3. 78 ST3 infrastructure and additional hardscape Project/Custumer name: Scope of work: Site location:
GAMUDA LAND VIETNAM Infrastructure, Sewerage, Drainage, Water supple, Road work, Hard and landscaping work Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi
VILAI VIET CONSTRUCTION .JSC
57
58
VILAI VIET CONSTRUCTION .JSC
VILAI VIET CONSTRUCTION .JSC
59
60
VILAI VIET CONSTRUCTION .JSC
4. Tropical precinct at parcel C2 Project/Custumer name: Scope of work: Site location:
GAMUDA LAND VIETNAM Landscaping work Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi
VILAI VIET CONSTRUCTION .JSC
61
62
VILAI VIET CONSTRUCTION .JSC
5. Water Filtration system for landed house Project/Custumer name: Scope of work: Site location:
GAMUDA LAND VIETNAM Design, Construction, Installation, Commissioning for water filtration and water tank. Parcel C2 – Gamuda Gardens, Hoang Mai, Ha Noi
Name of work
VILAI VIET CONSTRUCTION .JSC
63
6. BOOYOUNG INTERNATIONAL PROJECT Project/Custumer name: Scope of work: Site location:
64
VILAI VIET CONSTRUCTION .JSC
BOOYOUNG VINA Infrastructure, hard and landscaping (CT04 and CT07 tower) Mo Lao new urban area, Ha Dong, Ha Noi
VILAI VIET CONSTRUCTION .JSC
65
66
VILAI VIET CONSTRUCTION .JSC
7. Fivestar Kim giang Project/Custumer name: Scope of work: Site location:
Five Star Infrastructure, hard and landscaping, Swimming pool Kim Giang, Thanh Xuan, Ha Noi
VILAI VIET CONSTRUCTION .JSC
67
68
VILAI VIET CONSTRUCTION .JSC
Addr ess: 1st & 5th Floor, CT02, Nang Huong Tower, 583 Nguyen Trai street, Thanh Xuan Dist, Hanoi Tel: 0243.535.3027 |
Fax: 0243.535.3027 |
Hotline: 0982.610.675 |
Web: www.vilaiviet.com.vn